Proposal:H.011197.6
Parish:Livingston
Description:DENHAM SPRINGS SRTS PROJECT - NORTHSIDE
Type Construction:GRADING, DRAINAGE STRUCTURES, SIDEWALKS, AND RELATED WORK.
Estimated Construction Cost:$297,757.30
| Rank | License | Bidder | Construction Bid |
| 1 | 48896 | Command Construction Industries LLC | $324,324.50 |
| 2 | 55950 | Brown Industrial Construction, LLC | $337,414.10 |
| 3 | 42360 | L. King Company LLC | $389,969.36 |
| 4 | 45794 | DIEUDONNE ENTERPRISES, INC. | $419,601.70 |
| 5 | 05693 | Industrial Enterprises, Inc. | $437,303.48 |
| 6 | 57931 | KCR CONTRACTORS, LLC | $485,851.70 |
| 7 | 31943 | Hamp's Construction L.L.C. | $569,111.00 |
| 8 | 39001 | JD's Rebar & Construction Inc. | $622,081.15 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Command Construction Industries LLC | - 2 - Brown Industrial Construction, LLC | - 3 - L. King Company LLC | - 4 - DIEUDONNE ENTERPRISES, INC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.05 | LUMP | 111.00 | 111.00 | 21,500.00 | 21,500.00 | 21,594.10 | 21,594.10 | 13,000.00 | 13,000.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 652 | SQYD | 10.00 | 6,520.00 | 10.00 | 6,520.00 | 18.20 | 11,866.40 | 12.00 | 7,824.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 45 | LNFT | 10.00 | 450.00 | 13.00 | 585.00 | 14.80 | 666.00 | 10.00 | 450.00 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) 15" | 8 | LNFT | 25.00 | 200.00 | 97.00 | 776.00 | 82.90 | 663.20 | 20.00 | 160.00 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) 18" | 4 | LNFT | 25.00 | 100.00 | 200.00 | 800.00 | 165.80 | 663.20 | 20.00 | 80.00 | | 0006 | 202-03-38000 | Relocation of Sign Remove and Install | 1 | EACH | 125.00 | 125.00 | 500.00 | 500.00 | 185.90 | 185.90 | 250.00 | 250.00 | | 0007 | 202-03-38020 | Relocation of Sign Pole Remove and Install | 1 | EACH | 125.00 | 125.00 | 500.00 | 500.00 | 185.90 | 185.90 | 250.00 | 250.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 1.00 | 1.00 | 20,000.00 | 20,000.00 | 13,101.00 | 13,101.00 | 28,000.00 | 28,000.00 | | 0009 | 204-02-00100 | Temporary Hay or Straw Bales | 108 | EACH | 1.00 | 108.00 | 17.00 | 1,836.00 | 33.60 | 3,628.80 | 12.00 | 1,296.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 3,979 | LNFT | 1.00 | 3,979.00 | 1.90 | 7,560.10 | 3.30 | 13,130.70 | 2.50 | 9,947.50 | | 0011 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 67.5 | CUYD | 50.00 | 3,375.00 | 75.00 | 5,062.50 | 151.30 | 10,212.75 | 70.00 | 4,725.00 | | 0012 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 5 | LNFT | 100.00 | 500.00 | 75.00 | 375.00 | 152.70 | 763.50 | 90.00 | 450.00 | | 0013 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 50 | LNFT | 150.00 | 7,500.00 | 145.00 | 7,250.00 | 52.10 | 2,605.00 | 100.00 | 5,000.00 | | 0014 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 60 | LNFT | 150.00 | 9,000.00 | 100.00 | 6,000.00 | 65.40 | 3,924.00 | 110.00 | 6,600.00 | | 0015 | 701-05-01020 | Side Drain Pipe (15" RCP/PP/CMP) | 10 | LNFT | 150.00 | 1,500.00 | 122.00 | 1,220.00 | 143.10 | 1,431.00 | 90.00 | 900.00 | | 0016 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 38 | LNFT | 150.00 | 5,700.00 | 80.00 | 3,040.00 | 92.90 | 3,530.20 | 100.00 | 3,800.00 | | 0017 | 701-12-01040 | Corrugated Metal Pipe (Extension) (18") | 60 | LNFT | 150.00 | 9,000.00 | 100.00 | 6,000.00 | 82.90 | 4,974.00 | 120.00 | 7,200.00 | | 0018 | 701-15-00100 | Concrete Collar | 4 | EACH | 1.00 | 4.00 | 1,200.00 | 4,800.00 | 2,186.80 | 8,747.20 | 1,500.00 | 6,000.00 | | 0019 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 750.00 | 750.00 | 1,850.00 | 1,850.00 | 1,605.10 | 1,605.10 | 2,500.00 | 2,500.00 | | 0020 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 750.00 | 750.00 | 1,550.00 | 1,550.00 | 3,552.20 | 3,552.20 | 2,500.00 | 2,500.00 | | 0021 | 702-04-00200 | Adjusting Catch Basins Sidewalk Drain Cover | 28 | EACH | 750.00 | 21,000.00 | 1,300.00 | 36,400.00 | 1,485.20 | 41,585.60 | 1,600.00 | 44,800.00 | | 0022 | 705-09-00100 | Rebuilt Fence | 121 | LNFT | 15.00 | 1,815.00 | 20.00 | 2,420.00 | 14.90 | 1,802.90 | 20.00 | 2,420.00 | | 0023 | 706-01-00100 | Concrete Walk (4" Thick) | 2,266.1 | SQYD | 55.00 | 124,635.50 | 35.00 | 79,313.50 | 61.80 | 140,044.98 | 56.00 | 126,901.60 | | 0024 | 706-02-00200 | Concrete Drive (6" Thick) | 285.8 | SQYD | 60.00 | 17,148.00 | 75.00 | 21,435.00 | 96.10 | 27,465.38 | 62.00 | 17,719.60 | | 0025 | 706-04-00100 | Handicapped Curb Ramps | 9 | EACH | 750.00 | 6,750.00 | 1,100.00 | 9,900.00 | 542.80 | 4,885.20 | 2,300.00 | 20,700.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 13,500.00 | 13,500.00 | 12,630.50 | 12,630.50 | 20,000.00 | 20,000.00 | | 0027 | 726-01-00100 | Bedding Material | 19.7 | CUYD | 50.00 | 985.00 | 35.00 | 689.50 | 110.00 | 2,167.00 | 100.00 | 1,970.00 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 25,000.00 | 25,000.00 | 33,000.00 | 33,000.00 | 18,656.00 | 18,656.00 | 41,000.00 | 41,000.00 | | 0029 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 232 | SQFT | 25.00 | 5,800.00 | 25.00 | 5,800.00 | 21.10 | 4,895.20 | 20.00 | 4,640.00 | | 0030 | 729-21-00100 | U-Channel Post | 17 | EACH | 110.00 | 1,870.00 | 11.50 | 195.50 | 51.50 | 875.50 | 70.00 | 1,190.00 | | 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | 20 | EACH | 25.00 | 500.00 | 20.00 | 400.00 | 39.30 | 786.00 | 20.00 | 400.00 | | 0032 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 779 | LNFT | 3.00 | 2,337.00 | 3.50 | 2,726.50 | 6.20 | 4,829.80 | 3.00 | 2,337.00 | | 0033 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 790 | LNFT | 15.00 | 11,850.00 | 20.00 | 15,800.00 | 18.60 | 14,694.00 | 20.00 | 15,800.00 | | 0034 | 739-01-00100 | Hydro-Seeding | 1.09 | ACRE | 2,000.00 | 2,180.00 | 1,450.00 | 1,580.50 | 1,286.10 | 1,401.85 | 1,500.00 | 1,635.00 | | 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 11,500.00 | 11,500.00 | 2,165.80 | 2,165.80 | 14,000.00 | 14,000.00 | | 0036 | 741-11-00200 | Adjusting Water Valve and Meter Box | 1 | EACH | 250.00 | 250.00 | 1,420.00 | 1,420.00 | 1,406.90 | 1,406.90 | 750.00 | 750.00 | | 0037 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,406 | INLF | 1.00 | 2,406.00 | 1.50 | 3,609.00 | 1.10 | 2,646.60 | 1.00 | 2,406.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 324,324.50 | | 337,414.10 | | 389,969.36 | | 419,601.70 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Industrial Enterprises, Inc. | - 6 - KCR CONTRACTORS, LLC | - 7 - Hamp's Construction L.L.C. | - 8 - JD's Rebar & Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.05 | LUMP | 1,200.00 | 1,200.00 | 10,000.00 | 10,000.00 | 88,000.00 | 88,000.00 | 21,153.14 | 21,153.14 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 652 | SQYD | 9.60 | 6,259.20 | 7.00 | 4,564.00 | 60.00 | 39,120.00 | 9.54 | 6,220.08 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 45 | LNFT | 12.00 | 540.00 | 5.00 | 225.00 | 4.00 | 180.00 | 46.05 | 2,072.25 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) 15" | 8 | LNFT | 12.00 | 96.00 | 10.00 | 80.00 | 10.00 | 80.00 | 175.44 | 1,403.52 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) 18" | 4 | LNFT | 12.00 | 48.00 | 10.00 | 40.00 | 10.00 | 40.00 | 259.05 | 1,036.20 | | 0006 | 202-03-38000 | Relocation of Sign Remove and Install | 1 | EACH | 180.00 | 180.00 | 150.00 | 150.00 | 150.00 | 150.00 | 2,072.39 | 2,072.39 | | 0007 | 202-03-38020 | Relocation of Sign Pole Remove and Install | 1 | EACH | 180.00 | 180.00 | 150.00 | 150.00 | 150.00 | 150.00 | 3,028.55 | 3,028.55 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 6,000.00 | 6,000.00 | 25,000.00 | 25,000.00 | 75,000.00 | 75,000.00 | 16,579.09 | 16,579.09 | | 0009 | 204-02-00100 | Temporary Hay or Straw Bales | 108 | EACH | 13.20 | 1,425.60 | 15.00 | 1,620.00 | 12.00 | 1,296.00 | 15.98 | 1,725.84 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 3,979 | LNFT | 1.65 | 6,565.35 | 2.00 | 7,958.00 | 2.00 | 7,958.00 | 2.57 | 10,226.03 | | 0011 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 67.5 | CUYD | 55.00 | 3,712.50 | 100.00 | 6,750.00 | 100.00 | 6,750.00 | 308.47 | 20,821.73 | | 0012 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 5 | LNFT | 128.92 | 644.60 | 100.00 | 500.00 | 40.00 | 200.00 | 1,667.06 | 8,335.30 | | 0013 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 50 | LNFT | 74.58 | 3,729.00 | 100.00 | 5,000.00 | 45.00 | 2,250.00 | 111.14 | 5,557.00 | | 0014 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 60 | LNFT | 76.48 | 4,588.80 | 100.00 | 6,000.00 | 65.00 | 3,900.00 | 138.92 | 8,335.20 | | 0015 | 701-05-01020 | Side Drain Pipe (15" RCP/PP/CMP) | 10 | LNFT | 59.92 | 599.20 | 100.00 | 1,000.00 | 80.00 | 800.00 | 833.53 | 8,335.30 | | 0016 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 38 | LNFT | 63.08 | 2,397.04 | 100.00 | 3,800.00 | 80.00 | 3,040.00 | 219.35 | 8,335.30 | | 0017 | 701-12-01040 | Corrugated Metal Pipe (Extension) (18") | 60 | LNFT | 77.75 | 4,665.00 | 100.00 | 6,000.00 | 80.00 | 4,800.00 | 231.54 | 13,892.40 | | 0018 | 701-15-00100 | Concrete Collar | 4 | EACH | 600.00 | 2,400.00 | 500.00 | 2,000.00 | 1,200.00 | 4,800.00 | 2,778.44 | 11,113.76 | | 0019 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,800.00 | 1,800.00 | 1,400.00 | 1,400.00 | 400.00 | 400.00 | 5,556.88 | 5,556.88 | | 0020 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 1,800.00 | 1,800.00 | 2,000.00 | 2,000.00 | 400.00 | 400.00 | 5,556.88 | 5,556.88 | | 0021 | 702-04-00200 | Adjusting Catch Basins Sidewalk Drain Cover | 28 | EACH | 2,324.63 | 65,089.64 | 2,200.00 | 61,600.00 | 750.00 | 21,000.00 | 2,480.75 | 69,461.00 | | 0022 | 705-09-00100 | Rebuilt Fence | 121 | LNFT | 46.00 | 5,566.00 | 35.00 | 4,235.00 | 12.00 | 1,452.00 | 91.92 | 11,122.32 | | 0023 | 706-01-00100 | Concrete Walk (4" Thick) | 2,266.1 | SQYD | 86.50 | 196,017.65 | 69.00 | 156,360.90 | 70.00 | 158,627.00 | 54.06 | 122,505.37 | | 0024 | 706-02-00200 | Concrete Drive (6" Thick) | 285.8 | SQYD | 115.00 | 32,867.00 | 82.00 | 23,435.60 | 120.00 | 34,296.00 | 66.16 | 18,908.53 | | 0025 | 706-04-00100 | Handicapped Curb Ramps | 9 | EACH | 1,800.00 | 16,200.00 | 1,700.00 | 15,300.00 | 900.00 | 8,100.00 | 1,445.18 | 13,006.62 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 14,375.00 | 14,375.00 | 10,000.00 | 10,000.00 | 3,000.00 | 3,000.00 | 25,111.44 | 25,111.44 | | 0027 | 726-01-00100 | Bedding Material | 19.7 | CUYD | 77.00 | 1,516.90 | 100.00 | 1,970.00 | 150.00 | 2,955.00 | 216.79 | 4,270.76 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 22,800.00 | 22,800.00 | 40,000.00 | 40,000.00 | 51,500.00 | 51,500.00 | 130,000.00 | 130,000.00 | | 0029 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 232 | SQFT | 18.70 | 4,338.40 | 115.00 | 26,680.00 | 18.00 | 4,176.00 | 20.55 | 4,767.60 | | 0030 | 729-21-00100 | U-Channel Post | 17 | EACH | 45.65 | 776.05 | 75.00 | 1,275.00 | 88.00 | 1,496.00 | 79.90 | 1,358.30 | | 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | 20 | EACH | 19.80 | 396.00 | 15.00 | 300.00 | 35.00 | 700.00 | 25.11 | 502.20 | | 0032 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 779 | LNFT | 3.30 | 2,570.70 | 20.00 | 15,580.00 | 6.00 | 4,674.00 | 4.57 | 3,560.03 | | 0033 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 790 | LNFT | 19.80 | 15,642.00 | 25.00 | 19,750.00 | 17.00 | 13,430.00 | 25.11 | 19,836.90 | | 0034 | 739-01-00100 | Hydro-Seeding | 1.09 | ACRE | 1,375.00 | 1,498.75 | 1,580.00 | 1,722.20 | 1,500.00 | 1,635.00 | 17.12 | 18.66 | | 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,000.00 | 6,000.00 | 20,000.00 | 20,000.00 | 19,850.00 | 19,850.00 | 28,535.72 | 28,535.72 | | 0036 | 741-11-00200 | Adjusting Water Valve and Meter Box | 1 | EACH | 172.50 | 172.50 | 1,000.00 | 1,000.00 | 500.00 | 500.00 | 2,778.44 | 2,778.44 | | 0037 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,406 | INLF | 1.10 | 2,646.60 | 1.00 | 2,406.00 | 1.00 | 2,406.00 | 2.07 | 4,980.42 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 437,303.48 | | 485,851.70 | | 569,111.00 | | 622,081.15 |
|