Proposal:H.011327.6
Parish:St. Mary
Routes:US 90
Description:US 90: J-TURNS - ST. MARY PARISH
Type Construction:GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE (STONE), LIME TREATMENT, PAVEMENT WIDENING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, ASPHALTIC CONCRETE (SMA), PORTLAND CEMENT CONCRETE PAVEMENT, DRILLED SHAFT FOUNDATIONS, TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$14,842,579.50
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $15,685,526.71 |
| 2 | 00481 | COASTAL BRIDGE CO., L.L.C. | $15,875,454.62 |
| 3 | 33663 | Glenn Lege Construction Inc | $16,962,660.61 |
| 4 | 62139 | HUEY P. STOCKSTILL, LLC | $17,036,505.58 |
| 5 | 12487 | Diamond B Construction Co., L.L.C. | $17,869,860.32 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - COASTAL BRIDGE CO., L.L.C. | - 3 - Glenn Lege Construction Inc | - 4 - HUEY P. STOCKSTILL, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | 150,000.00 | 150,000.00 | 40,500.00 | 40,500.00 | 40,000.00 | 40,000.00 | | 0002 | 202-02-06120 | Removal of Curbs (Asphalt) | 125 | LNFT | 11.00 | 1,375.00 | 20.00 | 2,500.00 | 9.25 | 1,156.25 | 8.00 | 1,000.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 310 | LNFT | 11.00 | 3,410.00 | 5.00 | 1,550.00 | 9.25 | 2,867.50 | 9.00 | 2,790.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 870 | LNFT | 14.00 | 12,180.00 | 10.00 | 8,700.00 | 33.00 | 28,710.00 | 12.00 | 10,440.00 | | 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 789 | SQYD | 15.00 | 11,835.00 | 11.00 | 8,679.00 | 14.00 | 11,046.00 | 13.00 | 10,257.00 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 36,215.8 | SQYD | 6.00 | 217,294.80 | 15.00 | 543,237.00 | 5.20 | 188,322.16 | 10.00 | 362,158.00 | | 0007 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 12,000.00 | 12,000.00 | 5,000.00 | 5,000.00 | 5,845.00 | 5,845.00 | 12,000.00 | 12,000.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 2,300,000.00 | 2,300,000.00 | 1,200,000.00 | 1,200,000.00 | 2,417,000.00 | 2,417,000.00 | 1,063,000.00 | 1,063,000.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 237 | EACH | 110.00 | 26,070.00 | 10.00 | 2,370.00 | 144.00 | 34,128.00 | 117.00 | 27,729.00 | | 0010 | 302-02-02080 | Class II Base Course (6" Thick) (Stone) | 1,152.8 | SQYD | 25.00 | 28,820.00 | 25.00 | 28,820.00 | 25.50 | 29,396.40 | 23.00 | 26,514.40 | | 0011 | 304-04-00300 | Lime Treatment (Type D) (10" Thick) | 44,348 | SQYD | 3.00 | 133,044.00 | 1.00 | 44,348.00 | 5.50 | 243,914.00 | 6.00 | 266,088.00 | | 0012 | 305-01-03020 | Subgrade Layer (10" Thick) (Treated) | 23,679 | SQYD | 7.00 | 165,753.00 | 2.00 | 47,358.00 | 15.70 | 371,760.30 | 13.00 | 307,827.00 | | 0013 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 80.00 | 8,000.00 | 25.00 | 2,500.00 | 104.00 | 10,400.00 | 124.00 | 12,400.00 | | 0014 | 502-01-00100 | Superpave Asphaltic Concrete | 38,247.2 | TON | 80.00 | 3,059,776.00 | 70.00 | 2,677,304.00 | 91.50 | 3,499,618.80 | 93.00 | 3,556,989.60 | | 0015 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 65.5 | TON | 145.00 | 9,497.50 | 250.00 | 16,375.00 | 105.00 | 6,877.50 | 172.00 | 11,266.00 | | 0016 | 508-01-00100 | Asphalt Concrete (SMA) Wearing Course | 35,634.9 | TON | 110.00 | 3,919,839.00 | 120.00 | 4,276,188.00 | 125.50 | 4,472,179.95 | 140.00 | 4,988,886.00 | | 0017 | 509-01-00100 | Cold Planing Asphaltic Pavement | 269,082 | SQYD | 2.50 | 672,705.00 | 5.50 | 1,479,951.00 | 1.60 | 430,531.20 | 2.00 | 538,164.00 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -12,624 | CUYD | 23.00 | -290,352.00 | 0.01 | -126.24 | 0.10 | -1,262.40 | 0.00 | 0.00 | | 0019 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 200 | SQYD | 110.00 | 22,000.00 | 150.00 | 30,000.00 | 97.00 | 19,400.00 | 79.00 | 15,800.00 | | 0020 | 510-02-00100 | Pavement Widening (12" MINIMUM THICKNESS) | 692.7 | SQYD | 50.00 | 34,635.00 | 90.00 | 62,343.00 | 97.00 | 67,191.90 | 88.00 | 60,957.60 | | 0021 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 7,821.2 | SQYD | 86.00 | 672,623.20 | 80.00 | 625,696.00 | 93.00 | 727,371.60 | 85.00 | 664,802.00 | | 0022 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 3,653 | SQYD | 102.00 | 372,606.00 | 80.00 | 292,240.00 | 100.00 | 365,300.00 | 92.00 | 336,076.00 | | 0023 | 701-01-01000 | Cross Drain Pipe (24" RCP/PP) | 214 | LNFT | 70.00 | 14,980.00 | 80.50 | 17,227.00 | 70.00 | 14,980.00 | 64.00 | 13,696.00 | | 0024 | 701-01-01020 | Cross Drain Pipe (30" RCP/PP) | 20 | LNFT | 100.00 | 2,000.00 | 120.50 | 2,410.00 | 105.00 | 2,100.00 | 95.00 | 1,900.00 | | 0025 | 701-01-01040 | Cross Drain Pipe (36" RCP/PP) | 68 | LNFT | 115.00 | 7,820.00 | 127.00 | 8,636.00 | 116.00 | 7,888.00 | 106.00 | 7,208.00 | | 0026 | 701-01-01080 | Cross Drain Pipe (48" RCP/PP) | 16 | LNFT | 170.00 | 2,720.00 | 155.00 | 2,480.00 | 175.00 | 2,800.00 | 160.00 | 2,560.00 | | 0027 | 701-01-01120 | Cross Drain Pipe (60" RCP) | 16 | LNFT | 200.00 | 3,200.00 | 300.00 | 4,800.00 | 210.00 | 3,360.00 | 191.00 | 3,056.00 | | 0028 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 3,412 | LNFT | 60.00 | 204,720.00 | 60.00 | 204,720.00 | 58.00 | 197,896.00 | 53.00 | 180,836.00 | | 0029 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 636 | LNFT | 61.00 | 38,796.00 | 65.00 | 41,340.00 | 65.00 | 41,340.00 | 60.00 | 38,160.00 | | 0030 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 128 | LNFT | 90.00 | 11,520.00 | 85.00 | 10,880.00 | 93.00 | 11,904.00 | 85.00 | 10,880.00 | | 0031 | 701-14-00100 | Cleaning Existing Pipes | 5,805 | LNFT | 8.50 | 49,342.50 | 10.00 | 58,050.00 | 16.30 | 94,621.50 | 14.00 | 81,270.00 | | 0032 | 701-15-00100 | Concrete Collar | 43 | EACH | 550.00 | 23,650.00 | 790.00 | 33,970.00 | 550.00 | 23,650.00 | 500.00 | 21,500.00 | | 0033 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 5,200.00 | 5,200.00 | 5,600.00 | 5,600.00 | 5,210.00 | 5,210.00 | 4,800.00 | 4,800.00 | | 0034 | 702-02-00300 | Manholes (R-CB-11 MOD) | 4 | EACH | 5,500.00 | 22,000.00 | 7,400.00 | 29,600.00 | 5,325.00 | 21,300.00 | 4,800.00 | 19,200.00 | | 0035 | 702-03-00100 | Catch Basins (CB-01) | 37 | EACH | 3,800.00 | 140,600.00 | 2,450.00 | 90,650.00 | 4,050.00 | 149,850.00 | 3,700.00 | 136,900.00 | | 0036 | 702-03-00200 | Catch Basins (CB-02) | 2 | EACH | 5,200.00 | 10,400.00 | 4,570.00 | 9,140.00 | 6,365.00 | 12,730.00 | 5,800.00 | 11,600.00 | | 0037 | 702-03-00700 | Catch Basins (CB-08) | 1 | EACH | 9,100.00 | 9,100.00 | 8,750.00 | 8,750.00 | 8,680.00 | 8,680.00 | 7,600.00 | 7,600.00 | | 0038 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 2,700.00 | 2,700.00 | 2,645.00 | 2,645.00 | 2,085.00 | 2,085.00 | 1,900.00 | 1,900.00 | | 0039 | 702-08-00100 | Side Drain Safety End (Type I) | 55 | EACH | 1,580.00 | 86,900.00 | 1,110.00 | 61,050.00 | 1,795.00 | 98,725.00 | 1,600.00 | 88,000.00 | | 0040 | 704-03-00100 | Blocked Out Guard Rail | 175 | LNFT | 26.00 | 4,550.00 | 20.00 | 3,500.00 | 26.00 | 4,550.00 | 23.00 | 4,025.00 | | 0041 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 95.00 | 4,750.00 | 55.00 | 2,750.00 | 93.00 | 4,650.00 | 85.00 | 4,250.00 | | 0042 | 704-10-00100 | Guard Rail Anchor Block | 2 | EACH | 2,600.00 | 5,200.00 | 4,500.00 | 9,000.00 | 2,605.00 | 5,210.00 | 2,400.00 | 4,800.00 | | 0043 | 704-11-00100 | Guard Rail End Treatment (Flared) | 1 | EACH | 3,000.00 | 3,000.00 | 2,500.00 | 2,500.00 | 2,780.00 | 2,780.00 | 2,500.00 | 2,500.00 | | 0044 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 1 | EACH | 3,250.00 | 3,250.00 | 2,500.00 | 2,500.00 | 3,010.00 | 3,010.00 | 2,700.00 | 2,700.00 | | 0045 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 162.1 | SQYD | 52.00 | 8,429.20 | 60.00 | 9,726.00 | 64.00 | 10,374.40 | 58.00 | 9,401.80 | | 0046 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 172.4 | SQYD | 64.00 | 11,033.60 | 65.00 | 11,206.00 | 69.50 | 11,981.80 | 63.00 | 10,861.20 | | 0047 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (10" THICK) | 374.9 | SQYD | 95.00 | 35,615.50 | 107.00 | 40,114.30 | 105.00 | 39,364.50 | 95.00 | 35,615.50 | | 0048 | 707-03-00100 | Combination Concrete Curb and Gutter | 8,843.7 | LNFT | 22.00 | 194,561.40 | 65.00 | 574,840.50 | 23.15 | 204,731.66 | 21.00 | 185,717.70 | | 0049 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 600,000.00 | 600,000.00 | 250,000.00 | 250,000.00 | 297,785.00 | 297,785.00 | 581,000.00 | 581,000.00 | | 0050 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 24,486 | LNFT | 0.30 | 7,345.80 | 0.35 | 8,570.10 | 0.40 | 9,794.40 | 0.30 | 7,345.80 | | 0051 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 231 | LNFT | 1.10 | 254.10 | 1.00 | 231.00 | 1.20 | 277.20 | 1.00 | 231.00 | | 0052 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 44.792 | MILE | 450.00 | 20,156.40 | 400.00 | 17,916.80 | 420.00 | 18,812.64 | 175.00 | 7,838.60 | | 0053 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 89.585 | MILE | 625.00 | 55,990.63 | 1.00 | 89.59 | 725.00 | 64,949.13 | 625.00 | 55,990.63 | | 0054 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 67 | EACH | 1.00 | 67.00 | 50.00 | 3,350.00 | 58.00 | 3,886.00 | 50.00 | 3,350.00 | | 0055 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 40 | EACH | 1.00 | 40.00 | 55.00 | 2,200.00 | 65.00 | 2,600.00 | 55.00 | 2,200.00 | | 0056 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 75,000.00 | 75,000.00 | 18,500.00 | 18,500.00 | 23,875.00 | 23,875.00 | 50,000.00 | 50,000.00 | | 0057 | 726-01-00100 | Bedding Material | 475 | CUYD | 115.00 | 54,625.00 | 95.00 | 45,125.00 | 115.00 | 54,625.00 | 100.00 | 47,500.00 | | 0058 | 727-01-00100 | Mobilization | 1 | LUMP | 1,200,000.00 | 1,200,000.00 | 1,500,000.00 | 1,500,000.00 | 711,975.00 | 711,975.00 | 1,690,000.00 | 1,690,000.00 | | 0059 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 2,588.8 | SQFT | 17.00 | 44,009.60 | 22.50 | 58,248.00 | 18.50 | 47,892.80 | 18.00 | 46,598.40 | | 0060 | 729-04-00102 | Sign (Type D)(Furnish and Install) | 30 | SQFT | 30.00 | 900.00 | 25.00 | 750.00 | 32.40 | 972.00 | 29.00 | 870.00 | | 0061 | 729-16-00200 | Object Marker Assembly (Type 2) | 55 | EACH | 70.00 | 3,850.00 | 45.00 | 2,475.00 | 75.00 | 4,125.00 | 69.00 | 3,795.00 | | 0062 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 110.00 | 440.00 | 75.00 | 300.00 | 100.00 | 400.00 | 90.00 | 360.00 | | 0063 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 226 | EACH | 74.00 | 16,724.00 | 80.00 | 18,080.00 | 81.00 | 18,306.00 | 70.00 | 15,820.00 | | 0064 | 731-02-00100 | Reflectorized Raised Pavement Markers | 5,591 | EACH | 8.50 | 47,523.50 | 7.50 | 41,932.50 | 8.70 | 48,641.70 | 8.00 | 44,728.00 | | 0065 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 11,096 | LNFT | 0.85 | 9,431.60 | 0.75 | 8,322.00 | 0.90 | 9,986.40 | 0.80 | 8,876.80 | | 0066 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 24,486 | LNFT | 4.40 | 107,738.40 | 4.00 | 97,944.00 | 4.65 | 113,859.90 | 4.00 | 97,944.00 | | 0067 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 231 | LNFT | 17.00 | 3,927.00 | 15.00 | 3,465.00 | 17.50 | 4,042.50 | 15.00 | 3,465.00 | | 0068 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 44.792 | MILE | 4,400.00 | 197,084.80 | 4,000.00 | 179,168.00 | 4,630.00 | 207,386.96 | 4,000.00 | 179,168.00 | | 0069 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 17.908 | MILE | 1,400.00 | 25,071.20 | 1,250.00 | 22,385.00 | 1,450.00 | 25,966.60 | 1,300.00 | 23,280.40 | | 0070 | 732-03-02001 | Plast Pave Striping (Broken Line) (4" Width) (Thermo 90 mil)(Blk Cont) | 4.488 | MILE | 4,400.00 | 19,747.20 | 4,000.00 | 17,952.00 | 4,630.00 | 20,779.44 | 4,000.00 | 17,952.00 | | 0071 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.026 | MILE | 4,400.00 | 114.40 | 4,000.00 | 104.00 | 4,630.00 | 120.38 | 3,100.00 | 80.60 | | 0072 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 3.726 | MILE | 4,400.00 | 16,394.40 | 4,000.00 | 14,904.00 | 4,630.00 | 17,251.38 | 4,100.00 | 15,276.60 | | 0073 | 732-04-00001 | Plastic Pavement Legends and Symbols (Message) (NO) | 1 | EACH | 550.00 | 550.00 | 500.00 | 500.00 | 580.00 | 580.00 | 520.00 | 520.00 | | 0074 | 732-04-00001 | Plastic Pavement Legends and Symbols (Message) (TRUCKS) | 1 | EACH | 550.00 | 550.00 | 500.00 | 500.00 | 580.00 | 580.00 | 520.00 | 520.00 | | 0075 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 40 | EACH | 450.00 | 18,000.00 | 425.00 | 17,000.00 | 492.00 | 19,680.00 | 430.00 | 17,200.00 | | 0076 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 15 | EACH | 375.00 | 5,625.00 | 350.00 | 5,250.00 | 405.00 | 6,075.00 | 375.00 | 5,625.00 | | 0077 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 8 | EACH | 375.00 | 3,000.00 | 350.00 | 2,800.00 | 405.00 | 3,240.00 | 375.00 | 3,000.00 | | 0078 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 3 | EACH | 450.00 | 1,350.00 | 400.00 | 1,200.00 | 465.00 | 1,395.00 | 420.00 | 1,260.00 | | 0079 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 41 | EACH | 450.00 | 18,450.00 | 400.00 | 16,400.00 | 465.00 | 19,065.00 | 420.00 | 17,220.00 | | 0080 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 7 | EACH | 500.00 | 3,500.00 | 400.00 | 2,800.00 | 520.00 | 3,640.00 | 450.00 | 3,150.00 | | 0081 | 732-05-00100 | Removal of Existing Markings | 22.396 | MILE | 1,106.44 | 24,779.83 | 1,000.00 | 22,396.00 | 1,160.00 | 25,979.36 | 1,000.00 | 22,396.00 | | 0082 | 736-01-00100 | Trenching and Backfilling | 2,572 | LNFT | 3.00 | 7,716.00 | 4.59 | 11,805.48 | 5.20 | 13,374.40 | 3.00 | 7,716.00 | | 0083 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 1,442 | LNFT | 12.00 | 17,304.00 | 9.01 | 12,992.42 | 10.45 | 15,068.90 | 12.00 | 17,304.00 | | 0084 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 370 | LNFT | 26.00 | 9,620.00 | 11.92 | 4,410.40 | 13.80 | 5,106.00 | 26.00 | 9,620.00 | | 0085 | 736-04-04080 | Signal Support (25' Single Mast Arm) | 3 | EACH | 9,000.00 | 27,000.00 | 8,564.00 | 25,692.00 | 9,875.00 | 29,625.00 | 8,500.00 | 25,500.00 | | 0086 | 736-04-04100 | Signal Support (30' Single Mast Arm) | 2 | EACH | 9,200.00 | 18,400.00 | 8,940.00 | 17,880.00 | 10,345.00 | 20,690.00 | 8,800.00 | 17,600.00 | | 0087 | 736-04-04140 | Signal Support (40' Single Mast Arm) | 1 | EACH | 10,500.00 | 10,500.00 | 11,495.00 | 11,495.00 | 13,300.00 | 13,300.00 | 10,100.00 | 10,100.00 | | 0088 | 736-04-04160 | Signal Support (45' Single Mast Arm) | 2 | EACH | 11,000.00 | 22,000.00 | 12,006.00 | 24,012.00 | 13,900.00 | 27,800.00 | 10,500.00 | 21,000.00 | | 0089 | 736-04-05007 | Signal Support (40'span, 30' span add-on arm) | 1 | EACH | 13,200.00 | 13,200.00 | 10,020.00 | 10,020.00 | 16,550.00 | 16,550.00 | 12,600.00 | 12,600.00 | | 0090 | 736-04-05009 | Signal Support (45'span, 25' span add-on arm) | 1 | EACH | 13,500.00 | 13,500.00 | 12,775.00 | 12,775.00 | 16,450.00 | 16,450.00 | 12,800.00 | 12,800.00 | | 0091 | 736-05-01000 | Signal Heads (1 Section, 12" Led Lens, R) | 2 | EACH | 650.00 | 1,300.00 | 508.00 | 1,016.00 | 590.00 | 1,180.00 | 630.00 | 1,260.00 | | 0092 | 736-05-01020 | Signal Heads (1 Section, 12" Led Lens, Y) | 6 | EACH | 650.00 | 3,900.00 | 508.00 | 3,048.00 | 590.00 | 3,540.00 | 630.00 | 3,780.00 | | 0093 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 7 | EACH | 1,075.00 | 7,525.00 | 898.00 | 6,286.00 | 1,040.00 | 7,280.00 | 1,040.00 | 7,280.00 | | 0094 | 736-05-02070 | Signal Hds (3 Sec, 12" Led Lens, LT. R, LT. Y, LT. G) | 8 | EACH | 1,075.00 | 8,600.00 | 898.00 | 7,184.00 | 1,040.00 | 8,320.00 | 1,040.00 | 8,320.00 | | 0095 | 736-05-02080 | Signal Hds (3 Sec, 12" Led Lens, RT. R, RT. Y, RT. G) | 5 | EACH | 1,075.00 | 5,375.00 | 898.00 | 4,490.00 | 1,040.00 | 5,200.00 | 1,040.00 | 5,200.00 | | 0096 | 736-06-00200 | Signal Service (Pedestal Required) | 3 | EACH | 2,000.00 | 6,000.00 | 1,915.00 | 5,745.00 | 2,216.00 | 6,648.00 | 2,000.00 | 6,000.00 | | 0097 | 736-06-00600 | Signal Service (Existing Pole) | 4 | EACH | 1,600.00 | 6,400.00 | 1,300.00 | 5,200.00 | 1,505.00 | 6,020.00 | 1,600.00 | 6,400.00 | | 0098 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 3 | EACH | 7,300.00 | 21,900.00 | 5,505.00 | 16,515.00 | 3,670.00 | 11,010.00 | 7,000.00 | 21,000.00 | | 0099 | 736-10-00300 | Underground Junction Box (Type F) | 17 | EACH | 500.00 | 8,500.00 | 475.00 | 8,075.00 | 480.00 | 8,160.00 | 500.00 | 8,500.00 | | 0100 | 736-10-00400 | Underground Junction Box (Type G) | 3 | EACH | 900.00 | 2,700.00 | 707.00 | 2,121.00 | 710.00 | 2,130.00 | 830.00 | 2,490.00 | | 0101 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 3,611 | LNFT | 2.65 | 9,569.15 | 2.50 | 9,027.50 | 4.50 | 16,249.50 | 2.50 | 9,027.50 | | 0102 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 773 | LNFT | 7.75 | 5,990.75 | 6.64 | 5,132.72 | 7.70 | 5,952.10 | 7.30 | 5,642.90 | | 0103 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 463 | LNFT | 3.20 | 1,481.60 | 3.00 | 1,389.00 | 3.45 | 1,597.35 | 3.10 | 1,435.30 | | 0104 | 736-12-03000 | Conductor (4c, #12 awg) | 3,617 | LNFT | 1.85 | 6,691.45 | 1.45 | 5,244.65 | 1.70 | 6,148.90 | 1.75 | 6,329.75 | | 0105 | 736-12-04000 | Conductor (6c, #14 awg) | 120 | LNFT | 1.70 | 204.00 | 1.65 | 198.00 | 2.50 | 300.00 | 1.65 | 198.00 | | 0106 | 736-12-06000 | Conductor (10c, #14 awg) | 768 | LNFT | 2.10 | 1,612.80 | 2.00 | 1,536.00 | 3.05 | 2,342.40 | 2.00 | 1,536.00 | | 0107 | 736-13-00002 | Cable (3/8") | 145 | LNFT | 22.00 | 3,190.00 | 21.00 | 3,045.00 | 9.75 | 1,413.75 | 21.00 | 3,045.00 | | 0108 | 739-01-00100 | Hydro-Seeding | 47.47 | ACRE | 1,500.00 | 71,205.00 | 1,200.00 | 56,964.00 | 1,320.00 | 62,660.40 | 1,200.00 | 56,964.00 | | 0109 | 740-01-00100 | Construction Layout | 1 | LUMP | 180,000.00 | 180,000.00 | 125,000.00 | 125,000.00 | 150,500.00 | 150,500.00 | 250,000.00 | 250,000.00 | | 0110 | 805-12-32020 | Reinforced Concrete Box Culverts (4' x 3') (Extension) | 20 | LNFT | 400.00 | 8,000.00 | 620.00 | 12,400.00 | 405.00 | 8,100.00 | 350.00 | 7,000.00 | | 0111 | 805-12-34020 | Reinforced Concrete Box Culverts (6' x 5') (Extension) | 100 | LNFT | 550.00 | 55,000.00 | 932.00 | 93,200.00 | 520.00 | 52,000.00 | 450.00 | 45,000.00 | | 0112 | 805-12-35000 | Reinforced Concrete Box Culverts (6' x 6') (Extension) | 14 | LNFT | 850.00 | 11,900.00 | 700.00 | 9,800.00 | 925.00 | 12,950.00 | 820.00 | 11,480.00 | | 0113 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 353,290 | INLF | 0.05 | 17,664.50 | 0.01 | 3,532.90 | 1.30 | 459,277.00 | 0.10 | 35,329.00 | | 0114 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 16,359 | INLF | 0.70 | 11,451.30 | 1.00 | 16,359.00 | 1.30 | 21,266.70 | 0.50 | 8,179.50 | | 0115 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 6,808 | INLF | 0.70 | 4,765.60 | 1.00 | 6,808.00 | 1.65 | 11,233.20 | 0.50 | 3,404.00 | | 0116 | NS-701-00002 | Trench Excavation Safety Protection (Depth > 5 feet) | 596 | LNFT | 18.00 | 10,728.00 | 45.00 | 26,820.00 | 17.40 | 10,370.40 | 16.00 | 9,536.00 | | 0117 | NS-706-00300 | Incidental Concrete Paving (with Special Applications) | 141.4 | SQYD | 120.00 | 16,968.00 | 120.00 | 16,968.00 | 110.00 | 15,554.00 | 125.00 | 17,675.00 | | 0118 | NS-713-00008 | Portable Changeable Message Sign | 6 | EACH | 10,000.00 | 60,000.00 | 10,800.00 | 64,800.00 | 9,840.00 | 59,040.00 | 14,000.00 | 84,000.00 | | 0119 | NS-724-00005 | Rumble Strips (Shoulder) | 17.9 | MILE | 250.00 | 4,475.00 | 250.00 | 4,475.00 | 292.00 | 5,226.80 | 400.00 | 7,160.00 | | 0120 | NS-736-00001 | GPS | 3 | EACH | 1,100.00 | 3,300.00 | 870.00 | 2,610.00 | 1,010.00 | 3,030.00 | 1,050.00 | 3,150.00 | | 0121 | NS-736-00005 | Video Detection Cabinet Components | 3 | EACH | 6,500.00 | 19,500.00 | 5,633.00 | 16,899.00 | 6,520.00 | 19,560.00 | 6,200.00 | 18,600.00 | | 0122 | NS-736-00006 | Video Detection Camera | 6 | EACH | 2,250.00 | 13,500.00 | 2,668.00 | 16,008.00 | 2,740.00 | 16,440.00 | 2,200.00 | 13,200.00 | | 0123 | NS-736-00130 | TS-2 Traffic Signal Cabinet (Ground Mounted) | 2 | EACH | 20,000.00 | 40,000.00 | 18,500.00 | 37,000.00 | 21,100.00 | 42,200.00 | 19,000.00 | 38,000.00 | | 0124 | NS-736-00131 | TS-2 Traffic Signal Cabinet (Pole Mounted) | 1 | EACH | 15,500.00 | 15,500.00 | 15,500.00 | 15,500.00 | 15,225.00 | 15,225.00 | 15,500.00 | 15,500.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 15,685,526.71 | | 15,875,454.62 | | 16,962,660.61 | | 17,036,505.58 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 115,000.00 | 115,000.00 | | 0002 | 202-02-06120 | Removal of Curbs (Asphalt) | 125 | LNFT | 32.00 | 4,000.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 310 | LNFT | 8.00 | 2,480.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 870 | LNFT | 19.00 | 16,530.00 | | 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 789 | SQYD | 43.00 | 33,927.00 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 36,215.8 | SQYD | 9.00 | 325,942.20 | | 0007 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 5,750.00 | 5,750.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 2,400,000.00 | 2,400,000.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 237 | EACH | 160.00 | 37,920.00 | | 0010 | 302-02-02080 | Class II Base Course (6" Thick) (Stone) | 1,152.8 | SQYD | 88.00 | 101,446.40 | | 0011 | 304-04-00300 | Lime Treatment (Type D) (10" Thick) | 44,348 | SQYD | 2.75 | 121,957.00 | | 0012 | 305-01-03020 | Subgrade Layer (10" Thick) (Treated) | 23,679 | SQYD | 17.00 | 402,543.00 | | 0013 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 85.00 | 8,500.00 | | 0014 | 502-01-00100 | Superpave Asphaltic Concrete | 38,247.2 | TON | 92.00 | 3,518,742.40 | | 0015 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 65.5 | TON | 286.00 | 18,733.00 | | 0016 | 508-01-00100 | Asphalt Concrete (SMA) Wearing Course | 35,634.9 | TON | 115.00 | 4,098,013.50 | | 0017 | 509-01-00100 | Cold Planing Asphaltic Pavement | 269,082 | SQYD | 2.90 | 780,337.80 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -12,624 | CUYD | 1.00 | -12,624.00 | | 0019 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 200 | SQYD | 105.00 | 21,000.00 | | 0020 | 510-02-00100 | Pavement Widening (12" MINIMUM THICKNESS) | 692.7 | SQYD | 100.00 | 69,270.00 | | 0021 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 7,821.2 | SQYD | 80.00 | 625,696.00 | | 0022 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 3,653 | SQYD | 90.00 | 328,770.00 | | 0023 | 701-01-01000 | Cross Drain Pipe (24" RCP/PP) | 214 | LNFT | 110.00 | 23,540.00 | | 0024 | 701-01-01020 | Cross Drain Pipe (30" RCP/PP) | 20 | LNFT | 135.00 | 2,700.00 | | 0025 | 701-01-01040 | Cross Drain Pipe (36" RCP/PP) | 68 | LNFT | 155.00 | 10,540.00 | | 0026 | 701-01-01080 | Cross Drain Pipe (48" RCP/PP) | 16 | LNFT | 275.00 | 4,400.00 | | 0027 | 701-01-01120 | Cross Drain Pipe (60" RCP) | 16 | LNFT | 505.00 | 8,080.00 | | 0028 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 3,412 | LNFT | 72.00 | 245,664.00 | | 0029 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 636 | LNFT | 80.00 | 50,880.00 | | 0030 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 128 | LNFT | 100.00 | 12,800.00 | | 0031 | 701-14-00100 | Cleaning Existing Pipes | 5,805 | LNFT | 16.50 | 95,782.50 | | 0032 | 701-15-00100 | Concrete Collar | 43 | EACH | 850.00 | 36,550.00 | | 0033 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 6,200.00 | 6,200.00 | | 0034 | 702-02-00300 | Manholes (R-CB-11 MOD) | 4 | EACH | 6,500.00 | 26,000.00 | | 0035 | 702-03-00100 | Catch Basins (CB-01) | 37 | EACH | 3,100.00 | 114,700.00 | | 0036 | 702-03-00200 | Catch Basins (CB-02) | 2 | EACH | 6,100.00 | 12,200.00 | | 0037 | 702-03-00700 | Catch Basins (CB-08) | 1 | EACH | 7,550.00 | 7,550.00 | | 0038 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 2,250.00 | 2,250.00 | | 0039 | 702-08-00100 | Side Drain Safety End (Type I) | 55 | EACH | 1,825.00 | 100,375.00 | | 0040 | 704-03-00100 | Blocked Out Guard Rail | 175 | LNFT | 25.00 | 4,375.00 | | 0041 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 72.00 | 3,600.00 | | 0042 | 704-10-00100 | Guard Rail Anchor Block | 2 | EACH | 2,750.00 | 5,500.00 | | 0043 | 704-11-00100 | Guard Rail End Treatment (Flared) | 1 | EACH | 2,300.00 | 2,300.00 | | 0044 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 1 | EACH | 2,700.00 | 2,700.00 | | 0045 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 162.1 | SQYD | 92.50 | 14,994.25 | | 0046 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 172.4 | SQYD | 100.00 | 17,240.00 | | 0047 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (10" THICK) | 374.9 | SQYD | 122.00 | 45,737.80 | | 0048 | 707-03-00100 | Combination Concrete Curb and Gutter | 8,843.7 | LNFT | 31.00 | 274,154.70 | | 0049 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 485,500.00 | 485,500.00 | | 0050 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 24,486 | LNFT | 0.39 | 9,549.54 | | 0051 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 231 | LNFT | 1.00 | 231.00 | | 0052 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 44.792 | MILE | 154.00 | 6,897.97 | | 0053 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 89.585 | MILE | 1.00 | 89.59 | | 0054 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 67 | EACH | 1.00 | 67.00 | | 0055 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 40 | EACH | 1.00 | 40.00 | | 0056 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 2,500.00 | 2,500.00 | | 0057 | 726-01-00100 | Bedding Material | 475 | CUYD | 98.00 | 46,550.00 | | 0058 | 727-01-00100 | Mobilization | 1 | LUMP | 1,225,000.00 | 1,225,000.00 | | 0059 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 2,588.8 | SQFT | 45.00 | 116,496.00 | | 0060 | 729-04-00102 | Sign (Type D)(Furnish and Install) | 30 | SQFT | 45.00 | 1,350.00 | | 0061 | 729-16-00200 | Object Marker Assembly (Type 2) | 55 | EACH | 70.00 | 3,850.00 | | 0062 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 80.00 | 320.00 | | 0063 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 226 | EACH | 85.00 | 19,210.00 | | 0064 | 731-02-00100 | Reflectorized Raised Pavement Markers | 5,591 | EACH | 8.25 | 46,125.75 | | 0065 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 11,096 | LNFT | 0.82 | 9,098.72 | | 0066 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 24,486 | LNFT | 4.00 | 97,944.00 | | 0067 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 231 | LNFT | 16.00 | 3,696.00 | | 0068 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 44.792 | MILE | 4,325.00 | 193,725.40 | | 0069 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 17.908 | MILE | 1,275.00 | 22,832.70 | | 0070 | 732-03-02001 | Plast Pave Striping (Broken Line) (4" Width) (Thermo 90 mil)(Blk Cont) | 4.488 | MILE | 4,350.00 | 19,522.80 | | 0071 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.026 | MILE | 3,125.00 | 81.25 | | 0072 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 3.726 | MILE | 4,100.00 | 15,276.60 | | 0073 | 732-04-00001 | Plastic Pavement Legends and Symbols (Message) (NO) | 1 | EACH | 525.00 | 525.00 | | 0074 | 732-04-00001 | Plastic Pavement Legends and Symbols (Message) (TRUCKS) | 1 | EACH | 525.00 | 525.00 | | 0075 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 40 | EACH | 450.00 | 18,000.00 | | 0076 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 15 | EACH | 355.00 | 5,325.00 | | 0077 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 8 | EACH | 355.00 | 2,840.00 | | 0078 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 3 | EACH | 425.00 | 1,275.00 | | 0079 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 41 | EACH | 425.00 | 17,425.00 | | 0080 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 7 | EACH | 455.00 | 3,185.00 | | 0081 | 732-05-00100 | Removal of Existing Markings | 22.396 | MILE | 1,000.00 | 22,396.00 | | 0082 | 736-01-00100 | Trenching and Backfilling | 2,572 | LNFT | 5.00 | 12,860.00 | | 0083 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 1,442 | LNFT | 9.25 | 13,338.50 | | 0084 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 370 | LNFT | 12.00 | 4,440.00 | | 0085 | 736-04-04080 | Signal Support (25' Single Mast Arm) | 3 | EACH | 8,750.00 | 26,250.00 | | 0086 | 736-04-04100 | Signal Support (30' Single Mast Arm) | 2 | EACH | 9,900.00 | 19,800.00 | | 0087 | 736-04-04140 | Signal Support (40' Single Mast Arm) | 1 | EACH | 12,000.00 | 12,000.00 | | 0088 | 736-04-04160 | Signal Support (45' Single Mast Arm) | 2 | EACH | 12,750.00 | 25,500.00 | | 0089 | 736-04-05007 | Signal Support (40'span, 30' span add-on arm) | 1 | EACH | 15,000.00 | 15,000.00 | | 0090 | 736-04-05009 | Signal Support (45'span, 25' span add-on arm) | 1 | EACH | 14,750.00 | 14,750.00 | | 0091 | 736-05-01000 | Signal Heads (1 Section, 12" Led Lens, R) | 2 | EACH | 550.00 | 1,100.00 | | 0092 | 736-05-01020 | Signal Heads (1 Section, 12" Led Lens, Y) | 6 | EACH | 550.00 | 3,300.00 | | 0093 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 7 | EACH | 955.00 | 6,685.00 | | 0094 | 736-05-02070 | Signal Hds (3 Sec, 12" Led Lens, LT. R, LT. Y, LT. G) | 8 | EACH | 955.00 | 7,640.00 | | 0095 | 736-05-02080 | Signal Hds (3 Sec, 12" Led Lens, RT. R, RT. Y, RT. G) | 5 | EACH | 955.00 | 4,775.00 | | 0096 | 736-06-00200 | Signal Service (Pedestal Required) | 3 | EACH | 2,000.00 | 6,000.00 | | 0097 | 736-06-00600 | Signal Service (Existing Pole) | 4 | EACH | 1,350.00 | 5,400.00 | | 0098 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 3 | EACH | 5,750.00 | 17,250.00 | | 0099 | 736-10-00300 | Underground Junction Box (Type F) | 17 | EACH | 500.00 | 8,500.00 | | 0100 | 736-10-00400 | Underground Junction Box (Type G) | 3 | EACH | 775.00 | 2,325.00 | | 0101 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 3,611 | LNFT | 4.00 | 14,444.00 | | 0102 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 773 | LNFT | 7.00 | 5,411.00 | | 0103 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 463 | LNFT | 3.15 | 1,458.45 | | 0104 | 736-12-03000 | Conductor (4c, #12 awg) | 3,617 | LNFT | 1.55 | 5,606.35 | | 0105 | 736-12-04000 | Conductor (6c, #14 awg) | 120 | LNFT | 2.25 | 270.00 | | 0106 | 736-12-06000 | Conductor (10c, #14 awg) | 768 | LNFT | 2.75 | 2,112.00 | | 0107 | 736-13-00002 | Cable (3/8") | 145 | LNFT | 9.00 | 1,305.00 | | 0108 | 739-01-00100 | Hydro-Seeding | 47.47 | ACRE | 2,650.00 | 125,795.50 | | 0109 | 740-01-00100 | Construction Layout | 1 | LUMP | 272,000.00 | 272,000.00 | | 0110 | 805-12-32020 | Reinforced Concrete Box Culverts (4' x 3') (Extension) | 20 | LNFT | 600.00 | 12,000.00 | | 0111 | 805-12-34020 | Reinforced Concrete Box Culverts (6' x 5') (Extension) | 100 | LNFT | 725.00 | 72,500.00 | | 0112 | 805-12-35000 | Reinforced Concrete Box Culverts (6' x 6') (Extension) | 14 | LNFT | 775.00 | 10,850.00 | | 0113 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 353,290 | INLF | 1.05 | 370,954.50 | | 0114 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 16,359 | INLF | 1.05 | 17,176.95 | | 0115 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 6,808 | INLF | 2.15 | 14,637.20 | | 0116 | NS-701-00002 | Trench Excavation Safety Protection (Depth > 5 feet) | 596 | LNFT | 10.00 | 5,960.00 | | 0117 | NS-706-00300 | Incidental Concrete Paving (with Special Applications) | 141.4 | SQYD | 165.00 | 23,331.00 | | 0118 | NS-713-00008 | Portable Changeable Message Sign | 6 | EACH | 9,750.00 | 58,500.00 | | 0119 | NS-724-00005 | Rumble Strips (Shoulder) | 17.9 | MILE | 530.00 | 9,487.00 | | 0120 | NS-736-00001 | GPS | 3 | EACH | 900.00 | 2,700.00 | | 0121 | NS-736-00005 | Video Detection Cabinet Components | 3 | EACH | 5,750.00 | 17,250.00 | | 0122 | NS-736-00006 | Video Detection Camera | 6 | EACH | 2,750.00 | 16,500.00 | | 0123 | NS-736-00130 | TS-2 Traffic Signal Cabinet (Ground Mounted) | 2 | EACH | 18,500.00 | 37,000.00 | | 0124 | NS-736-00131 | TS-2 Traffic Signal Cabinet (Pole Mounted) | 1 | EACH | 13,500.00 | 13,500.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 17,869,860.32 |
|