Proposal:H.002798.6
Parish:St. Mary
Routes:LA 323
Description:BAYOU TECHE BRIDGE (OAKLAWN)
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PRECAST CONCRETE PILES, TREATED TIMBER PILES, BRIDGE REPAIRS, AND RELATED WORK.
Estimated Construction Cost:$11,789,723.00
| Rank | License | Bidder | Construction Bid |
| 1 | 36827 | Shavers-Whittle Construction LLC | $9,474,571.30 |
| 2 | 00481 | COASTAL BRIDGE CO., L.L.C. | $10,971,585.90 |
| 3 | 59878 | GLF CONSTRUCTION CORPORATION | $11,223,865.55 |
| 4 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $11,584,131.30 |
| 5 | 26435 | C.E.C., Inc. | $11,944,927.95 |
| 6 | 02179 | Boh Bros. Construction Co., LLC. | $14,590,701.55 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Shavers-Whittle Construction LLC | - 2 - COASTAL BRIDGE CO., L.L.C. | - 3 - GLF CONSTRUCTION CORPORATION | - 4 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.762 | lump | 30,000.00 | 30,000.00 | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | 150,000.00 | 150,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | lump | 10,000.00 | 10,000.00 | 56,000.00 | 56,000.00 | 20,000.00 | 20,000.00 | 150,000.00 | 150,000.00 | | 0003 | 202-02-04000 | Removal of Bridge (Main Span Superstructure) | 1 | each | 275,000.00 | 275,000.00 | 135,000.00 | 135,000.00 | 200,000.00 | 200,000.00 | 342,000.00 | 342,000.00 | | 0004 | 202-02-04000 | Removal of Bridge (STA. 1+363.957, Approach Spans and Main Span Substructure) | 1 | each | 152,000.00 | 152,000.00 | 150,000.00 | 150,000.00 | 300,000.00 | 300,000.00 | 342,000.00 | 342,000.00 | | 0005 | 202-02-12300 | Removal of Fender System | 1 | each | 74,000.00 | 74,000.00 | 120,000.00 | 120,000.00 | 75,000.00 | 75,000.00 | 65,000.00 | 65,000.00 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 1,462.6 | sq m | 13.50 | 19,745.10 | 10.00 | 14,626.00 | 15.00 | 21,939.00 | 7.00 | 10,238.20 | | 0007 | 203-02-00100 | Drainage Excavation | 801 | cu m | 13.50 | 10,813.50 | 25.00 | 20,025.00 | 15.00 | 12,015.00 | 25.00 | 20,025.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | lump | 185,000.00 | 185,000.00 | 200,000.00 | 200,000.00 | 175,000.00 | 175,000.00 | 170,000.00 | 170,000.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 500 | ln m | 8.00 | 4,000.00 | 10.00 | 5,000.00 | 10.00 | 5,000.00 | 11.00 | 5,500.00 | | 0010 | 302-02-05000 | Class II Base Course (250 mm Thick) | 2,305.1 | sq m | 42.50 | 97,966.75 | 45.00 | 103,729.50 | 50.00 | 115,255.00 | 60.00 | 138,306.00 | | 0011 | 401-01-00100 | Aggregate Surface Course (Net Section) | 18.4 | cu m | 160.00 | 2,944.00 | 175.00 | 3,220.00 | 200.00 | 3,680.00 | 300.00 | 5,520.00 | | 0012 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | cu m | 75.00 | 7,500.00 | 100.00 | 10,000.00 | 80.00 | 8,000.00 | 100.00 | 10,000.00 | | 0013 | 502-01-00100 | Superpave Asphaltic Concrete | 585.1 | Mg | 160.00 | 93,616.00 | 150.00 | 87,765.00 | 175.00 | 102,392.50 | 150.00 | 87,765.00 | | 0014 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 84.4 | Mg | 200.00 | 16,880.00 | 250.00 | 21,100.00 | 200.00 | 16,880.00 | 195.00 | 16,458.00 | | 0015 | 701-05-01040 | Side Drain Pipe (450 mm RCP/PP/CMP) | 18 | ln m | 225.00 | 4,050.00 | 225.00 | 4,050.00 | 200.00 | 3,600.00 | 240.00 | 4,320.00 | | 0016 | 701-05-01060 | Side Drain Pipe (600 mm RCP/PP/CMP) | 7.2 | ln m | 350.00 | 2,520.00 | 350.00 | 2,520.00 | 240.00 | 1,728.00 | 370.00 | 2,664.00 | | 0017 | 704-03-00100 | Blocked Out Guard Rail | 106.68 | ln m | 72.50 | 7,734.30 | 85.00 | 9,067.80 | 80.00 | 8,534.40 | 65.00 | 6,934.20 | | 0018 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 30.48 | ln m | 245.00 | 7,467.60 | 160.00 | 4,876.80 | 325.00 | 9,906.00 | 225.00 | 6,858.00 | | 0019 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 4 | each | 2,800.00 | 11,200.00 | 2,800.00 | 11,200.00 | 2,800.00 | 11,200.00 | 2,600.00 | 10,400.00 | | 0020 | 708-01-00100 | Right-of-Way Monument | 15 | each | 425.00 | 6,375.00 | 250.00 | 3,750.00 | 50.00 | 750.00 | 210.00 | 3,150.00 | | 0021 | 708-02-00100 | Right-of-Way Monument Witness Post | 15 | each | 250.00 | 3,750.00 | 250.00 | 3,750.00 | 150.00 | 2,250.00 | 210.00 | 3,150.00 | | 0022 | 712-04-00100 | Flexible Revetment | 451 | sq m | 110.00 | 49,610.00 | 120.00 | 54,120.00 | 125.00 | 56,375.00 | 130.00 | 58,630.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | lump | 25,000.00 | 25,000.00 | 100,000.00 | 100,000.00 | 120,000.00 | 120,000.00 | 100,000.00 | 100,000.00 | | 0024 | 716-01-00100 | Mulch (Vegetative) | 4.7 | Mg | 1,250.00 | 5,875.00 | 1,500.00 | 7,050.00 | 1,300.00 | 6,110.00 | 700.00 | 3,290.00 | | 0025 | 717-01-00100 | Seeding | 26 | kg | 25.00 | 650.00 | 50.00 | 1,300.00 | 24.00 | 624.00 | 35.00 | 910.00 | | 0026 | 718-01-00100 | Fertilizer | 855 | kg | 1.70 | 1,453.50 | 2.00 | 1,710.00 | 1.75 | 1,496.25 | 2.00 | 1,710.00 | | 0027 | 722-01-00100 | Project Site Laboratory | 1 | each | 35,000.00 | 35,000.00 | 50,000.00 | 50,000.00 | 18,000.00 | 18,000.00 | 7,000.00 | 7,000.00 | | 0028 | 727-01-00100 | Mobilization | 1 | lump | 350,000.00 | 350,000.00 | 700,000.00 | 700,000.00 | 850,000.00 | 850,000.00 | 1,150,000.00 | 1,150,000.00 | | 0029 | 729-01-00100 | Sign (Type A) | 1.2 | sq m | 925.00 | 1,110.00 | 600.00 | 720.00 | 800.00 | 960.00 | 500.00 | 600.00 | | 0030 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | each | 85.00 | 340.00 | 100.00 | 400.00 | 100.00 | 400.00 | 80.00 | 320.00 | | 0031 | 730-09-00100 | Electrical System | 1 | lump | 1,195,000.00 | 1,195,000.00 | 1,400,000.00 | 1,400,000.00 | 1,890,000.00 | 1,890,000.00 | 1,250,000.00 | 1,250,000.00 | | 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 28 | each | 335.00 | 9,380.00 | 20.00 | 560.00 | 25.00 | 700.00 | 310.00 | 8,680.00 | | 0033 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (100 mm Width) (Thermoplastic 90 mil) | 1.356 | km | 12,000.00 | 16,272.00 | 5,000.00 | 6,780.00 | 8,000.00 | 10,848.00 | 11,000.00 | 14,916.00 | | 0034 | 735-01-00100 | Mailboxes | 4 | each | 7.00 | 28.00 | 20.00 | 80.00 | 25.00 | 100.00 | 3.00 | 12.00 | | 0035 | 735-02-00100 | Mailbox Supports (Single) | 4 | each | 275.00 | 1,100.00 | 200.00 | 800.00 | 500.00 | 2,000.00 | 250.00 | 1,000.00 | | 0036 | 740-01-00100 | Construction Layout | 1 | lump | 75,000.00 | 75,000.00 | 165,000.00 | 165,000.00 | 120,000.00 | 120,000.00 | 76,500.00 | 76,500.00 | | 0037 | 804-01-00200 | Precast Concrete Piles (350 mm) | 61 | ln m | 335.00 | 20,435.00 | 285.00 | 17,385.00 | 450.00 | 27,450.00 | 425.00 | 25,925.00 | | 0038 | 804-01-00600 | Precast Concrete Piles (600 mm) | 2,140 | ln m | 460.00 | 984,400.00 | 440.00 | 941,600.00 | 475.00 | 1,016,500.00 | 425.00 | 909,500.00 | | 0039 | 804-02-00200 | Treated Timber Piles (Coastal Treatment) | 2,780 | ln m | 51.50 | 143,170.00 | 98.00 | 272,440.00 | 85.00 | 236,300.00 | 100.00 | 278,000.00 | | 0040 | 804-12-00100 | Loading Permanent Piles | 1 | each | 500.00 | 500.00 | 100.00 | 100.00 | 60,000.00 | 60,000.00 | 7,000.00 | 7,000.00 | | 0041 | 804-17-00100 | Dynamic Monitoring | 4 | each | 3,000.00 | 12,000.00 | 3,000.00 | 12,000.00 | 3,000.00 | 12,000.00 | 1,100.00 | 4,400.00 | | 0042 | 805-01-00600 | Class A Concrete (Piers) | 206.99 | cu m | 1,350.00 | 279,436.50 | 2,600.00 | 538,174.00 | 1,500.00 | 310,485.00 | 1,700.00 | 351,883.00 | | 0043 | 805-01-00700 | Class A Concrete (Bents) | 105.65 | cu m | 1,600.00 | 169,040.00 | 2,165.00 | 228,732.25 | 1,800.00 | 190,170.00 | 1,700.00 | 179,605.00 | | 0044 | 805-01-00900 | Class A Concrete (Counterweights) | 21.35 | cu m | 1,175.00 | 25,086.25 | 2,100.00 | 44,835.00 | 2,400.00 | 51,240.00 | 1,600.00 | 34,160.00 | | 0045 | 805-03-00100 | Class AA Concrete | 197.61 | cu m | 1,200.00 | 237,132.00 | 1,700.00 | 335,937.00 | 1,800.00 | 355,698.00 | 1,300.00 | 256,893.00 | | 0046 | 805-04-00100 | Class AA(M) Concrete | 87.36 | cu m | 2,250.00 | 196,560.00 | 3,700.00 | 323,232.00 | 2,000.00 | 174,720.00 | 3,000.00 | 262,080.00 | | 0047 | 806-01-00100 | Deformed Reinforcing Steel | 67,388 | kg | 2.10 | 141,514.80 | 2.50 | 168,470.00 | 1.75 | 117,929.00 | 2.25 | 151,623.00 | | 0048 | 807-08-00100 | Structural Metalwork (Grade 36) | 5,353 | lump | 40,000.00 | 40,000.00 | 20,000.00 | 20,000.00 | 85,000.00 | 85,000.00 | 60,000.00 | 60,000.00 | | 0049 | 807-08-00100 | Structural Metalwork (Grade 50) | 121,922 | lump | 1,170,000.00 | 1,170,000.00 | 1,373,000.00 | 1,373,000.00 | 1,500,000.00 | 1,500,000.00 | 1,300,000.00 | 1,300,000.00 | | 0050 | 808-01-00100 | Steel Grid Flooring | 207.2 | sq m | 1,000.00 | 207,200.00 | 850.00 | 176,120.00 | 1,200.00 | 248,640.00 | 1,000.00 | 207,200.00 | | 0051 | 809-01-00100 | Movable Bridge Machinery | 1 | lump | 1,475,000.00 | 1,475,000.00 | 1,363,000.00 | 1,363,000.00 | 1,650,000.00 | 1,650,000.00 | 1,500,000.00 | 1,500,000.00 | | 0052 | 809-02-00100 | Traffic Barriers | 1 | lump | 600,000.00 | 600,000.00 | 734,000.00 | 734,000.00 | 400,000.00 | 400,000.00 | 575,000.00 | 575,000.00 | | 0053 | 809-03-00100 | Operating House | 1 | lump | 625,000.00 | 625,000.00 | 520,000.00 | 520,000.00 | 300,000.00 | 300,000.00 | 550,000.00 | 550,000.00 | | 0054 | 810-01-00100 | Concrete Railing (Standard Barrier) | 112.28 | ln m | 350.00 | 39,298.00 | 300.00 | 33,684.00 | 280.00 | 31,438.40 | 350.00 | 39,298.00 | | 0055 | 812-01-00200 | Treated Timber (Coastal Treatment) | 37.83 | cu m | 5,000.00 | 189,150.00 | 6,825.00 | 258,189.75 | 3,600.00 | 136,188.00 | 13,500.00 | 510,705.00 | | 0056 | 813-01-00100 | Concrete Approach Slabs | 245.14 | sq m | 325.00 | 79,670.50 | 250.00 | 61,285.00 | 225.00 | 55,156.50 | 360.00 | 88,250.40 | | 0057 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 19 | ln m | 25.00 | 475.00 | 100.00 | 1,900.00 | 50.00 | 950.00 | 100.00 | 1,900.00 | | 0058 | NS-800-00260 | Hand Railing | 157.3 | ln m | 325.00 | 51,122.50 | 466.00 | 73,301.80 | 275.00 | 43,257.50 | 425.00 | 66,852.50 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 9,474,571.30 | | 10,971,585.90 | | 11,223,865.55 | | 11,584,131.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - C.E.C., Inc. | - 6 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.762 | lump | 10,000.00 | 10,000.00 | 75,000.00 | 75,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | lump | 60,000.00 | 60,000.00 | 2,000.00 | 2,000.00 | | 0003 | 202-02-04000 | Removal of Bridge (Main Span Superstructure) | 1 | each | 180,000.00 | 180,000.00 | 800,000.00 | 800,000.00 | | 0004 | 202-02-04000 | Removal of Bridge (STA. 1+363.957, Approach Spans and Main Span Substructure) | 1 | each | 210,000.00 | 210,000.00 | 100,000.00 | 100,000.00 | | 0005 | 202-02-12300 | Removal of Fender System | 1 | each | 110,000.00 | 110,000.00 | 120,000.00 | 120,000.00 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 1,462.6 | sq m | 5.75 | 8,409.95 | 15.00 | 21,939.00 | | 0007 | 203-02-00100 | Drainage Excavation | 801 | cu m | 6.00 | 4,806.00 | 35.00 | 28,035.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | lump | 24,000.00 | 24,000.00 | 300,000.00 | 300,000.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 500 | ln m | 10.00 | 5,000.00 | 5.00 | 2,500.00 | | 0010 | 302-02-05000 | Class II Base Course (250 mm Thick) | 2,305.1 | sq m | 30.00 | 69,153.00 | 40.00 | 92,204.00 | | 0011 | 401-01-00100 | Aggregate Surface Course (Net Section) | 18.4 | cu m | 120.00 | 2,208.00 | 200.00 | 3,680.00 | | 0012 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | cu m | 135.00 | 13,500.00 | 150.00 | 15,000.00 | | 0013 | 502-01-00100 | Superpave Asphaltic Concrete | 585.1 | Mg | 190.00 | 111,169.00 | 160.00 | 93,616.00 | | 0014 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 84.4 | Mg | 240.00 | 20,256.00 | 225.00 | 18,990.00 | | 0015 | 701-05-01040 | Side Drain Pipe (450 mm RCP/PP/CMP) | 18 | ln m | 158.00 | 2,844.00 | 300.00 | 5,400.00 | | 0016 | 701-05-01060 | Side Drain Pipe (600 mm RCP/PP/CMP) | 7.2 | ln m | 242.00 | 1,742.40 | 400.00 | 2,880.00 | | 0017 | 704-03-00100 | Blocked Out Guard Rail | 106.68 | ln m | 86.00 | 9,174.48 | 80.00 | 8,534.40 | | 0018 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 30.48 | ln m | 335.00 | 10,210.80 | 300.00 | 9,144.00 | | 0019 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 4 | each | 3,120.00 | 12,480.00 | 3,000.00 | 12,000.00 | | 0020 | 708-01-00100 | Right-of-Way Monument | 15 | each | 320.00 | 4,800.00 | 200.00 | 3,000.00 | | 0021 | 708-02-00100 | Right-of-Way Monument Witness Post | 15 | each | 130.00 | 1,950.00 | 200.00 | 3,000.00 | | 0022 | 712-04-00100 | Flexible Revetment | 451 | sq m | 80.00 | 36,080.00 | 125.00 | 56,375.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | lump | 35,000.00 | 35,000.00 | 100,000.00 | 100,000.00 | | 0024 | 716-01-00100 | Mulch (Vegetative) | 4.7 | Mg | 300.00 | 1,410.00 | 1,400.00 | 6,580.00 | | 0025 | 717-01-00100 | Seeding | 26 | kg | 80.00 | 2,080.00 | 25.00 | 650.00 | | 0026 | 718-01-00100 | Fertilizer | 855 | kg | 15.00 | 12,825.00 | 1.50 | 1,282.50 | | 0027 | 722-01-00100 | Project Site Laboratory | 1 | each | 25,000.00 | 25,000.00 | 65,000.00 | 65,000.00 | | 0028 | 727-01-00100 | Mobilization | 1 | lump | 1,000,000.00 | 1,000,000.00 | 1,170,000.00 | 1,170,000.00 | | 0029 | 729-01-00100 | Sign (Type A) | 1.2 | sq m | 1,000.00 | 1,200.00 | 50.00 | 60.00 | | 0030 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | each | 100.00 | 400.00 | 95.00 | 380.00 | | 0031 | 730-09-00100 | Electrical System | 1 | lump | 1,350,000.00 | 1,350,000.00 | 1,250,000.00 | 1,250,000.00 | | 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 28 | each | 24.00 | 672.00 | 22.00 | 616.00 | | 0033 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (100 mm Width) (Thermoplastic 90 mil) | 1.356 | km | 6,020.00 | 8,163.12 | 5,500.00 | 7,458.00 | | 0034 | 735-01-00100 | Mailboxes | 4 | each | 10.00 | 40.00 | 6.00 | 24.00 | | 0035 | 735-02-00100 | Mailbox Supports (Single) | 4 | each | 450.00 | 1,800.00 | 370.00 | 1,480.00 | | 0036 | 740-01-00100 | Construction Layout | 1 | lump | 80,000.00 | 80,000.00 | 300,000.00 | 300,000.00 | | 0037 | 804-01-00200 | Precast Concrete Piles (350 mm) | 61 | ln m | 600.00 | 36,600.00 | 470.00 | 28,670.00 | | 0038 | 804-01-00600 | Precast Concrete Piles (600 mm) | 2,140 | ln m | 600.00 | 1,284,000.00 | 560.00 | 1,198,400.00 | | 0039 | 804-02-00200 | Treated Timber Piles (Coastal Treatment) | 2,780 | ln m | 90.00 | 250,200.00 | 70.00 | 194,600.00 | | 0040 | 804-12-00100 | Loading Permanent Piles | 1 | each | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | | 0041 | 804-17-00100 | Dynamic Monitoring | 4 | each | 2,000.00 | 8,000.00 | 10,000.00 | 40,000.00 | | 0042 | 805-01-00600 | Class A Concrete (Piers) | 206.99 | cu m | 2,400.00 | 496,776.00 | 3,335.00 | 690,311.65 | | 0043 | 805-01-00700 | Class A Concrete (Bents) | 105.65 | cu m | 2,900.00 | 306,385.00 | 2,800.00 | 295,820.00 | | 0044 | 805-01-00900 | Class A Concrete (Counterweights) | 21.35 | cu m | 2,500.00 | 53,375.00 | 3,100.00 | 66,185.00 | | 0045 | 805-03-00100 | Class AA Concrete | 197.61 | cu m | 2,100.00 | 414,981.00 | 2,200.00 | 434,742.00 | | 0046 | 805-04-00100 | Class AA(M) Concrete | 87.36 | cu m | 2,900.00 | 253,344.00 | 7,100.00 | 620,256.00 | | 0047 | 806-01-00100 | Deformed Reinforcing Steel | 67,388 | kg | 2.40 | 161,731.20 | 4.00 | 269,552.00 | | 0048 | 807-08-00100 | Structural Metalwork (Grade 36) | 5,353 | lump | 135,000.00 | 135,000.00 | 55,000.00 | 55,000.00 | | 0049 | 807-08-00100 | Structural Metalwork (Grade 50) | 121,922 | lump | 1,200,000.00 | 1,200,000.00 | 1,350,000.00 | 1,350,000.00 | | 0050 | 808-01-00100 | Steel Grid Flooring | 207.2 | sq m | 1,100.00 | 227,920.00 | 1,150.00 | 238,280.00 | | 0051 | 809-01-00100 | Movable Bridge Machinery | 1 | lump | 1,750,000.00 | 1,750,000.00 | 1,420,000.00 | 1,420,000.00 | | 0052 | 809-02-00100 | Traffic Barriers | 1 | lump | 700,000.00 | 700,000.00 | 1,250,000.00 | 1,250,000.00 | | 0053 | 809-03-00100 | Operating House | 1 | lump | 650,000.00 | 650,000.00 | 650,000.00 | 650,000.00 | | 0054 | 810-01-00100 | Concrete Railing (Standard Barrier) | 112.28 | ln m | 600.00 | 67,368.00 | 2,400.00 | 269,472.00 | | 0055 | 812-01-00200 | Treated Timber (Coastal Treatment) | 37.83 | cu m | 8,500.00 | 321,555.00 | 16,200.00 | 612,846.00 | | 0056 | 813-01-00100 | Concrete Approach Slabs | 245.14 | sq m | 350.00 | 85,799.00 | 600.00 | 147,084.00 | | 0057 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 19 | ln m | 60.00 | 1,140.00 | 400.00 | 7,600.00 | | 0058 | NS-800-00260 | Hand Railing | 157.3 | ln m | 600.00 | 94,380.00 | 350.00 | 55,055.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 11,944,927.95 | | 14,590,701.55 |
|