Proposal:H.012328.6
Parish:Iberia
Routes:LA 182
Description:LA 182: 588' NW LA 320 - BEG CURB/GUTTER
Type Construction:COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, THIN ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,293,604.19
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $1,748,432.41 |
| 2 | 00481 | COASTAL BRIDGE CO., L.L.C. | $1,864,627.69 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - COASTAL BRIDGE CO., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 501-01-00005 | Thin Asphaltic Concrete (Coarse Mix) | 7,332.1 | TON | 151.00 | 1,107,147.10 | 60.00 | 439,926.00 | | 0002 | 501-02-00001 | Tack Coat | 19,127 | GAL | 12.00 | 229,524.00 | 50.00 | 956,350.00 | | 0003 | 509-01-00100 | Cold Planing Asphaltic Pavement | 2,374 | SQYD | 5.00 | 11,870.00 | 20.00 | 47,480.00 | | 0004 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -36 | CUYD | 1.00 | -36.00 | 0.01 | -0.36 | | 0005 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 570 | SQYD | 140.00 | 79,800.00 | 175.00 | 99,750.00 | | 0006 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 28,250.00 | 28,250.00 | 20,000.00 | 20,000.00 | | 0007 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.273 | MILE | 154.00 | 812.04 | 450.00 | 2,372.85 | | 0008 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.273 | MILE | 1.00 | 5.27 | 800.00 | 4,218.40 | | 0009 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 12.296 | MILE | 1.00 | 12.30 | 1,300.00 | 15,984.80 | | 0010 | 727-01-00100 | Mobilization | 1 | LUMP | 165,000.00 | 165,000.00 | 150,000.00 | 150,000.00 | | 0011 | 731-02-00100 | Reflectorized Raised Pavement Markers | 712 | EACH | 12.00 | 8,544.00 | 10.00 | 7,120.00 | | 0012 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 2,464 | LNFT | 2.15 | 5,297.60 | 2.00 | 4,928.00 | | 0013 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 320 | LNFT | 4.50 | 1,440.00 | 4.00 | 1,280.00 | | 0014 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 74 | LNFT | 27.00 | 1,998.00 | 25.00 | 1,850.00 | | 0015 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.296 | MILE | 5,700.00 | 70,087.20 | 4,500.00 | 55,332.00 | | 0016 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.273 | MILE | 1,550.00 | 8,173.15 | 1,500.00 | 7,909.50 | | 0017 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 3 | EACH | 535.00 | 1,605.00 | 450.00 | 1,350.00 | | 0018 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 535.00 | 1,605.00 | 500.00 | 1,500.00 | | 0019 | 740-01-00100 | Construction Layout | 1 | LUMP | 18,000.00 | 18,000.00 | 40,000.00 | 40,000.00 | | 0020 | NS-724-00004 | Rumble Strips (Centerline) | 5.39 | MILE | 575.00 | 3,099.25 | 450.00 | 2,425.50 | | 0021 | NS-724-00005 | Rumble Strips (Shoulder) | 10.78 | MILE | 575.00 | 6,198.50 | 450.00 | 4,851.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,748,432.41 | | 1,864,627.69 |
|