Proposal:H.011792.6
Parish:Tangipahoa
Routes:LA 1065, LA 3260
Description:LA 1065 & LA 3260: HAMMOND ROAD TRANSFER
Type Construction:MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY AND RELATED WORK.
Estimated Construction Cost:$478,025.90
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC. | $447,464.32 |
| 2 | 00849 | F. G. Sullivan, Jr. Contractor LLC | $513,974.70 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $529,411.55 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC. | - 2 - F. G. Sullivan, Jr. Contractor LLC | - 3 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 155 | SQYD | 20.00 | 3,100.00 | 15.00 | 2,325.00 | 25.00 | 3,875.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 229 | SQYD | 13.50 | 3,091.50 | 15.00 | 3,435.00 | 28.00 | 6,412.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 25 | LNFT | 10.00 | 250.00 | 10.00 | 250.00 | 45.00 | 1,125.00 | | 0004 | 203-01-00100 | General Excavation | 460 | CUYD | 30.00 | 13,800.00 | 15.00 | 6,900.00 | 48.00 | 22,080.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 275 | CUYD | 20.00 | 5,500.00 | 15.00 | 4,125.00 | 30.00 | 8,250.00 | | 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 43 | CUYD | 40.00 | 1,720.00 | 50.00 | 2,150.00 | 70.00 | 3,010.00 | | 0007 | 601-01-00900 | Portland Cement Concrete Pavement (12" Thick) To be used for truck apron on NW corner of W. Church St. and N. Morrison Blvd. intersection. | 40 | SQYD | 200.00 | 8,000.00 | 125.00 | 5,000.00 | 230.00 | 9,200.00 | | 0008 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 6 | EACH | 200.00 | 1,200.00 | 200.00 | 1,200.00 | 285.00 | 1,710.00 | | 0009 | 706-04-00100 | Handicapped Curb Ramps | 5 | EACH | 3,000.00 | 15,000.00 | 950.00 | 4,750.00 | 4,200.00 | 21,000.00 | | 0010 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 1.5 | SQYD | 1,500.00 | 2,250.00 | 775.00 | 1,162.50 | 420.00 | 630.00 | | 0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 42,000.00 | 42,000.00 | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | | 0012 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 220 | LNFT | 0.01 | 2.20 | 0.25 | 55.00 | 0.30 | 66.00 | | 0013 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 174 | LNFT | 0.01 | 1.74 | 0.75 | 130.50 | 1.00 | 174.00 | | 0014 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.41 | MILE | 775.00 | 317.75 | 2,000.00 | 820.00 | 1.00 | 0.41 | | 0015 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.876 | MILE | 1.00 | 5.88 | 600.00 | 3,525.60 | 1.00 | 5.88 | | 0016 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 2 | EACH | 1.00 | 2.00 | 15.00 | 30.00 | 1.00 | 2.00 | | 0017 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 2 | EACH | 1.00 | 2.00 | 25.00 | 50.00 | 1.00 | 2.00 | | 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 42,000.00 | 42,000.00 | 96,000.00 | 96,000.00 | 52,000.00 | 52,000.00 | | 0019 | 731-02-00100 | Reflectorized Raised Pavement Markers | 259 | EACH | 16.00 | 4,144.00 | 7.00 | 1,813.00 | 11.00 | 2,849.00 | | 0020 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 110 | LNFT | 5.00 | 550.00 | 3.00 | 330.00 | 4.00 | 440.00 | | 0021 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 87 | LNFT | 22.00 | 1,914.00 | 16.00 | 1,392.00 | 20.00 | 1,740.00 | | 0022 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.578 | MILE | 5,000.00 | 17,890.00 | 5,500.00 | 19,679.00 | 4,550.00 | 16,279.90 | | 0023 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.205 | MILE | 2,750.00 | 563.75 | 1,500.00 | 307.50 | 2,525.00 | 517.63 | | 0024 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.059 | MILE | 5,500.00 | 324.50 | 10,000.00 | 590.00 | 4,325.00 | 255.18 | | 0025 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 400.00 | 800.00 | 425.00 | 850.00 | 350.00 | 700.00 | | 0026 | 732-04-16000 | Plastic Pavement Legends and Symbols (Pedestrian Crossing) | 3 | EACH | 500.00 | 1,500.00 | 500.00 | 1,500.00 | 310.00 | 930.00 | | 0027 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 900.00 | 900.00 | 800.00 | 800.00 | 755.00 | 755.00 | | 0028 | 732-05-00100 | Removal of Existing Markings | 2.657 | MILE | 7,500.00 | 19,927.50 | 6,000.00 | 15,942.00 | 7,150.00 | 18,997.55 | | 0029 | 735-01-00100 | Mailboxes | 2 | EACH | 200.00 | 400.00 | 25.00 | 50.00 | 19.00 | 38.00 | | 0030 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 500.00 | 1,000.00 | 355.00 | 710.00 | 72.50 | 145.00 | | 0031 | 739-01-00100 | Hydro-Seeding | 0.68 | ACRE | 3,000.00 | 2,040.00 | 2,500.00 | 1,700.00 | 2,555.00 | 1,737.40 | | 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 15,100.00 | 15,100.00 | 12,500.00 | 12,500.00 | | 0033 | NS-200-00020 | Cleaning Existing Ditches | 150 | LNFT | 15.00 | 2,250.00 | 9.00 | 1,350.00 | 11.50 | 1,725.00 | | 0034 | NS-502-01000 | Asphalt Concrete | 1,663.2 | TON | 95.00 | 158,004.00 | 98.00 | 162,993.60 | 93.00 | 154,677.60 | | 0035 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 499 | TON | 95.00 | 47,405.00 | 125.00 | 62,375.00 | 142.00 | 70,858.00 | | 0036 | NS-509-01000 | Milling Asphalt Pavement | 5,721 | SQYD | 3.50 | 20,023.50 | 4.00 | 22,884.00 | 5.00 | 28,605.00 | | 0037 | NS-509-02000 | Contractor Retained Reclaimed Asphalt Pavement | -203 | CUYD | 5.00 | -1,015.00 | 0.00 | 0.00 | 1.00 | -203.00 | | 0038 | NS-510-01400 | Pavement Patching (12" Minimum Thickness) | 100 | SQYD | 75.00 | 7,500.00 | 150.00 | 15,000.00 | 140.00 | 14,000.00 | | 0039 | NS-706-00100 | Truncated Dome System (Asphaltic Concrete Pavement) | 18 | EACH | 300.00 | 5,400.00 | 1,150.00 | 20,700.00 | 2,000.00 | 36,000.00 | | 0040 | NS-713-00008 | Portable Changeable Message Sign | 6 | EACH | 450.00 | 2,700.00 | 1,000.00 | 6,000.00 | 1,887.00 | 11,322.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 447,464.32 | | 513,974.70 | | 529,411.55 |
|