Proposal:H.011674.6
Parish:West Feliciana
Routes:LA 1263, LA 3057
Description:LA 1263 & LA 3057: PATCH & OVERLAY
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALTIC CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,446,223.38
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $1,182,594.50 |
| 2 | 00481 | COASTAL BRIDGE CO., L.L.C. | $1,236,575.19 |
| 3 | 12031 | R.J. Daigle & Sons Contractors, Inc | $1,240,754.88 |
| 4 | 00046 | Barber Bros. Contracting Co., L.L.C | $1,358,796.80 |
| 5 | 00849 | F. G. Sullivan, Jr. Contractor LLC | $1,419,111.26 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - COASTAL BRIDGE CO., L.L.C. | - 3 - R.J. Daigle & Sons Contractors, Inc | - 4 - Barber Bros. Contracting Co., L.L.C | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 40 | SQYD | 12.50 | 500.00 | 20.00 | 800.00 | 57.50 | 2,300.00 | 20.00 | 800.00 | | 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 36 | LNFT | 8.00 | 288.00 | 15.00 | 540.00 | 46.00 | 1,656.00 | 20.00 | 720.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 315 | CUYD | 50.00 | 15,750.00 | 25.00 | 7,875.00 | 65.12 | 20,512.80 | 20.00 | 6,300.00 | | 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 80 | EACH | 60.00 | 4,800.00 | 55.00 | 4,400.00 | 110.00 | 8,800.00 | 100.00 | 8,000.00 | | 0005 | 204-06-00100 | Temporary Silt Fencing | 2,038 | LNFT | 1.50 | 3,057.00 | 1.60 | 3,260.80 | 2.15 | 4,381.70 | 2.00 | 4,076.00 | | 0006 | 302-02-02080 | Class II Base Course (6" Thick) (Stone) | 5,731.1 | SQYD | 17.00 | 97,428.70 | 27.00 | 154,739.70 | 23.25 | 133,248.08 | 18.00 | 103,159.80 | | 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 97 | CUYD | 50.00 | 4,850.00 | 50.00 | 4,850.00 | 203.72 | 19,760.84 | 55.00 | 5,335.00 | | 0008 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 500 | CUYD | 1.00 | 500.00 | 10.00 | 5,000.00 | 0.01 | 5.00 | 35.00 | 17,500.00 | | 0009 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 9,420 | LNFT | 1.50 | 14,130.00 | 1.10 | 10,362.00 | 2.13 | 20,064.60 | 2.25 | 21,195.00 | | 0010 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 7,520 | LNFT | 2.00 | 15,040.00 | 1.25 | 9,400.00 | 2.13 | 16,017.60 | 2.25 | 16,920.00 | | 0011 | 602-03-00100 | Cleaning and Sealing Random cracks | 666 | LNFT | 1.50 | 999.00 | 1.25 | 832.50 | 4.31 | 2,870.46 | 6.00 | 3,996.00 | | 0012 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 15.9 | SQYD | 650.00 | 10,335.00 | 165.00 | 2,623.50 | 310.50 | 4,936.95 | 350.00 | 5,565.00 | | 0013 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 17 | SQYD | 650.00 | 11,050.00 | 165.00 | 2,805.00 | 310.50 | 5,278.50 | 325.00 | 5,525.00 | | 0014 | 702-04-00100 | Adjusting Manholes | 4 | EACH | 350.00 | 1,400.00 | 165.00 | 660.00 | 134.31 | 537.24 | 750.00 | 3,000.00 | | 0015 | 702-04-00200 | Adjusting Catch Basins | 22 | EACH | 750.00 | 16,500.00 | 1,600.00 | 35,200.00 | 345.00 | 7,590.00 | 800.00 | 17,600.00 | | 0016 | 706-01-00100 | Concrete Walk (4" Thick) | 40 | SQYD | 80.00 | 3,200.00 | 75.00 | 3,000.00 | 74.75 | 2,990.00 | 175.00 | 7,000.00 | | 0017 | 706-04-00100 | Handicapped Curb Ramps | 4 | EACH | 5,500.00 | 22,000.00 | 1,250.00 | 5,000.00 | 1,029.25 | 4,117.00 | 3,000.00 | 12,000.00 | | 0018 | 707-01-00300 | Concrete Curb (Mountable) | 500 | LNFT | 20.00 | 10,000.00 | 20.00 | 10,000.00 | 27.89 | 13,945.00 | 7.00 | 3,500.00 | | 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 60,000.00 | 60,000.00 | 40,000.00 | 40,000.00 | 16,100.00 | 16,100.00 | 75,000.00 | 75,000.00 | | 0020 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 464 | LNFT | 0.25 | 116.00 | 0.35 | 162.40 | 0.39 | 180.96 | 0.50 | 232.00 | | 0021 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 72 | LNFT | 0.75 | 54.00 | 1.00 | 72.00 | 1.10 | 79.20 | 1.00 | 72.00 | | 0022 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.766 | MILE | 200.00 | 2,353.20 | 400.00 | 4,706.40 | 293.71 | 3,455.79 | 300.00 | 3,529.80 | | 0023 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.054 | MILE | 300.00 | 916.20 | 500.00 | 1,527.00 | 550.10 | 1,680.01 | 500.00 | 1,527.00 | | 0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 39.888 | MILE | 300.00 | 11,966.40 | 625.00 | 24,930.00 | 687.36 | 27,417.42 | 550.00 | 21,938.40 | | 0025 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 5 | EACH | 25.00 | 125.00 | 50.00 | 250.00 | 55.00 | 275.00 | 50.00 | 250.00 | | 0026 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 3 | EACH | 25.00 | 75.00 | 45.00 | 135.00 | 49.50 | 148.50 | 50.00 | 150.00 | | 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 29,714.14 | 29,714.14 | 125,000.00 | 125,000.00 | | 0028 | 729-16-00300 | Object Marker Assembly (Type 3) | 20 | EACH | 125.00 | 2,500.00 | 85.00 | 1,700.00 | 163.35 | 3,267.00 | 150.00 | 3,000.00 | | 0029 | 731-02-00100 | Reflectorized Raised Pavement Markers | 880 | EACH | 6.50 | 5,720.00 | 8.00 | 7,040.00 | 8.80 | 7,744.00 | 9.00 | 7,920.00 | | 0030 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 464 | LNFT | 3.00 | 1,392.00 | 4.00 | 1,856.00 | 4.40 | 2,041.60 | 4.50 | 2,088.00 | | 0031 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 72 | LNFT | 15.00 | 1,080.00 | 20.00 | 1,440.00 | 22.00 | 1,584.00 | 22.50 | 1,620.00 | | 0032 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 13.296 | MILE | 4,000.00 | 53,184.00 | 4,500.00 | 59,832.00 | 4,950.00 | 65,815.20 | 4,700.00 | 62,491.20 | | 0033 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.018 | MILE | 2,500.00 | 2,545.00 | 1,500.00 | 1,527.00 | 1,653.24 | 1,683.00 | 1,700.00 | 1,730.60 | | 0034 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 450.00 | 450.00 | 350.00 | 350.00 | 385.00 | 385.00 | 400.00 | 400.00 | | 0035 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 450.00 | 1,800.00 | 350.00 | 1,400.00 | 385.00 | 1,540.00 | 400.00 | 1,600.00 | | 0036 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 600.00 | 1,800.00 | 350.00 | 1,050.00 | 385.00 | 1,155.00 | 400.00 | 1,200.00 | | 0037 | 739-01-00100 | Hydro-Seeding | 1.09 | ACRE | 1,300.00 | 1,417.00 | 1,350.00 | 1,471.50 | 1,424.50 | 1,552.71 | 1,500.00 | 1,635.00 | | 0038 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 17,135.00 | 17,135.00 | 15,000.00 | 15,000.00 | | 0039 | NS-200-00020 | Cleaning Existing Ditches | 400 | LNFT | 8.00 | 3,200.00 | 8.00 | 3,200.00 | 11.80 | 4,720.00 | 10.00 | 4,000.00 | | 0040 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 288 | INLF | 1.50 | 432.00 | 1.00 | 288.00 | 1.44 | 414.72 | 2.50 | 720.00 | | 0041 | NS-502-01000 | Asphalt Concrete | 6,314 | TON | 67.00 | 423,038.00 | 70.00 | 441,980.00 | 74.36 | 469,509.04 | 78.00 | 492,492.00 | | 0042 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,329 | TON | 100.00 | 132,900.00 | 130.00 | 172,770.00 | 95.69 | 127,172.01 | 78.00 | 103,662.00 | | 0043 | NS-509-01000 | Milling Asphalt Pavement | 48,549 | SQYD | 2.00 | 97,098.00 | 1.00 | 48,549.00 | 2.32 | 112,633.68 | 3.00 | 145,647.00 | | 0044 | NS-509-02000 | Contractor Retained Reclaimed Asphalt Pavement | -961 | CUYD | 15.00 | -14,415.00 | 0.01 | -9.61 | 0.00 | 0.00 | 0.00 | 0.00 | | 0045 | NS-510-01100 | Pavement Patching (6" Minimum Thickness) | 5 | SQYD | 200.00 | 1,000.00 | 250.00 | 1,250.00 | 301.48 | 1,507.40 | 400.00 | 2,000.00 | | 0046 | NS-510-01400 | Pavement Patching (12" Minimum Thickness) | 118 | SQYD | 140.00 | 16,520.00 | 250.00 | 29,500.00 | 209.61 | 24,733.98 | 150.00 | 17,700.00 | | 0047 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 5 | EACH | 4,750.00 | 23,750.00 | 2,500.00 | 12,500.00 | 6,532.00 | 32,660.00 | 3,000.00 | 15,000.00 | | 0048 | NS-MSC-00080 | Detectable Warning System Retrofit for Curb Ramps | 15 | EACH | 650.00 | 9,750.00 | 50.00 | 750.00 | 1,029.25 | 15,438.75 | 600.00 | 9,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,182,594.50 | | 1,236,575.19 | | 1,240,754.88 | | 1,358,796.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - F. G. Sullivan, Jr. Contractor LLC | | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 40 | SQYD | 15.00 | 600.00 | | 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 36 | LNFT | 15.00 | 540.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 315 | CUYD | 20.00 | 6,300.00 | | 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 80 | EACH | 100.00 | 8,000.00 | | 0005 | 204-06-00100 | Temporary Silt Fencing | 2,038 | LNFT | 2.00 | 4,076.00 | | 0006 | 302-02-02080 | Class II Base Course (6" Thick) (Stone) | 5,731.1 | SQYD | 20.00 | 114,622.00 | | 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 97 | CUYD | 35.00 | 3,395.00 | | 0008 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 500 | CUYD | 35.00 | 17,500.00 | | 0009 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 9,420 | LNFT | 2.00 | 18,840.00 | | 0010 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 7,520 | LNFT | 2.00 | 15,040.00 | | 0011 | 602-03-00100 | Cleaning and Sealing Random cracks | 666 | LNFT | 1.00 | 666.00 | | 0012 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 15.9 | SQYD | 750.00 | 11,925.00 | | 0013 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 17 | SQYD | 750.00 | 12,750.00 | | 0014 | 702-04-00100 | Adjusting Manholes | 4 | EACH | 1,500.00 | 6,000.00 | | 0015 | 702-04-00200 | Adjusting Catch Basins | 22 | EACH | 1,500.00 | 33,000.00 | | 0016 | 706-01-00100 | Concrete Walk (4" Thick) | 40 | SQYD | 65.00 | 2,600.00 | | 0017 | 706-04-00100 | Handicapped Curb Ramps | 4 | EACH | 950.00 | 3,800.00 | | 0018 | 707-01-00300 | Concrete Curb (Mountable) | 500 | LNFT | 10.00 | 5,000.00 | | 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | | 0020 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 464 | LNFT | 0.35 | 162.40 | | 0021 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 72 | LNFT | 0.70 | 50.40 | | 0022 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.766 | MILE | 300.00 | 3,529.80 | | 0023 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.054 | MILE | 250.00 | 763.50 | | 0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 39.888 | MILE | 320.00 | 12,764.16 | | 0025 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 5 | EACH | 35.00 | 175.00 | | 0026 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 3 | EACH | 35.00 | 105.00 | | 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 196,275.00 | 196,275.00 | | 0028 | 729-16-00300 | Object Marker Assembly (Type 3) | 20 | EACH | 135.00 | 2,700.00 | | 0029 | 731-02-00100 | Reflectorized Raised Pavement Markers | 880 | EACH | 8.00 | 7,040.00 | | 0030 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 464 | LNFT | 4.00 | 1,856.00 | | 0031 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 72 | LNFT | 20.00 | 1,440.00 | | 0032 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 13.296 | MILE | 4,500.00 | 59,832.00 | | 0033 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.018 | MILE | 1,500.00 | 1,527.00 | | 0034 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 350.00 | 350.00 | | 0035 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 350.00 | 1,400.00 | | 0036 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 350.00 | 1,050.00 | | 0037 | 739-01-00100 | Hydro-Seeding | 1.09 | ACRE | 1,400.00 | 1,526.00 | | 0038 | 740-01-00100 | Construction Layout | 1 | LUMP | 35,000.00 | 35,000.00 | | 0039 | NS-200-00020 | Cleaning Existing Ditches | 400 | LNFT | 9.00 | 3,600.00 | | 0040 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 288 | INLF | 3.00 | 864.00 | | 0041 | NS-502-01000 | Asphalt Concrete | 6,314 | TON | 75.00 | 473,550.00 | | 0042 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,329 | TON | 75.00 | 99,675.00 | | 0043 | NS-509-01000 | Milling Asphalt Pavement | 48,549 | SQYD | 3.00 | 145,647.00 | | 0044 | NS-509-02000 | Contractor Retained Reclaimed Asphalt Pavement | -961 | CUYD | 0.00 | 0.00 | | 0045 | NS-510-01100 | Pavement Patching (6" Minimum Thickness) | 5 | SQYD | 175.00 | 875.00 | | 0046 | NS-510-01400 | Pavement Patching (12" Minimum Thickness) | 118 | SQYD | 150.00 | 17,700.00 | | 0047 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 5 | EACH | 4,000.00 | 20,000.00 | | 0048 | NS-MSC-00080 | Detectable Warning System Retrofit for Curb Ramps | 15 | EACH | 1,000.00 | 15,000.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,419,111.26 |
|