Proposal:H.011224.6
Parish:Pointe Coupee
Routes:US 190
Description:US 190: GUARDRAIL/RUTTING REP. (PHASE 1)
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, GUARDRAIL REPLACEMENT, AND RELATED WORK.
Estimated Construction Cost:$9,086,306.80
| Rank | License | Bidder | Construction Bid |
| 1 | 48896 | Command Construction Industries LLC | $7,698,435.60 |
| 2 | 00481 | COASTAL BRIDGE CO., L.L.C. | $7,972,625.57 |
| 3 | 00849 | F. G. Sullivan, Jr. Contractor LLC | $8,962,379.00 |
| 4 | 00046 | Barber Bros. Contracting Co., L.L.C | $9,060,083.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Command Construction Industries LLC | - 2 - COASTAL BRIDGE CO., L.L.C. | - 3 - F. G. Sullivan, Jr. Contractor LLC | - 4 - Barber Bros. Contracting Co., L.L.C | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of Temporary Concrete Barriers | 63 | EACH | 650.00 | 40,950.00 | 1,000.00 | 63,000.00 | 500.00 | 31,500.00 | 500.00 | 31,500.00 | | 0002 | 202-02-06101 | Removal of Concrete Median Barrier and Footing Morganza Bridge | 6 | SQYD | 1,000.00 | 6,000.00 | 10,000.00 | 60,000.00 | 500.00 | 3,000.00 | 200.00 | 1,200.00 | | 0003 | 202-02-14500 | Removal of Guard Rail Double Faced | 62,350 | LNFT | 18.00 | 1,122,300.00 | 26.50 | 1,652,275.00 | 20.00 | 1,247,000.00 | 20.00 | 1,247,000.00 | | 0004 | 202-02-14500 | Removal of Guard Rail Single Faced @ Bridges | 2,580 | LNFT | 4.00 | 10,320.00 | 30.00 | 77,400.00 | 4.00 | 10,320.00 | 5.00 | 12,900.00 | | 0005 | 704-03-00100 | Blocked Out Guard Rail | 2,675 | LNFT | 18.00 | 48,150.00 | 25.00 | 66,875.00 | 20.00 | 53,500.00 | 20.00 | 53,500.00 | | 0006 | 704-04-00100 | Blocked Out Guard Rail (Double Faced) | 63,550 | LNFT | 21.00 | 1,334,550.00 | 22.00 | 1,398,100.00 | 23.00 | 1,461,650.00 | 28.00 | 1,779,400.00 | | 0007 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 200 | LNFT | 120.00 | 24,000.00 | 150.00 | 30,000.00 | 125.00 | 25,000.00 | 135.00 | 27,000.00 | | 0008 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 450 | LNFT | 60.00 | 27,000.00 | 70.00 | 31,500.00 | 60.00 | 27,000.00 | 65.00 | 29,250.00 | | 0009 | 704-10-00100 | Guard Rail Anchor Block | 2 | EACH | 4,500.00 | 9,000.00 | 10,000.00 | 20,000.00 | 4,500.00 | 9,000.00 | 5,000.00 | 10,000.00 | | 0010 | 704-11-00100 | Guard Rail End Treatment (Flared) | 8 | EACH | 2,300.00 | 18,400.00 | 5,000.00 | 40,000.00 | 2,500.00 | 20,000.00 | 2,600.00 | 20,800.00 | | 0011 | 704-11-00300 | Guard Rail End Treatment (Bi-Directional) | 97 | EACH | 4,800.00 | 465,600.00 | 5,500.00 | 533,500.00 | 5,000.00 | 485,000.00 | 5,400.00 | 523,800.00 | | 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 550,000.00 | 550,000.00 | 800,000.00 | 800,000.00 | 550,000.00 | 550,000.00 | | 0013 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 18.556 | MILE | 250.00 | 4,639.00 | 400.00 | 7,422.40 | 500.00 | 9,278.00 | 300.00 | 5,566.80 | | 0014 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 40.956 | MILE | 700.00 | 28,669.20 | 625.00 | 25,597.50 | 700.00 | 28,669.20 | 300.00 | 12,286.80 | | 0015 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 1,479 | EACH | 5.00 | 7,395.00 | 8.00 | 11,832.00 | 5.00 | 7,395.00 | 5.00 | 7,395.00 | | 0016 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 7,000.00 | 7,000.00 | 15,000.00 | 15,000.00 | | 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 | 775,000.00 | 775,000.00 | 800,000.00 | 800,000.00 | 600,000.00 | 600,000.00 | | 0018 | 731-02-00100 | Reflectorized Raised Pavement Markers | 4,812 | EACH | 6.50 | 31,278.00 | 8.00 | 38,496.00 | 7.00 | 33,684.00 | 10.00 | 48,120.00 | | 0019 | 732-02-02100 | Plastic Pavement Striping (Solid Line) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil) | 71.716 | MILE | 4,000.00 | 286,864.00 | 4,500.00 | 322,722.00 | 4,200.00 | 301,207.20 | 4,500.00 | 322,722.00 | | 0020 | 732-03-02100 | Plastic Pavement Striping (Broken Line) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil) | 35.908 | MILE | 1,400.00 | 50,271.20 | 1,500.00 | 53,862.00 | 1,200.00 | 43,089.60 | 1,400.00 | 50,271.20 | | 0021 | 732-05-00100 | Removal of Existing Markings | 86.466 | MILE | 1,200.00 | 103,759.20 | 1.00 | 86.47 | 1,000.00 | 86,466.00 | 400.00 | 34,586.40 | | 0022 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,000.00 | 1,000.00 | 35,000.00 | 35,000.00 | 133,000.00 | 133,000.00 | 50,000.00 | 50,000.00 | | 0023 | NS-502-04000 | Asphalt Concrete (SMA) Wearing Course | 15,547 | TON | 110.00 | 1,710,170.00 | 100.00 | 1,554,700.00 | 100.00 | 1,554,700.00 | 115.00 | 1,787,905.00 | | 0024 | NS-509-01000 | Milling Asphalt Pavement | 141,340 | SQYD | 5.00 | 706,700.00 | 2.00 | 282,680.00 | 3.00 | 424,020.00 | 4.00 | 565,360.00 | | 0025 | NS-510-01700 | Pavement Patching (18" Minimum Thickness) | 4,722 | SQYD | 180.00 | 849,960.00 | 60.00 | 283,320.00 | 150.00 | 708,300.00 | 100.00 | 472,200.00 | | 0026 | NS-729-00026 | Linear Delineation System Panels (1.5" Width) | 125,720 | LNFT | 5.50 | 691,460.00 | 0.01 | 1,257.20 | 5.00 | 628,600.00 | 6.00 | 754,320.00 | | 0027 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 4 | EACH | 2,500.00 | 10,000.00 | 12,000.00 | 48,000.00 | 6,000.00 | 24,000.00 | 12,000.00 | 48,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,698,435.60 | | 7,972,625.57 | | 8,962,379.00 | | 9,060,083.20 |
|