Proposal:H.009278.6
Parish:Union
Description:BERNICE SR2S PROJECT
Type Construction:SIDEWALKS, GRADING, DRAINAGE STRUCTURES, PAVEMENT MARKINGS AND RELATED WORK.
Estimated Construction Cost:$242,205.20
| Rank | License | Bidder | Construction Bid |
| 1 | 32563 | The Mabry Company Llc | $197,822.00 |
| 2 | 54549 | Chad Pody Construction Company, LLC | $213,224.00 |
| 3 | 15099 | Amethyst Construction, Inc. | $223,303.65 |
| 4 | 39001 | JD's Rebar & Construction Inc. | $281,534.84 |
| 5 | 18546 | C W & W Contractors, Inc. | $291,611.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - The Mabry Company Llc | - 2 - Chad Pody Construction Company, LLC | - 3 - Amethyst Construction, Inc. | - 4 - JD's Rebar & Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 1,500.00 | 1,500.00 | 5,000.00 | 5,000.00 | 3,000.00 | 3,000.00 | 8,200.00 | 8,200.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 36 | SQYD | 20.00 | 720.00 | 15.00 | 540.00 | 12.00 | 432.00 | 26.56 | 956.16 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 69 | SQYD | 20.00 | 1,380.00 | 15.00 | 1,035.00 | 15.00 | 1,035.00 | 46.19 | 3,187.11 | | 0004 | 202-02-32160 | Removal of Pipe (Yard Drain) (8") | 20 | LNFT | 20.00 | 400.00 | 10.00 | 200.00 | 10.00 | 200.00 | 31.87 | 637.40 | | 0005 | 202-03-38000 | Relocation of Sign Traffic Sign & Post | 8 | EACH | 250.00 | 2,000.00 | 168.75 | 1,350.00 | 150.00 | 1,200.00 | 184.41 | 1,475.28 | | 0006 | 202-03-38020 | Relocation of Sign Pole (Street Sign Pole) | 1 | EACH | 250.00 | 250.00 | 400.00 | 400.00 | 150.00 | 150.00 | 224.08 | 224.08 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 3,000.00 | 3,000.00 | 4,250.00 | 4,250.00 | 10,000.00 | 10,000.00 | 11,500.00 | 11,500.00 | | 0008 | 204-02-00100 | Temporary Hay or Straw Bales | 42 | EACH | 25.00 | 1,050.00 | 22.00 | 924.00 | 45.00 | 1,890.00 | 54.00 | 2,268.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 2,571 | LNFT | 3.00 | 7,713.00 | 3.50 | 8,998.50 | 2.00 | 5,142.00 | 1.37 | 3,522.27 | | 0010 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 30 | CUYD | 75.00 | 2,250.00 | 58.00 | 1,740.00 | 70.00 | 2,100.00 | 510.00 | 15,300.00 | | 0011 | 701-01-02040 | Cross Drain Pipe (30" RCP/PP or 36" CMP) | 26 | LNFT | 100.00 | 2,600.00 | 185.00 | 4,810.00 | 110.00 | 2,860.00 | 329.53 | 8,567.78 | | 0012 | 701-07-00200 | Yard Drain Pipe (6") | 10 | LNFT | 30.00 | 300.00 | 22.00 | 220.00 | 40.00 | 400.00 | 257.77 | 2,577.70 | | 0013 | 701-07-00400 | Yard Drain Pipe (10") | 70 | LNFT | 45.00 | 3,150.00 | 25.00 | 1,750.00 | 50.00 | 3,500.00 | 74.40 | 5,208.00 | | 0014 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 20 | LNFT | 100.00 | 2,000.00 | 125.00 | 2,500.00 | 140.00 | 2,800.00 | 181.76 | 3,635.20 | | 0015 | 701-15-00100 | Concrete Collar | 2 | EACH | 750.00 | 1,500.00 | 1,500.00 | 3,000.00 | 1,500.00 | 3,000.00 | 998.50 | 1,997.00 | | 0016 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 2,750.00 | 11,000.00 | 3,000.00 | 12,000.00 | 4,500.00 | 18,000.00 | 2,218.48 | 8,873.92 | | 0017 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 900.00 | 900.00 | 1,800.00 | 1,800.00 | 750.00 | 750.00 | 1,510.72 | 1,510.72 | | 0018 | 702-04-00100 | Adjusting Manholes (Type 2 or Type 2 Cleanout) | 2 | EACH | 900.00 | 1,800.00 | 1,300.00 | 2,600.00 | 900.00 | 1,800.00 | 1,228.93 | 2,457.86 | | 0019 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 1 | EACH | 900.00 | 900.00 | 900.00 | 900.00 | 800.00 | 800.00 | 1,593.56 | 1,593.56 | | 0020 | 706-01-00100 | Concrete Walk (4" Thick) | 1,246.6 | SQYD | 40.00 | 49,864.00 | 55.00 | 68,563.00 | 48.50 | 60,460.10 | 48.00 | 59,836.80 | | 0021 | 706-01-00100 | Concrete Walk (4" Thick) (w/Key) | 103.1 | SQYD | 45.00 | 4,639.50 | 70.00 | 7,217.00 | 64.00 | 6,598.40 | 48.68 | 5,018.91 | | 0022 | 706-02-00200 | Concrete Drive (6" Thick) | 425.3 | SQYD | 55.00 | 23,391.50 | 70.00 | 29,771.00 | 68.00 | 28,920.40 | 48.00 | 20,414.40 | | 0023 | 706-04-00100 | Handicapped Curb Ramps | 12 | EACH | 850.00 | 10,200.00 | 700.00 | 8,400.00 | 1,250.00 | 15,000.00 | 1,152.12 | 13,825.44 | | 0024 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 35 | SQYD | 85.00 | 2,975.00 | 85.00 | 2,975.00 | 70.00 | 2,450.00 | 109.27 | 3,824.45 | | 0025 | 711-04-00100 | Geotextile Fabric | 35 | SQYD | 3.00 | 105.00 | 12.00 | 420.00 | 2.00 | 70.00 | 26.33 | 921.55 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 5,750.00 | 5,750.00 | 10,500.00 | 10,500.00 | 12,324.60 | 12,324.60 | | 0027 | 726-01-00100 | Bedding Material | 13.9 | CUYD | 100.00 | 1,390.00 | 55.00 | 764.50 | 85.00 | 1,181.50 | 132.62 | 1,843.42 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 30,000.00 | 30,000.00 | 19,000.00 | 19,000.00 | 14,000.00 | 14,000.00 | 41,000.00 | 41,000.00 | | 0029 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 329 | LNFT | 35.00 | 11,515.00 | 8.00 | 2,632.00 | 35.00 | 11,515.00 | 39.21 | 12,900.09 | | 0030 | 732-05-00100 | Removal of Existing Markings | 0.05 | MILE | 17,500.00 | 875.00 | 13,200.00 | 660.00 | 15,000.00 | 750.00 | 39,214.60 | 1,960.73 | | 0031 | 735-01-00100 | Mailboxes | 5 | EACH | 500.00 | 2,500.00 | 240.00 | 1,200.00 | 250.00 | 1,250.00 | 56.02 | 280.10 | | 0032 | 739-01-00100 | Hydro-Seeding | 0.7 | ACRE | 3,000.00 | 2,100.00 | 8,000.00 | 5,600.00 | 2,000.00 | 1,400.00 | 15,000.00 | 10,500.00 | | 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,000.00 | 3,000.00 | 4,500.00 | 4,500.00 | 5,000.00 | 5,000.00 | 7,842.93 | 7,842.93 | | 0034 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 87 | INLF | 2.00 | 174.00 | 2.00 | 174.00 | 2.75 | 239.25 | 21.19 | 1,843.53 | | 0035 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 240 | INLF | 2.00 | 480.00 | 2.00 | 480.00 | 2.75 | 660.00 | 6.64 | 1,593.60 | | 0036 | NS-ENH-20100 | Trench Drains (Metal) | 5 | LNFT | 40.00 | 200.00 | 220.00 | 1,100.00 | 850.00 | 4,250.00 | 382.45 | 1,912.25 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 197,822.00 | | 213,224.00 | | 223,303.65 | | 281,534.84 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - C W & W Contractors, Inc. | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 15,000.00 | 15,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 36 | SQYD | 20.00 | 720.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 69 | SQYD | 20.00 | 1,380.00 | | 0004 | 202-02-32160 | Removal of Pipe (Yard Drain) (8") | 20 | LNFT | 10.00 | 200.00 | | 0005 | 202-03-38000 | Relocation of Sign Traffic Sign & Post | 8 | EACH | 250.00 | 2,000.00 | | 0006 | 202-03-38020 | Relocation of Sign Pole (Street Sign Pole) | 1 | EACH | 250.00 | 250.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 10,000.00 | 10,000.00 | | 0008 | 204-02-00100 | Temporary Hay or Straw Bales | 42 | EACH | 20.00 | 840.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 2,571 | LNFT | 3.00 | 7,713.00 | | 0010 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 30 | CUYD | 75.00 | 2,250.00 | | 0011 | 701-01-02040 | Cross Drain Pipe (30" RCP/PP or 36" CMP) | 26 | LNFT | 120.00 | 3,120.00 | | 0012 | 701-07-00200 | Yard Drain Pipe (6") | 10 | LNFT | 40.00 | 400.00 | | 0013 | 701-07-00400 | Yard Drain Pipe (10") | 70 | LNFT | 25.00 | 1,750.00 | | 0014 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 20 | LNFT | 100.00 | 2,000.00 | | 0015 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,000.00 | 2,000.00 | | 0016 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 3,500.00 | 14,000.00 | | 0017 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,500.00 | 1,500.00 | | 0018 | 702-04-00100 | Adjusting Manholes (Type 2 or Type 2 Cleanout) | 2 | EACH | 2,500.00 | 5,000.00 | | 0019 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 1 | EACH | 1,000.00 | 1,000.00 | | 0020 | 706-01-00100 | Concrete Walk (4" Thick) | 1,246.6 | SQYD | 55.00 | 68,563.00 | | 0021 | 706-01-00100 | Concrete Walk (4" Thick) (w/Key) | 103.1 | SQYD | 60.00 | 6,186.00 | | 0022 | 706-02-00200 | Concrete Drive (6" Thick) | 425.3 | SQYD | 65.00 | 27,644.50 | | 0023 | 706-04-00100 | Handicapped Curb Ramps | 12 | EACH | 1,500.00 | 18,000.00 | | 0024 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 35 | SQYD | 100.00 | 3,500.00 | | 0025 | 711-04-00100 | Geotextile Fabric | 35 | SQYD | 10.00 | 350.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | | 0027 | 726-01-00100 | Bedding Material | 13.9 | CUYD | 150.00 | 2,085.00 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 45,000.00 | 45,000.00 | | 0029 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 329 | LNFT | 50.00 | 16,450.00 | | 0030 | 732-05-00100 | Removal of Existing Markings | 0.05 | MILE | 20,000.00 | 1,000.00 | | 0031 | 735-01-00100 | Mailboxes | 5 | EACH | 175.00 | 875.00 | | 0032 | 739-01-00100 | Hydro-Seeding | 0.7 | ACRE | 6,000.00 | 4,200.00 | | 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,500.00 | 7,500.00 | | 0034 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 87 | INLF | 5.00 | 435.00 | | 0035 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 240 | INLF | 5.00 | 1,200.00 | | 0036 | NS-ENH-20100 | Trench Drains (Metal) | 5 | LNFT | 500.00 | 2,500.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 291,611.50 |
|