Proposal:H.002260.6
Parish:Jefferson
Routes:LA 45
Description:LA 45: GOOSE BAYOU BRIDGE AND APPROACHES
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT OVERLAY, PRECAST CONCRETE PILES, TREATED TIMBER PILES, PRECAST PRESTRESSED CONCRETE GIRDER SPANS BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$4,736,796.50
| Rank | License | Bidder | Construction Bid |
| 1 | 34567 | James Construction Group LLC | $6,473,193.39 |
| 2 | 36827 | Shavers-Whittle Construction LLC | $7,072,844.20 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $7,435,357.30 |
| 4 | 36961 | Cycle Construction Co. L.L.C. | $7,977,313.16 |
| 5 | 39462 | JB JAMES CONSTRUCTION LLC | $8,977,958.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - James Construction Group LLC | - 2 - Shavers-Whittle Construction LLC | - 3 - Boh Bros. Construction Co., LLC. | - 4 - Cycle Construction Co. L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 143,000.00 | 143,000.00 | 150,000.00 | 150,000.00 | 5,000.00 | 5,000.00 | 215,000.00 | 215,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 150,000.00 | 150,000.00 | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | 250,000.00 | 250,000.00 | | 0003 | 202-02-00010 | Removal of Boat Launch (Sta. 113+90, lt., Two Ramps, Three 28' Piers, One 50' Slip) | 2 | EACH | 25,000.00 | 50,000.00 | 35,000.00 | 70,000.00 | 4,500.00 | 9,000.00 | 1,800.00 | 3,600.00 | | 0004 | 202-02-00020 | Removal of Concrete Slab (Sta. 11+00, Rt., 13.4' x 33') | 49.1 | SQYD | 20.00 | 982.00 | 90.00 | 4,419.00 | 50.00 | 2,455.00 | 46.00 | 2,258.60 | | 0005 | 202-02-04000 | Removal of Bridge Sta.113+37,30.5'x303' | 1 | EACH | 111,750.00 | 111,750.00 | 300,000.00 | 300,000.00 | 185,000.00 | 185,000.00 | 300,000.00 | 300,000.00 | | 0006 | 202-02-05000 | Removal of Building Sta. 110+00, Lt., 28' x 56', Wood Frame On Piers | 1 | EACH | 1.00 | 1.00 | 2,500.00 | 2,500.00 | 2,000.00 | 2,000.00 | 6,400.00 | 6,400.00 | | 0007 | 202-02-05000 | Removal of Building Sta. 117+44, Lt., 27' x 32', Wood Frame On Piers | 1 | EACH | 1.00 | 1.00 | 1,500.00 | 1,500.00 | 2,000.00 | 2,000.00 | 4,700.00 | 4,700.00 | | 0008 | 202-02-06100 | Removal of Concrete Walks and Drives | 159 | SQYD | 6.00 | 954.00 | 30.00 | 4,770.00 | 18.00 | 2,862.00 | 17.00 | 2,703.00 | | 0009 | 202-02-12000 | Removal of Fence | 35 | LNFT | 5.00 | 175.00 | 65.00 | 2,275.00 | 25.00 | 875.00 | 23.00 | 805.00 | | 0010 | 202-02-12020 | Removal of Fence (Chain Link) | 18 | LNFT | 5.00 | 90.00 | 15.00 | 270.00 | 25.00 | 450.00 | 10.00 | 180.00 | | 0011 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 4,163.4 | SQYD | 5.00 | 20,817.00 | 7.50 | 31,225.50 | 11.00 | 45,797.40 | 14.00 | 58,287.60 | | 0012 | 203-01-00100 | General Excavation | 4,640 | CUYD | 11.00 | 51,040.00 | 12.50 | 58,000.00 | 20.00 | 92,800.00 | 15.00 | 69,600.00 | | 0013 | 203-03-00100 | Embankment | 4,258 | CUYD | 35.00 | 149,030.00 | 30.00 | 127,740.00 | 65.00 | 276,770.00 | 44.00 | 187,352.00 | | 0014 | 203-08-00100 | Geotextile Fabric | 293 | SQYD | 7.50 | 2,197.50 | 4.00 | 1,172.00 | 2.25 | 659.25 | 3.50 | 1,025.50 | | 0015 | 204-02-00100 | Temporary Hay or Straw Bales | 28 | EACH | 40.00 | 1,120.00 | 22.00 | 616.00 | 18.00 | 504.00 | 17.00 | 476.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 4,460 | LNFT | 5.00 | 22,300.00 | 3.00 | 13,380.00 | 2.00 | 8,920.00 | 2.00 | 8,920.00 | | 0017 | 302-02-05121 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 4,105.9 | SQYD | 35.00 | 143,706.50 | 32.00 | 131,388.80 | 34.00 | 139,600.60 | 33.00 | 135,494.70 | | 0018 | 304-05-00100 | Lime Treatment (Type E) | 29.1 | TON | 250.00 | 7,275.00 | 550.00 | 16,005.00 | 525.00 | 15,277.50 | 745.00 | 21,679.50 | | 0019 | 401-01-00100 | Aggregate Surface Course (Net Section) | 275.8 | CUYD | 100.00 | 27,580.00 | 100.00 | 27,580.00 | 30.00 | 8,274.00 | 105.00 | 28,959.00 | | 0020 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 70.00 | 7,000.00 | 80.00 | 8,000.00 | 115.00 | 11,500.00 | 111.00 | 11,100.00 | | 0021 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 34 | LNFT | 198.00 | 6,732.00 | 200.00 | 6,800.00 | 150.00 | 5,100.00 | 130.00 | 4,420.00 | | 0022 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 48 | LNFT | 260.00 | 12,480.00 | 275.00 | 13,200.00 | 175.00 | 8,400.00 | 150.00 | 7,200.00 | | 0023 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 52 | LNFT | 80.00 | 4,160.00 | 90.00 | 4,680.00 | 90.00 | 4,680.00 | 78.00 | 4,056.00 | | 0024 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 98 | LNFT | 86.00 | 8,428.00 | 100.00 | 9,800.00 | 115.00 | 11,270.00 | 100.00 | 9,800.00 | | 0025 | 701-03-02040 | Storm Drain Pipe (Outfall) (24" PP or 30" CMP) | 168 | LNFT | 74.00 | 12,432.00 | 85.00 | 14,280.00 | 115.00 | 19,320.00 | 100.00 | 16,800.00 | | 0026 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 42 | LNFT | 169.00 | 7,098.00 | 175.00 | 7,350.00 | 125.00 | 5,250.00 | 110.00 | 4,620.00 | | 0027 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 32 | LNFT | 70.00 | 2,240.00 | 80.00 | 2,560.00 | 115.00 | 3,680.00 | 100.00 | 3,200.00 | | 0028 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 44 | LNFT | 80.00 | 3,520.00 | 90.00 | 3,960.00 | 125.00 | 5,500.00 | 110.00 | 4,840.00 | | 0029 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 110 | LNFT | 86.00 | 9,460.00 | 100.00 | 11,000.00 | 150.00 | 16,500.00 | 135.00 | 14,850.00 | | 0030 | 701-06-01080 | Side Drain Pipe Arch (36" Equiv. RCPA/CMPA) | 260 | LNFT | 130.00 | 33,800.00 | 150.00 | 39,000.00 | 175.00 | 45,500.00 | 155.00 | 40,300.00 | | 0031 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 5,000.00 | 5,000.00 | 5,500.00 | 5,500.00 | 7,000.00 | 7,000.00 | 6,100.00 | 6,100.00 | | 0032 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 3,000.00 | 12,000.00 | 3,500.00 | 14,000.00 | 4,500.00 | 18,000.00 | 3,900.00 | 15,600.00 | | 0033 | 703-03-00100 | Perforated Pipe Underdrains | 58 | LNFT | 148.82 | 8,631.56 | 130.00 | 7,540.00 | 55.00 | 3,190.00 | 370.00 | 21,460.00 | | 0034 | 704-03-00100 | Blocked Out Guard Rail | 87.5 | LNFT | 42.00 | 3,675.00 | 44.00 | 3,850.00 | 50.00 | 4,375.00 | 44.00 | 3,850.00 | | 0035 | 706-02-00200 | Concrete Drive (6" Thick) | 284.5 | SQYD | 117.02 | 33,292.19 | 70.00 | 19,915.00 | 85.00 | 24,182.50 | 83.00 | 23,613.50 | | 0036 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 34 | SQYD | 71.00 | 2,414.00 | 100.00 | 3,400.00 | 70.00 | 2,380.00 | 67.00 | 2,278.00 | | 0037 | 708-01-00100 | Right-of-Way Monument | 19 | EACH | 325.00 | 6,175.00 | 350.00 | 6,650.00 | 350.00 | 6,650.00 | 238.00 | 4,522.00 | | 0038 | 710-01-00100 | Flowable Fill | 40 | CUYD | 300.00 | 12,000.00 | 135.00 | 5,400.00 | 200.00 | 8,000.00 | 139.00 | 5,560.00 | | 0039 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 293 | SQYD | 100.00 | 29,300.00 | 120.00 | 35,160.00 | 175.00 | 51,275.00 | 105.00 | 30,765.00 | | 0040 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 85,000.00 | 85,000.00 | 150,000.00 | 150,000.00 | 175,000.00 | 175,000.00 | 155,000.00 | 155,000.00 | | 0041 | 713-02-00500 | Temporary Pavement Markings (24" Width) Solid Line | 31 | LNFT | 1.00 | 31.00 | 9.00 | 279.00 | 1.15 | 35.65 | 9.00 | 279.00 | | 0042 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.451 | MILE | 1,496.67 | 675.00 | 2,800.00 | 1,262.80 | 1,700.00 | 766.70 | 2,800.00 | 1,262.80 | | 0043 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 0.442 | MILE | 19,909.50 | 8,800.00 | 17,000.00 | 7,514.00 | 23,000.00 | 10,166.00 | 17,300.00 | 7,646.60 | | 0044 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 56 | EACH | 350.00 | 19,600.00 | 700.00 | 39,200.00 | 315.00 | 17,640.00 | 460.00 | 25,760.00 | | 0045 | 716-01-00100 | Mulch (Vegetative) | 0.4 | TON | 3,000.00 | 1,200.00 | 3,000.00 | 1,200.00 | 1,350.00 | 540.00 | 1,350.00 | 540.00 | | 0046 | 717-01-00100 | Seeding | 99 | LB | 25.00 | 2,475.00 | 11.00 | 1,089.00 | 11.00 | 1,089.00 | 11.00 | 1,089.00 | | 0047 | 718-01-00100 | Fertilizer | 3,308 | LB | 0.50 | 1,654.00 | 0.80 | 2,646.40 | 0.60 | 1,984.80 | 1.00 | 3,308.00 | | 0048 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 86 | SQYD | 6.00 | 516.00 | 3.50 | 301.00 | 5.00 | 430.00 | 6.00 | 516.00 | | 0049 | 725-01-00100 | Temporary Detour Roads | 431.7 | SQYD | 82.00 | 35,399.40 | 173.00 | 74,684.10 | 105.00 | 45,328.50 | 110.00 | 47,487.00 | | 0050 | 726-01-00100 | Bedding Material | 102.1 | CUYD | 84.00 | 8,576.40 | 80.00 | 8,168.00 | 75.00 | 7,657.50 | 83.00 | 8,474.30 | | 0051 | 727-01-00100 | Mobilization | 1 | LUMP | 640,000.00 | 640,000.00 | 650,000.00 | 650,000.00 | 583,000.00 | 583,000.00 | 600,000.00 | 600,000.00 | | 0052 | 729-01-00100 | Sign (Type A) | 53.6 | SQFT | 30.00 | 1,608.00 | 33.00 | 1,768.80 | 34.00 | 1,822.40 | 33.00 | 1,768.80 | | 0053 | 729-08-00100 | Mounting (2 1/2" Size Post) | 2 | EACH | 1,375.00 | 2,750.00 | 1,300.00 | 2,600.00 | 1,600.00 | 3,200.00 | 1,500.00 | 3,000.00 | | 0054 | 729-08-00210 | Mounting (3 1/2" Size Post)(Structure Mount) | 1 | EACH | 900.00 | 900.00 | 2,000.00 | 2,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | | 0055 | 729-16-00300 | Object Marker Assembly (Type 3) | 3 | EACH | 85.00 | 255.00 | 100.00 | 300.00 | 100.00 | 300.00 | 95.00 | 285.00 | | 0056 | 729-21-00100 | U-Channel Post | 5 | EACH | 175.00 | 875.00 | 100.00 | 500.00 | 200.00 | 1,000.00 | 215.00 | 1,075.00 | | 0057 | 730-09-00100 | Electrical System | 1 | LUMP | 96,000.00 | 96,000.00 | 108,000.00 | 108,000.00 | 110,000.00 | 110,000.00 | 110,000.00 | 110,000.00 | | 0058 | 731-02-00100 | Reflectorized Raised Pavement Markers | 82 | EACH | 15.00 | 1,230.00 | 18.00 | 1,476.00 | 17.00 | 1,394.00 | 17.00 | 1,394.00 | | 0059 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 44 | LNFT | 20.00 | 880.00 | 28.00 | 1,232.00 | 23.00 | 1,012.00 | 27.00 | 1,188.00 | | 0060 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.282 | MILE | 7,988.00 | 10,240.62 | 13,000.00 | 16,666.00 | 9,000.00 | 11,538.00 | 13,000.00 | 16,666.00 | | 0061 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.024 | MILE | 8,334.00 | 200.02 | 8,000.00 | 192.00 | 9,500.00 | 228.00 | 11,000.00 | 264.00 | | 0062 | 732-05-00100 | Removal of Existing Markings | 0.152 | MILE | 7,402.00 | 1,125.10 | 15,000.00 | 2,280.00 | 8,400.00 | 1,276.80 | 16,500.00 | 2,508.00 | | 0063 | 735-01-00100 | Mailboxes | 19 | EACH | 8.00 | 152.00 | 1.00 | 19.00 | 9.00 | 171.00 | 9.00 | 171.00 | | 0064 | 735-02-00100 | Mailbox Supports (Single) | 19 | EACH | 195.00 | 3,705.00 | 150.00 | 2,850.00 | 220.00 | 4,180.00 | 215.00 | 4,085.00 | | 0065 | 740-01-00100 | Construction Layout | 1 | LUMP | 150,000.00 | 150,000.00 | 140,000.00 | 140,000.00 | 275,000.00 | 275,000.00 | 150,000.00 | 150,000.00 | | 0066 | 802-01-00100 | Structural Excavation | 161 | CUYD | 25.00 | 4,025.00 | 30.00 | 4,830.00 | 120.00 | 19,320.00 | 31.00 | 4,991.00 | | 0067 | 804-01-00600 | Precast Concrete Piles (24") | 10,502 | LNFT | 122.00 | 1,281,244.00 | 130.00 | 1,365,260.00 | 135.00 | 1,417,770.00 | 150.00 | 1,575,300.00 | | 0068 | 804-02-00200 | Treated Timber Piles (Coastal Treatment) | 1,560 | LNFT | 18.00 | 28,080.00 | 22.00 | 34,320.00 | 35.00 | 54,600.00 | 19.00 | 29,640.00 | | 0069 | 804-05-00600 | Precast Concrete Test Piles (24") | 2 | EACH | 100,000.00 | 200,000.00 | 100,000.00 | 200,000.00 | 35,000.00 | 70,000.00 | 13,000.00 | 26,000.00 | | 0070 | 804-09-00100 | Loading Test Piles | 2 | EACH | 50,000.00 | 100,000.00 | 25,000.00 | 50,000.00 | 71,000.00 | 142,000.00 | 70,000.00 | 140,000.00 | | 0071 | 804-10-00100 | Reloading Test Piles | 2 | EACH | 1,000.00 | 2,000.00 | 1,500.00 | 3,000.00 | 6,000.00 | 12,000.00 | 2,200.00 | 4,400.00 | | 0072 | 804-11-00100 | Redriving Test Piles | 2 | EACH | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 | 750.00 | 1,500.00 | 2,200.00 | 4,400.00 | | 0073 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | 10,000.00 | 10,000.00 | 70,000.00 | 70,000.00 | | 0074 | 804-17-00100 | Dynamic Monitoring | 12 | EACH | 2,000.00 | 24,000.00 | 4,500.00 | 54,000.00 | 5,600.00 | 67,200.00 | 4,000.00 | 48,000.00 | | 0075 | 805-01-00100 | Class A Concrete | 11.91 | CUYD | 500.00 | 5,955.00 | 500.00 | 5,955.00 | 500.00 | 5,955.00 | 1,700.00 | 20,247.00 | | 0076 | 805-01-00400 | Class A Concrete (Retaining Walls) | 68.6 | CUYD | 900.00 | 61,740.00 | 675.00 | 46,305.00 | 700.00 | 48,020.00 | 1,700.00 | 116,620.00 | | 0077 | 805-01-00700 | Class A Concrete (Bents) | 286.48 | CUYD | 1,400.00 | 401,072.00 | 1,600.00 | 458,368.00 | 2,000.00 | 572,960.00 | 2,400.00 | 687,552.00 | | 0078 | 805-04-00100 | Class AA(M) Concrete | 772.4 | CUYD | 1,100.00 | 849,640.00 | 1,400.00 | 1,081,360.00 | 1,500.00 | 1,158,600.00 | 1,500.00 | 1,158,600.00 | | 0079 | 805-08-00200 | Precast-Prestressed Concrete Girder (Type II) | 356 | LNFT | 275.00 | 97,900.00 | 150.00 | 53,400.00 | 210.00 | 74,760.00 | 250.00 | 89,000.00 | | 0080 | 806-01-00100 | Deformed Reinforcing Steel | 257,010 | LB | 1.25 | 321,262.50 | 1.13 | 290,421.30 | 1.60 | 411,216.00 | 1.00 | 257,010.00 | | 0081 | 807-01-00100 | Steel (AASHTO M 270. Grade 36) | 14,000 | LB | 1.80 | 25,200.00 | 8.00 | 112,000.00 | 8.00 | 112,000.00 | 2.50 | 35,000.00 | | 0082 | 807-08-00100 | Structural Metalwork | 2,610 | LUMP | 75,000.00 | 75,000.00 | 25,000.00 | 25,000.00 | 3,000.00 | 3,000.00 | 100,000.00 | 100,000.00 | | 0083 | 810-02-00100 | Steel Railing | 797.82 | LNFT | 300.00 | 239,346.00 | 225.00 | 179,509.50 | 260.00 | 207,433.20 | 222.00 | 177,116.04 | | 0084 | 813-01-00100 | Concrete Approach Slabs | 396.56 | SQYD | 250.00 | 99,140.00 | 230.00 | 91,208.80 | 150.00 | 59,484.00 | 322.00 | 127,692.32 | | 0085 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 224 | INLF | 7.00 | 1,568.00 | 0.55 | 123.20 | 1.00 | 224.00 | 1.00 | 224.00 | | 0086 | NS-502-01000 | Asphalt Concrete | 1,418.1 | TON | 116.00 | 164,499.60 | 125.00 | 177,262.50 | 125.00 | 177,262.50 | 128.00 | 181,516.80 | | 0087 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 301.3 | TON | 150.00 | 45,195.00 | 165.00 | 49,714.50 | 200.00 | 60,260.00 | 167.00 | 50,317.10 | | 0088 | NS-510-01100 | Pavement Patching (6" Minimum Thickness) | 99 | SQYD | 80.00 | 7,920.00 | 90.00 | 8,910.00 | 75.00 | 7,425.00 | 89.00 | 8,811.00 | | 0089 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 570 | INLF | 7.00 | 3,990.00 | 0.60 | 342.00 | 1.00 | 570.00 | 1.00 | 570.00 | | 0090 | NS-701-00002 | Trench Excavation Safety Protection (Depth > 5 feet) | 220 | LNFT | 26.00 | 5,720.00 | 35.00 | 7,700.00 | 300.00 | 66,000.00 | 33.00 | 7,260.00 | | 0091 | NS-804-00002 | Construction Site Survey | 1 | LUMP | 10,000.00 | 10,000.00 | 55,000.00 | 55,000.00 | 25,000.00 | 25,000.00 | 8,500.00 | 8,500.00 | | 0092 | NS-804-00006 | Vibration Monitoring | 44 | DAY | 375.00 | 16,500.00 | 550.00 | 24,200.00 | 700.00 | 30,800.00 | 600.00 | 26,400.00 | | 0093 | NS-813-00001 | Settlement Plate Installation & Monitoring | 5 | EACH | 650.00 | 3,250.00 | 4,000.00 | 20,000.00 | 380.00 | 1,900.00 | 300.00 | 1,500.00 | | 0094 | NS-P26-06000 | Fire Hydrants (Jefferson Parish) | 3 | EACH | 5,500.00 | 16,500.00 | 5,500.00 | 16,500.00 | 4,000.00 | 12,000.00 | 5,500.00 | 16,500.00 | | 0095 | NS-P26-06020 | Fittings for Waterlines (DI) (Jefferson Parish) | 1,200 | LB | 6.00 | 7,200.00 | 8.00 | 9,600.00 | 15.00 | 18,000.00 | 11.00 | 13,200.00 | | 0096 | NS-P26-07000 | Gate Valve and Valve Box (8") (Jefferson Parish) | 4 | EACH | 1,900.00 | 7,600.00 | 2,200.00 | 8,800.00 | 1,600.00 | 6,400.00 | 2,500.00 | 10,000.00 | | 0097 | NS-P26-07020 | Gate Valve and Valve Box (12") (Jefferson Parish) | 4 | EACH | 2,880.00 | 11,520.00 | 3,200.00 | 12,800.00 | 2,500.00 | 10,000.00 | 3,500.00 | 14,000.00 | | 0098 | NS-P26-12020 | Long Body Transitional Coupling (6") (Jefferson Parish) | 2 | EACH | 230.00 | 460.00 | 250.00 | 500.00 | 300.00 | 600.00 | 350.00 | 700.00 | | 0099 | NS-P26-12040 | Long Body Transitional Coupling (8") (Jefferson Parish) | 1 | EACH | 400.00 | 400.00 | 450.00 | 450.00 | 350.00 | 350.00 | 550.00 | 550.00 | | 0100 | NS-P26-12080 | Long Body Transitional Coupling (12 inch) (Jefferson Parish) | 2 | EACH | 720.00 | 1,440.00 | 800.00 | 1,600.00 | 400.00 | 800.00 | 850.00 | 1,700.00 | | 0101 | NS-P26-18000 | Removal and Disposal of Existing AC Waterline (Jefferson Parish) | 520 | LNFT | 18.00 | 9,360.00 | 22.00 | 11,440.00 | 32.00 | 16,640.00 | 28.00 | 14,560.00 | | 0102 | NS-P26-23000 | Water Service Connections (Jefferson Parish) Includes all necessary work to install a new Water Service Connection and reconnect to any existing (or new) Water Meter | 10 | EACH | 1,300.00 | 13,000.00 | 1,500.00 | 15,000.00 | 1,500.00 | 15,000.00 | 600.00 | 6,000.00 | | 0103 | NS-P26-23060 | Waterline (8" PVC) (Jefferson Parish) | 178 | LNFT | 46.00 | 8,188.00 | 55.00 | 9,790.00 | 75.00 | 13,350.00 | 72.00 | 12,816.00 | | 0104 | NS-P26-23080 | Waterline (12" PVC) (Jefferson Parish) | 873 | LNFT | 58.00 | 50,634.00 | 75.00 | 65,475.00 | 90.00 | 78,570.00 | 84.00 | 73,332.00 | | 0105 | NS-P26-23120 | Waterline (6" PVC) (Restrained) (Jefferson Parish) | 60 | LNFT | 38.00 | 2,280.00 | 45.00 | 2,700.00 | 55.00 | 3,300.00 | 89.00 | 5,340.00 | | 0106 | NS-P26-23140 | Waterline (8" PVC) (Restrained) (Jefferson Parish) | 55 | LNFT | 54.00 | 2,970.00 | 75.00 | 4,125.00 | 65.00 | 3,575.00 | 100.00 | 5,500.00 | | 0107 | NS-P26-23160 | Waterline (12" PVC) (Restrained) (Jefferson Parish) | 197 | LNFT | 70.00 | 13,790.00 | 80.00 | 15,760.00 | 75.00 | 14,775.00 | 115.00 | 22,655.00 | | 0108 | NS-P26-23180 | Waterline (14 inch HDPE) (Directional Drill) (Jefferson Parish) | 525 | LF | 140.00 | 73,500.00 | 160.00 | 84,000.00 | 180.00 | 94,500.00 | 250.00 | 131,250.00 | | 0109 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 56 | EACH | 25.00 | 1,400.00 | 125.00 | 7,000.00 | 80.00 | 4,480.00 | 275.00 | 15,400.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,473,193.39 | | 7,072,844.20 | | 7,435,357.30 | | 7,977,313.16 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 500,000.00 | 500,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | | 0003 | 202-02-00010 | Removal of Boat Launch (Sta. 113+90, lt., Two Ramps, Three 28' Piers, One 50' Slip) | 2 | EACH | 10,000.00 | 20,000.00 | | 0004 | 202-02-00020 | Removal of Concrete Slab (Sta. 11+00, Rt., 13.4' x 33') | 49.1 | SQYD | 25.00 | 1,227.50 | | 0005 | 202-02-04000 | Removal of Bridge Sta.113+37,30.5'x303' | 1 | EACH | 120,000.00 | 120,000.00 | | 0006 | 202-02-05000 | Removal of Building Sta. 110+00, Lt., 28' x 56', Wood Frame On Piers | 1 | EACH | 1.00 | 1.00 | | 0007 | 202-02-05000 | Removal of Building Sta. 117+44, Lt., 27' x 32', Wood Frame On Piers | 1 | EACH | 1.00 | 1.00 | | 0008 | 202-02-06100 | Removal of Concrete Walks and Drives | 159 | SQYD | 20.00 | 3,180.00 | | 0009 | 202-02-12000 | Removal of Fence | 35 | LNFT | 10.00 | 350.00 | | 0010 | 202-02-12020 | Removal of Fence (Chain Link) | 18 | LNFT | 10.00 | 180.00 | | 0011 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 4,163.4 | SQYD | 15.00 | 62,451.00 | | 0012 | 203-01-00100 | General Excavation | 4,640 | CUYD | 30.00 | 139,200.00 | | 0013 | 203-03-00100 | Embankment | 4,258 | CUYD | 65.00 | 276,770.00 | | 0014 | 203-08-00100 | Geotextile Fabric | 293 | SQYD | 5.00 | 1,465.00 | | 0015 | 204-02-00100 | Temporary Hay or Straw Bales | 28 | EACH | 20.00 | 560.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 4,460 | LNFT | 3.00 | 13,380.00 | | 0017 | 302-02-05121 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 4,105.9 | SQYD | 33.00 | 135,494.70 | | 0018 | 304-05-00100 | Lime Treatment (Type E) | 29.1 | TON | 350.00 | 10,185.00 | | 0019 | 401-01-00100 | Aggregate Surface Course (Net Section) | 275.8 | CUYD | 110.00 | 30,338.00 | | 0020 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 125.00 | 12,500.00 | | 0021 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 34 | LNFT | 160.00 | 5,440.00 | | 0022 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 48 | LNFT | 175.00 | 8,400.00 | | 0023 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 52 | LNFT | 90.00 | 4,680.00 | | 0024 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 98 | LNFT | 115.00 | 11,270.00 | | 0025 | 701-03-02040 | Storm Drain Pipe (Outfall) (24" PP or 30" CMP) | 168 | LNFT | 115.00 | 19,320.00 | | 0026 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 42 | LNFT | 120.00 | 5,040.00 | | 0027 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 32 | LNFT | 110.00 | 3,520.00 | | 0028 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 44 | LNFT | 120.00 | 5,280.00 | | 0029 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 110 | LNFT | 175.00 | 19,250.00 | | 0030 | 701-06-01080 | Side Drain Pipe Arch (36" Equiv. RCPA/CMPA) | 260 | LNFT | 200.00 | 52,000.00 | | 0031 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 7,500.00 | 7,500.00 | | 0032 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 6,500.00 | 26,000.00 | | 0033 | 703-03-00100 | Perforated Pipe Underdrains | 58 | LNFT | 30.00 | 1,740.00 | | 0034 | 704-03-00100 | Blocked Out Guard Rail | 87.5 | LNFT | 42.00 | 3,675.00 | | 0035 | 706-02-00200 | Concrete Drive (6" Thick) | 284.5 | SQYD | 62.00 | 17,639.00 | | 0036 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 34 | SQYD | 85.00 | 2,890.00 | | 0037 | 708-01-00100 | Right-of-Way Monument | 19 | EACH | 300.00 | 5,700.00 | | 0038 | 710-01-00100 | Flowable Fill | 40 | CUYD | 150.00 | 6,000.00 | | 0039 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 293 | SQYD | 85.00 | 24,905.00 | | 0040 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 60,000.00 | 60,000.00 | | 0041 | 713-02-00500 | Temporary Pavement Markings (24" Width) Solid Line | 31 | LNFT | 1.00 | 31.00 | | 0042 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.451 | MILE | 1,500.00 | 676.50 | | 0043 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 0.442 | MILE | 19,500.00 | 8,619.00 | | 0044 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 56 | EACH | 700.00 | 39,200.00 | | 0045 | 716-01-00100 | Mulch (Vegetative) | 0.4 | TON | 1,200.00 | 480.00 | | 0046 | 717-01-00100 | Seeding | 99 | LB | 10.00 | 990.00 | | 0047 | 718-01-00100 | Fertilizer | 3,308 | LB | 0.50 | 1,654.00 | | 0048 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 86 | SQYD | 4.00 | 344.00 | | 0049 | 725-01-00100 | Temporary Detour Roads | 431.7 | SQYD | 105.00 | 45,328.50 | | 0050 | 726-01-00100 | Bedding Material | 102.1 | CUYD | 90.00 | 9,189.00 | | 0051 | 727-01-00100 | Mobilization | 1 | LUMP | 751,000.00 | 751,000.00 | | 0052 | 729-01-00100 | Sign (Type A) | 53.6 | SQFT | 30.00 | 1,608.00 | | 0053 | 729-08-00100 | Mounting (2 1/2" Size Post) | 2 | EACH | 1,375.00 | 2,750.00 | | 0054 | 729-08-00210 | Mounting (3 1/2" Size Post)(Structure Mount) | 1 | EACH | 900.00 | 900.00 | | 0055 | 729-16-00300 | Object Marker Assembly (Type 3) | 3 | EACH | 85.00 | 255.00 | | 0056 | 729-21-00100 | U-Channel Post | 5 | EACH | 175.00 | 875.00 | | 0057 | 730-09-00100 | Electrical System | 1 | LUMP | 99,000.00 | 99,000.00 | | 0058 | 731-02-00100 | Reflectorized Raised Pavement Markers | 82 | EACH | 15.00 | 1,230.00 | | 0059 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 44 | LNFT | 20.00 | 880.00 | | 0060 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.282 | MILE | 8,000.00 | 10,256.00 | | 0061 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.024 | MILE | 8,400.00 | 201.60 | | 0062 | 732-05-00100 | Removal of Existing Markings | 0.152 | MILE | 6,500.00 | 988.00 | | 0063 | 735-01-00100 | Mailboxes | 19 | EACH | 10.00 | 190.00 | | 0064 | 735-02-00100 | Mailbox Supports (Single) | 19 | EACH | 200.00 | 3,800.00 | | 0065 | 740-01-00100 | Construction Layout | 1 | LUMP | 75,000.00 | 75,000.00 | | 0066 | 802-01-00100 | Structural Excavation | 161 | CUYD | 75.00 | 12,075.00 | | 0067 | 804-01-00600 | Precast Concrete Piles (24") | 10,502 | LNFT | 202.50 | 2,126,655.00 | | 0068 | 804-02-00200 | Treated Timber Piles (Coastal Treatment) | 1,560 | LNFT | 45.00 | 70,200.00 | | 0069 | 804-05-00600 | Precast Concrete Test Piles (24") | 2 | EACH | 85,000.00 | 170,000.00 | | 0070 | 804-09-00100 | Loading Test Piles | 2 | EACH | 2,000.00 | 4,000.00 | | 0071 | 804-10-00100 | Reloading Test Piles | 2 | EACH | 1,000.00 | 2,000.00 | | 0072 | 804-11-00100 | Redriving Test Piles | 2 | EACH | 1,000.00 | 2,000.00 | | 0073 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1,000.00 | 1,000.00 | | 0074 | 804-17-00100 | Dynamic Monitoring | 12 | EACH | 1,200.00 | 14,400.00 | | 0075 | 805-01-00100 | Class A Concrete | 11.91 | CUYD | 1,500.00 | 17,865.00 | | 0076 | 805-01-00400 | Class A Concrete (Retaining Walls) | 68.6 | CUYD | 1,650.00 | 113,190.00 | | 0077 | 805-01-00700 | Class A Concrete (Bents) | 286.48 | CUYD | 1,820.00 | 521,393.60 | | 0078 | 805-04-00100 | Class AA(M) Concrete | 772.4 | CUYD | 1,800.00 | 1,390,320.00 | | 0079 | 805-08-00200 | Precast-Prestressed Concrete Girder (Type II) | 356 | LNFT | 425.00 | 151,300.00 | | 0080 | 806-01-00100 | Deformed Reinforcing Steel | 257,010 | LB | 2.00 | 514,020.00 | | 0081 | 807-01-00100 | Steel (AASHTO M 270. Grade 36) | 14,000 | LB | 3.50 | 49,000.00 | | 0082 | 807-08-00100 | Structural Metalwork | 2,610 | LUMP | 50,000.00 | 50,000.00 | | 0083 | 810-02-00100 | Steel Railing | 797.82 | LNFT | 415.00 | 331,095.30 | | 0084 | 813-01-00100 | Concrete Approach Slabs | 396.56 | SQYD | 265.00 | 105,088.40 | | 0085 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 224 | INLF | 2.00 | 448.00 | | 0086 | NS-502-01000 | Asphalt Concrete | 1,418.1 | TON | 125.00 | 177,262.50 | | 0087 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 301.3 | TON | 160.00 | 48,208.00 | | 0088 | NS-510-01100 | Pavement Patching (6" Minimum Thickness) | 99 | SQYD | 85.00 | 8,415.00 | | 0089 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 570 | INLF | 2.50 | 1,425.00 | | 0090 | NS-701-00002 | Trench Excavation Safety Protection (Depth > 5 feet) | 220 | LNFT | 20.00 | 4,400.00 | | 0091 | NS-804-00002 | Construction Site Survey | 1 | LUMP | 5,000.00 | 5,000.00 | | 0092 | NS-804-00006 | Vibration Monitoring | 44 | DAY | 800.00 | 35,200.00 | | 0093 | NS-813-00001 | Settlement Plate Installation & Monitoring | 5 | EACH | 10,000.00 | 50,000.00 | | 0094 | NS-P26-06000 | Fire Hydrants (Jefferson Parish) | 3 | EACH | 9,500.00 | 28,500.00 | | 0095 | NS-P26-06020 | Fittings for Waterlines (DI) (Jefferson Parish) | 1,200 | LB | 10.00 | 12,000.00 | | 0096 | NS-P26-07000 | Gate Valve and Valve Box (8") (Jefferson Parish) | 4 | EACH | 3,500.00 | 14,000.00 | | 0097 | NS-P26-07020 | Gate Valve and Valve Box (12") (Jefferson Parish) | 4 | EACH | 5,500.00 | 22,000.00 | | 0098 | NS-P26-12020 | Long Body Transitional Coupling (6") (Jefferson Parish) | 2 | EACH | 3,000.00 | 6,000.00 | | 0099 | NS-P26-12040 | Long Body Transitional Coupling (8") (Jefferson Parish) | 1 | EACH | 3,500.00 | 3,500.00 | | 0100 | NS-P26-12080 | Long Body Transitional Coupling (12 inch) (Jefferson Parish) | 2 | EACH | 4,500.00 | 9,000.00 | | 0101 | NS-P26-18000 | Removal and Disposal of Existing AC Waterline (Jefferson Parish) | 520 | LNFT | 25.00 | 13,000.00 | | 0102 | NS-P26-23000 | Water Service Connections (Jefferson Parish) Includes all necessary work to install a new Water Service Connection and reconnect to any existing (or new) Water Meter | 10 | EACH | 650.00 | 6,500.00 | | 0103 | NS-P26-23060 | Waterline (8" PVC) (Jefferson Parish) | 178 | LNFT | 30.00 | 5,340.00 | | 0104 | NS-P26-23080 | Waterline (12" PVC) (Jefferson Parish) | 873 | LNFT | 45.00 | 39,285.00 | | 0105 | NS-P26-23120 | Waterline (6" PVC) (Restrained) (Jefferson Parish) | 60 | LNFT | 30.00 | 1,800.00 | | 0106 | NS-P26-23140 | Waterline (8" PVC) (Restrained) (Jefferson Parish) | 55 | LNFT | 50.00 | 2,750.00 | | 0107 | NS-P26-23160 | Waterline (12" PVC) (Restrained) (Jefferson Parish) | 197 | LNFT | 65.00 | 12,805.00 | | 0108 | NS-P26-23180 | Waterline (14 inch HDPE) (Directional Drill) (Jefferson Parish) | 525 | LF | 220.00 | 115,500.00 | | 0109 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 56 | EACH | 215.00 | 12,040.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,977,958.60 |
|