Proposal:H.000169.6
Parish:Ouachita
Routes:US 80
Description:UNION PACIFIC RAILROAD BRIDGE AT SICARD
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, PRECAST PRESTRESSED CONCRETE GIRDER SPANS BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$6,991,230.10
| Rank | License | Bidder | Construction Bid |
| 1 | 38936 | SOUTHERN INDUSTRIAL CONTRACTORS LLC | $6,589,062.54 |
| 2 | 34567 | James Construction Group LLC | $7,268,224.55 |
| 3 | 49239 | WL Bass Construction Inc. | $7,474,006.15 |
| 4 | 39462 | JB JAMES CONSTRUCTION LLC | $8,293,927.46 |
| 5 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $8,431,052.25 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - SOUTHERN INDUSTRIAL CONTRACTORS LLC | - 2 - James Construction Group LLC | - 3 - WL Bass Construction Inc. | - 4 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 50,000.00 | 50,000.00 | 295,000.00 | 295,000.00 | 100,000.00 | 100,000.00 | 400,000.00 | 400,000.00 | | 0002 | 202-02-04000 | Removal of Bridge (Sta. 106+51.62; 24' X 649' Steel and Concrete Girder Bridge) | 1 | EACH | 150,000.00 | 150,000.00 | 250,000.00 | 250,000.00 | 150,000.00 | 150,000.00 | 350,000.00 | 350,000.00 | | 0003 | 202-02-06060 | Removal of Concrete Catch Basin | 3 | EACH | 2,000.00 | 6,000.00 | 700.00 | 2,100.00 | 250.00 | 750.00 | 500.00 | 1,500.00 | | 0004 | 202-02-32140 | Removal of Pipe (Storm Drain) 15" RCP | 288 | LNFT | 20.00 | 5,760.00 | 35.00 | 10,080.00 | 10.00 | 2,880.00 | 15.00 | 4,320.00 | | 0005 | 202-02-32140 | Removal of Pipe (Storm Drain) 24" RCP | 49 | LNFT | 25.00 | 1,225.00 | 35.00 | 1,715.00 | 10.00 | 490.00 | 20.00 | 980.00 | | 0006 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,434 | SQYD | 5.00 | 7,170.00 | 10.00 | 14,340.00 | 7.00 | 10,038.00 | 6.73 | 9,650.82 | | 0007 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 1,145 | SQYD | 5.00 | 5,725.00 | 9.00 | 10,305.00 | 7.00 | 8,015.00 | 7.00 | 8,015.00 | | 0008 | 203-01-00100 | General Excavation | 6,614 | CUYD | 7.00 | 46,298.00 | 9.50 | 62,833.00 | 6.00 | 39,684.00 | 15.00 | 99,210.00 | | 0009 | 203-03-00100 | Embankment | 15,228 | CUYD | 15.00 | 228,420.00 | 18.00 | 274,104.00 | 15.00 | 228,420.00 | 31.00 | 472,068.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 3,164 | LNFT | 2.00 | 6,328.00 | 3.15 | 9,966.60 | 1.00 | 3,164.00 | 3.00 | 9,492.00 | | 0011 | 302-02-05121 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 3,671 | SQYD | 23.00 | 84,433.00 | 35.00 | 128,485.00 | 24.00 | 88,104.00 | 28.00 | 102,788.00 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 18.93 | TON | 200.00 | 3,786.00 | 275.00 | 5,205.75 | 150.00 | 2,839.50 | 400.00 | 7,572.00 | | 0013 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 386 | LNFT | 50.00 | 19,300.00 | 80.00 | 30,880.00 | 65.00 | 25,090.00 | 95.00 | 36,670.00 | | 0014 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 2,500.00 | 10,000.00 | 3,500.00 | 14,000.00 | 3,500.00 | 14,000.00 | 2,882.77 | 11,531.08 | | 0015 | 702-03-00500 | Catch Basins (CB-06) | 2 | EACH | 6,000.00 | 12,000.00 | 4,500.00 | 9,000.00 | 5,500.00 | 11,000.00 | 5,100.00 | 10,200.00 | | 0016 | 704-03-00100 | Blocked Out Guard Rail | 50 | LNFT | 22.00 | 1,100.00 | 20.00 | 1,000.00 | 20.00 | 1,000.00 | 20.00 | 1,000.00 | | 0017 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 90.00 | 9,000.00 | 60.00 | 6,000.00 | 60.00 | 6,000.00 | 60.00 | 6,000.00 | | 0018 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 3,000.00 | 12,000.00 | 2,200.00 | 8,800.00 | 2,200.00 | 8,800.00 | 2,300.00 | 9,200.00 | | 0019 | 705-06-00400 | Chain Link Fence (7 Foot Height) | 758 | LNFT | 60.00 | 45,480.00 | 95.00 | 72,010.00 | 30.00 | 22,740.00 | 75.00 | 56,850.00 | | 0020 | 707-03-00100 | Combination Concrete Curb and Gutter | 378.6 | LNFT | 25.00 | 9,465.00 | 40.00 | 15,144.00 | 35.00 | 13,251.00 | 30.00 | 11,358.00 | | 0021 | 708-01-00100 | Right-of-Way Monument | 4 | EACH | 220.00 | 880.00 | 300.00 | 1,200.00 | 300.00 | 1,200.00 | 250.00 | 1,000.00 | | 0022 | 708-02-00100 | Right-of-Way Monument Witness Post | 4 | EACH | 120.00 | 480.00 | 300.00 | 1,200.00 | 300.00 | 1,200.00 | 250.00 | 1,000.00 | | 0023 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 582 | SQYD | 50.00 | 29,100.00 | 72.05 | 41,933.10 | 65.00 | 37,830.00 | 70.00 | 40,740.00 | | 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | 80,000.00 | 80,000.00 | 31,500.00 | 31,500.00 | | 0025 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 1.2 | MILE | 10,000.00 | 12,000.00 | 10,000.00 | 12,000.00 | 10,000.00 | 12,000.00 | 10,000.00 | 12,000.00 | | 0026 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 40 | EACH | 20.00 | 800.00 | 20.00 | 800.00 | 20.00 | 800.00 | 20.00 | 800.00 | | 0027 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 50 | EACH | 1,000.00 | 50,000.00 | 600.00 | 30,000.00 | 200.00 | 10,000.00 | 1,250.00 | 62,500.00 | | 0028 | 716-01-00100 | Mulch (Vegetative) | 4.47 | TON | 1,260.00 | 5,632.20 | 700.00 | 3,129.00 | 850.00 | 3,799.50 | 1,100.00 | 4,917.00 | | 0029 | 717-01-00100 | Seeding | 67 | LB | 12.00 | 804.00 | 15.00 | 1,005.00 | 15.00 | 1,005.00 | 10.00 | 670.00 | | 0030 | 718-01-00100 | Fertilizer | 2,233 | LB | 1.00 | 2,233.00 | 0.50 | 1,116.50 | 1.00 | 2,233.00 | 0.60 | 1,339.80 | | 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 640,000.00 | 640,000.00 | 720,219.00 | 720,219.00 | 700,000.00 | 700,000.00 | 400,000.00 | 400,000.00 | | 0032 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 75.00 | 300.00 | 75.00 | 300.00 | 75.00 | 300.00 | | 0033 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 176 | EACH | 25.00 | 4,400.00 | 20.00 | 3,520.00 | 20.00 | 3,520.00 | 20.00 | 3,520.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 41 | EACH | 25.00 | 1,025.00 | 20.00 | 820.00 | 20.00 | 820.00 | 20.00 | 820.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.2 | MILE | 8,640.00 | 10,368.00 | 7,200.00 | 8,640.00 | 7,200.00 | 8,640.00 | 7,300.00 | 8,760.00 | | 0036 | 732-05-00100 | Removal of Existing Markings | 0.15 | MILE | 18,000.00 | 2,700.00 | 15,000.00 | 2,250.00 | 15,000.00 | 2,250.00 | 15,000.00 | 2,250.00 | | 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 44,500.00 | 44,500.00 | 75,000.00 | 75,000.00 | 51,000.00 | 51,000.00 | | 0038 | 802-02-00100 | Structural Excavation for Intermediate Bents | 956.3 | CUYD | 30.00 | 28,689.00 | 16.00 | 15,300.80 | 14.00 | 13,388.20 | 35.00 | 33,470.50 | | 0039 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | 15,000.00 | 15,000.00 | 135,000.00 | 135,000.00 | | 0040 | 804-01-00200 | Precast Concrete Piles (14") | 100 | LNFT | 80.00 | 8,000.00 | 140.00 | 14,000.00 | 160.00 | 16,000.00 | 99.00 | 9,900.00 | | 0041 | 804-01-00400 | Precast Concrete Piles (18") | 2,530 | LNFT | 80.00 | 202,400.00 | 80.00 | 202,400.00 | 80.00 | 202,400.00 | 100.00 | 253,000.00 | | 0042 | 804-01-00600 | Precast Concrete Piles (24") | 2,520 | LNFT | 100.00 | 252,000.00 | 140.00 | 352,800.00 | 105.00 | 264,600.00 | 125.00 | 315,000.00 | | 0043 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 1.00 | 1.00 | 2,500.00 | 2,500.00 | | 0044 | 804-17-00100 | Dynamic Monitoring | 6 | EACH | 3,000.00 | 18,000.00 | 1,500.00 | 9,000.00 | 3,000.00 | 18,000.00 | 1,000.00 | 6,000.00 | | 0045 | 805-01-00100 | Class A Concrete | 46.3 | CUYD | 1,000.00 | 46,300.00 | 1,100.00 | 50,930.00 | 1,400.00 | 64,820.00 | 900.00 | 41,670.00 | | 0046 | 805-01-00500 | Class A Concrete (Footings) | 343.43 | CUYD | 500.00 | 171,715.00 | 350.00 | 120,200.50 | 615.00 | 211,209.45 | 600.00 | 206,058.00 | | 0047 | 805-01-00700 | Class A Concrete (Bents) | 1,231.2 | CUYD | 650.00 | 800,280.00 | 750.00 | 923,400.00 | 825.00 | 1,015,740.00 | 821.00 | 1,010,815.20 | | 0048 | 805-04-00100 | Class AA(M) Concrete | 932.06 | CUYD | 650.00 | 605,839.00 | 675.00 | 629,140.50 | 950.00 | 885,457.00 | 1,000.00 | 932,060.00 | | 0049 | 805-08-00300 | Precast-Prestressed Concrete Girder (Type III) | 930 | LNFT | 140.40 | 130,572.00 | 120.00 | 111,600.00 | 150.00 | 139,500.00 | 140.00 | 130,200.00 | | 0050 | 805-08-00400 | Precast-Prestressed Concrete Girder (Type IV) | 416.9 | LNFT | 151.80 | 63,285.42 | 120.00 | 50,028.00 | 170.00 | 70,873.00 | 155.00 | 64,619.50 | | 0051 | 805-08-00700 | Precast-Prestressed Concrete Girder (Type BT-72) | 997.1 | LNFT | 190.00 | 189,449.00 | 160.00 | 159,536.00 | 225.00 | 224,347.50 | 180.00 | 179,478.00 | | 0052 | 805-11-00100 | Strip Seal Joints | 413.56 | LNFT | 175.00 | 72,373.00 | 35.00 | 14,474.60 | 70.00 | 28,949.20 | 181.00 | 74,854.36 | | 0053 | 806-01-00100 | Deformed Reinforcing Steel | 614,848 | LB | 0.79 | 485,729.92 | 1.00 | 614,848.00 | 1.00 | 614,848.00 | 1.25 | 768,560.00 | | 0054 | 807-08-00100 | Structural Metalwork | 746,875 | LUMP | 1,512,000.00 | 1,512,000.00 | 1,350,000.00 | 1,350,000.00 | 1,670,000.00 | 1,670,000.00 | 1,500,000.00 | 1,500,000.00 | | 0055 | 810-01-00100 | Concrete Railing (Standard Barrier) | 635 | LNFT | 55.00 | 34,925.00 | 80.00 | 50,800.00 | 60.00 | 38,100.00 | 65.00 | 41,275.00 | | 0056 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 1,015 | LNFT | 75.00 | 76,125.00 | 80.00 | 81,200.00 | 60.00 | 60,900.00 | 70.00 | 71,050.00 | | 0057 | 813-01-00100 | Concrete Approach Slabs | 355.56 | SQYD | 200.00 | 71,112.00 | 320.00 | 113,779.20 | 255.00 | 90,667.80 | 270.00 | 96,001.20 | | 0058 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 144 | INLF | 10.00 | 1,440.00 | 5.00 | 720.00 | 6.00 | 864.00 | 3.00 | 432.00 | | 0059 | NS-502-01000 | Asphalt Concrete | 1,041.2 | TON | 130.00 | 135,356.00 | 155.00 | 161,386.00 | 135.00 | 140,562.00 | 165.00 | 171,798.00 | | 0060 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 416 | INLF | 10.00 | 4,160.00 | 5.00 | 2,080.00 | 1.00 | 416.00 | 4.00 | 1,664.00 | | 0061 | NS-700-00180 | Impact Attenuator (Construction Zone) | 1 | EACH | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | | 0062 | NS-MSC-00120 | Drainage Structure Special Detail PG-DRAIN01 | 1 | EACH | 20,000.00 | 20,000.00 | 2,000.00 | 2,000.00 | 5,500.00 | 5,500.00 | 7,000.00 | 7,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,589,062.54 | | 7,268,224.55 | | 7,474,006.15 | | 8,293,927.46 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 750,000.00 | 750,000.00 | | 0002 | 202-02-04000 | Removal of Bridge (Sta. 106+51.62; 24' X 649' Steel and Concrete Girder Bridge) | 1 | EACH | 150,000.00 | 150,000.00 | | 0003 | 202-02-06060 | Removal of Concrete Catch Basin | 3 | EACH | 1,400.00 | 4,200.00 | | 0004 | 202-02-32140 | Removal of Pipe (Storm Drain) 15" RCP | 288 | LNFT | 22.00 | 6,336.00 | | 0005 | 202-02-32140 | Removal of Pipe (Storm Drain) 24" RCP | 49 | LNFT | 43.00 | 2,107.00 | | 0006 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,434 | SQYD | 10.00 | 14,340.00 | | 0007 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 1,145 | SQYD | 10.00 | 11,450.00 | | 0008 | 203-01-00100 | General Excavation | 6,614 | CUYD | 9.00 | 59,526.00 | | 0009 | 203-03-00100 | Embankment | 15,228 | CUYD | 23.00 | 350,244.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 3,164 | LNFT | 2.50 | 7,910.00 | | 0011 | 302-02-05121 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 3,671 | SQYD | 38.00 | 139,498.00 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 18.93 | TON | 600.00 | 11,358.00 | | 0013 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 386 | LNFT | 100.00 | 38,600.00 | | 0014 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 4,000.00 | 16,000.00 | | 0015 | 702-03-00500 | Catch Basins (CB-06) | 2 | EACH | 7,000.00 | 14,000.00 | | 0016 | 704-03-00100 | Blocked Out Guard Rail | 50 | LNFT | 22.00 | 1,100.00 | | 0017 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 67.00 | 6,700.00 | | 0018 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,700.00 | 10,800.00 | | 0019 | 705-06-00400 | Chain Link Fence (7 Foot Height) | 758 | LNFT | 100.00 | 75,800.00 | | 0020 | 707-03-00100 | Combination Concrete Curb and Gutter | 378.6 | LNFT | 35.00 | 13,251.00 | | 0021 | 708-01-00100 | Right-of-Way Monument | 4 | EACH | 325.00 | 1,300.00 | | 0022 | 708-02-00100 | Right-of-Way Monument Witness Post | 4 | EACH | 325.00 | 1,300.00 | | 0023 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 582 | SQYD | 87.00 | 50,634.00 | | 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 93,000.00 | 93,000.00 | | 0025 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 1.2 | MILE | 11,000.00 | 13,200.00 | | 0026 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 40 | EACH | 22.00 | 880.00 | | 0027 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 50 | EACH | 1,100.00 | 55,000.00 | | 0028 | 716-01-00100 | Mulch (Vegetative) | 4.47 | TON | 800.00 | 3,576.00 | | 0029 | 717-01-00100 | Seeding | 67 | LB | 16.00 | 1,072.00 | | 0030 | 718-01-00100 | Fertilizer | 2,233 | LB | 0.55 | 1,228.15 | | 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 840,000.00 | 840,000.00 | | 0032 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 80.00 | 320.00 | | 0033 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 176 | EACH | 21.00 | 3,696.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 41 | EACH | 21.00 | 861.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.2 | MILE | 7,250.00 | 8,700.00 | | 0036 | 732-05-00100 | Removal of Existing Markings | 0.15 | MILE | 16,000.00 | 2,400.00 | | 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | | 0038 | 802-02-00100 | Structural Excavation for Intermediate Bents | 956.3 | CUYD | 45.00 | 43,033.50 | | 0039 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 25,000.00 | 25,000.00 | | 0040 | 804-01-00200 | Precast Concrete Piles (14") | 100 | LNFT | 108.00 | 10,800.00 | | 0041 | 804-01-00400 | Precast Concrete Piles (18") | 2,530 | LNFT | 80.00 | 202,400.00 | | 0042 | 804-01-00600 | Precast Concrete Piles (24") | 2,520 | LNFT | 102.00 | 257,040.00 | | 0043 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 6,000.00 | 6,000.00 | | 0044 | 804-17-00100 | Dynamic Monitoring | 6 | EACH | 850.00 | 5,100.00 | | 0045 | 805-01-00100 | Class A Concrete | 46.3 | CUYD | 1,225.00 | 56,717.50 | | 0046 | 805-01-00500 | Class A Concrete (Footings) | 343.43 | CUYD | 610.00 | 209,492.30 | | 0047 | 805-01-00700 | Class A Concrete (Bents) | 1,231.2 | CUYD | 610.00 | 751,032.00 | | 0048 | 805-04-00100 | Class AA(M) Concrete | 932.06 | CUYD | 800.00 | 745,648.00 | | 0049 | 805-08-00300 | Precast-Prestressed Concrete Girder (Type III) | 930 | LNFT | 125.00 | 116,250.00 | | 0050 | 805-08-00400 | Precast-Prestressed Concrete Girder (Type IV) | 416.9 | LNFT | 135.00 | 56,281.50 | | 0051 | 805-08-00700 | Precast-Prestressed Concrete Girder (Type BT-72) | 997.1 | LNFT | 155.00 | 154,550.50 | | 0052 | 805-11-00100 | Strip Seal Joints | 413.56 | LNFT | 160.00 | 66,169.60 | | 0053 | 806-01-00100 | Deformed Reinforcing Steel | 614,848 | LB | 0.90 | 553,363.20 | | 0054 | 807-08-00100 | Structural Metalwork | 746,875 | LUMP | 1,900,000.00 | 1,900,000.00 | | 0055 | 810-01-00100 | Concrete Railing (Standard Barrier) | 635 | LNFT | 80.00 | 50,800.00 | | 0056 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 1,015 | LNFT | 80.00 | 81,200.00 | | 0057 | 813-01-00100 | Concrete Approach Slabs | 355.56 | SQYD | 325.00 | 115,557.00 | | 0058 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 144 | INLF | 7.00 | 1,008.00 | | 0059 | NS-502-01000 | Asphalt Concrete | 1,041.2 | TON | 135.00 | 140,562.00 | | 0060 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 416 | INLF | 10.00 | 4,160.00 | | 0061 | NS-700-00180 | Impact Attenuator (Construction Zone) | 1 | EACH | 11,000.00 | 11,000.00 | | 0062 | NS-MSC-00120 | Drainage Structure Special Detail PG-DRAIN01 | 1 | EACH | 7,500.00 | 7,500.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,431,052.25 |
|