Search


Bid Tabulations for the Letting of 6/8/2016 LA DOTD Headquarters

Proposal:H.000169.6
Parish:Ouachita
Routes:US 80
Description:UNION PACIFIC RAILROAD BRIDGE AT SICARD
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, PRECAST PRESTRESSED CONCRETE GIRDER SPANS BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$6,991,230.10
Rank License BidderConstruction Bid
138936SOUTHERN INDUSTRIAL CONTRACTORS LLC$6,589,062.54
234567James Construction Group LLC$7,268,224.55
349239WL Bass Construction Inc.$7,474,006.15
439462JB JAMES CONSTRUCTION LLC$8,293,927.46
512312GILCHRIST CONSTRUCTION CO. LLC$8,431,052.25


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
SOUTHERN INDUSTRIAL CONTRACTORS LLC
- 2 -
James Construction Group LLC
- 3 -
WL Bass Construction Inc.
- 4 -
JB JAMES CONSTRUCTION LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 2     LUMP50,000.0050,000.00295,000.00295,000.00100,000.00100,000.00400,000.00400,000.00
0002202-02-04000Removal of Bridge (Sta. 106+51.62; 24' X 649' Steel and Concrete Girder Bridge)1     EACH150,000.00150,000.00250,000.00250,000.00150,000.00150,000.00350,000.00350,000.00
0003202-02-06060Removal of Concrete Catch Basin 3     EACH2,000.006,000.00700.002,100.00250.00750.00500.001,500.00
0004202-02-32140Removal of Pipe (Storm Drain) 15" RCP288     LNFT20.005,760.0035.0010,080.0010.002,880.0015.004,320.00
0005202-02-32140Removal of Pipe (Storm Drain) 24" RCP49     LNFT25.001,225.0035.001,715.0010.00490.0020.00980.00
0006202-02-32500Removal of Portland Cement Concrete Pavement 1,434     SQYD5.007,170.0010.0014,340.007.0010,038.006.739,650.82
0007202-02-38500Removal of Surfacing and Stabilized Base 1,145     SQYD5.005,725.009.0010,305.007.008,015.007.008,015.00
0008203-01-00100General Excavation 6,614     CUYD7.0046,298.009.5062,833.006.0039,684.0015.0099,210.00
0009203-03-00100Embankment 15,228     CUYD15.00228,420.0018.00274,104.0015.00228,420.0031.00472,068.00
0010204-06-00100Temporary Silt Fencing 3,164     LNFT2.006,328.003.159,966.601.003,164.003.009,492.00
0011302-02-05121Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 3,671     SQYD23.0084,433.0035.00128,485.0024.0088,104.0028.00102,788.00
0012304-05-00100Lime Treatment (Type E) 18.93  TON200.003,786.00275.005,205.75150.002,839.50400.007,572.00
0013701-05-01040Side Drain Pipe (18" RCP/PP/CMP) 386     LNFT50.0019,300.0080.0030,880.0065.0025,090.0095.0036,670.00
0014702-03-00100Catch Basins (CB-01) 4     EACH2,500.0010,000.003,500.0014,000.003,500.0014,000.002,882.7711,531.08
0015702-03-00500Catch Basins (CB-06) 2     EACH6,000.0012,000.004,500.009,000.005,500.0011,000.005,100.0010,200.00
0016704-03-00100Blocked Out Guard Rail 50     LNFT22.001,100.0020.001,000.0020.001,000.0020.001,000.00
0017704-08-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT90.009,000.0060.006,000.0060.006,000.0060.006,000.00
0018704-11-00100Guard Rail End Treatment (Flared) 4     EACH3,000.0012,000.002,200.008,800.002,200.008,800.002,300.009,200.00
0019705-06-00400Chain Link Fence (7 Foot Height) 758     LNFT60.0045,480.0095.0072,010.0030.0022,740.0075.0056,850.00
0020707-03-00100Combination Concrete Curb and Gutter 378.6   LNFT25.009,465.0040.0015,144.0035.0013,251.0030.0011,358.00
0021708-01-00100Right-of-Way Monument 4     EACH220.00880.00300.001,200.00300.001,200.00250.001,000.00
0022708-02-00100Right-of-Way Monument Witness Post 4     EACH120.00480.00300.001,200.00300.001,200.00250.001,000.00
0023712-01-00100Concrete Cast-in-Place Revetment (4" Thick) 582     SQYD50.0029,100.0072.0541,933.1065.0037,830.0070.0040,740.00
0024713-01-00100Temporary Signs and Barricades 1     LUMP50,000.0050,000.0025,000.0025,000.0080,000.0080,000.0031,500.0031,500.00
0025713-04-01020Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) 1.2   MILE10,000.0012,000.0010,000.0012,000.0010,000.0012,000.0010,000.0012,000.00
0026713-06-00100Temporary Reflectorized Raised Pavement Markers 40     EACH20.00800.0020.00800.0020.00800.0020.00800.00
0027713-07-00100Temporary Precast Concrete Barrier (Contractor Furnished) 50     EACH1,000.0050,000.00600.0030,000.00200.0010,000.001,250.0062,500.00
0028716-01-00100Mulch (Vegetative) 4.47  TON1,260.005,632.20700.003,129.00850.003,799.501,100.004,917.00
0029717-01-00100Seeding 67     LB12.00804.0015.001,005.0015.001,005.0010.00670.00
0030718-01-00100Fertilizer 2,233     LB1.002,233.000.501,116.501.002,233.000.601,339.80
0031727-01-00100Mobilization 1     LUMP640,000.00640,000.00720,219.00720,219.00700,000.00700,000.00400,000.00400,000.00
0032729-16-00300Object Marker Assembly (Type 3) 4     EACH100.00400.0075.00300.0075.00300.0075.00300.00
0033731-01-00100Nonreflectorized Raised Pavement Markers 176     EACH25.004,400.0020.003,520.0020.003,520.0020.003,520.00
0034731-02-00100Reflectorized Raised Pavement Markers 41     EACH25.001,025.0020.00820.0020.00820.0020.00820.00
0035732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 1.2   MILE8,640.0010,368.007,200.008,640.007,200.008,640.007,300.008,760.00
0036732-05-00100Removal of Existing Markings 0.15  MILE18,000.002,700.0015,000.002,250.0015,000.002,250.0015,000.002,250.00
0037740-01-00100Construction Layout 1     LUMP50,000.0050,000.0044,500.0044,500.0075,000.0075,000.0051,000.0051,000.00
0038802-02-00100Structural Excavation for Intermediate Bents 956.3   CUYD30.0028,689.0016.0015,300.8014.0013,388.2035.0033,470.50
0039803-05-00100Temporary Sheeting 1     LUMP50,000.0050,000.00100,000.00100,000.0015,000.0015,000.00135,000.00135,000.00
0040804-01-00200Precast Concrete Piles (14") 100     LNFT80.008,000.00140.0014,000.00160.0016,000.0099.009,900.00
0041804-01-00400Precast Concrete Piles (18") 2,530     LNFT80.00202,400.0080.00202,400.0080.00202,400.00100.00253,000.00
0042804-01-00600Precast Concrete Piles (24") 2,520     LNFT100.00252,000.00140.00352,800.00105.00264,600.00125.00315,000.00
0043804-12-00100Loading Permanent Piles 1     EACH10,000.0010,000.0010,000.0010,000.001.001.002,500.002,500.00
0044804-17-00100Dynamic Monitoring 6     EACH3,000.0018,000.001,500.009,000.003,000.0018,000.001,000.006,000.00
0045805-01-00100Class A Concrete 46.3   CUYD1,000.0046,300.001,100.0050,930.001,400.0064,820.00900.0041,670.00
0046805-01-00500Class A Concrete (Footings) 343.43  CUYD500.00171,715.00350.00120,200.50615.00211,209.45600.00206,058.00
0047805-01-00700Class A Concrete (Bents) 1,231.2   CUYD650.00800,280.00750.00923,400.00825.001,015,740.00821.001,010,815.20
0048805-04-00100Class AA(M) Concrete 932.06  CUYD650.00605,839.00675.00629,140.50950.00885,457.001,000.00932,060.00
0049805-08-00300Precast-Prestressed Concrete Girder (Type III) 930     LNFT140.40130,572.00120.00111,600.00150.00139,500.00140.00130,200.00
0050805-08-00400Precast-Prestressed Concrete Girder (Type IV) 416.9   LNFT151.8063,285.42120.0050,028.00170.0070,873.00155.0064,619.50
0051805-08-00700Precast-Prestressed Concrete Girder (Type BT-72) 997.1   LNFT190.00189,449.00160.00159,536.00225.00224,347.50180.00179,478.00
0052805-11-00100Strip Seal Joints 413.56  LNFT175.0072,373.0035.0014,474.6070.0028,949.20181.0074,854.36
0053806-01-00100Deformed Reinforcing Steel 614,848     LB0.79485,729.921.00614,848.001.00614,848.001.25768,560.00
0054807-08-00100Structural Metalwork 746,875     LUMP1,512,000.001,512,000.001,350,000.001,350,000.001,670,000.001,670,000.001,500,000.001,500,000.00
0055810-01-00100Concrete Railing (Standard Barrier) 635     LNFT55.0034,925.0080.0050,800.0060.0038,100.0065.0041,275.00
0056810-01-00200Concrete Railing (Slotted Barrier) 1,015     LNFT75.0076,125.0080.0081,200.0060.0060,900.0070.0071,050.00
0057813-01-00100Concrete Approach Slabs 355.56  SQYD200.0071,112.00320.00113,779.20255.0090,667.80270.0096,001.20
0058NS-500-00340Saw Cutting Asphaltic Concrete Pavement 144     INLF10.001,440.005.00720.006.00864.003.00432.00
0059NS-502-01000Asphalt Concrete 1,041.2   TON130.00135,356.00155.00161,386.00135.00140,562.00165.00171,798.00
0060NS-600-00220Saw Cutting Portland Cement Concrete Pavement 416     INLF10.004,160.005.002,080.001.00416.004.001,664.00
0061NS-700-00180Impact Attenuator (Construction Zone) 1     EACH25,000.0025,000.0010,000.0010,000.005,000.005,000.0010,000.0010,000.00
0062NS-MSC-00120Drainage Structure Special Detail PG-DRAIN011     EACH20,000.0020,000.002,000.002,000.005,500.005,500.007,000.007,000.00
             
  CONTRACTOR TOTAL   6,589,062.54 7,268,224.55 7,474,006.15 8,293,927.46



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
GILCHRIST CONSTRUCTION CO. LLC
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 2     LUMP750,000.00750,000.00
0002202-02-04000Removal of Bridge (Sta. 106+51.62; 24' X 649' Steel and Concrete Girder Bridge)1     EACH150,000.00150,000.00
0003202-02-06060Removal of Concrete Catch Basin 3     EACH1,400.004,200.00
0004202-02-32140Removal of Pipe (Storm Drain) 15" RCP288     LNFT22.006,336.00
0005202-02-32140Removal of Pipe (Storm Drain) 24" RCP49     LNFT43.002,107.00
0006202-02-32500Removal of Portland Cement Concrete Pavement 1,434     SQYD10.0014,340.00
0007202-02-38500Removal of Surfacing and Stabilized Base 1,145     SQYD10.0011,450.00
0008203-01-00100General Excavation 6,614     CUYD9.0059,526.00
0009203-03-00100Embankment 15,228     CUYD23.00350,244.00
0010204-06-00100Temporary Silt Fencing 3,164     LNFT2.507,910.00
0011302-02-05121Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 3,671     SQYD38.00139,498.00
0012304-05-00100Lime Treatment (Type E) 18.93  TON600.0011,358.00
0013701-05-01040Side Drain Pipe (18" RCP/PP/CMP) 386     LNFT100.0038,600.00
0014702-03-00100Catch Basins (CB-01) 4     EACH4,000.0016,000.00
0015702-03-00500Catch Basins (CB-06) 2     EACH7,000.0014,000.00
0016704-03-00100Blocked Out Guard Rail 50     LNFT22.001,100.00
0017704-08-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT67.006,700.00
0018704-11-00100Guard Rail End Treatment (Flared) 4     EACH2,700.0010,800.00
0019705-06-00400Chain Link Fence (7 Foot Height) 758     LNFT100.0075,800.00
0020707-03-00100Combination Concrete Curb and Gutter 378.6   LNFT35.0013,251.00
0021708-01-00100Right-of-Way Monument 4     EACH325.001,300.00
0022708-02-00100Right-of-Way Monument Witness Post 4     EACH325.001,300.00
0023712-01-00100Concrete Cast-in-Place Revetment (4" Thick) 582     SQYD87.0050,634.00
0024713-01-00100Temporary Signs and Barricades 1     LUMP93,000.0093,000.00
0025713-04-01020Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) 1.2   MILE11,000.0013,200.00
0026713-06-00100Temporary Reflectorized Raised Pavement Markers 40     EACH22.00880.00
0027713-07-00100Temporary Precast Concrete Barrier (Contractor Furnished) 50     EACH1,100.0055,000.00
0028716-01-00100Mulch (Vegetative) 4.47  TON800.003,576.00
0029717-01-00100Seeding 67     LB16.001,072.00
0030718-01-00100Fertilizer 2,233     LB0.551,228.15
0031727-01-00100Mobilization 1     LUMP840,000.00840,000.00
0032729-16-00300Object Marker Assembly (Type 3) 4     EACH80.00320.00
0033731-01-00100Nonreflectorized Raised Pavement Markers 176     EACH21.003,696.00
0034731-02-00100Reflectorized Raised Pavement Markers 41     EACH21.00861.00
0035732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 1.2   MILE7,250.008,700.00
0036732-05-00100Removal of Existing Markings 0.15  MILE16,000.002,400.00
0037740-01-00100Construction Layout 1     LUMP100,000.00100,000.00
0038802-02-00100Structural Excavation for Intermediate Bents 956.3   CUYD45.0043,033.50
0039803-05-00100Temporary Sheeting 1     LUMP25,000.0025,000.00
0040804-01-00200Precast Concrete Piles (14") 100     LNFT108.0010,800.00
0041804-01-00400Precast Concrete Piles (18") 2,530     LNFT80.00202,400.00
0042804-01-00600Precast Concrete Piles (24") 2,520     LNFT102.00257,040.00
0043804-12-00100Loading Permanent Piles 1     EACH6,000.006,000.00
0044804-17-00100Dynamic Monitoring 6     EACH850.005,100.00
0045805-01-00100Class A Concrete 46.3   CUYD1,225.0056,717.50
0046805-01-00500Class A Concrete (Footings) 343.43  CUYD610.00209,492.30
0047805-01-00700Class A Concrete (Bents) 1,231.2   CUYD610.00751,032.00
0048805-04-00100Class AA(M) Concrete 932.06  CUYD800.00745,648.00
0049805-08-00300Precast-Prestressed Concrete Girder (Type III) 930     LNFT125.00116,250.00
0050805-08-00400Precast-Prestressed Concrete Girder (Type IV) 416.9   LNFT135.0056,281.50
0051805-08-00700Precast-Prestressed Concrete Girder (Type BT-72) 997.1   LNFT155.00154,550.50
0052805-11-00100Strip Seal Joints 413.56  LNFT160.0066,169.60
0053806-01-00100Deformed Reinforcing Steel 614,848     LB0.90553,363.20
0054807-08-00100Structural Metalwork 746,875     LUMP1,900,000.001,900,000.00
0055810-01-00100Concrete Railing (Standard Barrier) 635     LNFT80.0050,800.00
0056810-01-00200Concrete Railing (Slotted Barrier) 1,015     LNFT80.0081,200.00
0057813-01-00100Concrete Approach Slabs 355.56  SQYD325.00115,557.00
0058NS-500-00340Saw Cutting Asphaltic Concrete Pavement 144     INLF7.001,008.00
0059NS-502-01000Asphalt Concrete 1,041.2   TON135.00140,562.00
0060NS-600-00220Saw Cutting Portland Cement Concrete Pavement 416     INLF10.004,160.00
0061NS-700-00180Impact Attenuator (Construction Zone) 1     EACH11,000.0011,000.00
0062NS-MSC-00120Drainage Structure Special Detail PG-DRAIN011     EACH7,500.007,500.00
       
  CONTRACTOR TOTAL   8,431,052.25