Proposal:H.011575.6
Parish:Pointe Coupee
Routes:LA 10, LA 417, LA 77
Description:LA 417, LA 77 & LA 10: STAB, OVLY & AGG
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, LIME TREATMENT IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$10,525,336.73
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $8,998,431.48 |
| 2 | 00849 | F. G. Sullivan, Jr. Contractor LLC | $9,818,213.38 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $10,010,544.41 |
| 4 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $10,290,133.18 |
| 5 | 00046 | Barber Bros. Contracting Co., L.L.C | $10,699,375.95 |
| 6 | 00481 | COASTAL BRIDGE CO., L.L.C. | $11,264,501.97 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - F. G. Sullivan, Jr. Contractor LLC | - 3 - Diamond B Construction Co., L.L.C. | - 4 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 171 | SQYD | 10.00 | 1,710.00 | 9.00 | 1,539.00 | 10.00 | 1,710.00 | 15.00 | 2,565.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 769 | LNFT | 6.00 | 4,614.00 | 7.00 | 5,383.00 | 12.50 | 9,612.50 | 15.00 | 11,535.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) SEE DRAINAGE SUMMARY FOR LOCATIONS | 2,871 | LNFT | 6.00 | 17,226.00 | 22.00 | 63,162.00 | 10.00 | 28,710.00 | 5.50 | 15,790.50 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) SEE DRAINAGE SUMMARY FOR LOCATIONS | 231 | LNFT | 6.00 | 1,386.00 | 8.50 | 1,963.50 | 6.00 | 1,386.00 | 5.50 | 1,270.50 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 8,303 | CUYD | 15.00 | 124,545.00 | 5.00 | 41,515.00 | 16.00 | 132,848.00 | 25.00 | 207,575.00 | | 0006 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 2,116 | CUYD | 15.00 | 31,740.00 | 2.00 | 4,232.00 | 18.00 | 38,088.00 | 13.00 | 27,508.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 302 | EACH | 95.00 | 28,690.00 | 103.00 | 31,106.00 | 130.00 | 39,260.00 | 100.00 | 30,200.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 18,000 | LNFT | 1.50 | 27,000.00 | 1.70 | 30,600.00 | 2.00 | 36,000.00 | 1.65 | 29,700.00 | | 0009 | 303-02-00100 | Removal of Existing Patches | 2,000 | SQYD | 5.00 | 10,000.00 | 2.00 | 4,000.00 | 9.00 | 18,000.00 | 10.00 | 20,000.00 | | 0010 | 304-01-00100 | Lime | 113.08 | TON | 195.00 | 22,050.60 | 220.00 | 24,877.60 | 196.00 | 22,163.68 | 200.00 | 22,616.00 | | 0011 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | 4,785.95 | SQYD | 3.25 | 15,554.34 | 3.00 | 14,357.85 | 13.00 | 62,217.35 | 3.35 | 16,032.93 | | 0013 | 308-01-00100 | In-Place Cement Treated Base Course (12" Thick) | 191,439 | SQYD | 8.00 | 1,531,512.00 | 9.50 | 1,818,670.50 | 8.00 | 1,531,512.00 | 9.25 | 1,770,810.75 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 6,222 | CUYD | 20.00 | 124,440.00 | 17.25 | 107,329.50 | 36.00 | 223,992.00 | 40.00 | 248,880.00 | | 0015 | 403-01-00100 | Aggregate Roadway Surfacing (Vehicular Measurement) | 6,353.9 | CUYD | 45.00 | 285,925.50 | 60.50 | 384,410.95 | 60.00 | 381,234.00 | 80.00 | 508,312.00 | | 0016 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 2,064 | LNFT | 90.00 | 185,760.00 | 151.00 | 311,664.00 | 99.00 | 204,336.00 | 125.00 | 258,000.00 | | 0017 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 56 | LNFT | 98.00 | 5,488.00 | 140.00 | 7,840.00 | 105.00 | 5,880.00 | 150.00 | 8,400.00 | | 0018 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 112 | LNFT | 125.00 | 14,000.00 | 143.00 | 16,016.00 | 132.00 | 14,784.00 | 130.00 | 14,560.00 | | 0019 | 701-02-01060 | Cross Drain Pipe Arch (42" Equiv. RCPA) | 112 | LNFT | 190.00 | 21,280.00 | 173.00 | 19,376.00 | 200.00 | 22,400.00 | 150.00 | 16,800.00 | | 0020 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | 64 | LNFT | 400.00 | 25,600.00 | 293.00 | 18,752.00 | 420.00 | 26,880.00 | 355.00 | 22,720.00 | | 0021 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) RCP ONLY | 72 | LNFT | 80.00 | 5,760.00 | 74.00 | 5,328.00 | 85.00 | 6,120.00 | 70.00 | 5,040.00 | | 0022 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) RCP ONLY | 192 | LNFT | 95.00 | 18,240.00 | 80.00 | 15,360.00 | 100.00 | 19,200.00 | 80.00 | 15,360.00 | | 0023 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 16 | LNFT | 100.00 | 1,600.00 | 175.00 | 2,800.00 | 105.00 | 1,680.00 | 175.00 | 2,800.00 | | 0024 | 701-14-00100 | Cleaning Existing Pipes | 1,120 | LNFT | 10.00 | 11,200.00 | 10.50 | 11,760.00 | 10.50 | 11,760.00 | 30.00 | 33,600.00 | | 0025 | 701-15-00100 | Concrete Collar | 2 | EACH | 650.00 | 1,300.00 | 940.00 | 1,880.00 | 700.00 | 1,400.00 | 850.00 | 1,700.00 | | 0026 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 212.5 | LNFT | 55.00 | 11,687.50 | 40.00 | 8,500.00 | 55.00 | 11,687.50 | 45.00 | 9,562.50 | | 0027 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 412 | LNFT | 36.00 | 14,832.00 | 35.00 | 14,420.00 | 45.00 | 18,540.00 | 33.00 | 13,596.00 | | 0028 | 704-03-00100 | Blocked Out Guard Rail | 312.5 | LNFT | 20.00 | 6,250.00 | 21.00 | 6,562.50 | 26.00 | 8,125.00 | 23.00 | 7,187.50 | | 0029 | 704-06-00100 | Guard Rail Anchor Sections (Trailing End) | 25 | LNFT | 60.00 | 1,500.00 | 65.50 | 1,637.50 | 86.00 | 2,150.00 | 90.00 | 2,250.00 | | 0030 | 704-06-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 6.25 | LNFT | 80.00 | 500.00 | 102.97 | 643.56 | 95.00 | 593.75 | 97.00 | 606.25 | | 0031 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 76.00 | 15,200.00 | 73.00 | 14,600.00 | 64.00 | 12,800.00 | 75.00 | 15,000.00 | | 0032 | 704-11-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 2 | EACH | 2,000.00 | 4,000.00 | 2,450.00 | 4,900.00 | 5,725.00 | 11,450.00 | 2,400.00 | 4,800.00 | | 0033 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 5 | EACH | 2,000.00 | 10,000.00 | 2,650.00 | 13,250.00 | 2,550.00 | 12,750.00 | 2,700.00 | 13,500.00 | | 0034 | 706-02-00200 | Concrete Drive (6" Thick) | 156 | SQYD | 72.00 | 11,232.00 | 80.00 | 12,480.00 | 74.00 | 11,544.00 | 78.00 | 12,168.00 | | 0035 | 711-03-00200 | Riprap (10 lb) | 520 | TON | 60.00 | 31,200.00 | 87.00 | 45,240.00 | 78.00 | 40,560.00 | 95.00 | 49,400.00 | | 0036 | 711-03-00300 | Riprap (30 lb) | 520 | TON | 60.00 | 31,200.00 | 96.00 | 49,920.00 | 77.00 | 40,040.00 | 81.00 | 42,120.00 | | 0037 | 711-04-00100 | Geotextile Fabric | 2,060 | SQYD | 2.00 | 4,120.00 | 2.00 | 4,120.00 | 2.00 | 4,120.00 | 3.50 | 7,210.00 | | 0038 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 460,000.00 | 460,000.00 | 91,000.00 | 91,000.00 | 190,000.00 | 190,000.00 | 55,000.00 | 55,000.00 | | 0039 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 168 | LNFT | 0.25 | 42.00 | 0.30 | 50.40 | 0.25 | 42.00 | 0.80 | 134.40 | | 0040 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 57.28 | MILE | 100.00 | 5,728.00 | 177.00 | 10,138.56 | 154.00 | 8,821.12 | 225.00 | 12,888.00 | | 0041 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 25.35 | MILE | 400.00 | 10,140.00 | 434.00 | 11,001.90 | 1.00 | 25.35 | 400.00 | 10,140.00 | | 0042 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 121.14 | MILE | 300.00 | 36,342.00 | 650.00 | 78,741.00 | 1.00 | 121.14 | 600.00 | 72,684.00 | | 0043 | 717-01-00100 | Seeding | 1,304.2 | LB | 10.00 | 13,042.00 | 11.00 | 14,346.20 | 15.50 | 20,215.10 | 11.00 | 14,346.20 | | 0044 | 718-01-00100 | Fertilizer | 43,471 | LB | 0.55 | 23,909.05 | 0.60 | 26,082.60 | 0.50 | 21,735.50 | 0.60 | 26,082.60 | | 0045 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 25,000.00 | 25,000.00 | 5,600.00 | 5,600.00 | 2,525.00 | 2,525.00 | 3,500.00 | 3,500.00 | | 0046 | 726-01-00100 | Bedding Material | 1,339 | CUYD | 89.00 | 119,171.00 | 56.00 | 74,984.00 | 90.00 | 120,510.00 | 90.00 | 120,510.00 | | 0047 | 727-01-00100 | Mobilization | 1 | LUMP | 230,000.00 | 230,000.00 | 250,000.00 | 250,000.00 | 330,000.00 | 330,000.00 | 490,000.00 | 490,000.00 | | 0048 | 729-16-00200 | Object Marker Assembly (Type 2) | 144 | EACH | 45.00 | 6,480.00 | 49.00 | 7,056.00 | 62.00 | 8,928.00 | 47.00 | 6,768.00 | | 0049 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 75.00 | 900.00 | 82.00 | 984.00 | 77.00 | 924.00 | 80.00 | 960.00 | | 0050 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,332 | EACH | 6.00 | 13,992.00 | 6.50 | 15,158.00 | 6.00 | 13,992.00 | 6.50 | 15,158.00 | | 0051 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 56 | LNFT | 25.00 | 1,400.00 | 27.50 | 1,540.00 | 26.15 | 1,464.40 | 21.00 | 1,176.00 | | 0052 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 40.38 | MILE | 3,900.00 | 157,482.00 | 4,120.00 | 166,365.60 | 4,000.00 | 161,520.00 | 3,700.00 | 149,406.00 | | 0053 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 10.966 | MILE | 1,200.00 | 13,159.20 | 1,302.00 | 14,277.73 | 1,215.00 | 13,323.69 | 1,000.00 | 10,966.00 | | 0054 | 735-01-00100 | Mailboxes | 129 | EACH | 1.00 | 129.00 | 3.25 | 419.25 | 1.00 | 129.00 | 1.00 | 129.00 | | 0055 | 735-02-00100 | Mailbox Supports (Single) | 123 | EACH | 100.00 | 12,300.00 | 120.00 | 14,760.00 | 105.00 | 12,915.00 | 110.00 | 13,530.00 | | 0056 | 735-04-00100 | Mailbox Supports (Multiple) | 2 | EACH | 350.00 | 700.00 | 355.00 | 710.00 | 250.00 | 500.00 | 360.00 | 720.00 | | 0057 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 91,800.00 | 91,800.00 | 190,000.00 | 190,000.00 | 27,000.00 | 27,000.00 | | 0058 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 164.45 | CUYD | 950.00 | 156,227.50 | 1,271.00 | 209,015.95 | 955.00 | 157,049.75 | 900.00 | 148,005.00 | | 0059 | 805-12-22020 | Reinforced Concrete Box Culverts (7' x 6') (Precast) | 64 | LNFT | 600.00 | 38,400.00 | 1,465.00 | 93,760.00 | 710.00 | 45,440.00 | 650.00 | 41,600.00 | | 0060 | 805-12-23020 | Reinforced Concrete Box Culverts (8' x 7') (Precast) | 168 | LNFT | 700.00 | 117,600.00 | 1,438.00 | 241,584.00 | 760.00 | 127,680.00 | 600.00 | 100,800.00 | | 0061 | 805-12-23040 | Reinforced Concrete Box Culverts (9' x 7') (Precast) | 48 | LNFT | 800.00 | 38,400.00 | 2,300.00 | 110,400.00 | 875.00 | 42,000.00 | 1,000.00 | 48,000.00 | | 0062 | 805-12-24000 | Reinforced Concrete Box Culverts (8' x 8') (Precast) | 160 | LNFT | 750.00 | 120,000.00 | 2,375.00 | 380,000.00 | 825.00 | 132,000.00 | 700.00 | 112,000.00 | | 0063 | 806-01-00100 | Deformed Reinforcing Steel | 10,940 | LB | 1.75 | 19,145.00 | 2.10 | 22,974.00 | 1.75 | 19,145.00 | 1.50 | 16,410.00 | | 0064 | NS-200-00020 | Cleaning Existing Ditches | 8,225 | LNFT | 6.75 | 55,518.75 | 2.70 | 22,207.50 | 7.00 | 57,575.00 | 15.00 | 123,375.00 | | 0065 | NS-500-00300 | Traffic Maintenance Superpave Asphaltic Concrete | 950 | TON | 71.00 | 67,450.00 | 75.00 | 71,250.00 | 92.00 | 87,400.00 | 120.00 | 114,000.00 | | 0066 | NS-502-01000 | Asphalt Concrete | 36,192.2 | TON | 71.00 | 2,569,646.20 | 80.00 | 2,895,376.00 | 76.00 | 2,750,607.20 | 75.00 | 2,714,415.00 | | 0067 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 3,139.2 | TON | 71.00 | 222,883.20 | 86.00 | 269,971.20 | 115.00 | 361,008.00 | 140.00 | 439,488.00 | | 0068 | NS-507-01100 | Asphalt Material (CRS-2P Emulsion) | 125,414 | GAL | 2.00 | 250,828.00 | 2.75 | 344,888.50 | 2.35 | 294,722.90 | 2.35 | 294,722.90 | | 0069 | NS-507-02200 | Aggregate (S2) | 184,432.3 | SQYD | 0.86 | 158,611.78 | 1.00 | 184,432.30 | 0.90 | 165,989.07 | 0.90 | 165,989.07 | | 0070 | NS-507-02300 | Aggregate (S3) | 184,432.3 | SQYD | 0.68 | 125,413.96 | 0.75 | 138,324.23 | 0.70 | 129,102.61 | 0.73 | 134,635.58 | | 0071 | NS-509-01000 | Milling Asphalt Pavement | 167,857 | SQYD | 2.00 | 335,714.00 | 2.00 | 335,714.00 | 2.00 | 335,714.00 | 1.50 | 251,785.50 | | 0072 | NS-509-02000 | Contractor Retained Reclaimed Asphalt Pavement | -6,995 | CUYD | 1.00 | -6,995.00 | 0.00 | 0.00 | 1.00 | -6,995.00 | 1.00 | -6,995.00 | | 0073 | NS-510-01400 | Pavement Patching (12" Minimum Thickness) | 1,377 | SQYD | 70.00 | 96,390.00 | 43.00 | 59,211.00 | 75.00 | 103,275.00 | 95.00 | 130,815.00 | | 0074 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,954 | INLF | 0.85 | 1,660.90 | 5.00 | 9,770.00 | 7.50 | 14,655.00 | 1.50 | 2,931.00 | | 0075 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 57,432 | SQYD | 14.00 | 804,048.00 | 6.00 | 344,592.00 | 17.15 | 984,958.80 | 14.75 | 847,122.00 | | 0076 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,846 | CUYD | 5.00 | 9,230.00 | 48.50 | 89,531.00 | 52.00 | 95,992.00 | 60.00 | 110,760.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,998,431.48 | | 9,818,213.38 | | 10,010,544.41 | | 10,290,133.18 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Barber Bros. Contracting Co., L.L.C | - 6 - COASTAL BRIDGE CO., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 171 | SQYD | 10.00 | 1,710.00 | 65.00 | 11,115.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 769 | LNFT | 15.00 | 11,535.00 | 16.25 | 12,496.25 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) SEE DRAINAGE SUMMARY FOR LOCATIONS | 2,871 | LNFT | 50.00 | 143,550.00 | 5.00 | 14,355.00 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) SEE DRAINAGE SUMMARY FOR LOCATIONS | 231 | LNFT | 20.00 | 4,620.00 | 60.00 | 13,860.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 8,303 | CUYD | 10.00 | 83,030.00 | 28.00 | 232,484.00 | | 0006 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 2,116 | CUYD | 10.00 | 21,160.00 | 36.00 | 76,176.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 302 | EACH | 175.00 | 52,850.00 | 55.00 | 16,610.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 18,000 | LNFT | 1.75 | 31,500.00 | 2.00 | 36,000.00 | | 0009 | 303-02-00100 | Removal of Existing Patches | 2,000 | SQYD | 15.00 | 30,000.00 | 5.00 | 10,000.00 | | 0010 | 304-01-00100 | Lime | 113.08 | TON | 230.00 | 26,008.40 | 200.00 | 22,616.00 | | 0011 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | 4,785.95 | SQYD | 1.50 | 7,178.93 | 6.50 | 31,108.68 | | 0013 | 308-01-00100 | In-Place Cement Treated Base Course (12" Thick) | 191,439 | SQYD | 8.00 | 1,531,512.00 | 10.00 | 1,914,390.00 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 6,222 | CUYD | 40.00 | 248,880.00 | 25.00 | 155,550.00 | | 0015 | 403-01-00100 | Aggregate Roadway Surfacing (Vehicular Measurement) | 6,353.9 | CUYD | 75.00 | 476,542.50 | 80.00 | 508,312.00 | | 0016 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 2,064 | LNFT | 120.00 | 247,680.00 | 96.00 | 198,144.00 | | 0017 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 56 | LNFT | 150.00 | 8,400.00 | 95.00 | 5,320.00 | | 0018 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 112 | LNFT | 140.00 | 15,680.00 | 105.00 | 11,760.00 | | 0019 | 701-02-01060 | Cross Drain Pipe Arch (42" Equiv. RCPA) | 112 | LNFT | 165.00 | 18,480.00 | 135.00 | 15,120.00 | | 0020 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | 64 | LNFT | 230.00 | 14,720.00 | 350.00 | 22,400.00 | | 0021 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) RCP ONLY | 72 | LNFT | 100.00 | 7,200.00 | 75.00 | 5,400.00 | | 0022 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) RCP ONLY | 192 | LNFT | 120.00 | 23,040.00 | 75.00 | 14,400.00 | | 0023 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 16 | LNFT | 400.00 | 6,400.00 | 125.00 | 2,000.00 | | 0024 | 701-14-00100 | Cleaning Existing Pipes | 1,120 | LNFT | 20.00 | 22,400.00 | 16.00 | 17,920.00 | | 0025 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,500.00 | 3,000.00 | 800.00 | 1,600.00 | | 0026 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 212.5 | LNFT | 60.00 | 12,750.00 | 40.00 | 8,500.00 | | 0027 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 412 | LNFT | 40.00 | 16,480.00 | 35.00 | 14,420.00 | | 0028 | 704-03-00100 | Blocked Out Guard Rail | 312.5 | LNFT | 22.00 | 6,875.00 | 20.00 | 6,250.00 | | 0029 | 704-06-00100 | Guard Rail Anchor Sections (Trailing End) | 25 | LNFT | 65.00 | 1,625.00 | 60.00 | 1,500.00 | | 0030 | 704-06-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 6.25 | LNFT | 100.00 | 625.00 | 95.00 | 593.75 | | 0031 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 80.00 | 16,000.00 | 67.00 | 13,400.00 | | 0032 | 704-11-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 2 | EACH | 2,200.00 | 4,400.00 | 2,250.00 | 4,500.00 | | 0033 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 5 | EACH | 3,000.00 | 15,000.00 | 2,425.00 | 12,125.00 | | 0034 | 706-02-00200 | Concrete Drive (6" Thick) | 156 | SQYD | 125.00 | 19,500.00 | 65.00 | 10,140.00 | | 0035 | 711-03-00200 | Riprap (10 lb) | 520 | TON | 95.00 | 49,400.00 | 90.00 | 46,800.00 | | 0036 | 711-03-00300 | Riprap (30 lb) | 520 | TON | 110.00 | 57,200.00 | 90.00 | 46,800.00 | | 0037 | 711-04-00100 | Geotextile Fabric | 2,060 | SQYD | 1.00 | 2,060.00 | 2.00 | 4,120.00 | | 0038 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 500,000.00 | 500,000.00 | 137,846.00 | 137,846.00 | | 0039 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 168 | LNFT | 0.50 | 84.00 | 1.00 | 168.00 | | 0040 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 57.28 | MILE | 365.00 | 20,907.20 | 400.00 | 22,912.00 | | 0041 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 25.35 | MILE | 430.00 | 10,900.50 | 1.00 | 25.35 | | 0042 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 121.14 | MILE | 650.00 | 78,741.00 | 1.00 | 121.14 | | 0043 | 717-01-00100 | Seeding | 1,304.2 | LB | 10.00 | 13,042.00 | 10.00 | 13,042.00 | | 0044 | 718-01-00100 | Fertilizer | 43,471 | LB | 1.00 | 43,471.00 | 0.55 | 23,909.05 | | 0045 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 35,000.00 | 35,000.00 | 25,000.00 | 25,000.00 | | 0046 | 726-01-00100 | Bedding Material | 1,339 | CUYD | 50.00 | 66,950.00 | 82.00 | 109,798.00 | | 0047 | 727-01-00100 | Mobilization | 1 | LUMP | 1,000,000.00 | 1,000,000.00 | 1,100,000.00 | 1,100,000.00 | | 0048 | 729-16-00200 | Object Marker Assembly (Type 2) | 144 | EACH | 50.00 | 7,200.00 | 45.00 | 6,480.00 | | 0049 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 80.00 | 960.00 | 75.00 | 900.00 | | 0050 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,332 | EACH | 6.50 | 15,158.00 | 8.00 | 18,656.00 | | 0051 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 56 | LNFT | 30.00 | 1,680.00 | 20.00 | 1,120.00 | | 0052 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 40.38 | MILE | 4,000.00 | 161,520.00 | 4,500.00 | 181,710.00 | | 0053 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 10.966 | MILE | 1,200.00 | 13,159.20 | 1,500.00 | 16,449.00 | | 0054 | 735-01-00100 | Mailboxes | 129 | EACH | 1.00 | 129.00 | 1.00 | 129.00 | | 0055 | 735-02-00100 | Mailbox Supports (Single) | 123 | EACH | 110.00 | 13,530.00 | 100.00 | 12,300.00 | | 0056 | 735-04-00100 | Mailbox Supports (Multiple) | 2 | EACH | 350.00 | 700.00 | 165.00 | 330.00 | | 0057 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | 300,000.00 | 300,000.00 | | 0058 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 164.45 | CUYD | 1,000.00 | 164,450.00 | 850.00 | 139,782.50 | | 0059 | 805-12-22020 | Reinforced Concrete Box Culverts (7' x 6') (Precast) | 64 | LNFT | 950.00 | 60,800.00 | 650.00 | 41,600.00 | | 0060 | 805-12-23020 | Reinforced Concrete Box Culverts (8' x 7') (Precast) | 168 | LNFT | 1,000.00 | 168,000.00 | 650.00 | 109,200.00 | | 0061 | 805-12-23040 | Reinforced Concrete Box Culverts (9' x 7') (Precast) | 48 | LNFT | 1,800.00 | 86,400.00 | 1,000.00 | 48,000.00 | | 0062 | 805-12-24000 | Reinforced Concrete Box Culverts (8' x 8') (Precast) | 160 | LNFT | 1,500.00 | 240,000.00 | 700.00 | 112,000.00 | | 0063 | 806-01-00100 | Deformed Reinforcing Steel | 10,940 | LB | 3.00 | 32,820.00 | 1.35 | 14,769.00 | | 0064 | NS-200-00020 | Cleaning Existing Ditches | 8,225 | LNFT | 6.50 | 53,462.50 | 15.00 | 123,375.00 | | 0065 | NS-500-00300 | Traffic Maintenance Superpave Asphaltic Concrete | 950 | TON | 10.00 | 9,500.00 | 125.00 | 118,750.00 | | 0066 | NS-502-01000 | Asphalt Concrete | 36,192.2 | TON | 70.00 | 2,533,454.00 | 82.00 | 2,967,760.40 | | 0067 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 3,139.2 | TON | 1.00 | 3,139.20 | 125.00 | 392,400.00 | | 0068 | NS-507-01100 | Asphalt Material (CRS-2P Emulsion) | 125,414 | GAL | 2.40 | 300,993.60 | 2.25 | 282,181.50 | | 0069 | NS-507-02200 | Aggregate (S2) | 184,432.3 | SQYD | 0.95 | 175,210.69 | 0.90 | 165,989.07 | | 0070 | NS-507-02300 | Aggregate (S3) | 184,432.3 | SQYD | 0.75 | 138,324.23 | 0.75 | 138,324.23 | | 0071 | NS-509-01000 | Milling Asphalt Pavement | 167,857 | SQYD | 3.00 | 503,571.00 | 5.00 | 839,285.00 | | 0072 | NS-509-02000 | Contractor Retained Reclaimed Asphalt Pavement | -6,995 | CUYD | 0.00 | 0.00 | 0.01 | -69.95 | | 0073 | NS-510-01400 | Pavement Patching (12" Minimum Thickness) | 1,377 | SQYD | 75.00 | 103,275.00 | 50.00 | 68,850.00 | | 0074 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,954 | INLF | 2.00 | 3,908.00 | 2.00 | 3,908.00 | | 0075 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 57,432 | SQYD | 12.00 | 689,184.00 | 3.00 | 172,296.00 | | 0076 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,846 | CUYD | 60.00 | 110,760.00 | 20.00 | 36,920.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 10,699,375.95 | | 11,264,501.97 |
|