Bid Tabulations for the Letting of 5/11/2016 LA DOTD Headquarters

Proposal:H.010344.6
Parish:Sabine
Routes:LA 174
Description:LA 174: LA 175 - DESOTO PL
Type Construction:DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALTIC SURFACE TREATMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,575,066.58
Rank License BidderConstruction Bid
108815W. E. MCDONALD & SON, LLC.$2,379,527.35
208584Madden Contracting Co., LLC$2,386,492.26
302268Soil Stabilizers, Inc.$2,522,080.41
412312GILCHRIST CONSTRUCTION CO. LLC$2,574,080.50


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
W. E. MCDONALD & SON, LLC.
- 2 -
Madden Contracting Co., LLC
- 3 -
Soil Stabilizers, Inc.
- 4 -
GILCHRIST CONSTRUCTION CO. LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-01-00100Removal of Structures and Obstructions 1     LUMP10,000.0010,000.005,000.005,000.005,000.005,000.005,000.005,000.00
0002202-02-14500Removal of Guard Rail 252     LNFT11.002,772.0011.002,772.0020.005,040.0020.005,040.00
0003203-07-00100Borrow (Vehicular Measurement) 1,000     CUYD15.0015,000.0015.0015,000.0015.0015,000.0030.0030,000.00
0004203-07-00200Borrow (Vehicular Measurement) (Selected Soils) 1,993     CUYD15.0029,895.0015.0029,895.0017.5034,877.5016.0031,888.00
0005303-01-00400In-Place Cement Stabilized Base Course (12" Thick) 57,394     SQYD8.10464,891.408.30476,370.208.75502,197.509.00516,546.00
0006304-05-00100Lime Treatment (Type E) 490.9   TON415.00203,723.50500.00245,450.00500.00245,450.00450.00220,905.00
0007401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 1,117     CUYD30.0033,510.0027.5030,717.5050.0055,850.0042.0046,914.00
0008502-01-00100Superpave Asphaltic Concrete 10,723.3   TON86.29925,313.5686.50927,565.4587.00932,927.1086.00922,203.80
0009502-01-00200Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 419.3   TON169.2970,983.30170.0071,281.00170.0071,281.00160.0067,088.00
0010507-01-00100Asphaltic Material (CRS-2P Emulsion) 39,026     GAL2.1081,954.602.1081,954.602.3491,320.842.5097,565.00
0011507-02-00200Aggregate (S2) 57,393     SQYD1.3275,758.761.3275,758.761.0761,410.511.1063,132.30
0012507-02-00300Aggregate (S3) 57,393     SQYD1.1063,132.301.1063,132.300.8448,210.120.9051,653.70
0013509-01-00100Cold Planing Asphaltic Pavement 50,066     SQYD1.6281,106.921.6582,608.901.6281,106.922.50125,165.00
0014509-02-00100Contractor Retained Reclaimed Asphaltic Pavement -4,702     CUYD0.10-470.200.10-470.200.10-470.201.00-4,702.00
0015701-01-01000Cross Drain Pipe (24" RCP/PP) 48     LNFT175.008,400.00108.005,184.00135.006,480.00400.0019,200.00
0016701-01-01020Cross Drain Pipe (30" RCP/PP) 48     LNFT185.008,880.00121.005,808.00155.007,440.00180.008,640.00
0017701-02-01000Cross Drain Pipe Arch (24" Equiv. RCPA) 136     LNFT150.0020,400.00109.0014,824.00175.0023,800.00180.0024,480.00
0018701-08-00100Relaying Pipe 40     LNFT200.008,000.00100.004,000.00150.006,000.00100.004,000.00
0019701-15-00100Concrete Collar 10     EACH1,200.0012,000.00675.006,750.00800.008,000.001,600.0016,000.00
0020704-03-00100Blocked Out Guard Rail 50     LNFT19.50975.0019.50975.0019.50975.0021.001,050.00
0021704-07-00200Guard Rail Bridge Attachments (Single Thrie Beam) 50     LNFT45.002,250.0045.002,250.0045.002,250.0027.001,350.00
0022704-08-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT60.006,000.0060.006,000.0060.006,000.0071.007,100.00
0023704-11-00100Guard Rail End Treatment (Flared) 4     EACH2,100.008,400.002,100.008,400.002,100.008,400.002,300.009,200.00
0024711-01-04000Riprap (55 lb, 18" Thick) 40     SQYD100.004,000.0076.003,040.00120.004,800.00125.005,000.00
0025711-04-00100Geotextile Fabric 40     SQYD5.00200.002.0080.003.00120.0012.00480.00
0026713-01-00100Temporary Signs and Barricades 1     LUMP8,200.008,200.0054,500.0054,500.0030,000.0030,000.0025,000.0025,000.00
0027713-02-00500Temporary Pavement Markings (24" Width) 32     LNFT0.010.320.5016.000.5016.000.5016.00
0028713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 12.832 MILE300.003,849.60375.004,812.00300.003,849.60350.004,491.20
0029713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 3.542 MILE0.010.04650.002,302.30650.002,302.30650.002,302.30
0030713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 20.352 MILE0.010.20950.0019,334.40950.0019,334.40950.0019,334.40
0031716-01-00100Mulch (Vegetative) 10     TON725.007,250.001,000.0010,000.00600.006,000.00750.007,500.00
0032717-01-00100Seeding 150     LB13.502,025.0015.002,250.009.001,350.0014.002,100.00
0033718-01-00100Fertilizer 5,000     LB0.502,500.001.005,000.000.552,750.000.552,750.00
0034722-02-00100Project Site Laboratory (Equipped) 1     EACH1.001.002,500.002,500.002,500.002,500.003,500.003,500.00
0035726-01-00100Bedding Material 117.4   CUYD100.0011,740.0090.0010,566.00100.0011,740.00100.0011,740.00
0036727-01-00100Mobilization 1     LUMP81,000.0081,000.0054,500.0054,500.00150,000.00150,000.00160,000.00160,000.00
0037729-16-00200Object Marker Assembly (Type 2) 11     EACH65.00715.0065.00715.00300.003,300.0050.00550.00
0038729-16-00300Object Marker Assembly (Type 3) 4     EACH75.00300.0075.00300.00300.001,200.0080.00320.00
0039731-02-00100Reflectorized Raised Pavement Markers 896     EACH8.007,168.008.007,168.0010.509,408.008.007,168.00
0040732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 16     LNFT16.00256.0016.00256.0016.00256.0016.00256.00
0041732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 6.784 MILE13,950.0094,636.803,950.0026,796.803,950.0026,796.804,000.0027,136.00
0042732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 1.771 MILE1,750.003,099.251,750.003,099.251,751.003,101.021,800.003,187.80
0043735-01-00100Mailboxes 10     EACH1.0010.001.0010.001.0010.005.0050.00
0044735-02-00100Mailbox Supports (Single) 8     EACH300.002,400.00300.002,400.00300.002,400.00160.001,280.00
0045735-03-00100Mailbox Supports (Double) 1     EACH300.00300.00300.00300.00300.00300.00200.00200.00
0046740-01-00100Construction Layout 1     LUMP7,000.007,000.0015,000.0015,000.0020,000.0020,000.0017,500.0017,500.00
0047NS-200-00020Cleaning Existing Ditches 40     LNFT250.0010,000.008.00320.0050.002,000.0070.002,800.00
             
  CONTRACTOR TOTAL   2,379,527.35 2,386,492.26 2,522,080.41 2,574,080.50