Proposal:H.011764.6
Parish:Caldwell, Franklin, Tensas
Description:DISTRICT 58 GUARD RAIL REPLACEMENT (AREA A)
Type Construction:GRADING, DRAINAGE STRUCTURES,GUARD RAIL REPLACEMENT AND RELATED WORK.
Estimated Construction Cost:$1,499,016.10
| Rank | License | Bidder | Construction Bid |
| 1 | 38764 | Atwood Fence Company Inc. | $1,460,698.75 |
| 2 | 34068 | Alpha Service And Products, Inc. | $1,499,862.60 |
| 3 | 60022 | D. O'BRIAN CONSTRUCTION, LLC | $1,578,326.00 |
| 4 | 48896 | Command Construction Industries LLC | $1,689,811.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Atwood Fence Company Inc. | - 2 - Alpha Service And Products, Inc. | - 3 - D. O'BRIAN CONSTRUCTION, LLC | - 4 - Command Construction Industries LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,000.00 | 2,000.00 | 20,000.00 | 20,000.00 | 12,000.00 | 12,000.00 | 75,000.00 | 75,000.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 7,186 | LNFT | 7.00 | 50,302.00 | 10.00 | 71,860.00 | 10.00 | 71,860.00 | 15.00 | 107,790.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 6,950 | CUYD | 31.50 | 218,925.00 | 27.00 | 187,650.00 | 18.00 | 125,100.00 | 35.00 | 243,250.00 | | 0004 | 701-05-02040 | Side Drain Pipe (Erosion) (18" PP/CMP) | 210 | LNFT | 42.00 | 8,820.00 | 75.00 | 15,750.00 | 55.00 | 11,550.00 | 45.00 | 9,450.00 | | 0005 | 701-05-02060 | Side Drain Pipe (Erosion) (24" PP/CMP) | 600 | LNFT | 52.50 | 31,500.00 | 80.00 | 48,000.00 | 70.00 | 42,000.00 | 55.00 | 33,000.00 | | 0006 | 701-05-02080 | Side Drain Pipe (Erosion) (30" PP/CMP) | 140 | LNFT | 78.75 | 11,025.00 | 100.00 | 14,000.00 | 88.00 | 12,320.00 | 85.00 | 11,900.00 | | 0007 | 701-05-02100 | Side Drain Pipe (Erosion) (36" PP/CMP) | 100 | LNFT | 105.00 | 10,500.00 | 110.00 | 11,000.00 | 90.00 | 9,000.00 | 110.00 | 11,000.00 | | 0008 | 701-05-02120 | Side Drain Pipe (Erosion) (42" PP/CMP) | 200 | LNFT | 141.75 | 28,350.00 | 170.00 | 34,000.00 | 125.00 | 25,000.00 | 150.00 | 30,000.00 | | 0009 | 701-15-00100 | Concrete Collar | 6 | EACH | 1,050.00 | 6,300.00 | 1,100.00 | 6,600.00 | 950.00 | 5,700.00 | 1,150.00 | 6,900.00 | | 0010 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 1,690.6 | LNFT | 65.00 | 109,889.00 | 31.00 | 52,408.60 | 40.00 | 67,624.00 | 45.00 | 76,077.00 | | 0011 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 2,770 | LNFT | 70.00 | 193,900.00 | 57.00 | 157,890.00 | 58.00 | 160,660.00 | 50.00 | 138,500.00 | | 0012 | 704-03-00100 | Blocked Out Guard Rail | 962.6 | LNFT | 20.00 | 19,252.00 | 20.00 | 19,252.00 | 20.00 | 19,252.00 | 17.00 | 16,364.20 | | 0013 | 704-06-00100 | Guard Rail Anchor Sections (Trailing End) | 12.6 | LNFT | 150.00 | 1,890.00 | 70.00 | 882.00 | 110.00 | 1,386.00 | 100.00 | 1,260.00 | | 0014 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 50 | LNFT | 50.00 | 2,500.00 | 60.00 | 3,000.00 | 65.00 | 3,250.00 | 35.00 | 1,750.00 | | 0015 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 75.00 | 7,500.00 | 80.00 | 8,000.00 | 62.00 | 6,200.00 | 55.00 | 5,500.00 | | 0016 | 704-11-00100 | Guard Rail End Treatment (Flared) | 42 | EACH | 2,250.00 | 94,500.00 | 2,000.00 | 84,000.00 | 2,280.00 | 95,760.00 | 2,500.00 | 105,000.00 | | 0017 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 28 | EACH | 2,500.00 | 70,000.00 | 2,400.00 | 67,200.00 | 2,580.00 | 72,240.00 | 2,500.00 | 70,000.00 | | 0018 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 9,707 | SQYD | 47.25 | 458,655.75 | 50.00 | 485,350.00 | 72.00 | 698,904.00 | 50.00 | 485,350.00 | | 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 16,900.00 | 16,900.00 | 50,000.00 | 50,000.00 | | 0020 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 8,640 | SQYD | 3.50 | 30,240.00 | 6.00 | 51,840.00 | 4.00 | 34,560.00 | 3.00 | 25,920.00 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | 58,000.00 | 58,000.00 | 150,000.00 | 150,000.00 | | 0022 | 729-16-00300 | Object Marker Assembly (Type 3) | 72 | EACH | 75.00 | 5,400.00 | 90.00 | 6,480.00 | 95.00 | 6,840.00 | 75.00 | 5,400.00 | | 0023 | 739-01-00100 | Hydro-Seeding | 1.8 | ACRE | 3,750.00 | 6,750.00 | 4,000.00 | 7,200.00 | 1,400.00 | 2,520.00 | 3,000.00 | 5,400.00 | | 0024 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | 5,500.00 | 5,500.00 | 15,000.00 | 15,000.00 | | 0025 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 5 | EACH | 1,500.00 | 7,500.00 | 2,500.00 | 12,500.00 | 2,840.00 | 14,200.00 | 2,000.00 | 10,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,460,698.75 | | 1,499,862.60 | | 1,578,326.00 | | 1,689,811.20 |
|