Proposal:H.007085.6-R1
Parish:Bossier
Description:SHED ROAD IMPROVEMENTS BENTON ROAD TO AIRLINE DRIVE
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, PORTLAND CEMENT CONCRETE PAVEMENT, CONCRETE WALKS, DRILLED SHAFT FOUNDATIONS, WATER DISTRIBUTION SYSTEM, TRAFFIC SIGNALIZATION, ADDITIVE ALTERNATE NO. 1: 12” WATER MAIN; AND RELATED WORK.
Estimated Construction Cost:$11,174,558.01
| Rank | License | Bidder | Construction Bid |
| 1 | 48462 | Fessler And Bowman, Inc. | $9,489,619.80 |
| 2 | 40615 | SPECIALTY TRACKHOE & DOZER SERV.INC | $10,804,194.38 |
| 3 | 36374 | Best-Yet Builders, Llc | $11,347,265.02 |
| 4 | 34567 | James Construction Group LLC | $13,831,456.55 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Fessler And Bowman, Inc. | - 2 - SPECIALTY TRACKHOE & DOZER SERV.INC | - 3 - Best-Yet Builders, Llc | - 4 - James Construction Group LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 8.2 | LUMP | 25,000.00 | 25,000.00 | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | 230,125.00 | 230,125.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 250,000.00 | 250,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 750,000.00 | 750,000.00 | | 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 315.2 | LNFT | 6.00 | 1,891.20 | 8.75 | 2,758.00 | 20.00 | 6,304.00 | 4.50 | 1,418.40 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 4,008 | SQYD | 8.50 | 34,068.00 | 4.50 | 18,036.00 | 7.50 | 30,060.00 | 6.00 | 24,048.00 | | 0005 | 202-02-32000 | Removal of Paved Ditches | 1,135 | SQYD | 7.50 | 8,512.50 | 9.30 | 10,555.50 | 10.00 | 11,350.00 | 6.00 | 6,810.00 | | 0006 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 14,113 | SQYD | 8.25 | 116,432.25 | 6.00 | 84,678.00 | 5.00 | 70,565.00 | 6.00 | 84,678.00 | | 0007 | 203-01-00100 | General Excavation | 21,825 | CUYD | 14.00 | 305,550.00 | 8.20 | 178,965.00 | 9.00 | 196,425.00 | 18.00 | 392,850.00 | | 0008 | 203-03-00100 | Embankment | 1,497 | CUYD | 20.00 | 29,940.00 | 21.00 | 31,437.00 | 13.00 | 19,461.00 | 22.00 | 32,934.00 | | 0009 | 204-02-00100 | Temporary Hay or Straw Bales | 424 | EACH | 20.00 | 8,480.00 | 25.00 | 10,600.00 | 10.00 | 4,240.00 | 30.00 | 12,720.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 2,175 | LNFT | 2.00 | 4,350.00 | 2.50 | 5,437.50 | 2.00 | 4,350.00 | 4.00 | 8,700.00 | | 0011 | 302-02-03121 | Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 28,818.9 | SQYD | 13.00 | 374,645.70 | 19.75 | 569,173.28 | 19.50 | 561,968.55 | 25.00 | 720,472.50 | | 0012 | 302-02-06121 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 291.6 | SQYD | 20.00 | 5,832.00 | 41.25 | 12,028.50 | 29.00 | 8,456.40 | 45.00 | 13,122.00 | | 0013 | 304-05-00100 | Lime Treatment (Type E) | 364.56 | TON | 460.00 | 167,697.60 | 385.00 | 140,355.60 | 550.00 | 200,508.00 | 335.00 | 122,127.60 | | 0014 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,500 | CUYD | 82.00 | 123,000.00 | 78.00 | 117,000.00 | 20.00 | 30,000.00 | 50.00 | 75,000.00 | | 0015 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 253 | SQYD | 150.00 | 37,950.00 | 140.00 | 35,420.00 | 192.75 | 48,765.75 | 225.00 | 56,925.00 | | 0016 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 26,126.5 | SQYD | 49.00 | 1,280,198.50 | 58.50 | 1,528,400.25 | 50.00 | 1,306,325.00 | 55.00 | 1,436,957.50 | | 0017 | 601-02-00700 | Portland Cement Concrete Pavement (8" Thick) (Crossovers & Turnouts) | 1,704.4 | SQYD | 63.00 | 107,377.20 | 70.00 | 119,308.00 | 60.00 | 102,264.00 | 85.00 | 144,874.00 | | 0018 | 601-02-01000 | Portland Cement Concrete Pavement (9 1/2" Thick) (Crossovers & Turnouts) | 291.6 | SQYD | 91.00 | 26,535.60 | 80.00 | 23,328.00 | 70.00 | 20,412.00 | 90.00 | 26,244.00 | | 0019 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 45 | EACH | 170.00 | 7,650.00 | 200.00 | 9,000.00 | 100.00 | 4,500.00 | 125.00 | 5,625.00 | | 0020 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 1,181 | LNFT | 45.00 | 53,145.00 | 46.00 | 54,326.00 | 32.00 | 37,792.00 | 80.00 | 94,480.00 | | 0021 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 345 | LNFT | 65.00 | 22,425.00 | 58.25 | 20,096.25 | 36.00 | 12,420.00 | 104.00 | 35,880.00 | | 0022 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) (RCP ONLY) | 39 | LNFT | 46.00 | 1,794.00 | 104.00 | 4,056.00 | 72.00 | 2,808.00 | 130.00 | 5,070.00 | | 0023 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 635 | LNFT | 60.00 | 38,100.00 | 65.00 | 41,275.00 | 58.00 | 36,830.00 | 148.00 | 93,980.00 | | 0024 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) (RCP ONLY) | 38 | LNFT | 72.00 | 2,736.00 | 117.00 | 4,446.00 | 116.00 | 4,408.00 | 160.00 | 6,080.00 | | 0025 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 1,262 | LNFT | 77.00 | 97,174.00 | 85.50 | 107,901.00 | 84.00 | 106,008.00 | 160.00 | 201,920.00 | | 0026 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) (RCP ONLY) | 12 | LNFT | 105.00 | 1,260.00 | 190.00 | 2,280.00 | 168.00 | 2,016.00 | 185.00 | 2,220.00 | | 0027 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 304 | LNFT | 105.00 | 31,920.00 | 102.50 | 31,160.00 | 114.00 | 34,656.00 | 208.00 | 63,232.00 | | 0028 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 768 | LNFT | 145.00 | 111,360.00 | 132.00 | 101,376.00 | 153.00 | 117,504.00 | 272.00 | 208,896.00 | | 0029 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 80 | LNFT | 180.00 | 14,400.00 | 160.00 | 12,800.00 | 190.00 | 15,200.00 | 310.00 | 24,800.00 | | 0030 | 701-15-00100 | Concrete Collar | 3 | EACH | 350.00 | 1,050.00 | 900.00 | 2,700.00 | 1,000.00 | 3,000.00 | 1,500.00 | 4,500.00 | | 0031 | 702-01-00100 | Junction Boxes (MH-14xOPEN) | 5 | EACH | 41,000.00 | 205,000.00 | 38,500.00 | 192,500.00 | 20,000.00 | 100,000.00 | 74,000.00 | 370,000.00 | | 0032 | 702-02-00200 | Manholes (R-CB-11) | 15 | EACH | 3,350.00 | 50,250.00 | 6,200.00 | 93,000.00 | 6,000.00 | 90,000.00 | 6,000.00 | 90,000.00 | | 0033 | 702-02-00300 | Manholes (R-CB-11 MOD) | 5 | EACH | 15,000.00 | 75,000.00 | 30,000.00 | 150,000.00 | 7,000.00 | 35,000.00 | 10,000.00 | 50,000.00 | | 0034 | 702-03-00100 | Catch Basins (CB-01) | 9 | EACH | 3,700.00 | 33,300.00 | 2,800.00 | 25,200.00 | 3,650.00 | 32,850.00 | 3,000.00 | 27,000.00 | | 0035 | 702-03-00200 | Catch Basins (CB-02) | 7 | EACH | 4,750.00 | 33,250.00 | 3,500.00 | 24,500.00 | 3,750.00 | 26,250.00 | 5,000.00 | 35,000.00 | | 0036 | 702-03-00500 | Catch Basins (CB-06) | 17 | EACH | 4,250.00 | 72,250.00 | 4,400.00 | 74,800.00 | 4,000.00 | 68,000.00 | 5,500.00 | 93,500.00 | | 0037 | 702-03-00600 | Catch Basins (CB-07) | 11 | EACH | 4,600.00 | 50,600.00 | 5,350.00 | 58,850.00 | 4,250.00 | 46,750.00 | 6,800.00 | 74,800.00 | | 0038 | 702-03-00700 | Catch Basins (CB-08) | 10 | EACH | 5,750.00 | 57,500.00 | 6,200.00 | 62,000.00 | 4,500.00 | 45,000.00 | 8,000.00 | 80,000.00 | | 0039 | 702-04-00100 | Adjusting Manholes | 13 | EACH | 1,900.00 | 24,700.00 | 1,250.00 | 16,250.00 | 4,000.00 | 52,000.00 | 1,000.00 | 13,000.00 | | 0040 | 703-01-00100 | Shoulder Underdrain Systems | 7,366 | LNFT | 12.50 | 92,075.00 | 14.50 | 106,807.00 | 20.00 | 147,320.00 | 15.00 | 110,490.00 | | 0041 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 706 | LNFT | 21.00 | 14,826.00 | 16.00 | 11,296.00 | 16.00 | 11,296.00 | 21.00 | 14,826.00 | | 0042 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 103 | LNFT | 30.00 | 3,090.00 | 20.00 | 2,060.00 | 20.00 | 2,060.00 | 30.00 | 3,090.00 | | 0043 | 706-01-00100 | Concrete Walk (4" Thick) | 5,078.9 | SQYD | 41.50 | 210,774.35 | 35.00 | 177,761.50 | 50.00 | 253,945.00 | 58.00 | 294,576.20 | | 0044 | 706-02-00200 | Concrete Drive (6" Thick) | 1,304.5 | SQYD | 60.00 | 78,270.00 | 55.00 | 71,747.50 | 60.00 | 78,270.00 | 70.00 | 91,315.00 | | 0045 | 706-04-00100 | Handicapped Curb Ramps | 24 | EACH | 675.00 | 16,200.00 | 1,400.00 | 33,600.00 | 1,000.00 | 24,000.00 | 900.00 | 21,600.00 | | 0046 | 707-01-00100 | Concrete Curb | 7,833 | LNFT | 10.00 | 78,330.00 | 7.00 | 54,831.00 | 5.50 | 43,081.50 | 7.00 | 54,831.00 | | 0047 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 105,000.00 | 105,000.00 | 225,000.00 | 225,000.00 | 200,000.00 | 200,000.00 | | 0048 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.152 | MILE | 8,200.00 | 1,246.40 | 5,000.00 | 760.00 | 5,000.00 | 760.00 | 2,961.00 | 450.07 | | 0049 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.162 | MILE | 2,000.00 | 2,324.00 | 2,000.00 | 2,324.00 | 2,000.00 | 2,324.00 | 2,496.00 | 2,900.35 | | 0050 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 4.146 | MILE | 10,000.00 | 41,460.00 | 10,000.00 | 41,460.00 | 10,000.00 | 41,460.00 | 18,474.00 | 76,593.20 | | 0051 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) (Type 1 Removable) | 8 | EACH | 1,000.00 | 8,000.00 | 1,000.00 | 8,000.00 | 1,000.00 | 8,000.00 | 500.00 | 4,000.00 | | 0052 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 590 | EACH | 7.00 | 4,130.00 | 7.00 | 4,130.00 | 7.00 | 4,130.00 | 8.00 | 4,720.00 | | 0053 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 7 | EACH | 1,000.00 | 7,000.00 | 1,000.00 | 7,000.00 | 1,000.00 | 7,000.00 | 482.00 | 3,374.00 | | 0054 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 4 | EACH | 200.00 | 800.00 | 265.00 | 1,060.00 | 1,500.00 | 6,000.00 | 185.00 | 740.00 | | 0055 | 716-01-00100 | Mulch (Vegetative) | 3.6 | TON | 1,500.00 | 5,400.00 | 1,000.00 | 3,600.00 | 1,500.00 | 5,400.00 | 800.00 | 2,880.00 | | 0056 | 717-01-00100 | Seeding | 64 | LB | 15.00 | 960.00 | 20.00 | 1,280.00 | 15.00 | 960.00 | 25.00 | 1,600.00 | | 0057 | 718-01-00100 | Fertilizer | 1,600 | LB | 1.00 | 1,600.00 | 1.00 | 1,600.00 | 1.00 | 1,600.00 | 0.50 | 800.00 | | 0058 | 725-01-00100 | Temporary Detour Roads | 2,241.8 | SQYD | 60.00 | 134,508.00 | 75.00 | 168,135.00 | 51.90 | 116,349.42 | 73.00 | 163,651.40 | | 0059 | 726-01-00100 | Bedding Material | 1,519.7 | CUYD | 90.00 | 136,773.00 | 70.00 | 106,379.00 | 50.00 | 75,985.00 | 80.00 | 121,576.00 | | 0060 | 727-01-00100 | Mobilization | 1 | LUMP | 469,000.00 | 469,000.00 | 675,000.00 | 675,000.00 | 950,000.00 | 950,000.00 | 1,370,000.00 | 1,370,000.00 | | 0061 | 728-01-01200 | Jacked or Bored Pipe (36") (Steel Casing, 3/4" Wall Thickness) | 579 | LNFT | 560.00 | 324,240.00 | 700.00 | 405,300.00 | 700.00 | 405,300.00 | 707.00 | 409,353.00 | | 0062 | 729-01-00100 | Sign (Type A) | 18 | SQFT | 25.00 | 450.00 | 55.00 | 990.00 | 55.00 | 990.00 | 25.00 | 450.00 | | 0063 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 110 | SQFT | 50.00 | 5,500.00 | 55.00 | 6,050.00 | 55.00 | 6,050.00 | 25.00 | 2,750.00 | | 0064 | 729-21-00100 | U-Channel Post | 2 | EACH | 100.00 | 200.00 | 150.00 | 300.00 | 150.00 | 300.00 | 100.00 | 200.00 | | 0065 | 731-02-00100 | Reflectorized Raised Pavement Markers | 830 | EACH | 7.00 | 5,810.00 | 7.00 | 5,810.00 | 7.00 | 5,810.00 | 8.00 | 6,640.00 | | 0066 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 480 | LNFT | 5.00 | 2,400.00 | 5.00 | 2,400.00 | 5.00 | 2,400.00 | 8.00 | 3,840.00 | | 0067 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 238 | LNFT | 10.00 | 2,380.00 | 10.00 | 2,380.00 | 10.00 | 2,380.00 | 25.00 | 5,950.00 | | 0068 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.469 | MILE | 5,000.00 | 17,345.00 | 5,000.00 | 17,345.00 | 5,000.00 | 17,345.00 | 7,980.00 | 27,682.62 | | 0069 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.474 | MILE | 1,500.00 | 2,211.00 | 1,500.00 | 2,211.00 | 1,500.00 | 2,211.00 | 2,724.00 | 4,015.18 | | 0070 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.052 | MILE | 10,000.00 | 520.00 | 10,000.00 | 520.00 | 10,000.00 | 520.00 | 24,039.00 | 1,250.03 | | 0071 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 7 | EACH | 400.00 | 2,800.00 | 400.00 | 2,800.00 | 400.00 | 2,800.00 | 800.00 | 5,600.00 | | 0072 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 9 | EACH | 300.00 | 2,700.00 | 300.00 | 2,700.00 | 300.00 | 2,700.00 | 800.00 | 7,200.00 | | 0073 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 300.00 | 900.00 | 300.00 | 900.00 | 300.00 | 900.00 | 1,000.00 | 3,000.00 | | 0074 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,500.00 | 1,500.00 | | 0075 | 732-05-00100 | Removal of Existing Markings | 0.154 | MILE | 11,000.00 | 1,694.00 | 11,000.00 | 1,694.00 | 11,000.00 | 1,694.00 | 18,020.00 | 2,775.08 | | 0076 | 736-01-00100 | Trenching and Backfilling | 125 | LNFT | 5.00 | 625.00 | 6.00 | 750.00 | 6.00 | 750.00 | 4.10 | 512.50 | | 0077 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 75 | LNFT | 20.00 | 1,500.00 | 52.00 | 3,900.00 | 52.00 | 3,900.00 | 28.00 | 2,100.00 | | 0078 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 550 | LNFT | 25.00 | 13,750.00 | 78.00 | 42,900.00 | 78.00 | 42,900.00 | 32.00 | 17,600.00 | | 0079 | 736-04-04100 | Signal Support (30' Single Mast Arm) | 2 | EACH | 11,000.00 | 22,000.00 | 10,500.00 | 21,000.00 | 10,500.00 | 21,000.00 | 8,770.00 | 17,540.00 | | 0080 | 736-04-04140 | Signal Support (40' Single Mast Arm) | 1 | EACH | 12,000.00 | 12,000.00 | 11,000.00 | 11,000.00 | 11,000.00 | 11,000.00 | 10,142.00 | 10,142.00 | | 0081 | 736-04-04160 | Signal Support (45' Single Mast Arm) | 2 | EACH | 12,500.00 | 25,000.00 | 12,330.00 | 24,660.00 | 12,330.00 | 24,660.00 | 10,408.00 | 20,816.00 | | 0082 | 736-04-04180 | Signal Support (50' Single Mast Arm) | 1 | EACH | 14,000.00 | 14,000.00 | 12,500.00 | 12,500.00 | 12,500.00 | 12,500.00 | 11,373.00 | 11,373.00 | | 0083 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 10 | EACH | 1,000.00 | 10,000.00 | 1,200.00 | 12,000.00 | 1,200.00 | 12,000.00 | 944.00 | 9,440.00 | | 0084 | 736-05-02020 | Signal Heads (3 Section, 12" Led Lens, R, LT. Y, LT. G) | 2 | EACH | 1,000.00 | 2,000.00 | 1,200.00 | 2,400.00 | 1,200.00 | 2,400.00 | 944.00 | 1,888.00 | | 0085 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 3 | EACH | 1,800.00 | 5,400.00 | 1,800.00 | 5,400.00 | 1,800.00 | 5,400.00 | 1,299.00 | 3,897.00 | | 0086 | 736-05-05000 | Signal Heads (3 Section, 12" Optically Programmed Lens, R, Y, G) | 2 | EACH | 4,500.00 | 9,000.00 | 5,000.00 | 10,000.00 | 5,000.00 | 10,000.00 | 3,754.00 | 7,508.00 | | 0087 | 736-06-00100 | Signal Service | 1 | EACH | 1,000.00 | 1,000.00 | 3,000.00 | 3,000.00 | 3,000.00 | 3,000.00 | 1,302.00 | 1,302.00 | | 0088 | 736-06-00200 | Signal Service (Pedestal Required) | 1 | EACH | 2,000.00 | 2,000.00 | 2,500.00 | 2,500.00 | 2,500.00 | 2,500.00 | 2,124.00 | 2,124.00 | | 0089 | 736-08-00071 | Sig Cntrlr (TS-2, Type 2, w/Eth cap)(Type 6E Cabinet) (F&I) | 1 | EACH | 32,500.00 | 32,500.00 | 32,000.00 | 32,000.00 | 32,000.00 | 32,000.00 | 25,074.00 | 25,074.00 | | 0090 | 736-10-00300 | Underground Junction Box (Type F) | 7 | EACH | 450.00 | 3,150.00 | 650.00 | 4,550.00 | 650.00 | 4,550.00 | 477.00 | 3,339.00 | | 0091 | 736-10-00400 | Underground Junction Box (Type G) | 1 | EACH | 1,200.00 | 1,200.00 | 1,200.00 | 1,200.00 | 1,200.00 | 1,200.00 | 795.00 | 795.00 | | 0092 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 125 | LNFT | 5.00 | 625.00 | 72.00 | 9,000.00 | 72.00 | 9,000.00 | 4.20 | 525.00 | | 0093 | 736-12-01040 | Conductor (2c, #14 awg) | 250 | LNFT | 1.00 | 250.00 | 2.00 | 500.00 | 2.00 | 500.00 | 1.10 | 275.00 | | 0094 | 736-12-02020 | Conductor (3c, #14 awg) | 75 | LNFT | 1.00 | 75.00 | 2.00 | 150.00 | 2.00 | 150.00 | 1.00 | 75.00 | | 0095 | 736-12-04000 | Conductor (6c, #14 awg) | 225 | LNFT | 2.50 | 562.50 | 3.00 | 675.00 | 3.00 | 675.00 | 1.60 | 360.00 | | 0096 | 736-12-06000 | Conductor (10c, #14 awg) | 1,500 | LNFT | 3.00 | 4,500.00 | 4.00 | 6,000.00 | 4.00 | 6,000.00 | 2.05 | 3,075.00 | | 0097 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | 350,000.00 | 350,000.00 | 325,000.00 | 325,000.00 | 125,000.00 | 125,000.00 | | 0098 | 741-09-00100 | Adjusting Water House Connections | 5 | EACH | 360.00 | 1,800.00 | 550.00 | 2,750.00 | 550.00 | 2,750.00 | 550.00 | 2,750.00 | | 0099 | 741-10-00100 | Adjusting Water Service Lines | 100 | LNFT | 10.35 | 1,035.00 | 15.00 | 1,500.00 | 15.00 | 1,500.00 | 15.00 | 1,500.00 | | 0100 | 742-01-00500 | Sanitary Sewer Pipe (10") | 71 | LNFT | 72.50 | 5,147.50 | 130.00 | 9,230.00 | 130.00 | 9,230.00 | 155.00 | 11,005.00 | | 0101 | 742-01-00600 | Sanitary Sewer Pipe (12") | 636 | LNFT | 105.00 | 66,780.00 | 107.00 | 68,052.00 | 107.00 | 68,052.00 | 125.00 | 79,500.00 | | 0102 | 742-02-00100 | Adjusting Sanitary Sewer House Connections | 5 | EACH | 1,125.00 | 5,625.00 | 500.00 | 2,500.00 | 500.00 | 2,500.00 | 500.00 | 2,500.00 | | 0103 | 742-03-00100 | Adjusting Sanitary Sewer Services Lines | 150 | LNFT | 26.00 | 3,900.00 | 15.00 | 2,250.00 | 15.00 | 2,250.00 | 15.00 | 2,250.00 | | 0104 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 350,000.00 | 350,000.00 | 200,000.00 | 200,000.00 | 275,000.00 | 275,000.00 | 270,000.00 | 270,000.00 | | 0105 | 805-12-01080 | Reinforced Concrete Box Culverts (8' x 4') | 4,252 | LNFT | 440.00 | 1,870,880.00 | 490.00 | 2,083,480.00 | 556.75 | 2,367,301.00 | 600.00 | 2,551,200.00 | | 0106 | 805-12-02060 | Reinforced Concrete Box Culverts (8' x 5') | 520.6 | LNFT | 500.00 | 260,300.00 | 590.00 | 307,154.00 | 746.50 | 388,627.90 | 700.00 | 364,420.00 | | 0107 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 10,950 | INLF | 0.75 | 8,212.50 | 1.35 | 14,782.50 | 0.45 | 4,927.50 | 0.90 | 9,855.00 | | 0108 | NS-700-00180 | Impact Attenuator (Construction Zone) | 2 | EACH | 15,000.00 | 30,000.00 | 8,000.00 | 16,000.00 | 8,500.00 | 17,000.00 | 11,111.46 | 22,222.92 | | 0109 | NS-700-00181 | Impact Attenuator Relocation (Construction Zone) | 2 | EACH | 1,000.00 | 2,000.00 | 1,200.00 | 2,400.00 | 2,000.00 | 4,000.00 | 1,200.00 | 2,400.00 | | 0110 | NS-700-00182 | Repair and Restoration of Impact Attenuator (Const Zone) | 1 | EACH | 1.00 | 1.00 | 2,200.00 | 2,200.00 | 3,000.00 | 3,000.00 | 2,200.00 | 2,200.00 | | 0111 | NS-736-00001 | GPS | 1 | EACH | 1,500.00 | 1,500.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,474.00 | 1,474.00 | | 0112 | NS-736-00005 | Video Detection Cabinet Components | 1 | EACH | 11,000.00 | 11,000.00 | 12,000.00 | 12,000.00 | 12,000.00 | 12,000.00 | 10,930.00 | 10,930.00 | | 0113 | NS-736-00006 | Video Detection Camera | 6 | EACH | 2,000.00 | 12,000.00 | 2,800.00 | 16,800.00 | 2,800.00 | 16,800.00 | 1,959.00 | 11,754.00 | | 0114 | NS-736-00010 | LED Pedestrian Countdown Signal Head | 2 | EACH | 925.00 | 1,850.00 | 1,200.00 | 2,400.00 | 1,200.00 | 2,400.00 | 912.00 | 1,824.00 | | 0115 | NS-736-00011 | Pedestrian Push Buttons | 2 | EACH | 300.00 | 600.00 | 250.00 | 500.00 | 250.00 | 500.00 | 311.00 | 622.00 | | 0116 | NS-804-00002 | Construction Site Survey | 1 | LUMP | 50,000.00 | 50,000.00 | 40,000.00 | 40,000.00 | 125,000.00 | 125,000.00 | 40,000.00 | 40,000.00 | | 0117 | NS-804-00006 | Vibration Monitoring | 10 | DAY | 725.00 | 7,250.00 | 1,000.00 | 10,000.00 | 5,000.00 | 50,000.00 | 1,500.00 | 15,000.00 | | 0118 | NS-MSC-00120 | Drainage Structure (CB-09 MOD) | 15 | EACH | 7,200.00 | 108,000.00 | 9,200.00 | 138,000.00 | 10,000.00 | 150,000.00 | 25,000.00 | 375,000.00 | | 0119 | NS-P08-00001 | Test/Disinfect Water Mains | 1 | LUMP | 2,100.00 | 2,100.00 | 9,000.00 | 9,000.00 | 9,000.00 | 9,000.00 | 9,000.00 | 9,000.00 | | 0120 | NS-P08-00002 | 8" Open Cut C-900 DR 18 Water Main | 270 | LNFT | 20.70 | 5,589.00 | 46.00 | 12,420.00 | 46.00 | 12,420.00 | 59.00 | 15,930.00 | | 0121 | NS-P08-00002 | 8" Open Cut C-900 DR 18 Water Main (Base Bid) | 3,746 | LNFT | 21.00 | 78,666.00 | 46.00 | 172,316.00 | 46.00 | 172,316.00 | 46.00 | 172,316.00 | | 0122 | NS-P08-00003 | 8" Fusible C-900 DR 18 Street Bore | 340 | LNFT | 62.00 | 21,080.00 | 51.00 | 17,340.00 | 51.00 | 17,340.00 | 51.00 | 17,340.00 | | 0123 | NS-P08-00003 | 8" Fusible C-900 DR 18 Street Bore (Base Bid) | 420 | LNFT | 62.00 | 26,040.00 | 51.00 | 21,420.00 | 51.00 | 21,420.00 | 51.00 | 21,420.00 | | 0124 | NS-P08-00004 | 8" C-900 DR 18 Driveway Bore | 130 | LNFT | 31.00 | 4,030.00 | 46.00 | 5,980.00 | 46.00 | 5,980.00 | 46.00 | 5,980.00 | | 0125 | NS-P08-00004 | 8" C-900 DR 18 Driveway Bore (Base Bid) | 270 | LNFT | 31.00 | 8,370.00 | 46.00 | 12,420.00 | 46.00 | 12,420.00 | 46.00 | 12,420.00 | | 0126 | NS-P08-00005 | 6" Concrete on 4" Sand as required | 50 | SQYD | 65.00 | 3,250.00 | 75.00 | 3,750.00 | 200.00 | 10,000.00 | 60.00 | 3,000.00 | | 0127 | NS-P08-00006 | 4" Concrete on 4" Sand as required | 50 | SQYD | 46.00 | 2,300.00 | 55.00 | 2,750.00 | 150.00 | 7,500.00 | 55.00 | 2,750.00 | | 0128 | NS-P08-00007 | Compacted Backfill Sand (For Open Cut Under New Paving) | 50 | CUYD | 26.00 | 1,300.00 | 25.00 | 1,250.00 | 100.00 | 5,000.00 | 50.00 | 2,500.00 | | 0129 | NS-P08-00008 | Long Services | 15 | EACH | 1,150.00 | 17,250.00 | 1,000.00 | 15,000.00 | 1,000.00 | 15,000.00 | 1,318.00 | 19,770.00 | | 0130 | NS-P08-00009 | Short Services | 16 | EACH | 475.00 | 7,600.00 | 600.00 | 9,600.00 | 600.00 | 9,600.00 | 682.00 | 10,912.00 | | 0131 | NS-P08-00010 | 4" Tie-in with sleeve | 1 | EACH | 1,550.00 | 1,550.00 | 855.00 | 855.00 | 855.00 | 855.00 | 855.00 | 855.00 | | 0132 | NS-P08-00011 | 6" Tie-in with sleeve | 7 | EACH | 1,650.00 | 11,550.00 | 1,150.00 | 8,050.00 | 1,150.00 | 8,050.00 | 1,150.00 | 8,050.00 | | 0133 | NS-P08-00012 | 8" Tie-in with sleeve | 8 | EACH | 1,650.00 | 13,200.00 | 1,225.00 | 9,800.00 | 1,225.00 | 9,800.00 | 1,225.00 | 9,800.00 | | 0134 | NS-P08-00013 | 8" Bends | 30 | EACH | 450.00 | 13,500.00 | 600.00 | 18,000.00 | 600.00 | 18,000.00 | 600.00 | 18,000.00 | | 0135 | NS-P08-00013 | 8" Bends (Base Bid) | 11 | EACH | 450.00 | 4,950.00 | 600.00 | 6,600.00 | 600.00 | 6,600.00 | 600.00 | 6,600.00 | | 0136 | NS-P08-00014 | 6" Bends | 14 | EACH | 400.00 | 5,600.00 | 525.00 | 7,350.00 | 525.00 | 7,350.00 | 525.00 | 7,350.00 | | 0137 | NS-P08-00015 | 4" Bends | 2 | EACH | 300.00 | 600.00 | 475.00 | 950.00 | 475.00 | 950.00 | 475.00 | 950.00 | | 0138 | NS-P08-00016 | 8" Gate Valve | 17 | EACH | 1,350.00 | 22,950.00 | 1,300.00 | 22,100.00 | 1,300.00 | 22,100.00 | 1,300.00 | 22,100.00 | | 0139 | NS-P08-00016 | 8" Gate Valve (Base Bid) | 10 | EACH | 1,350.00 | 13,500.00 | 1,300.00 | 13,000.00 | 1,300.00 | 13,000.00 | 1,300.00 | 13,000.00 | | 0140 | NS-P08-00017 | 6" Gate Valve | 16 | EACH | 910.00 | 14,560.00 | 1,000.00 | 16,000.00 | 1,000.00 | 16,000.00 | 1,000.00 | 16,000.00 | | 0141 | NS-P08-00018 | 8" X 8" Tee (Base Bid) | 15 | EACH | 425.00 | 6,375.00 | 675.00 | 10,125.00 | 675.00 | 10,125.00 | 675.00 | 10,125.00 | | 0142 | NS-P08-00019 | 8" X 6" Swivel Tee | 13 | EACH | 425.00 | 5,525.00 | 1,376.00 | 17,888.00 | 1,376.00 | 17,888.00 | 1,376.00 | 17,888.00 | | 0143 | NS-P08-00019 | 8" X 6" Swivel Tee (Base Bid) | 3 | EACH | 425.00 | 1,275.00 | 1,376.00 | 4,128.00 | 1,376.00 | 4,128.00 | 1,376.00 | 4,128.00 | | 0144 | NS-P08-00020 | Double Steamer Fire Hydrant | 16 | EACH | 2,200.00 | 35,200.00 | 2,100.00 | 33,600.00 | 2,100.00 | 33,600.00 | 2,100.00 | 33,600.00 | | 0145 | NS-P08-00021 | 8" X 6" Reducer | 7 | EACH | 325.00 | 2,275.00 | 365.00 | 2,555.00 | 365.00 | 2,555.00 | 365.00 | 2,555.00 | | 0146 | NS-P08-00022 | 8" X 4" Reducer | 1 | EACH | 310.00 | 310.00 | 346.00 | 346.00 | 346.00 | 346.00 | 346.00 | 346.00 | | 0147 | NS-P08-00024 | Storm Drain Lining System (60" RCP) | 191 | LNFT | 340.00 | 64,940.00 | 590.00 | 112,690.00 | 650.00 | 124,150.00 | 325.00 | 62,075.00 | | 0148 | NS-P08-00025 | Storm Drain Lining System (42" RCP) | 192 | LNFT | 230.00 | 44,160.00 | 288.00 | 55,296.00 | 320.00 | 61,440.00 | 215.00 | 41,280.00 | | 0149 | NS-P08-00026 | Storm Drain Lining System (36" Steel Casing Pipe) | 579 | LNFT | 100.00 | 57,900.00 | 212.00 | 122,748.00 | 235.00 | 136,065.00 | 215.00 | 124,485.00 | | 0150 | NS-P08-00036 | 12" X 8" Wye for Sanitary Sewer Force Main | 1 | LNFT | 5,600.00 | 5,600.00 | 550.00 | 550.00 | 550.00 | 550.00 | 550.00 | 550.00 | | 0151 | NS-P08-00037 | 12" Open Cut C-900 DR 18 Force Main | 60 | LNFT | 155.00 | 9,300.00 | 52.00 | 3,120.00 | 52.00 | 3,120.00 | 52.00 | 3,120.00 | | 0161 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 40,000.00 | 40,000.00 | 33,000.00 | 33,000.00 | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | | | | SUBTOTAL GENERAL | | | | 9,215,655 | | 10,508,308 | | 11,051,379 | | 13,535,571 | | | | | | | | | | | | | | | | | Additive Section 1 | Additive Alternate No. 1 | | | | | | | | | | | | | | | | | | | | | | | | | | 0152 | NS-P08-00027 | 12" Open Cut C-900 DR 18 Water Main | 3,746 | LNFT | 40.00 | 149,840.00 | 52.00 | 194,792.00 | 52.00 | 194,792.00 | 52.00 | 194,792.00 | | 0153 | NS-P08-00028 | 12" Fusible C-900 DR 18 Street Bore | 420 | LNFT | 120.00 | 50,400.00 | 86.00 | 36,120.00 | 86.00 | 36,120.00 | 86.00 | 36,120.00 | | 0154 | NS-P08-00029 | 12" C-900 DR 18 Driveway Bore | 270 | LNFT | 60.00 | 16,200.00 | 66.00 | 17,820.00 | 66.00 | 17,820.00 | 66.00 | 17,820.00 | | 0155 | NS-P08-00030 | 12" Bends | 11 | EACH | 925.00 | 10,175.00 | 700.00 | 7,700.00 | 700.00 | 7,700.00 | 700.00 | 7,700.00 | | 0156 | NS-P08-00031 | 12" Gate Valve | 10 | EACH | 2,500.00 | 25,000.00 | 2,150.00 | 21,500.00 | 2,150.00 | 21,500.00 | 2,150.00 | 21,500.00 | | 0157 | NS-P08-00032 | 12" X 8" Tee | 14 | EACH | 1,300.00 | 18,200.00 | 775.00 | 10,850.00 | 775.00 | 10,850.00 | 775.00 | 10,850.00 | | 0158 | NS-P08-00033 | 12" X 6" Swivel Tee | 3 | EACH | 625.00 | 1,875.00 | 1,476.00 | 4,428.00 | 1,476.00 | 4,428.00 | 1,476.00 | 4,428.00 | | 0159 | NS-P08-00034 | 12" X 12" Tee | 1 | EACH | 625.00 | 625.00 | 1,476.00 | 1,476.00 | 1,476.00 | 1,476.00 | 1,476.00 | 1,476.00 | | 0160 | NS-P08-00035 | 12" X 8" Reducer | 2 | EACH | 825.00 | 1,650.00 | 600.00 | 1,200.00 | 600.00 | 1,200.00 | 600.00 | 1,200.00 | | | | SUBTOTAL ADDITIVE SECTION 1 | | | | 273,965.00 | | 295,886.00 | | 295,886.00 | | 295,886.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 9,489,619.80 | | 10,804,194.38 | | 11,347,265.02 | | 13,831,456.55 |
|