Proposal:H.010220.6
Parish:Acadia
Routes:LA 97
Description:LA 97: NEZPIQUE BR. - 0.09 MI N LA 100
Type Construction:GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALTIC SURFACE TREATMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK.
Estimated Construction Cost:$4,641,302.73
| Rank | License | Bidder | Construction Bid |
| 1 | 00481 | COASTAL BRIDGE CO., L.L.C. | $4,749,330.73 |
| 2 | 34356 | Prairie Contractors Inc. | $4,970,768.87 |
| 3 | 33663 | Glenn Lege Construction Inc | $5,153,777.12 |
| 4 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $5,267,506.00 |
| 5 | 12487 | Diamond B Construction Co., L.L.C. | $5,876,109.39 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - COASTAL BRIDGE CO., L.L.C. | - 2 - Prairie Contractors Inc. | - 3 - Glenn Lege Construction Inc | - 4 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 75 | SQYD | 45.00 | 3,375.00 | 15.00 | 1,125.00 | 20.00 | 1,500.00 | 20.00 | 1,500.00 | | 0002 | 202-02-32180 | Removal of Pipe Headwalls | 1 | EACH | 500.00 | 500.00 | 750.00 | 750.00 | 1,300.00 | 1,300.00 | 1,500.00 | 1,500.00 | | 0003 | 203-01-00100 | General Excavation | 1,091 | CUYD | 15.00 | 16,365.00 | 2.00 | 2,182.00 | 12.00 | 13,092.00 | 16.00 | 17,456.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 225 | CUYD | 30.00 | 6,750.00 | 25.00 | 5,625.00 | 17.00 | 3,825.00 | 30.00 | 6,750.00 | | 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 42 | EACH | 5.00 | 210.00 | 125.00 | 5,250.00 | 170.00 | 7,140.00 | 110.00 | 4,620.00 | | 0006 | 302-01-00500 | Class II Base Course (Asphaltic Concrete Base on Embankment Layer) | 1,021 | CUYD | 200.00 | 204,200.00 | 105.00 | 107,205.00 | 250.00 | 255,250.00 | 135.00 | 137,835.00 | | 0007 | 302-02-01040 | Class II Base Course (4" Thick) (Stone) | 46,513 | SQYD | 12.00 | 558,156.00 | 17.25 | 802,349.25 | 11.00 | 511,643.00 | 15.00 | 697,695.00 | | 0008 | 304-05-00100 | Lime Treatment (Type E) | 8.14 | TON | 350.00 | 2,849.00 | 3,500.00 | 28,490.00 | 1,180.00 | 9,605.20 | 1,500.00 | 12,210.00 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 11,525 | CUYD | 55.00 | 633,875.00 | 60.00 | 691,500.00 | 90.52 | 1,043,243.00 | 95.00 | 1,094,875.00 | | 0010 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 725 | CUYD | 100.00 | 72,500.00 | 60.00 | 43,500.00 | 41.00 | 29,725.00 | 60.06 | 43,543.50 | | 0011 | 502-01-00100 | Superpave Asphaltic Concrete | 18,434.3 | TON | 84.00 | 1,548,481.20 | 85.00 | 1,566,915.50 | 95.00 | 1,751,258.50 | 89.00 | 1,640,652.70 | | 0012 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 5,808.3 | TON | 125.00 | 726,037.50 | 48.00 | 278,798.40 | 115.00 | 667,954.50 | 89.00 | 516,938.70 | | 0013 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 2,720 | GAL | 3.05 | 8,296.00 | 3.25 | 8,840.00 | 3.35 | 9,112.00 | 3.20 | 8,704.00 | | 0014 | 507-02-00200 | Aggregate (S2) | 4,000 | SQYD | 3.75 | 15,000.00 | 4.00 | 16,000.00 | 4.20 | 16,800.00 | 4.00 | 16,000.00 | | 0015 | 507-02-00300 | Aggregate (S3) | 4,000 | SQYD | 3.60 | 14,400.00 | 3.75 | 15,000.00 | 3.90 | 15,600.00 | 3.75 | 15,000.00 | | 0016 | 509-01-00100 | Cold Planing Asphaltic Pavement | 54,981 | SQYD | 2.00 | 109,962.00 | 2.03 | 111,611.43 | 2.40 | 131,954.40 | 1.65 | 90,718.65 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -2,047 | CUYD | 0.01 | -20.47 | 0.01 | -20.47 | 0.10 | -204.70 | 1.00 | -2,047.00 | | 0018 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 3,315 | SQYD | 100.00 | 331,500.00 | 85.00 | 281,775.00 | 100.00 | 331,500.00 | 100.00 | 331,500.00 | | 0019 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 8 | LNFT | 130.00 | 1,040.00 | 140.00 | 1,120.00 | 115.00 | 920.00 | 225.00 | 1,800.00 | | 0020 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 8 | LNFT | 150.00 | 1,200.00 | 160.00 | 1,280.00 | 130.00 | 1,040.00 | 250.00 | 2,000.00 | | 0021 | 701-15-00100 | Concrete Collar | 3 | EACH | 2,000.00 | 6,000.00 | 800.00 | 2,400.00 | 560.00 | 1,680.00 | 1,900.00 | 5,700.00 | | 0022 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 6,000.00 | 6,000.00 | 5,200.00 | 5,200.00 | 3,300.00 | 3,300.00 | 7,500.00 | 7,500.00 | | 0023 | 706-02-00200 | Concrete Drive (6" Thick) | 155 | SQYD | 25.00 | 3,875.00 | 75.00 | 11,625.00 | 68.50 | 10,617.50 | 85.00 | 13,175.00 | | 0024 | 712-02-00100 | Sacked Concrete Revetment | 40 | SQYD | 140.00 | 5,600.00 | 80.00 | 3,200.00 | 110.00 | 4,400.00 | 400.00 | 16,000.00 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 55,000.00 | 55,000.00 | 450,000.00 | 450,000.00 | 66,770.00 | 66,770.00 | 50,000.00 | 50,000.00 | | 0026 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.42 | MILE | 300.00 | 2,226.00 | 450.00 | 3,339.00 | 650.00 | 4,823.00 | 425.00 | 3,153.50 | | 0027 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.938 | MILE | 600.00 | 4,162.80 | 0.01 | 0.07 | 666.00 | 4,620.71 | 625.00 | 4,336.25 | | 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 18.849 | MILE | 950.00 | 17,906.55 | 0.01 | 0.19 | 1,055.00 | 19,885.70 | 1,000.00 | 18,849.00 | | 0029 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 152 | EACH | 2.00 | 304.00 | 2.00 | 304.00 | 1.95 | 296.40 | 2.00 | 304.00 | | 0030 | 726-01-00100 | Bedding Material | 10 | CUYD | 10.00 | 100.00 | 95.00 | 950.00 | 80.00 | 800.00 | 100.00 | 1,000.00 | | 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 300,000.00 | 300,000.00 | 450,000.00 | 450,000.00 | 125,600.00 | 125,600.00 | 425,000.00 | 425,000.00 | | 0032 | 729-16-00200 | Object Marker Assembly (Type 2) | 32 | EACH | 75.00 | 2,400.00 | 55.00 | 1,760.00 | 78.00 | 2,496.00 | 50.00 | 1,600.00 | | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 647 | EACH | 8.00 | 5,176.00 | 9.00 | 5,823.00 | 9.00 | 5,823.00 | 8.00 | 5,176.00 | | 0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 9.424 | MILE | 3,600.00 | 33,926.40 | 3,700.00 | 34,868.80 | 4,000.00 | 37,696.00 | 3,700.00 | 34,868.80 | | 0035 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.469 | MILE | 1,500.00 | 5,203.50 | 1,700.00 | 5,897.30 | 1,665.00 | 5,775.89 | 1,600.00 | 5,550.40 | | 0036 | 735-01-00100 | Mailboxes | 60 | EACH | 1.00 | 60.00 | 10.00 | 600.00 | 5.50 | 330.00 | 3.00 | 180.00 | | 0037 | 735-02-00100 | Mailbox Supports (Single) | 66 | EACH | 110.00 | 7,260.00 | 125.00 | 8,250.00 | 172.00 | 11,352.00 | 115.00 | 7,590.00 | | 0038 | 735-03-00100 | Mailbox Supports (Double) | 5 | EACH | 175.00 | 875.00 | 175.00 | 875.00 | 200.00 | 1,000.00 | 160.00 | 800.00 | | 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 100.00 | 100.00 | 33,500.00 | 33,500.00 | 11,000.00 | 11,000.00 | | 0040 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 1,000 | LNFT | 5.00 | 5,000.00 | 5.15 | 5,150.00 | 5.55 | 5,550.00 | 7.00 | 7,000.00 | | 0041 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 245 | LNFT | 10.00 | 2,450.00 | 9.00 | 2,205.00 | 11.10 | 2,719.50 | 13.00 | 3,185.00 | | 0042 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 829 | INLF | 5.00 | 4,145.00 | 1.60 | 1,326.40 | 1.30 | 1,077.70 | 3.00 | 2,487.00 | | 0043 | NS-724-00001 | Rumble Strips (Centerline Ground-In) | 0.844 | MILE | 650.00 | 548.60 | 3,000.00 | 2,532.00 | 555.00 | 468.42 | 1,500.00 | 1,266.00 | | 0044 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 1.689 | MILE | 850.00 | 1,435.65 | 3,000.00 | 5,067.00 | 555.00 | 937.40 | 1,500.00 | 2,533.50 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,749,330.73 | | 4,970,768.87 | | 5,153,777.12 | | 5,267,506.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 75 | SQYD | 12.00 | 900.00 | | 0002 | 202-02-32180 | Removal of Pipe Headwalls | 1 | EACH | 550.00 | 550.00 | | 0003 | 203-01-00100 | General Excavation | 1,091 | CUYD | 49.00 | 53,459.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 225 | CUYD | 33.00 | 7,425.00 | | 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 42 | EACH | 265.00 | 11,130.00 | | 0006 | 302-01-00500 | Class II Base Course (Asphaltic Concrete Base on Embankment Layer) | 1,021 | CUYD | 170.00 | 173,570.00 | | 0007 | 302-02-01040 | Class II Base Course (4" Thick) (Stone) | 46,513 | SQYD | 16.00 | 744,208.00 | | 0008 | 304-05-00100 | Lime Treatment (Type E) | 8.14 | TON | 1.00 | 8.14 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 11,525 | CUYD | 99.00 | 1,140,975.00 | | 0010 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 725 | CUYD | 69.00 | 50,025.00 | | 0011 | 502-01-00100 | Superpave Asphaltic Concrete | 18,434.3 | TON | 104.00 | 1,917,167.20 | | 0012 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 5,808.3 | TON | 115.00 | 667,954.50 | | 0013 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 2,720 | GAL | 3.05 | 8,296.00 | | 0014 | 507-02-00200 | Aggregate (S2) | 4,000 | SQYD | 3.80 | 15,200.00 | | 0015 | 507-02-00300 | Aggregate (S3) | 4,000 | SQYD | 3.55 | 14,200.00 | | 0016 | 509-01-00100 | Cold Planing Asphaltic Pavement | 54,981 | SQYD | 1.50 | 82,471.50 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -2,047 | CUYD | 1.00 | -2,047.00 | | 0018 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 3,315 | SQYD | 120.00 | 397,800.00 | | 0019 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 8 | LNFT | 125.00 | 1,000.00 | | 0020 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 8 | LNFT | 144.00 | 1,152.00 | | 0021 | 701-15-00100 | Concrete Collar | 3 | EACH | 760.00 | 2,280.00 | | 0022 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 4,850.00 | 4,850.00 | | 0023 | 706-02-00200 | Concrete Drive (6" Thick) | 155 | SQYD | 75.00 | 11,625.00 | | 0024 | 712-02-00100 | Sacked Concrete Revetment | 40 | SQYD | 79.00 | 3,160.00 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 70,000.00 | 70,000.00 | | 0026 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.42 | MILE | 154.00 | 1,142.68 | | 0027 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.938 | MILE | 1.00 | 6.94 | | 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 18.849 | MILE | 1.00 | 18.85 | | 0029 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 152 | EACH | 1.80 | 273.60 | | 0030 | 726-01-00100 | Bedding Material | 10 | CUYD | 94.00 | 940.00 | | 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 400,000.00 | 400,000.00 | | 0032 | 729-16-00200 | Object Marker Assembly (Type 2) | 32 | EACH | 72.00 | 2,304.00 | | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 647 | EACH | 8.25 | 5,337.75 | | 0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 9.424 | MILE | 3,625.00 | 34,162.00 | | 0035 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.469 | MILE | 1,600.00 | 5,550.40 | | 0036 | 735-01-00100 | Mailboxes | 60 | EACH | 5.00 | 300.00 | | 0037 | 735-02-00100 | Mailbox Supports (Single) | 66 | EACH | 162.00 | 10,692.00 | | 0038 | 735-03-00100 | Mailbox Supports (Double) | 5 | EACH | 187.00 | 935.00 | | 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | | 0040 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 1,000 | LNFT | 5.00 | 5,000.00 | | 0041 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 245 | LNFT | 8.75 | 2,143.75 | | 0042 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 829 | INLF | 2.50 | 2,072.50 | | 0043 | NS-724-00001 | Rumble Strips (Centerline Ground-In) | 0.844 | MILE | 1,450.00 | 1,223.80 | | 0044 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 1.689 | MILE | 975.00 | 1,646.78 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,876,109.39 |
|