Proposal:H.010178.6
Parish:Natchitoches
Routes:LA 120
Description:LA 120: CURVE REALIGNMENT
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$2,170,502.40
| Rank | License | Bidder | Construction Bid |
| 1 | 52711 | Specialty Contractors Of La LLC | $1,689,876.36 |
| 2 | 40615 | SPECIALTY TRACKHOE & DOZER SERV.INC | $1,883,224.71 |
| 3 | 30774 | Progressive Construction Co., LLC | $2,082,281.14 |
| 4 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $2,197,480.49 |
| 5 | 08815 | W. E. MCDONALD & SON, LLC. | $2,379,515.30 |
| 6 | 12487 | Diamond B Construction Co., L.L.C. | $2,492,719.07 |
| 7 | 40486 | REGIONAL CONSTRUCTION, LLC | $2,494,836.10 |
| 8 | 35849 | T.L. CONSTRUCTION LLC | $2,654,211.95 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Specialty Contractors Of La LLC | - 2 - SPECIALTY TRACKHOE & DOZER SERV.INC | - 3 - Progressive Construction Co., LLC | - 4 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 15 | LUMP | 169,000.00 | 169,000.00 | 44,000.00 | 44,000.00 | 78,000.00 | 78,000.00 | 35,000.00 | 35,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 30,000.00 | 30,000.00 | 22,000.00 | 22,000.00 | 30,000.00 | 30,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 260 | SQYD | 2.00 | 520.00 | 7.00 | 1,820.00 | 7.50 | 1,950.00 | 16.00 | 4,160.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 107 | SQYD | 5.00 | 535.00 | 10.00 | 1,070.00 | 6.50 | 695.50 | 40.00 | 4,280.00 | | 0005 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 10,016.1 | SQYD | 3.00 | 30,048.30 | 7.25 | 72,616.73 | 7.00 | 70,112.70 | 7.40 | 74,119.14 | | 0006 | 203-01-00100 | General Excavation | 23,949 | CUYD | 2.50 | 59,872.50 | 2.50 | 59,872.50 | 9.00 | 215,541.00 | 5.50 | 131,719.50 | | 0007 | 203-03-00100 | Embankment | 33,523 | CUYD | 7.00 | 234,661.00 | 7.50 | 251,422.50 | 8.00 | 268,184.00 | 14.25 | 477,702.75 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 114 | EACH | 75.00 | 8,550.00 | 100.00 | 11,400.00 | 130.00 | 14,820.00 | 110.00 | 12,540.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 9,106 | LNFT | 3.16 | 28,774.96 | 2.00 | 18,212.00 | 2.00 | 18,212.00 | 2.20 | 20,033.20 | | 0010 | 302-02-04000 | Class II Base Course (8 1/2" Thick) | 18,361.5 | SQYD | 10.60 | 194,631.90 | 10.50 | 192,795.75 | 13.00 | 238,699.50 | 14.30 | 262,569.45 | | 0011 | 304-05-00100 | Lime Treatment (Type E) | 52.05 | TON | 400.00 | 20,820.00 | 465.00 | 24,203.25 | 495.00 | 25,764.75 | 435.00 | 22,641.75 | | 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 141 | CUYD | 100.00 | 14,100.00 | 120.00 | 16,920.00 | 65.00 | 9,165.00 | 95.00 | 13,395.00 | | 0013 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 2,000 | CUYD | 1.00 | 2,000.00 | 55.00 | 110,000.00 | 25.00 | 50,000.00 | 55.00 | 110,000.00 | | 0014 | 502-01-00100 | Superpave Asphaltic Concrete | 3,386.5 | TON | 103.00 | 348,809.50 | 99.75 | 337,803.38 | 103.00 | 348,809.50 | 97.00 | 328,490.50 | | 0015 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 199.8 | TON | 246.00 | 49,150.80 | 140.00 | 27,972.00 | 246.00 | 49,150.80 | 145.00 | 28,971.00 | | 0016 | 701-01-01000 | Cross Drain Pipe (24" RCP/PP) | 88 | LNFT | 82.00 | 7,216.00 | 60.00 | 5,280.00 | 114.00 | 10,032.00 | 100.00 | 8,800.00 | | 0017 | 701-01-01040 | Cross Drain Pipe (36" RCP/PP) | 264 | LNFT | 110.00 | 29,040.00 | 85.00 | 22,440.00 | 159.00 | 41,976.00 | 108.00 | 28,512.00 | | 0018 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 600 | LNFT | 44.00 | 26,400.00 | 40.00 | 24,000.00 | 49.50 | 29,700.00 | 50.00 | 30,000.00 | | 0019 | 705-01-00100 | Barbed Wire Fence | 1,042 | LNFT | 8.00 | 8,336.00 | 10.00 | 10,420.00 | 5.50 | 5,731.00 | 11.00 | 11,462.00 | | 0020 | 706-02-00100 | Concrete Drive (4" Thick) | 92 | SQYD | 40.00 | 3,680.00 | 72.00 | 6,624.00 | 73.00 | 6,716.00 | 69.00 | 6,348.00 | | 0021 | 708-01-00100 | Right-of-Way Monument | 29 | EACH | 150.00 | 4,350.00 | 150.00 | 4,350.00 | 175.00 | 5,075.00 | 280.00 | 8,120.00 | | 0022 | 708-02-00100 | Right-of-Way Monument Witness Post | 29 | EACH | 150.00 | 4,350.00 | 150.00 | 4,350.00 | 175.00 | 5,075.00 | 110.00 | 3,190.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 7,000.00 | 7,000.00 | 14,000.00 | 14,000.00 | 10,300.00 | 10,300.00 | 17,500.00 | 17,500.00 | | 0024 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 22 | LNFT | 1.00 | 22.00 | 20.00 | 440.00 | 0.55 | 12.10 | 0.60 | 13.20 | | 0025 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.747 | MILE | 500.00 | 873.50 | 300.00 | 524.10 | 1,300.00 | 2,271.10 | 270.00 | 471.69 | | 0026 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.085 | MILE | 700.00 | 759.50 | 1,500.00 | 1,627.50 | 715.00 | 775.78 | 740.00 | 802.90 | | 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 6.288 | MILE | 1,050.00 | 6,602.40 | 1,500.00 | 9,432.00 | 1,100.00 | 6,916.80 | 1,050.00 | 6,602.40 | | 0028 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 401 | EACH | 5.00 | 2,005.00 | 3.00 | 1,203.00 | 5.00 | 2,005.00 | 1.40 | 561.40 | | 0029 | 716-01-00100 | Mulch (Vegetative) | 40 | TON | 500.00 | 20,000.00 | 500.00 | 20,000.00 | 1,350.00 | 54,000.00 | 570.00 | 22,800.00 | | 0030 | 717-01-00100 | Seeding | 1,600 | LB | 8.00 | 12,800.00 | 10.00 | 16,000.00 | 5.50 | 8,800.00 | 11.00 | 17,600.00 | | 0031 | 718-01-00100 | Fertilizer | 20,000 | LB | 0.50 | 10,000.00 | 0.45 | 9,000.00 | 0.35 | 7,000.00 | 0.50 | 10,000.00 | | 0032 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 9,980 | SQYD | 2.00 | 19,960.00 | 1.50 | 14,970.00 | 1.00 | 9,980.00 | 1.70 | 16,966.00 | | 0033 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 1,667 | SQYD | 2.00 | 3,334.00 | 1.75 | 2,917.25 | 1.00 | 1,667.00 | 2.00 | 3,334.00 | | 0034 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 5,333 | SQYD | 2.00 | 10,666.00 | 2.00 | 10,666.00 | 1.00 | 5,333.00 | 2.25 | 11,999.25 | | 0035 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 8,000.00 | 8,000.00 | 20,000.00 | 20,000.00 | 7,500.00 | 7,500.00 | 5,000.00 | 5,000.00 | | 0036 | 725-01-00100 | Temporary Detour Roads | 4,530.3 | SQYD | 38.00 | 172,151.40 | 57.50 | 260,492.25 | 56.35 | 255,282.41 | 55.35 | 250,752.11 | | 0037 | 726-01-00100 | Bedding Material | 170.4 | CUYD | 98.00 | 16,699.20 | 80.00 | 13,632.00 | 100.00 | 17,040.00 | 95.00 | 16,188.00 | | 0038 | 727-01-00100 | Mobilization | 1 | LUMP | 90,000.00 | 90,000.00 | 135,000.00 | 135,000.00 | 122,000.00 | 122,000.00 | 125,000.00 | 125,000.00 | | 0039 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 99.2 | SQFT | 20.00 | 1,984.00 | 25.00 | 2,480.00 | 25.00 | 2,480.00 | 28.00 | 2,777.60 | | 0040 | 729-16-00200 | Object Marker Assembly (Type 2) | 6 | EACH | 110.00 | 660.00 | 100.00 | 600.00 | 66.00 | 396.00 | 60.00 | 360.00 | | 0041 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 14 | EACH | 100.00 | 1,400.00 | 150.00 | 2,100.00 | 150.00 | 2,100.00 | 170.00 | 2,380.00 | | 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 162 | EACH | 11.00 | 1,782.00 | 10.00 | 1,620.00 | 11.00 | 1,782.00 | 11.00 | 1,782.00 | | 0043 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 11 | LNFT | 27.00 | 297.00 | 100.00 | 1,100.00 | 27.50 | 302.50 | 25.00 | 275.00 | | 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.569 | MILE | 6,000.00 | 15,414.00 | 7,500.00 | 19,267.50 | 6,050.00 | 15,542.45 | 6,000.00 | 15,414.00 | | 0045 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.543 | MILE | 2,800.00 | 1,520.40 | 2,000.00 | 1,086.00 | 2,750.00 | 1,493.25 | 2,800.00 | 1,520.40 | | 0046 | 735-01-00100 | Mailboxes | 5 | EACH | 10.00 | 50.00 | 50.00 | 250.00 | 4.00 | 20.00 | 3.25 | 16.25 | | 0047 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 150.00 | 450.00 | 150.00 | 450.00 | 185.00 | 555.00 | 160.00 | 480.00 | | 0048 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 200.00 | 200.00 | 175.00 | 175.00 | 237.00 | 237.00 | 210.00 | 210.00 | | 0049 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 45,000.00 | 45,000.00 | 30,000.00 | 30,000.00 | 13,000.00 | 13,000.00 | | 0050 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 540 | INLF | 10.00 | 5,400.00 | 3.00 | 1,620.00 | 2.00 | 1,080.00 | 3.00 | 1,620.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,689,876.36 | | 1,883,224.71 | | 2,082,281.14 | | 2,197,480.49 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - W. E. MCDONALD & SON, LLC. | - 6 - Diamond B Construction Co., L.L.C. | - 7 - REGIONAL CONSTRUCTION, LLC | - 8 - T.L. CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 15 | LUMP | 195,000.00 | 195,000.00 | 80,000.00 | 80,000.00 | 40,000.00 | 40,000.00 | 77,000.00 | 77,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 5,000.00 | 5,000.00 | 40,000.00 | 40,000.00 | 12,800.00 | 12,800.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 260 | SQYD | 40.00 | 10,400.00 | 14.00 | 3,640.00 | 20.00 | 5,200.00 | 50.00 | 13,000.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 107 | SQYD | 30.00 | 3,210.00 | 15.00 | 1,605.00 | 20.00 | 2,140.00 | 78.00 | 8,346.00 | | 0005 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 10,016.1 | SQYD | 5.00 | 50,080.50 | 6.50 | 65,104.65 | 5.00 | 50,080.50 | 8.00 | 80,128.80 | | 0006 | 203-01-00100 | General Excavation | 23,949 | CUYD | 8.00 | 191,592.00 | 11.00 | 263,439.00 | 10.00 | 239,490.00 | 13.00 | 311,337.00 | | 0007 | 203-03-00100 | Embankment | 33,523 | CUYD | 12.00 | 402,276.00 | 14.00 | 469,322.00 | 18.00 | 603,414.00 | 14.50 | 486,083.50 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 114 | EACH | 100.00 | 11,400.00 | 105.00 | 11,970.00 | 40.00 | 4,560.00 | 240.00 | 27,360.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 9,106 | LNFT | 2.00 | 18,212.00 | 4.00 | 36,424.00 | 4.00 | 36,424.00 | 3.20 | 29,139.20 | | 0010 | 302-02-04000 | Class II Base Course (8 1/2" Thick) | 18,361.5 | SQYD | 13.00 | 238,699.50 | 14.50 | 266,241.75 | 10.00 | 183,615.00 | 15.50 | 284,603.25 | | 0011 | 304-05-00100 | Lime Treatment (Type E) | 52.05 | TON | 500.00 | 26,025.00 | 500.00 | 26,025.00 | 400.00 | 20,820.00 | 550.00 | 28,627.50 | | 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 141 | CUYD | 100.00 | 14,100.00 | 53.00 | 7,473.00 | 95.00 | 13,395.00 | 131.00 | 18,471.00 | | 0013 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 2,000 | CUYD | 10.00 | 20,000.00 | 70.00 | 140,000.00 | 95.00 | 190,000.00 | 90.00 | 180,000.00 | | 0014 | 502-01-00100 | Superpave Asphaltic Concrete | 3,386.5 | TON | 100.00 | 338,650.00 | 103.00 | 348,809.50 | 100.00 | 338,650.00 | 115.00 | 389,447.50 | | 0015 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 199.8 | TON | 150.00 | 29,970.00 | 246.00 | 49,150.80 | 150.00 | 29,970.00 | 295.00 | 58,941.00 | | 0016 | 701-01-01000 | Cross Drain Pipe (24" RCP/PP) | 88 | LNFT | 115.00 | 10,120.00 | 117.00 | 10,296.00 | 52.00 | 4,576.00 | 110.00 | 9,680.00 | | 0017 | 701-01-01040 | Cross Drain Pipe (36" RCP/PP) | 264 | LNFT | 140.00 | 36,960.00 | 165.00 | 43,560.00 | 74.00 | 19,536.00 | 155.00 | 40,920.00 | | 0018 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 600 | LNFT | 75.00 | 45,000.00 | 52.00 | 31,200.00 | 38.00 | 22,800.00 | 95.00 | 57,000.00 | | 0019 | 705-01-00100 | Barbed Wire Fence | 1,042 | LNFT | 10.00 | 10,420.00 | 11.00 | 11,462.00 | 9.00 | 9,378.00 | 7.50 | 7,815.00 | | 0020 | 706-02-00100 | Concrete Drive (4" Thick) | 92 | SQYD | 100.00 | 9,200.00 | 79.00 | 7,268.00 | 60.00 | 5,520.00 | 90.00 | 8,280.00 | | 0021 | 708-01-00100 | Right-of-Way Monument | 29 | EACH | 300.00 | 8,700.00 | 375.00 | 10,875.00 | 200.00 | 5,800.00 | 610.00 | 17,690.00 | | 0022 | 708-02-00100 | Right-of-Way Monument Witness Post | 29 | EACH | 300.00 | 8,700.00 | 275.00 | 7,975.00 | 200.00 | 5,800.00 | 650.00 | 18,850.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 40,000.00 | 40,000.00 | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 | | 0024 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 22 | LNFT | 0.50 | 11.00 | 0.50 | 11.00 | 8.00 | 176.00 | 2.00 | 44.00 | | 0025 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.747 | MILE | 400.00 | 698.80 | 154.00 | 269.04 | 700.00 | 1,222.90 | 780.00 | 1,362.66 | | 0026 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.085 | MILE | 650.00 | 705.25 | 1.00 | 1.09 | 600.00 | 651.00 | 800.00 | 868.00 | | 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 6.288 | MILE | 950.00 | 5,973.60 | 1.00 | 6.29 | 900.00 | 5,659.20 | 1,130.00 | 7,105.44 | | 0028 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 401 | EACH | 2.00 | 802.00 | 1.00 | 401.00 | 10.00 | 4,010.00 | 5.00 | 2,005.00 | | 0029 | 716-01-00100 | Mulch (Vegetative) | 40 | TON | 500.00 | 20,000.00 | 525.00 | 21,000.00 | 900.00 | 36,000.00 | 120.00 | 4,800.00 | | 0030 | 717-01-00100 | Seeding | 1,600 | LB | 10.00 | 16,000.00 | 10.50 | 16,800.00 | 20.00 | 32,000.00 | 10.00 | 16,000.00 | | 0031 | 718-01-00100 | Fertilizer | 20,000 | LB | 0.45 | 9,000.00 | 0.45 | 9,000.00 | 0.70 | 14,000.00 | 1.00 | 20,000.00 | | 0032 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 9,980 | SQYD | 1.50 | 14,970.00 | 1.55 | 15,469.00 | 3.00 | 29,940.00 | 1.55 | 15,469.00 | | 0033 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 1,667 | SQYD | 1.75 | 2,917.25 | 1.80 | 3,000.60 | 4.00 | 6,668.00 | 2.00 | 3,334.00 | | 0034 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 5,333 | SQYD | 2.00 | 10,666.00 | 2.15 | 11,465.95 | 5.00 | 26,665.00 | 3.00 | 15,999.00 | | 0035 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 5,000.00 | 5,000.00 | 2,500.00 | 2,500.00 | 3,000.00 | 3,000.00 | 20,000.00 | 20,000.00 | | 0036 | 725-01-00100 | Temporary Detour Roads | 4,530.3 | SQYD | 90.00 | 407,727.00 | 55.00 | 249,166.50 | 50.00 | 226,515.00 | 25.00 | 113,257.50 | | 0037 | 726-01-00100 | Bedding Material | 170.4 | CUYD | 100.00 | 17,040.00 | 99.00 | 16,869.60 | 100.00 | 17,040.00 | 120.00 | 20,448.00 | | 0038 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 155,000.00 | 155,000.00 | 50,000.00 | 50,000.00 | 150,000.00 | 150,000.00 | | 0039 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 99.2 | SQFT | 22.00 | 2,182.40 | 50.00 | 4,960.00 | 45.00 | 4,464.00 | 91.00 | 9,027.20 | | 0040 | 729-16-00200 | Object Marker Assembly (Type 2) | 6 | EACH | 75.00 | 450.00 | 80.00 | 480.00 | 200.00 | 1,200.00 | 120.00 | 720.00 | | 0041 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 14 | EACH | 125.00 | 1,750.00 | 255.00 | 3,570.00 | 200.00 | 2,800.00 | 582.00 | 8,148.00 | | 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 162 | EACH | 10.00 | 1,620.00 | 10.50 | 1,701.00 | 7.00 | 1,134.00 | 12.00 | 1,944.00 | | 0043 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 11 | LNFT | 25.00 | 275.00 | 26.00 | 286.00 | 14.00 | 154.00 | 30.00 | 330.00 | | 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.569 | MILE | 5,500.00 | 14,129.50 | 5,500.00 | 14,129.50 | 6,000.00 | 15,414.00 | 6,600.00 | 16,955.40 | | 0045 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.543 | MILE | 2,500.00 | 1,357.50 | 2,600.00 | 1,411.80 | 1,500.00 | 814.50 | 3,000.00 | 1,629.00 | | 0046 | 735-01-00100 | Mailboxes | 5 | EACH | 1.00 | 5.00 | 1.00 | 5.00 | 400.00 | 2,000.00 | 1.20 | 6.00 | | 0047 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 800.00 | 2,400.00 | 305.00 | 915.00 | 400.00 | 1,200.00 | 960.00 | 2,880.00 | | 0048 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 800.00 | 800.00 | 340.00 | 340.00 | 400.00 | 400.00 | 960.00 | 960.00 | | 0049 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 25,500.00 | 25,500.00 | 100,000.00 | 100,000.00 | 25,000.00 | 25,000.00 | | 0050 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 540 | INLF | 8.00 | 4,320.00 | 3.00 | 1,620.00 | 1.00 | 540.00 | 10.00 | 5,400.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,379,515.30 | | 2,492,719.07 | | 2,494,836.10 | | 2,654,211.95 |
|