Proposal:H.011441.6
Parish:Terrebonne
Routes:LA 3185
Description:LA 3185: RIGHT TURN LANE AT LA 20
Type Construction:GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II
BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$182,689.18
| Rank | License | Bidder | Construction Bid |
| 1 | 06487 | Huey Stockstill, Inc. | $212,954.53 |
| 2 | 06276 | Barriere Construction Co., LLC | $282,120.66 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Huey Stockstill, Inc. | - 2 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 406.2 | SQYD | 19.00 | 7,717.80 | 10.00 | 4,062.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 7 | SQYD | 327.00 | 2,289.00 | 20.00 | 140.00 | | 0003 | 202-03-38000 | Relocation of Sign RELOCATION OF SIGN AND U-CHANNEL POST | 2 | EACH | 500.00 | 1,000.00 | 400.00 | 800.00 | | 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 18,000.00 | 18,000.00 | 10,000.00 | 10,000.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 165 | CUYD | 44.00 | 7,260.00 | 30.00 | 4,950.00 | | 0006 | 302-02-06000 | Class II Base Course (12" Thick) | 502.3 | SQYD | 44.00 | 22,101.20 | 90.00 | 45,207.00 | | 0007 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 1,404 | LNFT | 3.00 | 4,212.00 | 2.00 | 2,808.00 | | 0008 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 562 | LNFT | 3.00 | 1,686.00 | 2.00 | 1,124.00 | | 0009 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 6,000.00 | 6,000.00 | 28,000.00 | 28,000.00 | | 0010 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 400 | LNFT | 0.01 | 4.00 | 0.25 | 100.00 | | 0011 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 80 | LNFT | 0.01 | 0.80 | 1.00 | 80.00 | | 0012 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.684 | MILE | 800.00 | 547.20 | 800.00 | 547.20 | | 0013 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 4 | EACH | 56.00 | 224.00 | 65.00 | 260.00 | | 0014 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 4 | EACH | 51.00 | 204.00 | 55.00 | 220.00 | | 0015 | 717-01-00100 | Seeding | 3.876 | LB | 87.00 | 337.21 | 130.00 | 503.88 | | 0016 | 718-01-00100 | Fertilizer | 129.2 | LB | 3.10 | 400.52 | 5.00 | 646.00 | | 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 21,000.00 | 21,000.00 | 28,000.00 | 28,000.00 | | 0018 | 731-02-00100 | Reflectorized Raised Pavement Markers | 44 | EACH | 23.00 | 1,012.00 | 25.00 | 1,100.00 | | 0019 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 200 | LNFT | 5.00 | 1,000.00 | 5.00 | 1,000.00 | | 0020 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 40 | LNFT | 23.00 | 920.00 | 25.00 | 1,000.00 | | 0021 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.342 | MILE | 11,000.00 | 3,762.00 | 13,000.00 | 4,446.00 | | 0022 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.047 | MILE | 8,000.00 | 376.00 | 10,000.00 | 470.00 | | 0023 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 600.00 | 1,200.00 | 600.00 | 1,200.00 | | 0024 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 600.00 | 1,200.00 | 600.00 | 1,200.00 | | 0025 | 735-01-00100 | Mailboxes | 2 | EACH | 1.00 | 2.00 | 10.00 | 20.00 | | 0026 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 170.00 | 340.00 | 850.00 | 1,700.00 | | 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 23,000.00 | 23,000.00 | | 0028 | NS-200-00020 | Cleaning Existing Ditches (STA 13+77 TO STA 15+77) | 200 | LNFT | 4.00 | 800.00 | 15.00 | 3,000.00 | | 0029 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 1,404 | LNFT | 3.00 | 4,212.00 | 0.75 | 1,053.00 | | 0030 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 562 | LNFT | 3.00 | 1,686.00 | 0.75 | 421.50 | | 0031 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 1,966 | LNFT | 0.85 | 1,671.10 | 1.00 | 1,966.00 | | 0032 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 3,656 | INLF | 0.70 | 2,559.20 | 1.00 | 3,656.00 | | 0033 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 3,072 | INLF | 1.00 | 3,072.00 | 2.50 | 7,680.00 | | 0034 | NS-502-01000 | Asphalt Concrete | 376.1 | TON | 145.00 | 54,534.50 | 200.00 | 75,220.00 | | 0035 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 9 | TON | 145.00 | 1,305.00 | 200.00 | 1,800.00 | | 0036 | NS-509-01000 | Milling Asphalt Pavement | 1,664 | SQYD | 12.00 | 19,968.00 | 9.00 | 14,976.00 | | 0037 | NS-509-02000 | Contractor Retained Reclaimed Asphalt Pavement | -92.4 | CUYD | 0.00 | 0.00 | 0.01 | -0.92 | | 0038 | NS-510-01400 | Pavement Patching (12" Minimum Thickness) | 105 | SQYD | 145.00 | 15,225.00 | 90.00 | 9,450.00 | | 0039 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 126 | INLF | 1.00 | 126.00 | 2.50 | 315.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 212,954.53 | | 282,120.66 |
|