Proposal:H.007331.6
Parish:St. Bernard
Description:PAKENHAM DR. (LA 46 – LA 39)
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, WATER DISTRIBUTION SYSTEM, ADDITIVE ALTERNATE 1: 8” WATER MAIN; AND RELATED WORK.
Estimated Construction Cost:$5,518,250.90
| Rank | License | Bidder | Construction Bid |
| 1 | 02179 | Boh Bros. Construction Co., LLC. | $5,371,987.55 |
| 2 | 48896 | Command Construction Industries LLC | $5,988,888.88 |
| 3 | 52550 | Gibbs & Register Inc. | $7,512,320.10 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Boh Bros. Construction Co., LLC. | - 2 - Command Construction Industries LLC | - 3 - Gibbs & Register Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing Including Tree Trimming | 1 | LUMP | 7,700.00 | 7,700.00 | 250,000.00 | 250,000.00 | 35,000.00 | 35,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 50,000.00 | 50,000.00 | 134,160.25 | 134,160.25 | 435,000.00 | 435,000.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 4,099.4 | SQYD | 12.00 | 49,192.80 | 10.00 | 40,994.00 | 8.00 | 32,795.20 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 1,617.9 | LNFT | 10.00 | 16,179.00 | 10.00 | 16,179.00 | 10.00 | 16,179.00 | | 0005 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 15,344.5 | SQYD | 3.50 | 53,705.75 | 25.00 | 383,612.50 | 8.00 | 122,756.00 | | 0006 | 203-01-00100 | General Excavation | 17,436 | CUYD | 16.00 | 278,976.00 | 10.00 | 174,360.00 | 16.00 | 278,976.00 | | 0007 | 203-03-00100 | Embankment | 218 | CUYD | 40.00 | 8,720.00 | 50.00 | 10,900.00 | 44.00 | 9,592.00 | | 0008 | 203-04-00100 | Nonplastic Embankment | 4,910.37 | CUYD | 30.00 | 147,311.10 | 25.00 | 122,759.25 | 30.00 | 147,311.10 | | 0009 | 203-07-00100 | Borrow (Vehicular Measurement) | 56 | CUYD | 21.00 | 1,176.00 | 50.00 | 2,800.00 | 450.00 | 25,200.00 | | 0010 | 203-08-00100 | Geotextile Fabric | 28,739.8 | SQYD | 1.00 | 28,739.80 | 3.00 | 86,219.40 | 2.25 | 64,664.55 | | 0011 | 204-02-00100 | Temporary Hay or Straw Bales | 474 | EACH | 20.00 | 9,480.00 | 1.00 | 474.00 | 14.00 | 6,636.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 9,418 | LNFT | 2.00 | 18,836.00 | 1.00 | 9,418.00 | 2.00 | 18,836.00 | | 0013 | 302-02-01500 | Class II Base Course (5" Thick) | 462.5 | SQYD | 15.00 | 6,937.50 | 20.00 | 9,250.00 | 66.00 | 30,525.00 | | 0014 | 302-02-03000 | Class II Base Course (8" Thick) | 13,067.3 | SQYD | 18.00 | 235,211.40 | 25.00 | 326,682.50 | 20.00 | 261,346.00 | | 0015 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 400 | CUYD | 40.00 | 16,000.00 | 75.00 | 30,000.00 | 90.00 | 36,000.00 | | 0016 | 502-01-00100 | Superpave Asphaltic Concrete | 4,186.5 | TON | 105.00 | 439,582.50 | 125.00 | 523,312.50 | 122.00 | 510,753.00 | | 0017 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 171.6 | TON | 105.00 | 18,018.00 | 225.00 | 38,610.00 | 180.00 | 30,888.00 | | 0018 | 509-01-00100 | Cold Planing Asphaltic Pavement | 395 | SQYD | 15.00 | 5,925.00 | 30.00 | 11,850.00 | 17.00 | 6,715.00 | | 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -22 | CUYD | 1.00 | -22.00 | 0.01 | -0.22 | 1.00 | -22.00 | | 0020 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 2,709 | SQYD | 70.00 | 189,630.00 | 100.00 | 270,900.00 | 1.00 | 2,709.00 | | 0021 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 1,144 | LNFT | 73.00 | 83,512.00 | 80.00 | 91,520.00 | 160.00 | 183,040.00 | | 0022 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 583 | LNFT | 82.00 | 47,806.00 | 90.00 | 52,470.00 | 120.00 | 69,960.00 | | 0023 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 745 | LNFT | 93.00 | 69,285.00 | 120.00 | 89,400.00 | 130.00 | 96,850.00 | | 0024 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 929 | LNFT | 106.00 | 98,474.00 | 150.00 | 139,350.00 | 145.00 | 134,705.00 | | 0025 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 98 | LNFT | 133.00 | 13,034.00 | 180.00 | 17,640.00 | 170.00 | 16,660.00 | | 0026 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 273 | LNFT | 182.00 | 49,686.00 | 220.00 | 60,060.00 | 210.00 | 57,330.00 | | 0027 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 194 | LNFT | 230.00 | 44,620.00 | 250.00 | 48,500.00 | 255.00 | 49,470.00 | | 0028 | 701-03-02080 | Storm Drain Pipe (Outfall) (36" PP or 42" CMP) CMP NOT ALLOWED | 20 | LNFT | 210.00 | 4,200.00 | 125.00 | 2,500.00 | 390.00 | 7,800.00 | | 0029 | 701-03-02120 | Storm Drain Pipe (Outfall) (48" PP or 54" CMP) CMP NOT ALLOWED | 20 | LNFT | 400.00 | 8,000.00 | 225.00 | 4,500.00 | 525.00 | 10,500.00 | | 0030 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 100 | LNFT | 108.00 | 10,800.00 | 90.00 | 9,000.00 | 125.00 | 12,500.00 | | 0031 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 255 | LNFT | 145.00 | 36,975.00 | 150.00 | 38,250.00 | 150.00 | 38,250.00 | | 0032 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 377 | LNFT | 160.00 | 60,320.00 | 180.00 | 67,860.00 | 170.00 | 64,090.00 | | 0033 | 701-07-00100 | Yard Drain Pipe (4") | 150 | LNFT | 70.00 | 10,500.00 | 10.00 | 1,500.00 | 68.00 | 10,200.00 | | 0034 | 701-07-00200 | Yard Drain Pipe (6") | 150 | LNFT | 75.00 | 11,250.00 | 10.00 | 1,500.00 | 68.00 | 10,200.00 | | 0035 | 701-09-00100 | Fabricating Pipe Fittings | 12 | EACH | 450.00 | 5,400.00 | 2,500.00 | 30,000.00 | 3,200.00 | 38,400.00 | | 0036 | 702-01-00100 | Junction Boxes (CONFLICT MANHOLE) | 2 | EACH | 3,900.00 | 7,800.00 | 6,000.00 | 12,000.00 | 10,000.00 | 20,000.00 | | 0037 | 702-02-00100 | Manholes (MH-06) | 2 | EACH | 8,000.00 | 16,000.00 | 5,000.00 | 10,000.00 | 7,500.00 | 15,000.00 | | 0038 | 702-02-00200 | Manholes (R-CB-11) | 18 | EACH | 6,300.00 | 113,400.00 | 5,000.00 | 90,000.00 | 11,500.00 | 207,000.00 | | 0039 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 3,100.00 | 3,100.00 | 2,000.00 | 2,000.00 | 5,600.00 | 5,600.00 | | 0040 | 702-03-00500 | Catch Basins (CB-06) | 15 | EACH | 5,600.00 | 84,000.00 | 5,000.00 | 75,000.00 | 7,300.00 | 109,500.00 | | 0041 | 702-03-00600 | Catch Basins (CB-07) | 16 | EACH | 6,700.00 | 107,200.00 | 6,500.00 | 104,000.00 | 7,700.00 | 123,200.00 | | 0042 | 702-03-00700 | Catch Basins (CB-08) | 15 | EACH | 8,900.00 | 133,500.00 | 7,500.00 | 112,500.00 | 11,500.00 | 172,500.00 | | 0043 | 702-03-00800 | Catch Basins (CB-09) | 10 | EACH | 6,700.00 | 67,000.00 | 4,000.00 | 40,000.00 | 8,000.00 | 80,000.00 | | 0044 | 702-04-00100 | Adjusting Manholes | 14 | EACH | 1,000.00 | 14,000.00 | 1,000.00 | 14,000.00 | 2,250.00 | 31,500.00 | | 0045 | 706-01-00100 | Concrete Walk (4" Thick) | 3,390.6 | SQYD | 60.00 | 203,436.00 | 40.00 | 135,624.00 | 35.00 | 118,671.00 | | 0046 | 706-02-00200 | Concrete Drive (6" Thick) | 2,161 | SQYD | 70.00 | 151,270.00 | 50.00 | 108,050.00 | 66.00 | 142,626.00 | | 0047 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 162.4 | SQYD | 65.00 | 10,556.00 | 40.00 | 6,496.00 | 49.00 | 7,957.60 | | 0048 | 706-04-00100 | Handicapped Curb Ramps | 25 | EACH | 2,400.00 | 60,000.00 | 1,000.00 | 25,000.00 | 1,500.00 | 37,500.00 | | 0049 | 707-03-00100 | Combination Concrete Curb and Gutter | 10,542.1 | LNFT | 26.00 | 274,094.60 | 24.00 | 253,010.40 | 29.00 | 305,720.90 | | 0050 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 95,000.00 | 95,000.00 | 1,000.00 | 1,000.00 | 205,000.00 | 205,000.00 | | 0051 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 3,630 | LNFT | 0.55 | 1,996.50 | 0.01 | 36.30 | 1.00 | 3,630.00 | | 0052 | 714-01-00600 | Slab Sodding (St. Augustine) | 3,086 | SQYD | 11.00 | 33,946.00 | 5.00 | 15,430.00 | 10.00 | 30,860.00 | | 0053 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 18,000.00 | 18,000.00 | 1,000.00 | 1,000.00 | 48,000.00 | 48,000.00 | | 0054 | 726-01-00100 | Bedding Material | 792.3 | CUYD | 83.00 | 65,760.90 | 50.00 | 39,615.00 | 100.00 | 79,230.00 | | 0055 | 727-01-00100 | Mobilization | 1 | LUMP | 136,000.00 | 136,000.00 | 500,000.00 | 500,000.00 | 679,000.00 | 679,000.00 | | 0056 | 729-01-00100 | Sign (Type A) | 167 | SQFT | 33.00 | 5,511.00 | 20.00 | 3,340.00 | 35.00 | 5,845.00 | | 0057 | 729-21-00100 | U-Channel Post | 28 | EACH | 136.00 | 3,808.00 | 100.00 | 2,800.00 | 125.00 | 3,500.00 | | 0058 | 731-02-00100 | Reflectorized Raised Pavement Markers | 108 | EACH | 11.00 | 1,188.00 | 10.00 | 1,080.00 | 14.00 | 1,512.00 | | 0059 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 7,044 | LNFT | 1.10 | 7,748.40 | 1.00 | 7,044.00 | 1.50 | 10,566.00 | | 0060 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 163 | LNFT | 4.40 | 717.20 | 4.00 | 652.00 | 5.50 | 896.50 | | 0061 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 120 | LNFT | 22.00 | 2,640.00 | 20.00 | 2,400.00 | 27.00 | 3,240.00 | | 0062 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.019 | MILE | 5,700.00 | 108.30 | 5,000.00 | 95.00 | 7,000.00 | 133.00 | | 0063 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 380.00 | 760.00 | 500.00 | 1,000.00 | 500.00 | 1,000.00 | | 0064 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 380.00 | 760.00 | 500.00 | 1,000.00 | 500.00 | 1,000.00 | | 0065 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 550.00 | 2,200.00 | 500.00 | 2,000.00 | 700.00 | 2,800.00 | | 0066 | 735-01-00100 | Mailboxes | 62 | EACH | 5.00 | 310.00 | 1.00 | 62.00 | 5.00 | 310.00 | | 0067 | 735-02-00100 | Mailbox Supports (Single) | 61 | EACH | 150.00 | 9,150.00 | 130.00 | 7,930.00 | 150.00 | 9,150.00 | | 0068 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 325.00 | 325.00 | 200.00 | 200.00 | 300.00 | 300.00 | | 0069 | 736-09-00100 | Loop Detector | 195 | LNFT | 19.00 | 3,705.00 | 20.00 | 3,900.00 | 20.00 | 3,900.00 | | 0070 | 736-12-01000 | Conductor (2c, Loop Lead in, imsa 50-2, #19 awg, Twisted Pair) | 340 | LNFT | 1.00 | 340.00 | 3.00 | 1,020.00 | 1.00 | 340.00 | | 0071 | 740-01-00100 | Construction Layout | 1 | LUMP | 70,000.00 | 70,000.00 | 1,000.00 | 1,000.00 | 65,000.00 | 65,000.00 | | 0072 | 741-01-01080 | Water Main (6" PVC) | 4,799 | LNFT | 42.00 | 201,558.00 | 20.00 | 95,980.00 | 36.50 | 175,163.50 | | 0073 | 741-03-00300 | Tapping Sleeve and Valve Assembly (6") (Various Locations) | 7 | EACH | 3,200.00 | 22,400.00 | 3,000.00 | 21,000.00 | 5,400.00 | 37,800.00 | | 0074 | 741-04-00100 | Fire Hydrant | 7 | EACH | 4,600.00 | 32,200.00 | 5,000.00 | 35,000.00 | 5,000.00 | 35,000.00 | | 0075 | 741-05-01040 | Water Service Line (1" PVC) | 2,500 | LNFT | 45.00 | 112,500.00 | 15.00 | 37,500.00 | 70.00 | 175,000.00 | | 0076 | 741-13-00100 | Removing Fire Hydrant | 7 | EACH | 170.00 | 1,190.00 | 500.00 | 3,500.00 | 1,000.00 | 7,000.00 | | 0077 | 741-15-00025 | Casing (2.5") (Water Distribution System) Casing (2.5") (Water Distribution System) | 2,500 | LNFT | 15.00 | 37,500.00 | 8.00 | 20,000.00 | 25.00 | 62,500.00 | | 0078 | 742-01-00400 | Sanitary Sewer Pipe (8") (DUCTILE IRON) | 24 | LNFT | 130.00 | 3,120.00 | 500.00 | 12,000.00 | 180.00 | 4,320.00 | | 0079 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 8 | EACH | 4,000.00 | 32,000.00 | 5,000.00 | 40,000.00 | 5,000.00 | 40,000.00 | | 0080 | NS-201-00004 | Arborist Services | 67 | EACH | 5,000.00 | 335,000.00 | 1,000.00 | 67,000.00 | 5,000.00 | 335,000.00 | | 0081 | NS-300-00060 | Geogrid | 13,310 | SQYD | 2.00 | 26,620.00 | 3.00 | 39,930.00 | 4.00 | 53,240.00 | | 0082 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 402 | INLF | 0.90 | 361.80 | 1.00 | 402.00 | 1.00 | 402.00 | | 0083 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 8,601 | INLF | 1.00 | 8,601.00 | 1.00 | 8,601.00 | 1.25 | 10,751.25 | | 0084 | NS-601-00001 | Integrally Colored Portland Cement Concrete | 304.8 | SQYD | 250.00 | 76,200.00 | 125.00 | 38,100.00 | 100.00 | 30,480.00 | | 0085 | NS-736-00120 | Construction Photographs And Video | 1 | LUMP | 28,000.00 | 28,000.00 | 30,000.00 | 30,000.00 | 37,000.00 | 37,000.00 | | 0086 | NS-804-00006 | Vibration Monitoring | 30 | DAY | 400.00 | 12,000.00 | 700.00 | 21,000.00 | 1,000.00 | 30,000.00 | | 0087 | NS-MSC-00280 | Adjusting Gas Valves and Valve Boxes | 16 | EACH | 500.00 | 8,000.00 | 100.00 | 1,600.00 | 300.00 | 4,800.00 | | 0088 | NS-P44-00001 | Sanitary Sewer Pipe Bursting (8" DIAMETER) | 4,700 | LNFT | 80.00 | 376,000.00 | 100.00 | 470,000.00 | 109.00 | 512,300.00 | | 0089 | NS-P44-00002 | Sanitary Sewer Laterals | 105 | EACH | 1,800.00 | 189,000.00 | 1,500.00 | 157,500.00 | 3,100.00 | 325,500.00 | | | | SUBTOTAL GENERAL | | | | 5,342,743 | | 5,775,929 | | 7,280,060 | | | | | | | | | | | | | | | Additive Section 1 | Additive Alternate 1 | | | | | | | | | | | | | | | | | | | | | | 0090 | 741-01-01100 | Water Main (8" PVC) | 4,799 | LNFT | 5.00 | 23,995.00 | 40.00 | 191,960.00 | 39.50 | 189,560.50 | | 0091 | 741-03-00400 | Tapping Sleeve and Valve Assembly (8") (Various Locations) | 7 | EACH | 750.00 | 5,250.00 | 3,000.00 | 21,000.00 | 6,100.00 | 42,700.00 | | | | SUBTOTAL ADDITIVE SECTION 1 | | | | 29,245.00 | | 212,960.00 | | 232,260.50 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,371,987.55 | | 5,988,888.88 | | 7,512,320.10 |
|