Proposal:H.001795.6
Parish:Bossier
Routes:LA 612
Description:RED CHUTE AND OLD CHANNEL BRIDGES
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE (STONE, RECYCLED PORTLAND CEMENT CONCRETE, BLENDED CALCIUM SULFATE), LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PRECAST CONCRETE PILINGS, CAST IN PLACE CONCRETE SLAB SPAN BRIDGE, PRECAST CONCRETE GIRDER SPANS BRIDGE, DETOUR ROAD AND BRIDGING, AND RELATED WORK.
Estimated Construction Cost:$3,515,354.00
| Rank | License | Bidder | Construction Bid |
| 1 | 34567 | James Construction Group LLC | $4,485,800.61 |
| 2 | 39462 | JB JAMES CONSTRUCTION LLC | $5,681,632.20 |
| 3 | 55519 | Key, LLC Of Mississippi | $6,176,977.95 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - James Construction Group LLC | - 2 - JB JAMES CONSTRUCTION LLC | - 3 - Key, LLC Of Mississippi | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4 | LUMP | 28,000.00 | 28,000.00 | 150,000.00 | 150,000.00 | 75,000.00 | 75,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,900.00 | 1,900.00 | 93,000.00 | 93,000.00 | 15,000.00 | 15,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 367 | SQYD | 2.00 | 734.00 | 15.00 | 5,505.00 | 8.50 | 3,119.50 | | 0004 | 202-02-04000 | Removal of Bridge (STA. 126+19.50; 24' X 267' CONCRETE PRECAST SLAB BRIDGE) | 1 | EACH | 72,405.00 | 72,405.00 | 125,000.00 | 125,000.00 | 95,000.00 | 95,000.00 | | 0005 | 202-02-04000 | Removal of Bridge (STA. 215+55.43; 24' X 171' CONCRETE PRECAST SLAB BRIDGE) | 1 | EACH | 62,300.00 | 62,300.00 | 100,000.00 | 100,000.00 | 75,000.00 | 75,000.00 | | 0006 | 202-02-12000 | Removal of Fence | 812 | LNFT | 0.57 | 462.84 | 3.00 | 2,436.00 | 5.75 | 4,669.00 | | 0007 | 202-02-12020 | Removal of Fence (Chain Link) | 45 | LNFT | 6.67 | 300.15 | 14.00 | 630.00 | 30.00 | 1,350.00 | | 0008 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 2,568.7 | SQYD | 5.00 | 12,843.50 | 11.00 | 28,255.70 | 6.50 | 16,696.55 | | 0009 | 202-03-00010 | Relocation 15' Steel Gate with Keypad Operator, Breaker Box, and Light Pole at Approx. Sta. 126+00.00 RT. | 1 | EACH | 283.29 | 283.29 | 2,500.00 | 2,500.00 | 10,000.00 | 10,000.00 | | 0010 | 202-03-00010 | Relocation 10' Aluminum Livestock Gate at Approx. Sta. 216+00.00 RT. | 1 | EACH | 283.29 | 283.29 | 2,500.00 | 2,500.00 | 1,500.00 | 1,500.00 | | 0011 | 202-03-00010 | Relocation 4-Rail Metal Pipe Fence | 110 | EACH | 95.32 | 10,485.20 | 125.00 | 13,750.00 | 115.00 | 12,650.00 | | 0012 | 203-02-00100 | Drainage Excavation | 3,093 | CUYD | 9.01 | 27,867.93 | 15.00 | 46,395.00 | 15.75 | 48,714.75 | | 0013 | 203-03-00100 | Embankment | 800 | CUYD | 27.00 | 21,600.00 | 35.00 | 28,000.00 | 29.75 | 23,800.00 | | 0014 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 17,000.00 | 17,000.00 | 56,000.00 | 56,000.00 | 82,500.00 | 82,500.00 | | 0015 | 204-02-00100 | Temporary Hay or Straw Bales | 90 | EACH | 29.33 | 2,639.70 | 20.00 | 1,800.00 | 25.00 | 2,250.00 | | 0016 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 6 | EACH | 200.00 | 1,200.00 | 250.00 | 1,500.00 | 200.00 | 1,200.00 | | 0017 | 204-06-00100 | Temporary Silt Fencing | 1,385 | LNFT | 2.95 | 4,085.75 | 3.50 | 4,847.50 | 5.00 | 6,925.00 | | 0018 | 302-02-03121 | Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 2,826.6 | SQYD | 37.00 | 104,584.20 | 29.00 | 81,971.40 | 47.25 | 133,556.85 | | 0019 | 304-05-00100 | Lime Treatment (Type E) | 40 | TON | 400.00 | 16,000.00 | 100.00 | 4,000.00 | 635.00 | 25,400.00 | | 0020 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 39.6 | CUYD | 100.00 | 3,960.00 | 165.00 | 6,534.00 | 175.00 | 6,930.00 | | 0021 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 500 | CUYD | 38.00 | 19,000.00 | 125.00 | 62,500.00 | 175.00 | 87,500.00 | | 0022 | 502-01-00100 | Superpave Asphaltic Concrete | 1,497.4 | TON | 149.00 | 223,112.60 | 148.00 | 221,615.20 | 150.00 | 224,610.00 | | 0023 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 598.5 | TON | 159.00 | 95,161.50 | 148.00 | 88,578.00 | 170.00 | 101,745.00 | | 0024 | 509-01-00100 | Cold Planing Asphaltic Pavement | 1,522 | SQYD | 14.50 | 22,069.00 | 15.00 | 22,830.00 | 14.00 | 21,308.00 | | 0025 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -90 | CUYD | 0.01 | -0.90 | 1.00 | -90.00 | 0.01 | -0.90 | | 0026 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 500 | SQYD | 140.00 | 70,000.00 | 200.00 | 100,000.00 | 100.00 | 50,000.00 | | 0027 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 552 | LNFT | 100.00 | 55,200.00 | 100.00 | 55,200.00 | 85.00 | 46,920.00 | | 0028 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 52 | LNFT | 117.00 | 6,084.00 | 150.00 | 7,800.00 | 150.00 | 7,800.00 | | 0029 | 701-03-02020 | Storm Drain Pipe (Outfall) (18" PP or 24" CMP) | 105 | LNFT | 50.00 | 5,250.00 | 100.00 | 10,500.00 | 85.00 | 8,925.00 | | 0030 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 6,000.00 | 6,000.00 | 8,500.00 | 8,500.00 | 3,775.00 | 3,775.00 | | 0031 | 702-08-00100 | Side Drain Safety End (Type I) | 3 | EACH | 3,950.00 | 11,850.00 | 3,000.00 | 9,000.00 | 2,825.00 | 8,475.00 | | 0032 | 702-08-00200 | Side Drain Safety End (Type 2) | 1 | EACH | 3,950.00 | 3,950.00 | 4,500.00 | 4,500.00 | 4,550.00 | 4,550.00 | | 0033 | 704-03-00100 | Blocked Out Guard Rail | 431.3 | LNFT | 20.00 | 8,626.00 | 20.00 | 8,626.00 | 25.00 | 10,782.50 | | 0034 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 191.7 | LNFT | 55.00 | 10,543.50 | 50.00 | 9,585.00 | 35.00 | 6,709.50 | | 0035 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,000.00 | 8,000.00 | 2,500.00 | 10,000.00 | 2,500.00 | 10,000.00 | | 0036 | 705-01-00100 | Barbed Wire Fence | 640 | LNFT | 5.00 | 3,200.00 | 7.00 | 4,480.00 | 10.00 | 6,400.00 | | 0037 | 708-01-00100 | Right-of-Way Monument | 28 | EACH | 100.00 | 2,800.00 | 250.00 | 7,000.00 | 150.00 | 4,200.00 | | 0038 | 708-02-00100 | Right-of-Way Monument Witness Post | 28 | EACH | 65.00 | 1,820.00 | 200.00 | 5,600.00 | 150.00 | 4,200.00 | | 0039 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 768 | SQYD | 138.37 | 106,268.16 | 160.00 | 122,880.00 | 120.00 | 92,160.00 | | 0040 | 711-04-00100 | Geotextile Fabric | 768 | SQYD | 5.00 | 3,840.00 | 2.50 | 1,920.00 | 3.35 | 2,572.80 | | 0041 | 712-04-00100 | Flexible Revetment | 677 | SQYD | 75.00 | 50,775.00 | 80.00 | 54,160.00 | 90.00 | 60,930.00 | | 0042 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 8,500.00 | 8,500.00 | 45,000.00 | 45,000.00 | 15,000.00 | 15,000.00 | | 0043 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.05 | MILE | 12,000.00 | 600.00 | 50,000.00 | 2,500.00 | 50,000.00 | 2,500.00 | | 0044 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 6 | EACH | 100.00 | 600.00 | 50.00 | 300.00 | 75.00 | 450.00 | | 0045 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 523 | SQYD | 5.00 | 2,615.00 | 2.00 | 1,046.00 | 5.00 | 2,615.00 | | 0046 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 95,000.00 | 95,000.00 | | 0047 | 725-01-00100 | Temporary Detour Roads | 3,012 | SQYD | 90.00 | 271,080.00 | 100.00 | 301,200.00 | 90.00 | 271,080.00 | | 0048 | 725-02-00100 | Temporary Detour Bridging | 220 | LNFT | 2,633.00 | 579,260.00 | 3,700.00 | 814,000.00 | 5,055.00 | 1,112,100.00 | | 0049 | 727-01-00100 | Mobilization | 1 | LUMP | 447,000.00 | 447,000.00 | 580,000.00 | 580,000.00 | 775,000.00 | 775,000.00 | | 0050 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 79.34 | 634.72 | 65.00 | 520.00 | 250.00 | 2,000.00 | | 0051 | 731-02-00100 | Reflectorized Raised Pavement Markers | 47 | EACH | 50.00 | 2,350.00 | 75.00 | 3,525.00 | 75.00 | 3,525.00 | | 0052 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.43 | MILE | 10,000.00 | 14,300.00 | 7,500.00 | 10,725.00 | 7,500.00 | 10,725.00 | | 0053 | 735-01-00100 | Mailboxes | 2 | EACH | 30.00 | 60.00 | 1.00 | 2.00 | 500.00 | 1,000.00 | | 0054 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 75.00 | 150.00 | 150.00 | 300.00 | 500.00 | 1,000.00 | | 0055 | 739-01-00100 | Hydro-Seeding | 4 | ACRE | 1,600.00 | 6,400.00 | 1,350.00 | 5,400.00 | 2,500.00 | 10,000.00 | | 0056 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 80,000.00 | 80,000.00 | 55,000.00 | 55,000.00 | | 0057 | 804-01-00300 | Precast Concrete Piles (16") | 4,500 | LNFT | 72.32 | 325,440.00 | 50.00 | 225,000.00 | 80.00 | 360,000.00 | | 0058 | 804-01-00600 | Precast Concrete Piles (24") | 1,536 | LNFT | 166.22 | 255,313.92 | 120.00 | 184,320.00 | 140.00 | 215,040.00 | | 0059 | 804-12-00100 | Loading Permanent Piles | 2 | EACH | 47,000.00 | 94,000.00 | 1,000.00 | 2,000.00 | 10,000.00 | 20,000.00 | | 0060 | 804-13-00100 | Precast Concrete Indicator Piles | 2 | EACH | 10,000.00 | 20,000.00 | 15,000.00 | 30,000.00 | 3,750.00 | 7,500.00 | | 0061 | 804-17-00100 | Dynamic Monitoring | 12 | EACH | 1,000.00 | 12,000.00 | 2,300.00 | 27,600.00 | 1,500.00 | 18,000.00 | | 0062 | 805-01-00700 | Class A Concrete (Bents) | 196.35 | CUYD | 1,200.00 | 235,620.00 | 1,700.00 | 333,795.00 | 1,030.00 | 202,240.50 | | 0063 | 805-03-00100 | Class AA Concrete | 726.25 | CUYD | 587.00 | 426,308.75 | 1,100.00 | 798,875.00 | 890.00 | 646,362.50 | | 0064 | 805-08-00800 | Precast-Prestressed Concrete Girder (Type Quad Beam) | 1,580 | LNFT | 95.00 | 150,100.00 | 90.00 | 142,200.00 | 95.00 | 150,100.00 | | 0065 | 806-01-00100 | Deformed Reinforcing Steel | 202,149 | LB | 0.99 | 200,127.51 | 1.00 | 202,149.00 | 1.10 | 222,363.90 | | 0066 | 807-08-00100 | Structural Metalwork | 4,894 | LUMP | 16,000.00 | 16,000.00 | 40,000.00 | 40,000.00 | 40,000.00 | 40,000.00 | | 0067 | 810-01-00100 | Concrete Railing (Standard Barrier) | 720 | LNFT | 90.00 | 64,800.00 | 80.00 | 57,600.00 | 100.00 | 72,000.00 | | 0068 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 240 | LNFT | 100.00 | 24,000.00 | 90.00 | 21,600.00 | 100.00 | 24,000.00 | | 0069 | 813-01-00100 | Concrete Approach Slabs | 546.1 | SQYD | 250.00 | 136,525.00 | 250.00 | 136,525.00 | 375.00 | 204,787.50 | | 0070 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 156 | LNFT | 7.00 | 1,092.00 | 4.15 | 647.40 | 25.00 | 3,900.00 | | 0071 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 1,000 | INLF | 0.77 | 770.00 | 1.00 | 1,000.00 | 15.00 | 15,000.00 | | 0072 | NS-700-00240 | Special Guard Rail Anchor Section | 4 | EACH | 1,500.00 | 6,000.00 | 1,550.00 | 6,200.00 | 5,000.00 | 20,000.00 | | 0073 | NS-713-00010 | Portable Changeable Message Sign (with comm and camera) | 4 | EACH | 11,700.00 | 46,800.00 | 7,500.00 | 30,000.00 | 43,750.00 | 175,000.00 | | 0074 | NS-724-00001 | Rumble Strips (Centerline Ground-In) | 0.58 | MILE | 300.00 | 174.00 | 600.00 | 348.00 | 2,750.00 | 1,595.00 | | 0075 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 1.16 | MILE | 600.00 | 696.00 | 600.00 | 696.00 | 3,250.00 | 3,770.00 | | 0076 | NS-804-00006 | Vibration Monitoring | 9 | DAY | 1,000.00 | 9,000.00 | 750.00 | 6,750.00 | 1,500.00 | 13,500.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,485,800.61 | | 5,681,632.20 | | 6,176,977.95 |
|