Proposal:H.001491.6
Parish:Lafourche
Routes:LA 20
Description:LA 20 WIDENING: LA 308 TO ST. PATRICK STREET
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, PAVEMENT WIDENING, SUPERPAVE ASPHALTIC CONCRETE
PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, TRAFFIC SIGNALIZATION, ALTERNATE AA1: ASPHALT; ALTERNATE AA2: CONCRETE; AND RELATED WORK.
Estimated Construction Cost:$10,834,062.88
Maximum Number of Days Allowed for Construction:9999
Calculated Daily User Cost:$3,000.00
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 06276 | BARRIERE CONSTRUCTION CO., LLC. | $9,859,958.70 | 248.00 | $10,603,958.70 |
| 2 | 12198 | Byron E. Talbot Contractor, Inc. | $10,340,084.93 | 420.00 | $11,600,084.93 |
| 3 | 48896 | Command Construction Industries LLC | $11,193,581.54 | 350.00 | $12,243,581.54 |
| 4 | 06487 | Huey Stockstill, Inc. | $11,282,714.30 | 444.00 | $12,614,714.30 |
| 5 | 39462 | JB JAMES CONSTRUCTION LLC | $12,507,548.86 | 450.00 | $13,857,548.86 |
| 6 | 34567 | James Construction Group LLC | $13,825,629.59 | 540.00 | $15,445,629.59 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - BARRIERE CONSTRUCTION CO., LLC. | - 2 - Byron E. Talbot Contractor, Inc. | - 3 - Command Construction Industries LLC | - 4 - Huey Stockstill, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 5 | LUMP | 5,000.00 | 5,000.00 | 20,000.00 | 20,000.00 | 200,000.00 | 200,000.00 | 75,000.00 | 75,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 40,000.00 | 40,000.00 | 200,000.00 | 200,000.00 | 50,000.00 | 50,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 59.9 | SQYD | 15.00 | 898.50 | 9.25 | 554.08 | 10.00 | 599.00 | 64.00 | 3,833.60 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 23,225.7 | SQYD | 15.00 | 348,385.50 | 7.00 | 162,579.90 | 10.00 | 232,257.00 | 16.00 | 371,611.20 | | 0005 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 11,039.6 | LNFT | 10.00 | 110,396.00 | 6.50 | 71,757.40 | 10.00 | 110,396.00 | 13.00 | 143,514.80 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 7,413 | SQYD | 10.00 | 74,130.00 | 11.00 | 81,543.00 | 10.00 | 74,130.00 | 28.00 | 207,564.00 | | 0007 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 362 | SQYD | 15.00 | 5,430.00 | 11.75 | 4,253.50 | 10.00 | 3,620.00 | 13.00 | 4,706.00 | | 0008 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 17,000.00 | 17,000.00 | 23,000.00 | 23,000.00 | 1,000.00 | 1,000.00 | 16,000.00 | 16,000.00 | | 0009 | 202-03-38000 | Relocation of Sign (LA 20 Widening) | 20 | EACH | 28.00 | 560.00 | 30.00 | 600.00 | 250.00 | 5,000.00 | 56.00 | 1,120.00 | | 0010 | 203-01-00100 | General Excavation | 28,692 | CUYD | 12.50 | 358,650.00 | 9.55 | 274,008.60 | 20.00 | 573,840.00 | 5.60 | 160,675.20 | | 0011 | 203-03-00100 | Embankment (Soil Blanket) | 6,578 | CUYD | 25.00 | 164,450.00 | 8.15 | 53,610.70 | 1.00 | 6,578.00 | 31.50 | 207,207.00 | | 0012 | 203-04-00200 | Nonplastic Embankment (Sand) | 8,684 | CUYD | 25.00 | 217,100.00 | 21.95 | 190,613.80 | 25.00 | 217,100.00 | 27.00 | 234,468.00 | | 0013 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,040 | CUYD | 20.00 | 40,800.00 | 9.50 | 19,380.00 | 1.00 | 2,040.00 | 21.00 | 42,840.00 | | 0014 | 204-02-00100 | Temporary Hay or Straw Bales | 84 | EACH | 15.00 | 1,260.00 | 16.00 | 1,344.00 | 15.00 | 1,260.00 | 9.00 | 756.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 9,400 | LNFT | 2.00 | 18,800.00 | 2.25 | 21,150.00 | 3.00 | 28,200.00 | 1.90 | 17,860.00 | | 0016 | 302-02-02101 | Class II Base Course (6" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 1,599.2 | SQYD | 22.00 | 35,182.40 | 16.25 | 25,987.00 | 20.00 | 31,984.00 | 13.00 | 20,789.60 | | 0017 | 302-02-07000 | Class II Base Course (14" Thick) | 37,578.2 | SQYD | 33.00 | 1,240,080.60 | 32.00 | 1,202,502.40 | 30.00 | 1,127,346.00 | 42.00 | 1,578,284.40 | | 0018 | 304-05-00100 | Lime Treatment (Type E) (12" Thick) | 655.98 | TON | 50.00 | 32,799.00 | 315.00 | 206,633.70 | 100.00 | 65,598.00 | 370.00 | 242,712.60 | | 0019 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 657.9 | CUYD | 50.00 | 32,895.00 | 80.00 | 52,632.00 | 50.00 | 32,895.00 | 23.00 | 15,131.70 | | 0020 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 36.3 | TON | 150.00 | 5,445.00 | 220.00 | 7,986.00 | 500.00 | 18,150.00 | 216.00 | 7,840.80 | | 0021 | 509-01-00100 | Cold Planing Asphaltic Pavement | 73,901 | SQYD | 2.00 | 147,802.00 | 2.00 | 147,802.00 | 5.00 | 369,505.00 | 1.90 | 140,411.90 | | 0022 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -3,079.1 | CUYD | 1.00 | -3,079.10 | 0.01 | -30.79 | 1.00 | -3,079.10 | 0.00 | 0.00 | | 0023 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 2,600 | SQYD | 85.00 | 221,000.00 | 100.00 | 260,000.00 | 90.00 | 234,000.00 | 87.25 | 226,850.00 | | 0024 | 601-02-00700 | Portland Cement Concrete Pavement (8" Thick) (Crossovers & Turnouts) | 1,565.5 | SQYD | 90.00 | 140,895.00 | 80.00 | 125,240.00 | 70.00 | 109,585.00 | 74.00 | 115,847.00 | | 0025 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 337 | LNFT | 8.00 | 2,696.00 | 10.00 | 3,370.00 | 10.00 | 3,370.00 | 9.00 | 3,033.00 | | 0026 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 15 | LNFT | 75.00 | 1,125.00 | 120.00 | 1,800.00 | 80.00 | 1,200.00 | 129.00 | 1,935.00 | | 0027 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 148 | LNFT | 95.00 | 14,060.00 | 60.00 | 8,880.00 | 100.00 | 14,800.00 | 56.00 | 8,288.00 | | 0028 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 1,022 | LNFT | 100.00 | 102,200.00 | 77.50 | 79,205.00 | 150.00 | 153,300.00 | 73.00 | 74,606.00 | | 0029 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 1,216 | LNFT | 110.00 | 133,760.00 | 95.00 | 115,520.00 | 175.00 | 212,800.00 | 93.00 | 113,088.00 | | 0030 | 701-05-01020 | Side Drain Pipe (15" RCP/PP/CMP) | 40 | LNFT | 70.00 | 2,800.00 | 50.00 | 2,000.00 | 75.00 | 3,000.00 | 94.00 | 3,760.00 | | 0031 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 123 | LNFT | 75.00 | 9,225.00 | 60.00 | 7,380.00 | 80.00 | 9,840.00 | 70.00 | 8,610.00 | | 0032 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 120 | LNFT | 95.00 | 11,400.00 | 62.00 | 7,440.00 | 100.00 | 12,000.00 | 83.00 | 9,960.00 | | 0033 | 701-05-01080 | Side Drain Pipe (30" RCP/PP/CMP) | 515 | LNFT | 100.00 | 51,500.00 | 78.00 | 40,170.00 | 150.00 | 77,250.00 | 74.00 | 38,110.00 | | 0034 | 701-05-01100 | Side Drain Pipe (36" RCP/PP/CMP) | 72 | LNFT | 110.00 | 7,920.00 | 100.00 | 7,200.00 | 175.00 | 12,600.00 | 119.00 | 8,568.00 | | 0035 | 701-05-01140 | Side Drain Pipe (48" RCP/PP/CMP) | 163 | LNFT | 160.00 | 26,080.00 | 140.00 | 22,820.00 | 225.00 | 36,675.00 | 167.00 | 27,221.00 | | 0036 | 701-06-01060 | Side Drain Pipe Arch (30" Equiv. RCPA/CMPA) | 453 | LNFT | 100.00 | 45,300.00 | 80.00 | 36,240.00 | 130.00 | 58,890.00 | 86.00 | 38,958.00 | | 0037 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 58 | LNFT | 95.00 | 5,510.00 | 130.00 | 7,540.00 | 75.00 | 4,350.00 | 93.00 | 5,394.00 | | 0038 | 701-12-01040 | Corrugated Metal Pipe (Extension) (18") | 32 | LNFT | 125.00 | 4,000.00 | 105.00 | 3,360.00 | 125.00 | 4,000.00 | 81.00 | 2,592.00 | | 0039 | 701-12-01080 | Corrugated Metal Pipe (Extension) (30") | 32 | LNFT | 155.00 | 4,960.00 | 150.00 | 4,800.00 | 135.00 | 4,320.00 | 155.00 | 4,960.00 | | 0040 | 701-12-01120 | Corrugated Metal Pipe (Extension) (42") | 40 | LNFT | 175.00 | 7,000.00 | 200.00 | 8,000.00 | 150.00 | 6,000.00 | 159.00 | 6,360.00 | | 0041 | 701-13-01040 | Corrugated Metal Pipe Arch (Extension) (24" Equiv.) | 32 | LNFT | 150.00 | 4,800.00 | 121.00 | 3,872.00 | 100.00 | 3,200.00 | 95.00 | 3,040.00 | | 0042 | 701-13-01140 | Corrugated Metal Pipe Arch (Extension) (54" Equiv.) | 34 | LNFT | 250.00 | 8,500.00 | 265.00 | 9,010.00 | 250.00 | 8,500.00 | 281.00 | 9,554.00 | | 0043 | 701-15-00100 | Concrete Collar | 7 | EACH | 1,300.00 | 9,100.00 | 250.00 | 1,750.00 | 1,000.00 | 7,000.00 | 562.00 | 3,934.00 | | 0044 | 702-02-00200 | Manholes (R-CB-11) | 2 | EACH | 3,000.00 | 6,000.00 | 3,300.00 | 6,600.00 | 4,000.00 | 8,000.00 | 4,000.00 | 8,000.00 | | 0045 | 702-03-00100 | Catch Basins (CB-01) | 18 | EACH | 4,000.00 | 72,000.00 | 3,550.00 | 63,900.00 | 3,000.00 | 54,000.00 | 4,000.00 | 72,000.00 | | 0046 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 4,500.00 | 4,500.00 | 4,425.00 | 4,425.00 | 4,000.00 | 4,000.00 | 6,000.00 | 6,000.00 | | 0047 | 702-03-00500 | Catch Basins (CB-06) | 1 | EACH | 6,000.00 | 6,000.00 | 3,500.00 | 3,500.00 | 4,000.00 | 4,000.00 | 5,000.00 | 5,000.00 | | 0048 | 702-04-00200 | Adjusting Catch Basins | 5 | EACH | 1,700.00 | 8,500.00 | 1,000.00 | 5,000.00 | 1,000.00 | 5,000.00 | 2,500.00 | 12,500.00 | | 0049 | 706-02-00200 | Concrete Drive (6" Thick) | 3,071.9 | SQYD | 90.00 | 276,471.00 | 71.00 | 218,104.90 | 45.00 | 138,235.50 | 59.00 | 181,242.10 | | 0050 | 706-02-00300 | Concrete Drive (8" Thick) | 165.1 | SQYD | 90.00 | 14,859.00 | 81.50 | 13,455.65 | 100.00 | 16,510.00 | 103.00 | 17,005.30 | | 0051 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 119.1 | SQYD | 90.00 | 10,719.00 | 50.00 | 5,955.00 | 90.00 | 10,719.00 | 66.00 | 7,860.60 | | 0052 | 706-03-00500 | Incidental Concrete Paving (8" Thick) | 3 | SQYD | 130.00 | 390.00 | 1,200.00 | 3,600.00 | 100.00 | 300.00 | 950.00 | 2,850.00 | | 0053 | 707-03-00100 | Combination Concrete Curb and Gutter | 28,143.5 | LNFT | 18.00 | 506,583.00 | 21.25 | 598,049.38 | 10.00 | 281,435.00 | 24.00 | 675,444.00 | | 0054 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 90 | SQYD | 100.00 | 9,000.00 | 96.00 | 8,640.00 | 100.00 | 9,000.00 | 150.00 | 13,500.00 | | 0055 | 711-04-00100 | Geotextile Fabric | 90 | SQYD | 10.00 | 900.00 | 1.25 | 112.50 | 5.00 | 450.00 | 13.00 | 1,170.00 | | 0056 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 200,000.00 | 200,000.00 | 300,000.00 | 300,000.00 | 1,000.00 | 1,000.00 | 200,000.00 | 200,000.00 | | 0059 | 726-01-00100 | Bedding Material | 596.6 | CUYD | 80.00 | 47,728.00 | 85.00 | 50,711.00 | 100.00 | 59,660.00 | 200.00 | 119,320.00 | | 0060 | 727-01-00100 | Mobilization | 1 | LUMP | 500,000.00 | 500,000.00 | 375,000.00 | 375,000.00 | 1,100,000.00 | 1,100,000.00 | 630,000.00 | 630,000.00 | | 0061 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 229 | SQFT | 16.00 | 3,664.00 | 20.00 | 4,580.00 | 15.00 | 3,435.00 | 16.00 | 3,664.00 | | 0062 | 729-01-00102 | Sign (Type A)(Furnish and Install) Traffic Signal Equipment | 113 | SQFT | 50.00 | 5,650.00 | 53.50 | 6,045.50 | 15.00 | 1,695.00 | 40.00 | 4,520.00 | | 0063 | 729-21-00100 | U-Channel Post | 45 | EACH | 82.00 | 3,690.00 | 90.00 | 4,050.00 | 80.00 | 3,600.00 | 85.00 | 3,825.00 | | 0064 | 731-02-00100 | Reflectorized Raised Pavement Markers | 835 | EACH | 8.00 | 6,680.00 | 7.00 | 5,845.00 | 10.00 | 8,350.00 | 7.00 | 5,845.00 | | 0065 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,160 | LNFT | 17.00 | 19,720.00 | 16.00 | 18,560.00 | 18.00 | 20,880.00 | 16.00 | 18,560.00 | | 0066 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 7.675 | MILE | 4,000.00 | 30,700.00 | 3,710.00 | 28,474.25 | 4,200.00 | 32,235.00 | 3,600.00 | 27,630.00 | | 0067 | 732-02-02020 | Plastic Pavement Striping (Solid Line) (6" Width) (Thermoplastic 90 mil) | 3.174 | MILE | 6,200.00 | 19,678.80 | 5,830.00 | 18,504.42 | 5,500.00 | 17,457.00 | 6,000.00 | 19,044.00 | | 0068 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.552 | MILE | 17,000.00 | 9,384.00 | 16,000.00 | 8,832.00 | 9,000.00 | 4,968.00 | 16,000.00 | 8,832.00 | | 0069 | 732-03-02020 | Plastic Pavement Striping (Broken Line) (6" Width) (Thermoplastic 90 mil) | 0.518 | MILE | 5,500.00 | 2,849.00 | 5,300.00 | 2,745.40 | 2,500.00 | 1,295.00 | 5,600.00 | 2,900.80 | | 0070 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 1.152 | MILE | 5,500.00 | 6,336.00 | 5,300.00 | 6,105.60 | 3,000.00 | 3,456.00 | 5,600.00 | 6,451.20 | | 0071 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 4 | EACH | 320.00 | 1,280.00 | 320.00 | 1,280.00 | 500.00 | 2,000.00 | 300.00 | 1,200.00 | | 0072 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 4 | EACH | 400.00 | 1,600.00 | 400.00 | 1,600.00 | 500.00 | 2,000.00 | 400.00 | 1,600.00 | | 0073 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 31 | EACH | 320.00 | 9,920.00 | 320.00 | 9,920.00 | 500.00 | 15,500.00 | 300.00 | 9,300.00 | | 0074 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 320.00 | 1,280.00 | 320.00 | 1,280.00 | 500.00 | 2,000.00 | 300.00 | 1,200.00 | | 0075 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 9 | EACH | 425.00 | 3,825.00 | 425.00 | 3,825.00 | 700.00 | 6,300.00 | 400.00 | 3,600.00 | | 0076 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 58 | EACH | 550.00 | 31,900.00 | 530.00 | 30,740.00 | 500.00 | 29,000.00 | 500.00 | 29,000.00 | | 0077 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 325.00 | 975.00 | 320.00 | 960.00 | 500.00 | 1,500.00 | 300.00 | 900.00 | | 0078 | 732-05-00100 | Removal of Existing Markings | 5.137 | MILE | 5,000.00 | 25,685.00 | 5,500.00 | 28,253.50 | 10,000.00 | 51,370.00 | 5,000.00 | 25,685.00 | | 0079 | 735-01-00100 | Mailboxes | 25 | EACH | 1.20 | 30.00 | 5.30 | 132.50 | 1.00 | 25.00 | 1.00 | 25.00 | | 0080 | 735-02-00100 | Mailbox Supports (Single) | 25 | EACH | 110.00 | 2,750.00 | 150.00 | 3,750.00 | 105.00 | 2,625.00 | 110.00 | 2,750.00 | | 0081 | 736-01-00100 | Trenching and Backfilling | 775 | LNFT | 4.00 | 3,100.00 | 5.95 | 4,611.25 | 5.00 | 3,875.00 | 6.00 | 4,650.00 | | 0082 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 3,045 | LNFT | 14.00 | 42,630.00 | 11.70 | 35,626.50 | 15.00 | 45,675.00 | 14.00 | 42,630.00 | | 0083 | 736-04-04060 | Signal Support (20' Single Mast Arm) | 4 | EACH | 8,000.00 | 32,000.00 | 9,200.00 | 36,800.00 | 8,000.00 | 32,000.00 | 10,000.00 | 40,000.00 | | 0084 | 736-04-04080 | Signal Support (25' Single Mast Arm) | 3 | EACH | 8,500.00 | 25,500.00 | 9,550.00 | 28,650.00 | 8,500.00 | 25,500.00 | 10,000.00 | 30,000.00 | | 0085 | 736-04-04100 | Signal Support (30' Single Mast Arm) | 1 | EACH | 9,250.00 | 9,250.00 | 10,100.00 | 10,100.00 | 9,000.00 | 9,000.00 | 11,000.00 | 11,000.00 | | 0086 | 736-04-04120 | Signal Support (35' Single Mast Arm) | 4 | EACH | 9,750.00 | 39,000.00 | 10,500.00 | 42,000.00 | 9,500.00 | 38,000.00 | 11,000.00 | 44,000.00 | | 0087 | 736-04-04140 | Signal Support (40' Single Mast Arm) | 3 | EACH | 11,000.00 | 33,000.00 | 11,345.00 | 34,035.00 | 10,000.00 | 30,000.00 | 12,000.00 | 36,000.00 | | 0088 | 736-04-04160 | Signal Support (45' Single Mast Arm) | 2 | EACH | 11,000.00 | 22,000.00 | 11,770.00 | 23,540.00 | 10,500.00 | 21,000.00 | 12,000.00 | 24,000.00 | | 0089 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 32 | EACH | 1,000.00 | 32,000.00 | 1,000.00 | 32,000.00 | 1,000.00 | 32,000.00 | 900.00 | 28,800.00 | | 0090 | 736-05-02070 | Signal Hds (3 Sec, 12" Led Lens, LT. R, LT. Y, LT. G) | 3 | EACH | 1,000.00 | 3,000.00 | 1,000.00 | 3,000.00 | 1,000.00 | 3,000.00 | 900.00 | 2,700.00 | | 0091 | 736-05-03000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 2 | EACH | 1,300.00 | 2,600.00 | 1,130.00 | 2,260.00 | 1,200.00 | 2,400.00 | 1,300.00 | 2,600.00 | | 0092 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 12 | EACH | 1,300.00 | 15,600.00 | 1,275.00 | 15,300.00 | 1,400.00 | 16,800.00 | 1,500.00 | 18,000.00 | | 0093 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 3 | EACH | 1,300.00 | 3,900.00 | 1,275.00 | 3,825.00 | 1,400.00 | 4,200.00 | 1,500.00 | 4,500.00 | | 0094 | 736-06-00100 | Signal Service | 5 | EACH | 1,300.00 | 6,500.00 | 1,115.00 | 5,575.00 | 1,400.00 | 7,000.00 | 2,000.00 | 10,000.00 | | 0095 | 736-06-00200 | Signal Service (Pedestal Required) | 3 | EACH | 2,250.00 | 6,750.00 | 2,650.00 | 7,950.00 | 2,200.00 | 6,600.00 | 2,400.00 | 7,200.00 | | 0096 | 736-08-00071 | Sig Cntrlr (TS-2, Type 2, w/Eth cap)(Type 6E Cabinet) (F&I) | 5 | EACH | 25,000.00 | 125,000.00 | 25,250.00 | 126,250.00 | 10,000.00 | 50,000.00 | 30,000.00 | 150,000.00 | | 0097 | 736-09-00100 | Loop Detector | 568 | LNFT | 16.00 | 9,088.00 | 17.00 | 9,656.00 | 20.00 | 11,360.00 | 17.00 | 9,656.00 | | 0098 | 736-10-00100 | Underground Junction Box (Type D) | 6 | EACH | 380.00 | 2,280.00 | 455.00 | 2,730.00 | 500.00 | 3,000.00 | 500.00 | 3,000.00 | | 0099 | 736-10-00300 | Underground Junction Box (Type F) | 16 | EACH | 550.00 | 8,800.00 | 635.00 | 10,160.00 | 700.00 | 11,200.00 | 600.00 | 9,600.00 | | 0100 | 736-10-00400 | Underground Junction Box (Type G) | 5 | EACH | 900.00 | 4,500.00 | 1,045.00 | 5,225.00 | 900.00 | 4,500.00 | 1,000.00 | 5,000.00 | | 0101 | 736-11-00100 | Conduit (1/2" HDPE, Schedule 80) | 84 | LNFT | 1.60 | 134.40 | 2.15 | 180.60 | 2.00 | 168.00 | 1.70 | 142.80 | | 0102 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 415 | LNFT | 3.00 | 1,245.00 | 2.65 | 1,099.75 | 5.00 | 2,075.00 | 1.80 | 747.00 | | 0103 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 560 | LNFT | 13.00 | 7,280.00 | 4.45 | 2,492.00 | 15.00 | 8,400.00 | 3.00 | 1,680.00 | | 0104 | 736-12-01001 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 4,965 | LNFT | 1.25 | 6,206.25 | 1.60 | 7,944.00 | 2.00 | 9,930.00 | 1.50 | 7,447.50 | | 0105 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 117 | LNFT | 3.40 | 397.80 | 3.30 | 386.10 | 3.00 | 351.00 | 3.40 | 397.80 | | 0106 | 736-12-04000 | Conductor (6c, #14 awg) | 1,680 | LNFT | 1.80 | 3,024.00 | 1.85 | 3,108.00 | 2.00 | 3,360.00 | 1.60 | 2,688.00 | | 0107 | 736-12-06000 | Conductor (10c, #14 awg) | 4,610 | LNFT | 2.25 | 10,372.50 | 2.30 | 10,603.00 | 2.00 | 9,220.00 | 2.00 | 9,220.00 | | 0108 | 739-01-00100 | Hydro-Seeding | 6.63 | ACRE | 1,300.00 | 8,619.00 | 2,750.00 | 18,232.50 | 1,000.00 | 6,630.00 | 2,700.00 | 17,901.00 | | 0109 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 175,000.00 | 175,000.00 | 1,000.00 | 1,000.00 | 100,000.00 | 100,000.00 | | 0110 | NS-200-00020 | Cleaning Existing Ditches | 12,500 | LNFT | 4.00 | 50,000.00 | 7.50 | 93,750.00 | 1.00 | 12,500.00 | 3.30 | 41,250.00 | | 0111 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 50 | LNFT | 15.00 | 750.00 | 20.00 | 1,000.00 | 5.00 | 250.00 | 11.00 | 550.00 | | 0112 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 624 | LNFT | 15.00 | 9,360.00 | 10.00 | 6,240.00 | 5.00 | 3,120.00 | 11.00 | 6,864.00 | | 0113 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 64,704 | INLF | 0.10 | 6,470.40 | 0.72 | 46,586.88 | 0.01 | 647.04 | 0.70 | 45,292.80 | | 0114 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 12,368 | INLF | 1.00 | 12,368.00 | 0.82 | 10,141.76 | 1.00 | 12,368.00 | 1.00 | 12,368.00 | | 0115 | NS-736-00001 | GPS | 5 | EACH | 1,000.00 | 5,000.00 | 955.00 | 4,775.00 | 1,000.00 | 5,000.00 | 1,000.00 | 5,000.00 | | 0116 | NS-736-00005 | Video Detection Cabinet Components | 5 | EACH | 8,500.00 | 42,500.00 | 7,650.00 | 38,250.00 | 5,000.00 | 25,000.00 | 8,000.00 | 40,000.00 | | 0117 | NS-736-00006 | Video Detection Camera | 20 | EACH | 2,000.00 | 40,000.00 | 2,015.00 | 40,300.00 | 2,000.00 | 40,000.00 | 2,100.00 | 42,000.00 | | 0118 | NS7360400001 | Signal Support (55' Single Arm) | 2 | EACH | 11,500.00 | 23,000.00 | 17,500.00 | 35,000.00 | 11,000.00 | 22,000.00 | 17,000.00 | 34,000.00 | | 0119 | NS7360400013 | Signal Support (Foundation, Special Design) (55' Single Arm) | 2 | EACH | 3,250.00 | 6,500.00 | 8,800.00 | 17,600.00 | 3,000.00 | 6,000.00 | 14,000.00 | 28,000.00 | | 0120 | NS-MSC-00120 | Drainage Structure (Paved Gutter Drain) | 2 | EACH | 4,000.00 | 8,000.00 | 3,525.00 | 7,050.00 | 3,000.00 | 6,000.00 | 9,800.00 | 19,600.00 | | 0129 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 35 | EACH | 55.00 | 1,925.00 | 60.00 | 2,100.00 | 70.00 | 2,450.00 | 56.00 | 1,960.00 | | 0130 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 5 | EACH | 60.00 | 300.00 | 60.00 | 300.00 | 100.00 | 500.00 | 61.00 | 305.00 | | 0131 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 3 | EACH | 55.00 | 165.00 | 60.00 | 180.00 | 85.00 | 255.00 | 56.00 | 168.00 | | | | SUBTOTAL GENERAL | | | | 6,264,178 | | 6,167,654 | | 6,711,433 | | 7,286,337 | | | | | | | | | | | | | | | | | Alternate AA1 | Alternate AA1 (Asphalt) | | | | | | | | | | | | | | | | | | | | | | | | | | 0121 | 502-01-00100 | Superpave Asphaltic Concrete | 44,199.2 | TON | 79.00 | 3,491,736.80 | 92.00 | 4,066,326.40 | 0.00 | 0.00 | 88.00 | 3,889,529.60 | | 0122 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.781 | MILE | 1,650.00 | 7,888.65 | 1,600.00 | 7,649.60 | 0.00 | 0.00 | 1,500.00 | 7,171.50 | | 0132 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.076 | MILE | 1,600.00 | 8,121.60 | 1,600.00 | 8,121.60 | 0.00 | 0.00 | 1,500.00 | 7,614.00 | | 0133 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) | 2.538 | MILE | 3,200.00 | 8,121.60 | 3,200.00 | 8,121.60 | 0.00 | 0.00 | 3,000.00 | 7,614.00 | | 0134 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 12.5 | MILE | 700.00 | 8,750.00 | 665.00 | 8,312.50 | 0.00 | 0.00 | 625.00 | 7,812.50 | | 0135 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 5.474 | MILE | 13,000.00 | 71,162.00 | 13,500.00 | 73,899.00 | 0.00 | 0.00 | 14,000.00 | 76,636.00 | | | | SUBTOTAL ALT AA1 | | | | 3,595,781 | | 4,172,431 | | 00 | | 3,996,378 | | | | | | | | | | | | | | | | | Alternate AA2 | Alternate AA2 (Concrete) | | | | | | | | | | | | | | | | | | | | | | | | | | 0123 | 502-01-00100 | Superpave Asphaltic Concrete | 27,539 | TON | 0.00 | 0.00 | 0.00 | 0.00 | 90.00 | 2,478,510.00 | 0.00 | 0.00 | | 0124 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 33,705.9 | SQYD | 0.00 | 0.00 | 0.00 | 0.00 | 55.00 | 1,853,824.50 | 0.00 | 0.00 | | 0125 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.276 | MILE | 0.00 | 0.00 | 0.00 | 0.00 | 4,000.00 | 13,104.00 | 0.00 | 0.00 | | 0126 | 732-03-02101 | Plastic Pavement Striping (Broken Line) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black Contrast) | 1.505 | MILE | 0.00 | 0.00 | 0.00 | 0.00 | 6,000.00 | 9,030.00 | 0.00 | 0.00 | | 0136 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.538 | MILE | 0.00 | 0.00 | 0.00 | 0.00 | 700.00 | 1,776.60 | 0.00 | 0.00 | | 0137 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) | 5.076 | MILE | 0.00 | 0.00 | 0.00 | 0.00 | 3,000.00 | 15,228.00 | 0.00 | 0.00 | | 0138 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 9.5 | MILE | 0.00 | 0.00 | 0.00 | 0.00 | 500.00 | 4,750.00 | 0.00 | 0.00 | | 0139 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 8.474 | MILE | 0.00 | 0.00 | 0.00 | 0.00 | 12,500.00 | 105,925.00 | 0.00 | 0.00 | | | | SUBTOTAL ALT AA2 | | | | 0.00 | | 0.00 | | 4,482,148.10 | | 0.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 9,859,958.70 | | 10,340,084.93 | | 11,193,581.54 | | 11,282,714.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - JB JAMES CONSTRUCTION LLC | - 6 - James Construction Group LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 5 | LUMP | 500,000.00 | 500,000.00 | 105,899.87 | 105,899.87 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 30,000.00 | 30,000.00 | 133,256.29 | 133,256.29 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 59.9 | SQYD | 14.00 | 838.60 | 8.58 | 513.94 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 23,225.7 | SQYD | 5.00 | 116,128.50 | 5.24 | 121,702.67 | | 0005 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 11,039.6 | LNFT | 3.00 | 33,118.80 | 8.15 | 89,972.74 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 7,413 | SQYD | 7.00 | 51,891.00 | 9.43 | 69,904.59 | | 0007 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 362 | SQYD | 15.00 | 5,430.00 | 9.54 | 3,453.48 | | 0008 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 35,000.00 | 35,000.00 | 14,832.00 | 14,832.00 | | 0009 | 202-03-38000 | Relocation of Sign (LA 20 Widening) | 20 | EACH | 300.00 | 6,000.00 | 25.00 | 500.00 | | 0010 | 203-01-00100 | General Excavation | 28,692 | CUYD | 13.00 | 372,996.00 | 22.84 | 655,325.28 | | 0011 | 203-03-00100 | Embankment (Soil Blanket) | 6,578 | CUYD | 62.00 | 407,836.00 | 29.67 | 195,169.26 | | 0012 | 203-04-00200 | Nonplastic Embankment (Sand) | 8,684 | CUYD | 32.00 | 277,888.00 | 44.61 | 387,393.24 | | 0013 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,040 | CUYD | 22.00 | 44,880.00 | 35.61 | 72,644.40 | | 0014 | 204-02-00100 | Temporary Hay or Straw Bales | 84 | EACH | 25.00 | 2,100.00 | 18.83 | 1,581.72 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 9,400 | LNFT | 3.00 | 28,200.00 | 3.10 | 29,140.00 | | 0016 | 302-02-02101 | Class II Base Course (6" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 1,599.2 | SQYD | 21.00 | 33,583.20 | 36.00 | 57,571.20 | | 0017 | 302-02-07000 | Class II Base Course (14" Thick) | 37,578.2 | SQYD | 33.00 | 1,240,080.60 | 42.55 | 1,598,952.41 | | 0018 | 304-05-00100 | Lime Treatment (Type E) (12" Thick) | 655.98 | TON | 150.00 | 98,397.00 | 435.60 | 285,744.89 | | 0019 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 657.9 | CUYD | 105.00 | 69,079.50 | 122.29 | 80,454.59 | | 0020 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 36.3 | TON | 225.00 | 8,167.50 | 92.00 | 3,339.60 | | 0021 | 509-01-00100 | Cold Planing Asphaltic Pavement | 73,901 | SQYD | 4.00 | 295,604.00 | 2.67 | 197,315.67 | | 0022 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -3,079.1 | CUYD | 0.01 | -30.79 | 1.00 | -3,079.10 | | 0023 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 2,600 | SQYD | 94.00 | 244,400.00 | 87.00 | 226,200.00 | | 0024 | 601-02-00700 | Portland Cement Concrete Pavement (8" Thick) (Crossovers & Turnouts) | 1,565.5 | SQYD | 95.00 | 148,722.50 | 129.16 | 202,199.98 | | 0025 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 337 | LNFT | 7.50 | 2,527.50 | 1.85 | 623.45 | | 0026 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 15 | LNFT | 135.00 | 2,025.00 | 134.39 | 2,015.85 | | 0027 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 148 | LNFT | 140.00 | 20,720.00 | 120.48 | 17,831.04 | | 0028 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 1,022 | LNFT | 150.00 | 153,300.00 | 131.89 | 134,791.58 | | 0029 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 1,216 | LNFT | 160.00 | 194,560.00 | 163.75 | 199,120.00 | | 0030 | 701-05-01020 | Side Drain Pipe (15" RCP/PP/CMP) | 40 | LNFT | 90.00 | 3,600.00 | 81.36 | 3,254.40 | | 0031 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 123 | LNFT | 95.00 | 11,685.00 | 76.39 | 9,395.97 | | 0032 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 120 | LNFT | 105.00 | 12,600.00 | 102.12 | 12,254.40 | | 0033 | 701-05-01080 | Side Drain Pipe (30" RCP/PP/CMP) | 515 | LNFT | 120.00 | 61,800.00 | 128.79 | 66,326.85 | | 0034 | 701-05-01100 | Side Drain Pipe (36" RCP/PP/CMP) | 72 | LNFT | 145.00 | 10,440.00 | 158.19 | 11,389.68 | | 0035 | 701-05-01140 | Side Drain Pipe (48" RCP/PP/CMP) | 163 | LNFT | 155.00 | 25,265.00 | 202.03 | 32,930.89 | | 0036 | 701-06-01060 | Side Drain Pipe Arch (30" Equiv. RCPA/CMPA) | 453 | LNFT | 160.00 | 72,480.00 | 140.55 | 63,669.15 | | 0037 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 58 | LNFT | 150.00 | 8,700.00 | 110.48 | 6,407.84 | | 0038 | 701-12-01040 | Corrugated Metal Pipe (Extension) (18") | 32 | LNFT | 110.00 | 3,520.00 | 92.29 | 2,953.28 | | 0039 | 701-12-01080 | Corrugated Metal Pipe (Extension) (30") | 32 | LNFT | 140.00 | 4,480.00 | 145.17 | 4,645.44 | | 0040 | 701-12-01120 | Corrugated Metal Pipe (Extension) (42") | 40 | LNFT | 160.00 | 6,400.00 | 161.22 | 6,448.80 | | 0041 | 701-13-01040 | Corrugated Metal Pipe Arch (Extension) (24" Equiv.) | 32 | LNFT | 100.00 | 3,200.00 | 130.12 | 4,163.84 | | 0042 | 701-13-01140 | Corrugated Metal Pipe Arch (Extension) (54" Equiv.) | 34 | LNFT | 250.00 | 8,500.00 | 322.09 | 10,951.06 | | 0043 | 701-15-00100 | Concrete Collar | 7 | EACH | 2,000.00 | 14,000.00 | 1,327.86 | 9,295.02 | | 0044 | 702-02-00200 | Manholes (R-CB-11) | 2 | EACH | 2,800.00 | 5,600.00 | 5,433.64 | 10,867.28 | | 0045 | 702-03-00100 | Catch Basins (CB-01) | 18 | EACH | 3,100.00 | 55,800.00 | 2,696.06 | 48,529.08 | | 0046 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 4,100.00 | 4,100.00 | 5,911.15 | 5,911.15 | | 0047 | 702-03-00500 | Catch Basins (CB-06) | 1 | EACH | 4,300.00 | 4,300.00 | 5,387.87 | 5,387.87 | | 0048 | 702-04-00200 | Adjusting Catch Basins | 5 | EACH | 2,500.00 | 12,500.00 | 2,516.22 | 12,581.10 | | 0049 | 706-02-00200 | Concrete Drive (6" Thick) | 3,071.9 | SQYD | 70.00 | 215,033.00 | 79.53 | 244,308.21 | | 0050 | 706-02-00300 | Concrete Drive (8" Thick) | 165.1 | SQYD | 80.00 | 13,208.00 | 155.53 | 25,678.00 | | 0051 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 119.1 | SQYD | 75.00 | 8,932.50 | 58.86 | 7,010.23 | | 0052 | 706-03-00500 | Incidental Concrete Paving (8" Thick) | 3 | SQYD | 150.00 | 450.00 | 91.21 | 273.63 | | 0053 | 707-03-00100 | Combination Concrete Curb and Gutter | 28,143.5 | LNFT | 17.00 | 478,439.50 | 26.39 | 742,706.97 | | 0054 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 90 | SQYD | 140.00 | 12,600.00 | 129.39 | 11,645.10 | | 0055 | 711-04-00100 | Geotextile Fabric | 90 | SQYD | 7.00 | 630.00 | 10.85 | 976.50 | | 0056 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 200,000.00 | 200,000.00 | 190,406.20 | 190,406.20 | | 0059 | 726-01-00100 | Bedding Material | 596.6 | CUYD | 95.00 | 56,677.00 | 99.24 | 59,206.58 | | 0060 | 727-01-00100 | Mobilization | 1 | LUMP | 1,155,000.00 | 1,155,000.00 | 127,822.09 | 127,822.09 | | 0061 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 229 | SQFT | 17.00 | 3,893.00 | 18.00 | 4,122.00 | | 0062 | 729-01-00102 | Sign (Type A)(Furnish and Install) Traffic Signal Equipment | 113 | SQFT | 17.00 | 1,921.00 | 49.00 | 5,537.00 | | 0063 | 729-21-00100 | U-Channel Post | 45 | EACH | 85.00 | 3,825.00 | 85.00 | 3,825.00 | | 0064 | 731-02-00100 | Reflectorized Raised Pavement Markers | 835 | EACH | 8.00 | 6,680.00 | 6.50 | 5,427.50 | | 0065 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,160 | LNFT | 18.00 | 20,880.00 | 15.00 | 17,400.00 | | 0066 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 7.675 | MILE | 3,700.00 | 28,397.50 | 3,500.41 | 26,865.65 | | 0067 | 732-02-02020 | Plastic Pavement Striping (Solid Line) (6" Width) (Thermoplastic 90 mil) | 3.174 | MILE | 6,100.00 | 19,361.40 | 5,500.64 | 17,459.03 | | 0068 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.552 | MILE | 18,000.00 | 9,936.00 | 15,001.76 | 8,280.97 | | 0069 | 732-03-02020 | Plastic Pavement Striping (Broken Line) (6" Width) (Thermoplastic 90 mil) | 0.518 | MILE | 5,600.00 | 2,900.80 | 5,000.58 | 2,590.30 | | 0070 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 1.152 | MILE | 6,000.00 | 6,912.00 | 5,000.58 | 5,760.67 | | 0071 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 4 | EACH | 350.00 | 1,400.00 | 300.04 | 1,200.16 | | 0072 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 4 | EACH | 450.00 | 1,800.00 | 375.05 | 1,500.20 | | 0073 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 31 | EACH | 350.00 | 10,850.00 | 300.04 | 9,301.24 | | 0074 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 350.00 | 1,400.00 | 300.04 | 1,200.16 | | 0075 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 9 | EACH | 450.00 | 4,050.00 | 400.05 | 3,600.45 | | 0076 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 58 | EACH | 600.00 | 34,800.00 | 500.06 | 29,003.48 | | 0077 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 350.00 | 1,050.00 | 300.04 | 900.12 | | 0078 | 732-05-00100 | Removal of Existing Markings | 5.137 | MILE | 5,500.00 | 28,253.50 | 5,000.58 | 25,687.98 | | 0079 | 735-01-00100 | Mailboxes | 25 | EACH | 25.00 | 625.00 | 3.00 | 75.00 | | 0080 | 735-02-00100 | Mailbox Supports (Single) | 25 | EACH | 150.00 | 3,750.00 | 113.00 | 2,825.00 | | 0081 | 736-01-00100 | Trenching and Backfilling | 775 | LNFT | 6.00 | 4,650.00 | 4.00 | 3,100.00 | | 0082 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 3,045 | LNFT | 12.00 | 36,540.00 | 13.00 | 39,585.00 | | 0083 | 736-04-04060 | Signal Support (20' Single Mast Arm) | 4 | EACH | 9,500.00 | 38,000.00 | 7,668.00 | 30,672.00 | | 0084 | 736-04-04080 | Signal Support (25' Single Mast Arm) | 3 | EACH | 9,600.00 | 28,800.00 | 8,142.00 | 24,426.00 | | 0085 | 736-04-04100 | Signal Support (30' Single Mast Arm) | 1 | EACH | 10,000.00 | 10,000.00 | 8,570.00 | 8,570.00 | | 0086 | 736-04-04120 | Signal Support (35' Single Mast Arm) | 4 | EACH | 10,500.00 | 42,000.00 | 9,187.00 | 36,748.00 | | 0087 | 736-04-04140 | Signal Support (40' Single Mast Arm) | 3 | EACH | 11,500.00 | 34,500.00 | 9,869.00 | 29,607.00 | | 0088 | 736-04-04160 | Signal Support (45' Single Mast Arm) | 2 | EACH | 12,500.00 | 25,000.00 | 10,258.00 | 20,516.00 | | 0089 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 32 | EACH | 900.00 | 28,800.00 | 936.00 | 29,952.00 | | 0090 | 736-05-02070 | Signal Hds (3 Sec, 12" Led Lens, LT. R, LT. Y, LT. G) | 3 | EACH | 900.00 | 2,700.00 | 936.00 | 2,808.00 | | 0091 | 736-05-03000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 2 | EACH | 1,000.00 | 2,000.00 | 1,134.00 | 2,268.00 | | 0092 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 12 | EACH | 1,300.00 | 15,600.00 | 1,287.00 | 15,444.00 | | 0093 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 3 | EACH | 1,300.00 | 3,900.00 | 1,287.00 | 3,861.00 | | 0094 | 736-06-00100 | Signal Service | 5 | EACH | 1,100.00 | 5,500.00 | 1,290.00 | 6,450.00 | | 0095 | 736-06-00200 | Signal Service (Pedestal Required) | 3 | EACH | 2,600.00 | 7,800.00 | 2,031.00 | 6,093.00 | | 0096 | 736-08-00071 | Sig Cntrlr (TS-2, Type 2, w/Eth cap)(Type 6E Cabinet) (F&I) | 5 | EACH | 25,000.00 | 125,000.00 | 23,580.00 | 117,900.00 | | 0097 | 736-09-00100 | Loop Detector | 568 | LNFT | 19.00 | 10,792.00 | 16.00 | 9,088.00 | | 0098 | 736-10-00100 | Underground Junction Box (Type D) | 6 | EACH | 500.00 | 3,000.00 | 346.00 | 2,076.00 | | 0099 | 736-10-00300 | Underground Junction Box (Type F) | 16 | EACH | 700.00 | 11,200.00 | 517.00 | 8,272.00 | | 0100 | 736-10-00400 | Underground Junction Box (Type G) | 5 | EACH | 1,100.00 | 5,500.00 | 793.00 | 3,965.00 | | 0101 | 736-11-00100 | Conduit (1/2" HDPE, Schedule 80) | 84 | LNFT | 1.10 | 92.40 | 1.50 | 126.00 | | 0102 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 415 | LNFT | 2.80 | 1,162.00 | 2.90 | 1,203.50 | | 0103 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 560 | LNFT | 4.50 | 2,520.00 | 12.00 | 6,720.00 | | 0104 | 736-12-01001 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 4,965 | LNFT | 1.50 | 7,447.50 | 1.10 | 5,461.50 | | 0105 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 117 | LNFT | 3.25 | 380.25 | 3.00 | 351.00 | | 0106 | 736-12-04000 | Conductor (6c, #14 awg) | 1,680 | LNFT | 2.00 | 3,360.00 | 1.60 | 2,688.00 | | 0107 | 736-12-06000 | Conductor (10c, #14 awg) | 4,610 | LNFT | 2.50 | 11,525.00 | 2.00 | 9,220.00 | | 0108 | 739-01-00100 | Hydro-Seeding | 6.63 | ACRE | 2,800.00 | 18,564.00 | 1,250.00 | 8,287.50 | | 0109 | 740-01-00100 | Construction Layout | 1 | LUMP | 80,000.00 | 80,000.00 | 567,063.34 | 567,063.34 | | 0110 | NS-200-00020 | Cleaning Existing Ditches | 12,500 | LNFT | 1.75 | 21,875.00 | 14.80 | 185,000.00 | | 0111 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 50 | LNFT | 7.50 | 375.00 | 1.60 | 80.00 | | 0112 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 624 | LNFT | 1.30 | 811.20 | 1.60 | 998.40 | | 0113 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 64,704 | INLF | 0.80 | 51,763.20 | 0.50 | 32,352.00 | | 0114 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 12,368 | INLF | 1.00 | 12,368.00 | 1.00 | 12,368.00 | | 0115 | NS-736-00001 | GPS | 5 | EACH | 1,000.00 | 5,000.00 | 891.00 | 4,455.00 | | 0116 | NS-736-00005 | Video Detection Cabinet Components | 5 | EACH | 8,000.00 | 40,000.00 | 7,693.00 | 38,465.00 | | 0117 | NS-736-00006 | Video Detection Camera | 20 | EACH | 2,000.00 | 40,000.00 | 1,829.00 | 36,580.00 | | 0118 | NS7360400001 | Signal Support (55' Single Arm) | 2 | EACH | 20,000.00 | 40,000.00 | 10,437.00 | 20,874.00 | | 0119 | NS7360400013 | Signal Support (Foundation, Special Design) (55' Single Arm) | 2 | EACH | 8,500.00 | 17,000.00 | 2,972.00 | 5,944.00 | | 0120 | NS-MSC-00120 | Drainage Structure (Paved Gutter Drain) | 2 | EACH | 1,100.00 | 2,200.00 | 3,772.81 | 7,545.62 | | 0129 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 35 | EACH | 60.00 | 2,100.00 | 50.01 | 1,750.35 | | 0130 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 5 | EACH | 65.00 | 325.00 | 55.01 | 275.05 | | 0131 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 3 | EACH | 65.00 | 195.00 | 50.01 | 150.03 | | | | SUBTOTAL GENERAL | | | | 7,886,414 | | 8,143,688 | | | | | | | | | | | | | Alternate AA1 | Alternate AA1 (Asphalt) | | | | | | | | | | | | | | | | | | 0121 | 502-01-00100 | Superpave Asphaltic Concrete | 44,199.2 | TON | 102.00 | 4,508,318.40 | 0.00 | 0.00 | | 0122 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.781 | MILE | 5,200.00 | 24,861.20 | 0.00 | 0.00 | | 0132 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.076 | MILE | 3,500.00 | 17,766.00 | 0.00 | 0.00 | | 0133 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) | 2.538 | MILE | 3,300.00 | 8,375.40 | 0.00 | 0.00 | | 0134 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 12.5 | MILE | 3,500.00 | 43,750.00 | 0.00 | 0.00 | | 0135 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 5.474 | MILE | 3,300.00 | 18,064.20 | 0.00 | 0.00 | | | | SUBTOTAL ALT AA1 | | | | 4,621,135 | | 00 | | | | | | | | | | | | | Alternate AA2 | Alternate AA2 (Concrete) | | | | | | | | | | | | | | | | | | 0123 | 502-01-00100 | Superpave Asphaltic Concrete | 27,539 | TON | 0.00 | 0.00 | 92.00 | 2,533,588.00 | | 0124 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 33,705.9 | SQYD | 0.00 | 0.00 | 89.24 | 3,007,914.52 | | 0125 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.276 | MILE | 0.00 | 0.00 | 1,500.17 | 4,914.56 | | 0126 | 732-03-02101 | Plastic Pavement Striping (Broken Line) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black Contrast) | 1.505 | MILE | 0.00 | 0.00 | 4,750.56 | 7,149.59 | | 0136 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.538 | MILE | 0.00 | 0.00 | 500.06 | 1,269.15 | | 0137 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) | 5.076 | MILE | 0.00 | 0.00 | 3,000.35 | 15,229.78 | | 0138 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 9.5 | MILE | 0.00 | 0.00 | 625.07 | 5,938.17 | | 0139 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 8.474 | MILE | 0.00 | 0.00 | 12,501.46 | 105,937.37 | | | | SUBTOTAL ALT AA2 | | | | 0.00 | | 5,681,941.14 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 12,507,548.86 | | 13,825,629.59 |
|