Proposal:H.001278.6
Parish:Caddo
Routes:LA 1, LA 3032
Description:INTERSECTION IMPROVEMENTS YOUREE DRIVE @ KINGS HIGHWAY
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, TRAFFIC SIGNALIZATION AND RELATED WORK.
Estimated Construction Cost:$8,954,602.47
| Rank | License | Bidder | Construction Bid |
| 1 | 28218 | F. J. Burnell, Inc. | $7,746,916.80 |
| 2 | 48462 | Fessler And Bowman, Inc. | $9,478,584.35 |
| 3 | 39462 | JB JAMES CONSTRUCTION LLC | $10,170,678.05 |
| 4 | 34567 | James Construction Group LLC | $10,670,148.02 |
| 5 | 36374 | Best-Yet Builders, Llc | $12,844,989.72 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - F. J. Burnell, Inc. | - 2 - Fessler And Bowman, Inc. | - 3 - JB JAMES CONSTRUCTION LLC | - 4 - James Construction Group LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 325,000.00 | 325,000.00 | 10,000.00 | 10,000.00 | 225,000.00 | 225,000.00 | 100,000.00 | 100,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 172,000.00 | 172,000.00 | 73,000.00 | 73,000.00 | 240,000.00 | 240,000.00 | 319,700.00 | 319,700.00 | | 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 12,260 | LNFT | 3.00 | 36,780.00 | 10.00 | 122,600.00 | 5.00 | 61,300.00 | 12.50 | 153,296.59 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 12,184 | SQYD | 7.50 | 91,380.00 | 10.00 | 121,840.00 | 8.00 | 97,472.00 | 6.00 | 73,104.00 | | 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 17,706 | SQYD | 9.00 | 159,354.00 | 28.00 | 495,768.00 | 9.00 | 159,354.00 | 7.25 | 128,368.50 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 358.1 | SQYD | 25.00 | 8,952.50 | 16.00 | 5,729.60 | 10.00 | 3,581.00 | 12.84 | 4,598.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 350,000.00 | 350,000.00 | 530,000.00 | 530,000.00 | 500,000.00 | 500,000.00 | 240,000.00 | 240,000.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 30 | EACH | 150.00 | 4,500.00 | 140.00 | 4,200.00 | 130.00 | 3,900.00 | 150.00 | 4,500.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 1,500 | LNFT | 5.00 | 7,500.00 | 3.00 | 4,500.00 | 3.00 | 4,500.00 | 3.00 | 4,500.00 | | 0010 | 302-02-05121 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 36,140.5 | SQYD | 22.00 | 795,091.00 | 23.00 | 831,231.50 | 30.00 | 1,084,215.00 | 30.00 | 1,084,215.00 | | 0011 | 306-02-00100 | Scarifying and Compacting Roadbed (6" Thick) | 32,242 | SQYD | 1.50 | 48,363.00 | 1.00 | 32,242.00 | 8.00 | 257,936.00 | 5.00 | 161,210.00 | | 0012 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 2,300 | CUYD | 30.00 | 69,000.00 | 100.00 | 230,000.00 | 125.00 | 287,500.00 | 76.00 | 174,800.00 | | 0013 | 502-01-00100 | Superpave Asphaltic Concrete | 1,115.4 | TON | 176.00 | 196,310.40 | 160.00 | 178,464.00 | 150.00 | 167,310.00 | 925.00 | 1,031,745.00 | | 0014 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 471.8 | TON | 204.00 | 96,247.20 | 185.00 | 87,283.00 | 200.00 | 94,360.00 | 170.78 | 80,574.00 | | 0015 | 509-01-00100 | Cold Planing Asphaltic Pavement | 20,494 | SQYD | 10.00 | 204,940.00 | 4.25 | 87,099.50 | 3.00 | 61,482.00 | 3.00 | 61,482.00 | | 0016 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,173 | CUYD | 1.00 | -1,173.00 | 0.25 | -293.25 | 1.00 | -1,173.00 | 0.01 | -11.73 | | 0017 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 28,123.8 | SQYD | 60.00 | 1,687,428.00 | 69.00 | 1,940,542.20 | 80.00 | 2,249,904.00 | 80.00 | 2,249,904.00 | | 0018 | 601-02-00500 | Portland Cement Concrete Pavement (7" Thick) (Crossovers & Turnouts) | 308.8 | SQYD | 75.00 | 23,160.00 | 65.00 | 20,072.00 | 130.00 | 40,144.00 | 174.83 | 53,987.50 | | 0019 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 45 | EACH | 150.00 | 6,750.00 | 200.00 | 9,000.00 | 150.00 | 6,750.00 | 86.40 | 3,887.90 | | 0020 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 14,706 | LNFT | 2.75 | 40,441.50 | 2.50 | 36,765.00 | 1.00 | 14,706.00 | 1.06 | 15,598.65 | | 0021 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 8,766 | LNFT | 2.75 | 24,106.50 | 2.50 | 21,915.00 | 3.25 | 28,489.50 | 0.91 | 8,014.75 | | 0022 | 602-05-03160 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) | 612.7 | SQYD | 200.00 | 122,540.00 | 200.00 | 122,540.00 | 300.00 | 183,810.00 | 117.39 | 71,922.59 | | 0023 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) (RCP ONLY) | 599 | LNFT | 45.00 | 26,955.00 | 59.50 | 35,640.50 | 85.00 | 50,915.00 | 52.68 | 31,552.86 | | 0024 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 1,457 | LNFT | 55.00 | 80,135.00 | 60.00 | 87,420.00 | 95.00 | 138,415.00 | 54.88 | 79,964.68 | | 0025 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 1,732 | LNFT | 80.00 | 138,560.00 | 90.00 | 155,880.00 | 125.00 | 216,500.00 | 90.00 | 155,880.00 | | 0026 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 640 | LNFT | 120.00 | 76,800.00 | 95.00 | 60,800.00 | 135.00 | 86,400.00 | 121.69 | 77,880.51 | | 0027 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 402 | LNFT | 180.00 | 72,360.00 | 125.00 | 50,250.00 | 165.00 | 66,330.00 | 118.51 | 47,641.94 | | 0028 | 701-10-01020 | Reinforced Concrete Pipe (Extension) (15") | 30 | LNFT | 200.00 | 6,000.00 | 95.00 | 2,850.00 | 150.00 | 4,500.00 | 75.00 | 2,250.00 | | 0029 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 61 | LNFT | 200.00 | 12,200.00 | 100.00 | 6,100.00 | 175.00 | 10,675.00 | 123.76 | 7,549.51 | | 0030 | 701-14-00100 | Cleaning Existing Pipes | 4,012 | LNFT | 15.00 | 60,180.00 | 12.50 | 50,150.00 | 5.50 | 22,066.00 | 35.00 | 140,420.00 | | 0031 | 701-15-00100 | Concrete Collar | 10 | EACH | 800.00 | 8,000.00 | 600.00 | 6,000.00 | 2,900.00 | 29,000.00 | 1,000.00 | 10,000.00 | | 0032 | 702-03-00100 | Catch Basins (CB-01) | 6 | EACH | 4,000.00 | 24,000.00 | 4,800.00 | 28,800.00 | 4,000.00 | 24,000.00 | 4,000.00 | 24,000.00 | | 0033 | 702-03-00500 | Catch Basins (CB-06) | 20 | EACH | 5,000.00 | 100,000.00 | 4,800.00 | 96,000.00 | 5,000.00 | 100,000.00 | 3,172.49 | 63,449.88 | | 0035 | 702-03-00700 | Catch Basins (CB-08) | 22 | EACH | 7,000.00 | 154,000.00 | 8,500.00 | 187,000.00 | 11,000.00 | 242,000.00 | 10,000.00 | 220,000.00 | | 0036 | 702-04-00200 | Adjusting Catch Basins | 6 | EACH | 2,500.00 | 15,000.00 | 2,600.00 | 15,600.00 | 2,500.00 | 15,000.00 | 2,700.00 | 16,200.00 | | 0037 | 702-04-00300 | Adjusting Junction Boxes | 1 | EACH | 2,500.00 | 2,500.00 | 2,400.00 | 2,400.00 | 4,000.00 | 4,000.00 | 3,000.00 | 3,000.00 | | 0038 | 702-07-00100 | Cross Drain Safety End (Type 1) | 4 | EACH | 3,000.00 | 12,000.00 | 1,150.00 | 4,600.00 | 1,500.00 | 6,000.00 | 3,111.76 | 12,447.04 | | 0039 | 706-01-00100 | Concrete Walk (4" Thick) | 1,585.2 | SQYD | 40.00 | 63,408.00 | 42.00 | 66,578.40 | 50.00 | 79,260.00 | 45.00 | 71,334.00 | | 0040 | 706-02-00200 | Concrete Drive (6" Thick) | 2,157.7 | SQYD | 50.00 | 107,885.00 | 80.00 | 172,616.00 | 75.00 | 161,827.50 | 87.00 | 187,719.90 | | 0041 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 897.7 | SQYD | 40.00 | 35,908.00 | 45.00 | 40,396.50 | 70.00 | 62,839.00 | 50.00 | 44,885.00 | | 0042 | 706-04-00100 | Handicapped Curb Ramps | 10 | EACH | 1,500.00 | 15,000.00 | 850.00 | 8,500.00 | 2,800.00 | 28,000.00 | 1,284.36 | 12,843.62 | | 0043 | 707-03-00100 | Combination Concrete Curb and Gutter | 11,998 | LNFT | 8.00 | 95,984.00 | 42.00 | 503,916.00 | 40.00 | 479,920.00 | 40.00 | 479,920.00 | | 0044 | 708-01-00100 | Right-of-Way Monument | 39 | EACH | 300.00 | 11,700.00 | 300.00 | 11,700.00 | 250.00 | 9,750.00 | 250.00 | 9,750.00 | | 0045 | 710-01-00100 | Flowable Fill | 26 | CUYD | 200.00 | 5,200.00 | 240.00 | 6,240.00 | 750.00 | 19,500.00 | 150.00 | 3,900.00 | | 0046 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 140,000.00 | 140,000.00 | 85,000.00 | 85,000.00 | 152,000.00 | 152,000.00 | | 0047 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,028 | LNFT | 2.25 | 2,313.00 | 2.25 | 2,313.00 | 1.00 | 1,028.00 | 6.00 | 6,168.00 | | 0048 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.117 | MILE | 1,500.00 | 7,675.50 | 400.00 | 2,046.80 | 1,000.00 | 5,117.00 | 5,000.00 | 25,585.00 | | 0049 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 18.235 | MILE | 1,650.00 | 30,087.75 | 1,700.00 | 30,999.50 | 1,000.00 | 18,235.00 | 5,000.00 | 91,175.00 | | 0050 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 2,440 | SQYD | 5.00 | 12,200.00 | 8.00 | 19,520.00 | 7.50 | 18,300.00 | 7.50 | 18,300.00 | | 0052 | 716-01-00100 | Mulch (Vegetative) | 0.3 | TON | 10,000.00 | 3,000.00 | 2,100.00 | 630.00 | 3,500.00 | 1,050.00 | 3,500.00 | 1,050.00 | | 0053 | 717-01-00100 | Seeding | 80 | LB | 15.00 | 1,200.00 | 16.00 | 1,280.00 | 5.50 | 440.00 | 5.50 | 440.00 | | 0054 | 718-01-00100 | Fertilizer | 250 | LB | 10.00 | 2,500.00 | 2.00 | 500.00 | 4.00 | 1,000.00 | 4.00 | 1,000.00 | | 0055 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 2,000.00 | 2,000.00 | 30,000.00 | 30,000.00 | 35,000.00 | 35,000.00 | 40,000.00 | 40,000.00 | | 0056 | 723-02-00100 | Granular Material (Vehicular Measurement) | 176 | CUYD | 30.00 | 5,280.00 | 100.00 | 17,600.00 | 100.00 | 17,600.00 | 68.00 | 11,968.00 | | 0057 | 726-01-00100 | Bedding Material | 1,360.4 | CUYD | 100.00 | 136,040.00 | 115.00 | 156,446.00 | 50.00 | 68,020.00 | 68.00 | 92,507.20 | | 0058 | 727-01-00100 | Mobilization | 1 | LUMP | 600,000.00 | 600,000.00 | 645,000.00 | 645,000.00 | 997,000.00 | 997,000.00 | 1,172,913.00 | 1,172,913.00 | | 0059 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 482.4 | SQFT | 36.00 | 17,366.40 | 31.50 | 15,195.60 | 25.00 | 12,060.00 | 20.00 | 9,648.00 | | 0060 | 729-04-00102 | Sign (Type D)(Furnish and Install) | 48 | SQFT | 25.00 | 1,200.00 | 23.50 | 1,128.00 | 25.00 | 1,200.00 | 22.00 | 1,056.00 | | 0061 | 729-21-00100 | U-Channel Post | 12 | EACH | 125.00 | 1,500.00 | 75.00 | 900.00 | 100.00 | 1,200.00 | 100.00 | 1,200.00 | | 0062 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,250 | EACH | 7.70 | 9,625.00 | 7.00 | 8,750.00 | 10.00 | 12,500.00 | 6.50 | 8,125.00 | | 0063 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 25,321 | LNFT | 1.10 | 27,853.10 | 1.00 | 25,321.00 | 2.00 | 50,642.00 | 1.15 | 29,119.15 | | 0064 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 3,409 | LNFT | 2.20 | 7,499.80 | 2.00 | 6,818.00 | 3.00 | 10,227.00 | 5.00 | 17,045.00 | | 0065 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,199 | LNFT | 8.80 | 10,551.20 | 8.00 | 9,592.00 | 10.00 | 11,990.00 | 11.00 | 13,189.00 | | 0066 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 278 | LNFT | 3.30 | 917.40 | 3.00 | 834.00 | 6.00 | 1,668.00 | 5.00 | 1,390.00 | | 0067 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 470 | LNFT | 11.00 | 5,170.00 | 10.50 | 4,935.00 | 13.00 | 6,110.00 | 11.00 | 5,170.00 | | 0068 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.068 | MILE | 1,650.00 | 5,062.20 | 1,575.00 | 4,832.10 | 1,900.00 | 5,829.20 | 4,500.00 | 13,806.00 | | 0069 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.673 | MILE | 5,500.00 | 3,701.50 | 5,250.00 | 3,533.25 | 10,000.00 | 6,730.00 | 9,558.00 | 6,432.53 | | 0070 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.24 | MILE | 5,500.00 | 1,320.00 | 5,250.00 | 1,260.00 | 10,000.00 | 2,400.00 | 11,050.00 | 2,652.00 | | 0071 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 550.00 | 550.00 | 525.00 | 525.00 | 800.00 | 800.00 | 500.00 | 500.00 | | 0072 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 25 | EACH | 330.00 | 8,250.00 | 315.00 | 7,875.00 | 500.00 | 12,500.00 | 340.00 | 8,500.00 | | 0073 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 330.00 | 1,320.00 | 315.00 | 1,260.00 | 500.00 | 2,000.00 | 500.00 | 2,000.00 | | 0074 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 4 | EACH | 330.00 | 1,320.00 | 315.00 | 1,260.00 | 700.00 | 2,800.00 | 500.00 | 2,000.00 | | 0075 | 732-05-00100 | Removal of Existing Markings | 4.68 | MILE | 5,500.00 | 25,740.00 | 5,000.00 | 23,400.00 | 8,000.00 | 37,440.00 | 4,900.00 | 22,932.00 | | 0076 | 736-04-03080 | Signal Support (30' Steel Strain Pole) | 4 | EACH | 9,400.00 | 37,600.00 | 10,000.00 | 40,000.00 | 7,800.00 | 31,200.00 | 8,300.00 | 33,200.00 | | 0077 | 736-04-04100 | Signal Support (30' Single Mast Arm) | 1 | EACH | 10,750.00 | 10,750.00 | 11,000.00 | 11,000.00 | 8,600.00 | 8,600.00 | 9,100.00 | 9,100.00 | | 0078 | 736-04-04160 | Signal Support (45' Single Mast Arm) | 1 | EACH | 12,500.00 | 12,500.00 | 14,500.00 | 14,500.00 | 12,500.00 | 12,500.00 | 11,372.87 | 11,372.87 | | 0081 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 14 | EACH | 1,100.00 | 15,400.00 | 875.00 | 12,250.00 | 875.00 | 12,250.00 | 954.97 | 13,369.63 | | 0082 | 736-05-02020 | Signal Heads (3 Section, 12" Led Lens, R, LT. Y, LT. G) | 7 | EACH | 1,100.00 | 7,700.00 | 875.00 | 6,125.00 | 875.00 | 6,125.00 | 942.26 | 6,595.80 | | 0083 | 736-05-02060 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) (Arrow Up) | 3 | EACH | 1,100.00 | 3,300.00 | 875.00 | 2,625.00 | 875.00 | 2,625.00 | 950.00 | 2,850.00 | | 0084 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 2 | EACH | 1,500.00 | 3,000.00 | 1,300.00 | 2,600.00 | 1,300.00 | 2,600.00 | 1,489.71 | 2,979.42 | | 0085 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 1 | EACH | 1,500.00 | 1,500.00 | 1,300.00 | 1,300.00 | 1,300.00 | 1,300.00 | 1,511.47 | 1,511.47 | | 0086 | 736-06-00100 | Signal Service | 2 | EACH | 1,500.00 | 3,000.00 | 2,500.00 | 5,000.00 | 2,500.00 | 5,000.00 | 5,854.70 | 11,709.40 | | 0087 | 736-08-00071 | Sig Cntrlr (TS-2, Type 2, w/Eth cap)(Type 6E Cabinet) (F&I) | 2 | EACH | 28,400.00 | 56,800.00 | 26,000.00 | 52,000.00 | 25,000.00 | 50,000.00 | 31,878.23 | 63,756.46 | | 0088 | 736-10-00100 | Underground Junction Box (Type D) | 7 | EACH | 400.00 | 2,800.00 | 500.00 | 3,500.00 | 500.00 | 3,500.00 | 500.00 | 3,500.00 | | 0090 | 736-10-00400 | Underground Junction Box (Type G) | 2 | EACH | 900.00 | 1,800.00 | 1,200.00 | 2,400.00 | 1,200.00 | 2,400.00 | 1,220.00 | 2,440.00 | | 0091 | 736-11-00200 | Conduit (1" HDPE, Schedule 80) | 522 | LNFT | 1.45 | 756.90 | 1.75 | 913.50 | 1.65 | 861.30 | 1.80 | 939.60 | | 0092 | 736-11-00500 | Conduit (4" HDPE, Schedule 80) | 350 | LNFT | 8.70 | 3,045.00 | 8.50 | 2,975.00 | 8.25 | 2,887.50 | 9.00 | 3,150.00 | | 0094 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 418 | LNFT | 3.00 | 1,254.00 | 4.25 | 1,776.50 | 4.05 | 1,692.90 | 5.00 | 2,090.00 | | 0096 | 736-12-06000 | Conductor (10c, #14 awg) | 4,418 | LNFT | 2.30 | 10,161.40 | 2.30 | 10,161.40 | 2.30 | 10,161.40 | 2.00 | 8,834.67 | | 0098 | 740-01-00100 | Construction Layout | 1 | LUMP | 75,000.00 | 75,000.00 | 75,000.00 | 75,000.00 | 150,000.00 | 150,000.00 | 100,000.00 | 100,000.00 | | 0099 | 741-01-01080 | Water Main (6" PVC) | 1,180 | LNFT | 62.00 | 73,160.00 | 120.00 | 141,600.00 | 53.00 | 62,540.00 | 117.50 | 138,650.00 | | 0100 | 741-01-01100 | Water Main (8" PVC) | 1,645 | LNFT | 65.00 | 106,925.00 | 125.00 | 205,625.00 | 56.00 | 92,120.00 | 56.00 | 92,120.00 | | 0101 | 741-02-00300 | Gate Valve (6") | 6 | EACH | 1,210.00 | 7,260.00 | 1,500.00 | 9,000.00 | 1,100.00 | 6,600.00 | 1,100.00 | 6,600.00 | | 0102 | 741-02-00400 | Gate Valve (8") | 2 | EACH | 1,540.00 | 3,080.00 | 1,850.00 | 3,700.00 | 1,400.00 | 2,800.00 | 1,400.00 | 2,800.00 | | 0103 | 741-04-00100 | Fire Hydrant | 2 | EACH | 3,850.00 | 7,700.00 | 4,000.00 | 8,000.00 | 3,500.00 | 7,000.00 | 3,500.00 | 7,000.00 | | 0104 | 741-05-01100 | Water Service Line (2" PVC) | 615 | LNFT | 11.00 | 6,765.00 | 32.00 | 19,680.00 | 10.00 | 6,150.00 | 10.00 | 6,150.00 | | 0105 | 741-08-00100 | Relocating Water Meter | 44 | EACH | 385.00 | 16,940.00 | 1,800.00 | 79,200.00 | 350.00 | 15,400.00 | 350.00 | 15,400.00 | | 0106 | 741-09-00100 | Adjusting Water House Connections | 44 | EACH | 137.50 | 6,050.00 | 2,100.00 | 92,400.00 | 125.00 | 5,500.00 | 125.00 | 5,500.00 | | 0107 | 741-10-00100 | Adjusting Water Service Lines | 820 | LNFT | 9.90 | 8,118.00 | 32.00 | 26,240.00 | 9.00 | 7,380.00 | 9.00 | 7,380.00 | | 0108 | 741-11-00200 | Adjusting Water Valve and Meter Box | 1 | EACH | 137.50 | 137.50 | 525.00 | 525.00 | 125.00 | 125.00 | 125.00 | 125.00 | | 0109 | 741-12-00100 | Remove Water Valve Including Box | 1 | EACH | 330.00 | 330.00 | 525.00 | 525.00 | 300.00 | 300.00 | 300.00 | 300.00 | | 0110 | 741-13-00100 | Removing Fire Hydrant | 1 | EACH | 660.00 | 660.00 | 525.00 | 525.00 | 600.00 | 600.00 | 600.00 | 600.00 | | 0111 | 741-14-00100 | Concrete Blocking | 11.3 | CUYD | 192.50 | 2,175.25 | 210.00 | 2,373.00 | 175.00 | 1,977.50 | 175.00 | 1,977.50 | | 0112 | 805-01-00400 | Class A Concrete (Retaining Walls) | 17.07 | CUYD | 2,000.00 | 34,140.00 | 2,250.00 | 38,407.50 | 2,100.00 | 35,847.00 | 1,900.00 | 32,433.00 | | 0113 | 805-01-00500 | Class A Concrete (Footings) | 17.59 | CUYD | 1,000.00 | 17,590.00 | 775.00 | 13,632.25 | 1,000.00 | 17,590.00 | 1,200.00 | 21,108.00 | | 0114 | 806-01-00100 | Deformed Reinforcing Steel | 1,565 | LB | 2.00 | 3,130.00 | 2.00 | 3,130.00 | 1.25 | 1,956.25 | 1.30 | 2,034.50 | | 0115 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 170,000 | INLF | 0.50 | 85,000.00 | 0.40 | 68,000.00 | 1.00 | 170,000.00 | 0.93 | 158,100.00 | | 0116 | NS-713-00008 | Portable Changeable Message Sign | 5 | EACH | 15,000.00 | 75,000.00 | 13,000.00 | 65,000.00 | 6,000.00 | 30,000.00 | 8,250.00 | 41,250.00 | | 0117 | NS-736-00005 | Video Detection Cabinet Components | 2 | EACH | 9,100.00 | 18,200.00 | 8,000.00 | 16,000.00 | 7,700.00 | 15,400.00 | 10,183.82 | 20,367.64 | | 0118 | NS-736-00006 | Video Detection Camera | 8 | EACH | 2,200.00 | 17,600.00 | 2,000.00 | 16,000.00 | 1,950.00 | 15,600.00 | 2,522.49 | 20,179.92 | | 0119 | NS-ITS-04060 | Fiber Optic Cable, SM, Furnish & Install, 2-12 Fibers | 274 | LNFT | 7.80 | 2,137.20 | 16.00 | 4,384.00 | 15.00 | 4,110.00 | 16.00 | 4,384.00 | | 0120 | NS-MSC-00120 | Drainage Structure (CONVERT CB TO JUNCTION BOX) | 2 | EACH | 2,500.00 | 5,000.00 | 2,400.00 | 4,800.00 | 5,200.00 | 10,400.00 | 4,000.00 | 8,000.00 | | 0121 | 202-02-06060 | Removal of Concrete Catch Basin | 22 | EACH | 750.00 | 16,500.00 | 550.00 | 12,100.00 | 1,000.00 | 22,000.00 | 1,130.27 | 24,865.94 | | 0123 | 703-03-00100 | Perforated Pipe Underdrains | 11,879 | LNFT | 15.00 | 178,185.00 | 18.00 | 213,822.00 | 10.00 | 118,790.00 | 10.38 | 123,304.02 | | 0124 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 172 | SQYD | 50.00 | 8,600.00 | 73.00 | 12,556.00 | 70.00 | 12,040.00 | 107.72 | 18,527.84 | | 0125 | 728-01-00400 | Jacked or Bored Pipe (8") (8”, HDPE, CLASS 200)(FURNISH AND INSTALL) | 110 | LNFT | 75.00 | 8,250.00 | 150.00 | 16,500.00 | 30.00 | 3,300.00 | 80.00 | 8,800.00 | | 0126 | 730-04-00100 | Jacked or Bored Casing (4" Diameter) (PVC/HDPE) | 320 | LNFT | 34.00 | 10,880.00 | 16.00 | 5,120.00 | 15.00 | 4,800.00 | 27.05 | 8,656.00 | | 0127 | 736-01-00100 | Trenching and Backfilling | 296 | LNFT | 4.60 | 1,361.60 | 10.50 | 3,108.00 | 10.00 | 2,960.00 | 6.65 | 1,968.40 | | 0128 | 736-03-00100 | Jacked or Bored Conduit (1" HPDE, Sch 80) | 250 | LNFT | 21.00 | 5,250.00 | 10.00 | 2,500.00 | 150.00 | 37,500.00 | 20.04 | 5,010.00 | | 0129 | 736-04-05008 | Signal Support (40'span, 35' span add-on arm) | 1 | EACH | 15,500.00 | 15,500.00 | 12,500.00 | 12,500.00 | 10,250.00 | 10,250.00 | 14,612.03 | 14,612.03 | | 0130 | 736-13-00002 | Cable (3/8") | 406 | LNFT | 6.00 | 2,436.00 | 2.50 | 1,015.00 | 2.50 | 1,015.00 | 5.63 | 2,285.78 | | 0131 | 304-05-00100 | Lime Treatment (Type E) | 256 | TON | 300.00 | 76,800.00 | 1,550.00 | 396,800.00 | 100.00 | 25,600.00 | 387.51 | 99,202.56 | | 0132 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 60 | SQYD | 100.00 | 6,000.00 | 200.00 | 12,000.00 | 1,100.00 | 66,000.00 | 120.00 | 7,200.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,746,916.80 | | 9,478,584.35 | | 10,170,678.05 | | 10,670,148.02 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Best-Yet Builders, Llc | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 500,000.00 | 500,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 500,000.00 | 500,000.00 | | 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 12,260 | LNFT | 10.00 | 122,600.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 12,184 | SQYD | 10.00 | 121,840.00 | | 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 17,706 | SQYD | 12.00 | 212,472.00 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 358.1 | SQYD | 30.00 | 10,743.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 500,000.00 | 500,000.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 30 | EACH | 500.00 | 15,000.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 1,500 | LNFT | 5.00 | 7,500.00 | | 0010 | 302-02-05121 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 36,140.5 | SQYD | 38.00 | 1,373,339.00 | | 0011 | 306-02-00100 | Scarifying and Compacting Roadbed (6" Thick) | 32,242 | SQYD | 10.00 | 322,420.00 | | 0012 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 2,300 | CUYD | 100.00 | 230,000.00 | | 0013 | 502-01-00100 | Superpave Asphaltic Concrete | 1,115.4 | TON | 150.00 | 167,310.00 | | 0014 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 471.8 | TON | 200.00 | 94,360.00 | | 0015 | 509-01-00100 | Cold Planing Asphaltic Pavement | 20,494 | SQYD | 7.00 | 143,458.00 | | 0016 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,173 | CUYD | 0.10 | -117.30 | | 0017 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 28,123.8 | SQYD | 85.00 | 2,390,523.00 | | 0018 | 601-02-00500 | Portland Cement Concrete Pavement (7" Thick) (Crossovers & Turnouts) | 308.8 | SQYD | 90.00 | 27,792.00 | | 0019 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 45 | EACH | 120.00 | 5,400.00 | | 0020 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 14,706 | LNFT | 7.20 | 105,883.20 | | 0021 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 8,766 | LNFT | 7.20 | 63,115.20 | | 0022 | 602-05-03160 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) | 612.7 | SQYD | 180.00 | 110,286.00 | | 0023 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) (RCP ONLY) | 599 | LNFT | 81.60 | 48,878.40 | | 0024 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 1,457 | LNFT | 86.40 | 125,884.80 | | 0025 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 1,732 | LNFT | 139.20 | 241,094.40 | | 0026 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 640 | LNFT | 201.60 | 129,024.00 | | 0027 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 402 | LNFT | 273.60 | 109,987.20 | | 0028 | 701-10-01020 | Reinforced Concrete Pipe (Extension) (15") | 30 | LNFT | 180.00 | 5,400.00 | | 0029 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 61 | LNFT | 150.00 | 9,150.00 | | 0030 | 701-14-00100 | Cleaning Existing Pipes | 4,012 | LNFT | 24.00 | 96,288.00 | | 0031 | 701-15-00100 | Concrete Collar | 10 | EACH | 1,200.00 | 12,000.00 | | 0032 | 702-03-00100 | Catch Basins (CB-01) | 6 | EACH | 4,800.00 | 28,800.00 | | 0033 | 702-03-00500 | Catch Basins (CB-06) | 20 | EACH | 6,000.00 | 120,000.00 | | 0035 | 702-03-00700 | Catch Basins (CB-08) | 22 | EACH | 7,200.00 | 158,400.00 | | 0036 | 702-04-00200 | Adjusting Catch Basins | 6 | EACH | 9,000.00 | 54,000.00 | | 0037 | 702-04-00300 | Adjusting Junction Boxes | 1 | EACH | 12,000.00 | 12,000.00 | | 0038 | 702-07-00100 | Cross Drain Safety End (Type 1) | 4 | EACH | 6,000.00 | 24,000.00 | | 0039 | 706-01-00100 | Concrete Walk (4" Thick) | 1,585.2 | SQYD | 72.00 | 114,134.40 | | 0040 | 706-02-00200 | Concrete Drive (6" Thick) | 2,157.7 | SQYD | 81.60 | 176,068.32 | | 0041 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 897.7 | SQYD | 78.00 | 70,020.60 | | 0042 | 706-04-00100 | Handicapped Curb Ramps | 10 | EACH | 2,400.00 | 24,000.00 | | 0043 | 707-03-00100 | Combination Concrete Curb and Gutter | 11,998 | LNFT | 48.00 | 575,904.00 | | 0044 | 708-01-00100 | Right-of-Way Monument | 39 | EACH | 500.00 | 19,500.00 | | 0045 | 710-01-00100 | Flowable Fill | 26 | CUYD | 300.00 | 7,800.00 | | 0046 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 250,000.00 | 250,000.00 | | 0047 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,028 | LNFT | 2.00 | 2,056.00 | | 0048 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.117 | MILE | 500.00 | 2,558.50 | | 0049 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 18.235 | MILE | 1,500.00 | 27,352.50 | | 0050 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 2,440 | SQYD | 10.00 | 24,400.00 | | 0052 | 716-01-00100 | Mulch (Vegetative) | 0.3 | TON | 25,000.00 | 7,500.00 | | 0053 | 717-01-00100 | Seeding | 80 | LB | 50.00 | 4,000.00 | | 0054 | 718-01-00100 | Fertilizer | 250 | LB | 20.00 | 5,000.00 | | 0055 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 40,000.00 | 40,000.00 | | 0056 | 723-02-00100 | Granular Material (Vehicular Measurement) | 176 | CUYD | 100.00 | 17,600.00 | | 0057 | 726-01-00100 | Bedding Material | 1,360.4 | CUYD | 125.00 | 170,050.00 | | 0058 | 727-01-00100 | Mobilization | 1 | LUMP | 1,000,000.00 | 1,000,000.00 | | 0059 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 482.4 | SQFT | 60.00 | 28,944.00 | | 0060 | 729-04-00102 | Sign (Type D)(Furnish and Install) | 48 | SQFT | 125.00 | 6,000.00 | | 0061 | 729-21-00100 | U-Channel Post | 12 | EACH | 125.00 | 1,500.00 | | 0062 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,250 | EACH | 7.00 | 8,750.00 | | 0063 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 25,321 | LNFT | 1.00 | 25,321.00 | | 0064 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 3,409 | LNFT | 2.00 | 6,818.00 | | 0065 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,199 | LNFT | 8.00 | 9,592.00 | | 0066 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 278 | LNFT | 3.00 | 834.00 | | 0067 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 470 | LNFT | 10.00 | 4,700.00 | | 0068 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.068 | MILE | 1,500.00 | 4,602.00 | | 0069 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.673 | MILE | 5,000.00 | 3,365.00 | | 0070 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.24 | MILE | 5,000.00 | 1,200.00 | | 0071 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 500.00 | 500.00 | | 0072 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 25 | EACH | 300.00 | 7,500.00 | | 0073 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 300.00 | 1,200.00 | | 0074 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 4 | EACH | 300.00 | 1,200.00 | | 0075 | 732-05-00100 | Removal of Existing Markings | 4.68 | MILE | 5,000.00 | 23,400.00 | | 0076 | 736-04-03080 | Signal Support (30' Steel Strain Pole) | 4 | EACH | 7,250.00 | 29,000.00 | | 0077 | 736-04-04100 | Signal Support (30' Single Mast Arm) | 1 | EACH | 10,000.00 | 10,000.00 | | 0078 | 736-04-04160 | Signal Support (45' Single Mast Arm) | 1 | EACH | 12,500.00 | 12,500.00 | | 0081 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 14 | EACH | 1,500.00 | 21,000.00 | | 0082 | 736-05-02020 | Signal Heads (3 Section, 12" Led Lens, R, LT. Y, LT. G) | 7 | EACH | 1,600.00 | 11,200.00 | | 0083 | 736-05-02060 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) (Arrow Up) | 3 | EACH | 1,600.00 | 4,800.00 | | 0084 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 2 | EACH | 1,800.00 | 3,600.00 | | 0085 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 1 | EACH | 1,800.00 | 1,800.00 | | 0086 | 736-06-00100 | Signal Service | 2 | EACH | 3,000.00 | 6,000.00 | | 0087 | 736-08-00071 | Sig Cntrlr (TS-2, Type 2, w/Eth cap)(Type 6E Cabinet) (F&I) | 2 | EACH | 27,500.00 | 55,000.00 | | 0088 | 736-10-00100 | Underground Junction Box (Type D) | 7 | EACH | 400.00 | 2,800.00 | | 0090 | 736-10-00400 | Underground Junction Box (Type G) | 2 | EACH | 1,300.00 | 2,600.00 | | 0091 | 736-11-00200 | Conduit (1" HDPE, Schedule 80) | 522 | LNFT | 6.00 | 3,132.00 | | 0092 | 736-11-00500 | Conduit (4" HDPE, Schedule 80) | 350 | LNFT | 20.00 | 7,000.00 | | 0094 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 418 | LNFT | 6.00 | 2,508.00 | | 0096 | 736-12-06000 | Conductor (10c, #14 awg) | 4,418 | LNFT | 4.00 | 17,672.00 | | 0098 | 740-01-00100 | Construction Layout | 1 | LUMP | 300,000.00 | 300,000.00 | | 0099 | 741-01-01080 | Water Main (6" PVC) | 1,180 | LNFT | 116.00 | 136,880.00 | | 0100 | 741-01-01100 | Water Main (8" PVC) | 1,645 | LNFT | 119.00 | 195,755.00 | | 0101 | 741-02-00300 | Gate Valve (6") | 6 | EACH | 1,450.00 | 8,700.00 | | 0102 | 741-02-00400 | Gate Valve (8") | 2 | EACH | 1,750.00 | 3,500.00 | | 0103 | 741-04-00100 | Fire Hydrant | 2 | EACH | 3,750.00 | 7,500.00 | | 0104 | 741-05-01100 | Water Service Line (2" PVC) | 615 | LNFT | 30.00 | 18,450.00 | | 0105 | 741-08-00100 | Relocating Water Meter | 44 | EACH | 1,700.00 | 74,800.00 | | 0106 | 741-09-00100 | Adjusting Water House Connections | 44 | EACH | 2,000.00 | 88,000.00 | | 0107 | 741-10-00100 | Adjusting Water Service Lines | 820 | LNFT | 30.00 | 24,600.00 | | 0108 | 741-11-00200 | Adjusting Water Valve and Meter Box | 1 | EACH | 500.00 | 500.00 | | 0109 | 741-12-00100 | Remove Water Valve Including Box | 1 | EACH | 500.00 | 500.00 | | 0110 | 741-13-00100 | Removing Fire Hydrant | 1 | EACH | 500.00 | 500.00 | | 0111 | 741-14-00100 | Concrete Blocking | 11.3 | CUYD | 220.00 | 2,486.00 | | 0112 | 805-01-00400 | Class A Concrete (Retaining Walls) | 17.07 | CUYD | 1,000.00 | 17,070.00 | | 0113 | 805-01-00500 | Class A Concrete (Footings) | 17.59 | CUYD | 1,000.00 | 17,590.00 | | 0114 | 806-01-00100 | Deformed Reinforcing Steel | 1,565 | LB | 2.50 | 3,912.50 | | 0115 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 170,000 | INLF | 0.50 | 85,000.00 | | 0116 | NS-713-00008 | Portable Changeable Message Sign | 5 | EACH | 15,000.00 | 75,000.00 | | 0117 | NS-736-00005 | Video Detection Cabinet Components | 2 | EACH | 9,500.00 | 19,000.00 | | 0118 | NS-736-00006 | Video Detection Camera | 8 | EACH | 3,000.00 | 24,000.00 | | 0119 | NS-ITS-04060 | Fiber Optic Cable, SM, Furnish & Install, 2-12 Fibers | 274 | LNFT | 10.00 | 2,740.00 | | 0120 | NS-MSC-00120 | Drainage Structure (CONVERT CB TO JUNCTION BOX) | 2 | EACH | 15,000.00 | 30,000.00 | | 0121 | 202-02-06060 | Removal of Concrete Catch Basin | 22 | EACH | 1,500.00 | 33,000.00 | | 0123 | 703-03-00100 | Perforated Pipe Underdrains | 11,879 | LNFT | 25.00 | 296,975.00 | | 0124 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 172 | SQYD | 100.00 | 17,200.00 | | 0125 | 728-01-00400 | Jacked or Bored Pipe (8") (8”, HDPE, CLASS 200)(FURNISH AND INSTALL) | 110 | LNFT | 150.00 | 16,500.00 | | 0126 | 730-04-00100 | Jacked or Bored Casing (4" Diameter) (PVC/HDPE) | 320 | LNFT | 25.00 | 8,000.00 | | 0127 | 736-01-00100 | Trenching and Backfilling | 296 | LNFT | 6.00 | 1,776.00 | | 0128 | 736-03-00100 | Jacked or Bored Conduit (1" HPDE, Sch 80) | 250 | LNFT | 20.00 | 5,000.00 | | 0129 | 736-04-05008 | Signal Support (40'span, 35' span add-on arm) | 1 | EACH | 16,000.00 | 16,000.00 | | 0130 | 736-13-00002 | Cable (3/8") | 406 | LNFT | 7.00 | 2,842.00 | | 0131 | 304-05-00100 | Lime Treatment (Type E) | 256 | TON | 900.00 | 230,400.00 | | 0132 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 60 | SQYD | 300.00 | 18,000.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 12,844,989.72 |
|