Proposal:H.001257.6
Parish:Avoyelles
Routes:LA 1, LA 114
Description:INTERSECTION LA 114 @ LA 1
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, CLASS II BASE COURSE (STONE, RECYCLED PORTLAND CEMENT CONCRETE, BLENDED CALCIUM SULFATE), LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$1,870,763.98
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $2,239,566.37 |
| 2 | 36936 | Dirtworks Inc Of Vicksburg | $2,518,214.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - GILCHRIST CONSTRUCTION CO. LLC | - 2 - Dirtworks Inc Of Vicksburg | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 9.6 | LUMP | 16,000.00 | 16,000.00 | 120,000.00 | 120,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 4,000.00 | 4,000.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-02040 | Removal of Asphalt Surfacing from Bridge Deck | 436 | SQYD | 5.00 | 2,180.00 | 10.00 | 4,360.00 | | 0004 | 202-02-04000 | Removal of Bridge STA. 209+84.50, 28' X 115', CONCRETE PRECAST SLAB SPAN | 1 | EACH | 18,000.00 | 18,000.00 | 50,000.00 | 50,000.00 | | 0005 | 202-02-04001 | Removal of Bridge (Partial Removal) Concrete Pile Bents | 1 | LUMP | 14,000.00 | 14,000.00 | 20,000.00 | 20,000.00 | | 0006 | 202-02-04040 | Removal of Bridge Superstructure (Concrete Slab Span) | 1,150 | SQFT | 14.00 | 16,100.00 | 25.00 | 28,750.00 | | 0007 | 202-02-05000 | Removal of Building METAL STRUCTURE LT. OF STA. 101+58.00, 24' X 14' | 1 | EACH | 2,400.00 | 2,400.00 | 15,000.00 | 15,000.00 | | 0008 | 202-02-05000 | Removal of Building METAL SIDING HOME RT. OF STA. 101+87.00, 35' X 43' (CONTAINS ASBESTOS) | 1 | EACH | 8,500.00 | 8,500.00 | 50,000.00 | 50,000.00 | | 0009 | 202-02-06000 | Removal of Concrete Approach Slabs | 125.96 | SQYD | 40.00 | 5,038.40 | 70.00 | 8,817.20 | | 0010 | 202-02-06100 | Removal of Concrete Walks and Drives | 23 | SQYD | 20.00 | 460.00 | 50.00 | 1,150.00 | | 0011 | 202-02-14500 | Removal of Guard Rail | 1,046 | LNFT | 7.00 | 7,322.00 | 5.00 | 5,230.00 | | 0012 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 8,332.8 | SQYD | 10.00 | 83,328.00 | 7.00 | 58,329.60 | | 0013 | 203-01-00100 | General Excavation | 21,625 | CUYD | 8.50 | 183,812.50 | 7.00 | 151,375.00 | | 0014 | 203-02-00100 | Drainage Excavation | 158 | CUYD | 25.00 | 3,950.00 | 15.00 | 2,370.00 | | 0015 | 203-03-00100 | Embankment | 7,118 | CUYD | 20.00 | 142,360.00 | 12.00 | 85,416.00 | | 0016 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 46 | EACH | 120.00 | 5,520.00 | 100.00 | 4,600.00 | | 0017 | 204-06-00100 | Temporary Silt Fencing | 6,447 | LNFT | 1.75 | 11,282.25 | 2.00 | 12,894.00 | | 0018 | 302-02-04121 | Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 2,715.6 | SQYD | 27.00 | 73,321.20 | 32.00 | 86,899.20 | | 0019 | 302-02-05121 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 6,665 | SQYD | 31.00 | 206,615.00 | 35.00 | 233,275.00 | | 0020 | 304-05-00100 | Lime Treatment (Type E) | 26.59 | TON | 500.00 | 13,295.00 | 600.00 | 15,954.00 | | 0021 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 50.96 | CUYD | 95.00 | 4,841.20 | 120.00 | 6,115.20 | | 0022 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 65.00 | 6,500.00 | 120.00 | 12,000.00 | | 0023 | 502-01-00100 | Superpave Asphaltic Concrete | 3,049.4 | TON | 100.00 | 304,940.00 | 95.00 | 289,693.00 | | 0024 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 532.8 | TON | 100.00 | 53,280.00 | 95.00 | 50,616.00 | | 0025 | 509-01-00100 | Cold Planing Asphaltic Pavement | 6,193 | SQYD | 2.50 | 15,482.50 | 10.00 | 61,930.00 | | 0026 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -258 | CUYD | 1.00 | -258.00 | 1.00 | -258.00 | | 0027 | 701-01-02120 | Cross Drain Pipe (42" RCP/PP or 48" CMP) | 214 | LNFT | 125.00 | 26,750.00 | 145.00 | 31,030.00 | | 0028 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 212 | LNFT | 95.00 | 20,140.00 | 93.00 | 19,716.00 | | 0029 | 702-07-00200 | Cross Drain Safety End (Type 2) | 2 | EACH | 4,200.00 | 8,400.00 | 5,000.00 | 10,000.00 | | 0030 | 702-08-00100 | Side Drain Safety End (Type I) | 12 | EACH | 1,900.00 | 22,800.00 | 2,500.00 | 30,000.00 | | 0031 | 704-03-00100 | Blocked Out Guard Rail | 387.5 | LNFT | 21.00 | 8,137.50 | 23.00 | 8,912.50 | | 0032 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 42.00 | 4,200.00 | 43.00 | 4,300.00 | | 0033 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,400.00 | 9,600.00 | 2,500.00 | 10,000.00 | | 0034 | 705-01-00100 | Barbed Wire Fence | 242 | LNFT | 13.00 | 3,146.00 | 12.00 | 2,904.00 | | 0035 | 708-01-00100 | Right-of-Way Monument | 11 | EACH | 150.00 | 1,650.00 | 200.00 | 2,200.00 | | 0036 | 708-02-00100 | Right-of-Way Monument Witness Post | 11 | EACH | 60.00 | 660.00 | 200.00 | 2,200.00 | | 0037 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 75 | SQYD | 68.00 | 5,100.00 | 90.00 | 6,750.00 | | 0038 | 711-04-00100 | Geotextile Fabric | 75 | SQYD | 3.50 | 262.50 | 15.00 | 1,125.00 | | 0039 | 712-04-00100 | Flexible Revetment | 316 | SQYD | 55.00 | 17,380.00 | 100.00 | 31,600.00 | | 0040 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | | 0041 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 115.4 | LNFT | 0.55 | 63.47 | 1.00 | 115.40 | | 0042 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.003 | MILE | 500.00 | 501.50 | 700.00 | 702.10 | | 0043 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.003 | MILE | 550.00 | 551.65 | 700.00 | 702.10 | | 0044 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.071 | MILE | 800.00 | 1,656.80 | 900.00 | 1,863.90 | | 0045 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 91 | EACH | 825.00 | 75,075.00 | 1,000.00 | 91,000.00 | | 0046 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 91 | EACH | 64.00 | 5,824.00 | 100.00 | 9,100.00 | | 0047 | 716-01-00100 | Mulch (Vegetative) | 19.2 | TON | 600.00 | 11,520.00 | 550.00 | 10,560.00 | | 0048 | 717-01-00100 | Seeding | 768 | LB | 11.00 | 8,448.00 | 8.00 | 6,144.00 | | 0049 | 718-01-00100 | Fertilizer | 9,600 | LB | 0.50 | 4,800.00 | 1.00 | 9,600.00 | | 0050 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 3,171 | SQYD | 1.75 | 5,549.25 | 1.50 | 4,756.50 | | 0051 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 3,000.00 | 3,000.00 | 25,000.00 | 25,000.00 | | 0052 | 726-01-00100 | Bedding Material | 218.5 | CUYD | 140.00 | 30,590.00 | 120.00 | 26,220.00 | | 0053 | 727-01-00100 | Mobilization | 1 | LUMP | 160,000.00 | 160,000.00 | 200,000.00 | 200,000.00 | | 0054 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 45.00 | 180.00 | 100.00 | 400.00 | | 0055 | 731-02-00100 | Reflectorized Raised Pavement Markers | 239 | EACH | 10.00 | 2,390.00 | 15.00 | 3,585.00 | | 0056 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 642 | LNFT | 4.00 | 2,568.00 | 5.00 | 3,210.00 | | 0057 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 682 | LNFT | 11.00 | 7,502.00 | 11.00 | 7,502.00 | | 0058 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.416 | MILE | 4,100.00 | 9,905.60 | 4,000.00 | 9,664.00 | | 0059 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 550.00 | 2,200.00 | 600.00 | 2,400.00 | | 0060 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 1,100.00 | 1,100.00 | 1,100.00 | 1,100.00 | | 0061 | 735-01-00100 | Mailboxes | 2 | EACH | 1.00 | 2.00 | 150.00 | 300.00 | | 0062 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 130.00 | 260.00 | 150.00 | 300.00 | | 0063 | 740-01-00100 | Construction Layout | 1 | LUMP | 18,000.00 | 18,000.00 | 20,000.00 | 20,000.00 | | 0064 | 804-01-00200 | Precast Concrete Piles (14") | 780 | LNFT | 52.00 | 40,560.00 | 75.00 | 58,500.00 | | 0065 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 2,600.00 | 2,600.00 | 500.00 | 500.00 | | 0066 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 13.248 | CUYD | 1,800.00 | 23,846.40 | 1,800.00 | 23,846.40 | | 0067 | 805-01-00700 | Class A Concrete (Bents) | 21.78 | CUYD | 2,600.00 | 56,628.00 | 1,400.00 | 30,492.00 | | 0068 | 805-03-00100 | Class AA Concrete | 113.85 | CUYD | 1,100.00 | 125,235.00 | 1,000.00 | 113,850.00 | | 0069 | 805-12-02000 | Reinforced Concrete Box Culverts (5' x 5') | 144 | LNFT | 475.00 | 68,400.00 | 675.00 | 97,200.00 | | 0070 | 806-01-00100 | Deformed Reinforcing Steel | 32,768.6 | LB | 1.25 | 40,960.75 | 1.00 | 32,768.60 | | 0071 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 200 | LNFT | 70.00 | 14,000.00 | 73.00 | 14,600.00 | | 0072 | 813-01-00100 | Concrete Approach Slabs | 200 | SQYD | 325.00 | 65,000.00 | 205.00 | 41,000.00 | | 0073 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 353 | LNFT | 3.00 | 1,059.00 | 30.00 | 10,590.00 | | 0074 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 105,727 | INLF | 0.70 | 74,008.90 | 0.50 | 52,863.50 | | 0075 | NS-700-00180 | Impact Attenuator (Construction Zone) | 4 | EACH | 2,400.00 | 9,600.00 | 5,500.00 | 22,000.00 | | 0076 | NS-700-00181 | Impact Attenuator Relocation (Construction Zone) | 4 | EACH | 1,000.00 | 4,000.00 | 1,600.00 | 6,400.00 | | 0077 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 0.825 | MILE | 1,800.00 | 1,485.00 | 5,000.00 | 4,125.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,239,566.37 | | 2,518,214.20 |
|