Proposal:H.011614.6
Parish:Ouachita
Routes:LA 15
Description:LA 15: DRAINAGE IMPROV 0.8 MI N OF US 80
Type Construction:CLEARING AND GRUBBING, PAVEMENT PATCHING, DRAINAGE STRUCTURES, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$207,256.89
| Rank | License | Bidder | Construction Bid |
| 1 | 23112 | BEN ALLEN, INC. | $202,022.00 |
| 2 | 18546 | C W & W Contractors, Inc. | $211,042.25 |
| 3 | 32563 | The Mabry Company Llc | $232,878.50 |
| 4 | 54549 | Chad Pody Construction Company, LLC | $243,812.50 |
| 5 | 36936 | Dirtworks Inc Of Vicksburg | $269,360.50 |
| 6 | 15099 | Amethyst Construction, Inc. | $282,758.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - BEN ALLEN, INC. | - 2 - C W & W Contractors, Inc. | - 3 - The Mabry Company Llc | - 4 - Chad Pody Construction Company, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) Approx 0.013 Acres | 0.013 | LUMP | 8,000.00 | 8,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 25,000.00 | 25,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,000.00 | 3,000.00 | 5,000.00 | 5,000.00 | 3,000.00 | 3,000.00 | 6,000.00 | 6,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 52 | SQYD | 10.00 | 520.00 | 10.00 | 520.00 | 10.00 | 520.00 | 12.00 | 624.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 42" x 40' RCP | 40 | LNFT | 100.00 | 4,000.00 | 25.00 | 1,000.00 | 20.00 | 800.00 | 10.00 | 400.00 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) 24" x 30' CMP | 30 | LNFT | 100.00 | 3,000.00 | 20.00 | 600.00 | 20.00 | 600.00 | 20.00 | 600.00 | | 0006 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 390 | CUYD | 15.00 | 5,850.00 | 30.00 | 11,700.00 | 15.00 | 5,850.00 | 25.00 | 9,750.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 290 | LNFT | 3.50 | 1,015.00 | 3.00 | 870.00 | 3.00 | 870.00 | 3.00 | 870.00 | | 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 9 | CUYD | 100.00 | 900.00 | 100.00 | 900.00 | 60.00 | 540.00 | 150.00 | 1,350.00 | | 0009 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 8.6 | CUYD | 100.00 | 860.00 | 100.00 | 860.00 | 100.00 | 860.00 | 150.00 | 1,290.00 | | 0010 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 17 | TON | 250.00 | 4,250.00 | 275.00 | 4,675.00 | 250.00 | 4,250.00 | 300.00 | 5,100.00 | | 0011 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 147 | SQYD | 175.00 | 25,725.00 | 150.00 | 22,050.00 | 125.00 | 18,375.00 | 155.00 | 22,785.00 | | 0012 | 701-02-02160 | Cross Drain Pipe Arch (48" Equiv. RCPA or 54" Equiv. CMPA) | 40 | LNFT | 175.00 | 7,000.00 | 200.00 | 8,000.00 | 300.00 | 12,000.00 | 150.00 | 6,000.00 | | 0013 | 710-01-00100 | Flowable Fill | 46.05 | CUYD | 160.00 | 7,368.00 | 125.00 | 5,756.25 | 120.00 | 5,526.00 | 190.00 | 8,749.50 | | 0014 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 162 | SQYD | 82.00 | 13,284.00 | 85.00 | 13,770.00 | 120.00 | 19,440.00 | 70.00 | 11,340.00 | | 0015 | 711-04-00100 | Geotextile Fabric | 162 | SQYD | 3.00 | 486.00 | 3.00 | 486.00 | 3.00 | 486.00 | 5.00 | 810.00 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 14,000.00 | 14,000.00 | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | | 0017 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 132 | LNFT | 5.00 | 660.00 | 20.00 | 2,640.00 | 10.00 | 1,320.00 | 10.00 | 1,320.00 | | 0018 | 716-01-00100 | Mulch (Vegetative) | 0.25 | TON | 2,500.00 | 625.00 | 2,500.00 | 625.00 | 4,000.00 | 1,000.00 | 4,000.00 | 1,000.00 | | 0019 | 717-01-00100 | Seeding | 7.5 | LB | 50.00 | 375.00 | 50.00 | 375.00 | 25.00 | 187.50 | 20.00 | 150.00 | | 0020 | 718-01-00100 | Fertilizer | 122 | LB | 3.00 | 366.00 | 2.00 | 244.00 | 5.00 | 610.00 | 10.00 | 1,220.00 | | 0021 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 60 | SQYD | 10.00 | 600.00 | 10.00 | 600.00 | 5.00 | 300.00 | 7.00 | 420.00 | | 0022 | 726-01-00100 | Bedding Material | 113 | CUYD | 110.00 | 12,430.00 | 100.00 | 11,300.00 | 110.00 | 12,430.00 | 150.00 | 16,950.00 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 35,000.00 | 35,000.00 | 24,000.00 | 24,000.00 | | 0024 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 85.00 | 340.00 | 90.00 | 360.00 | 100.00 | 400.00 | 85.00 | 340.00 | | 0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 6,000.00 | 6,000.00 | 4,000.00 | 4,000.00 | 7,000.00 | 7,000.00 | | 0026 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 14.97 | CUYD | 1,200.00 | 17,964.00 | 1,300.00 | 19,461.00 | 1,200.00 | 17,964.00 | 1,500.00 | 22,455.00 | | 0027 | 805-12-01000 | Reinforced Concrete Box Culverts (4' x 4') | 132 | LNFT | 325.00 | 42,900.00 | 350.00 | 46,200.00 | 375.00 | 49,500.00 | 308.00 | 40,656.00 | | 0028 | 806-01-00100 | Deformed Reinforcing Steel | 1,286 | LB | 3.00 | 3,858.00 | 3.00 | 3,858.00 | 3.00 | 3,858.00 | 2.00 | 2,572.00 | | 0029 | NS-200-00020 | Cleaning Existing Ditches | 210 | LNFT | 10.00 | 2,100.00 | 10.00 | 2,100.00 | 10.00 | 2,100.00 | 15.00 | 3,150.00 | | 0030 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 546 | INLF | 1.00 | 546.00 | 2.00 | 1,092.00 | 2.00 | 1,092.00 | 3.50 | 1,911.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 202,022.00 | | 211,042.25 | | 232,878.50 | | 243,812.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Dirtworks Inc Of Vicksburg | - 6 - Amethyst Construction, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) Approx 0.013 Acres | 0.013 | LUMP | 40,000.00 | 40,000.00 | 6,000.00 | 6,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 4,000.00 | 4,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 52 | SQYD | 15.00 | 780.00 | 50.00 | 2,600.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 42" x 40' RCP | 40 | LNFT | 80.00 | 3,200.00 | 50.00 | 2,000.00 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) 24" x 30' CMP | 30 | LNFT | 80.00 | 2,400.00 | 60.00 | 1,800.00 | | 0006 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 390 | CUYD | 35.00 | 13,650.00 | 32.00 | 12,480.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 290 | LNFT | 1.00 | 290.00 | 5.00 | 1,450.00 | | 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 9 | CUYD | 200.00 | 1,800.00 | 140.00 | 1,260.00 | | 0009 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 8.6 | CUYD | 200.00 | 1,720.00 | 115.00 | 989.00 | | 0010 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 17 | TON | 260.00 | 4,420.00 | 300.00 | 5,100.00 | | 0011 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 147 | SQYD | 200.00 | 29,400.00 | 135.00 | 19,845.00 | | 0012 | 701-02-02160 | Cross Drain Pipe Arch (48" Equiv. RCPA or 54" Equiv. CMPA) | 40 | LNFT | 200.00 | 8,000.00 | 212.00 | 8,480.00 | | 0013 | 710-01-00100 | Flowable Fill | 46.05 | CUYD | 150.00 | 6,907.50 | 194.00 | 8,933.70 | | 0014 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 162 | SQYD | 110.00 | 17,820.00 | 62.00 | 10,044.00 | | 0015 | 711-04-00100 | Geotextile Fabric | 162 | SQYD | 10.00 | 1,620.00 | 2.00 | 324.00 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | | 0017 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 132 | LNFT | 5.00 | 660.00 | 1.00 | 132.00 | | 0018 | 716-01-00100 | Mulch (Vegetative) | 0.25 | TON | 5,000.00 | 1,250.00 | 2,000.00 | 500.00 | | 0019 | 717-01-00100 | Seeding | 7.5 | LB | 70.00 | 525.00 | 14.00 | 105.00 | | 0020 | 718-01-00100 | Fertilizer | 122 | LB | 14.00 | 1,708.00 | 1.00 | 122.00 | | 0021 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 60 | SQYD | 10.00 | 600.00 | 5.00 | 300.00 | | 0022 | 726-01-00100 | Bedding Material | 113 | CUYD | 150.00 | 16,950.00 | 94.00 | 10,622.00 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 20,000.00 | 20,000.00 | 24,000.00 | 24,000.00 | | 0024 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 200.00 | 800.00 | 140.00 | 560.00 | | 0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,000.00 | 6,000.00 | 1,500.00 | 1,500.00 | | 0026 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 14.97 | CUYD | 1,200.00 | 17,964.00 | 2,850.00 | 42,664.50 | | 0027 | 805-12-01000 | Reinforced Concrete Box Culverts (4' x 4') | 132 | LNFT | 350.00 | 46,200.00 | 745.00 | 98,340.00 | | 0028 | 806-01-00100 | Deformed Reinforcing Steel | 1,286 | LB | 3.00 | 3,858.00 | 1.50 | 1,929.00 | | 0029 | NS-200-00020 | Cleaning Existing Ditches | 210 | LNFT | 20.00 | 4,200.00 | 24.00 | 5,040.00 | | 0030 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 546 | INLF | 3.00 | 1,638.00 | 3.00 | 1,638.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 269,360.50 | | 282,758.20 |
|