Proposal:H.008318.6
Parish:St. John the Baptist
Routes:LA 636-3
Description:LA 636-3: LA 628 - LA 44
Type Construction:DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$596,918.22
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $568,781.00 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $578,859.50 |
| 3 | 06487 | Huey Stockstill, Inc. | $678,904.50 |
| 4 | 12487 | Diamond B Construction Co., L.L.C. | $711,111.50 |
| 5 | 02179 | Boh Bros. Construction Co., LLC. | $887,233.55 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Barber Bros. Contracting Co., L.L.C | - 3 - Huey Stockstill, Inc. | - 4 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 83 | LNFT | 10.00 | 830.00 | 45.00 | 3,735.00 | 5.00 | 415.00 | 98.00 | 8,134.00 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) see summary of drainage sheet | 61 | LNFT | 15.00 | 915.00 | 15.00 | 915.00 | 61.00 | 3,721.00 | 95.00 | 5,795.00 | | 0003 | 202-02-38300 | Removal of Sign and U-Channel Post | 2 | EACH | 1.00 | 2.00 | 25.00 | 50.00 | 10.00 | 20.00 | 290.00 | 580.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 100 | CUYD | 20.00 | 2,000.00 | 35.00 | 3,500.00 | 69.00 | 6,900.00 | 34.00 | 3,400.00 | | 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 10 | EACH | 10.00 | 100.00 | 25.00 | 250.00 | 15.00 | 150.00 | 17.50 | 175.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 9,755 | LNFT | 0.50 | 4,877.50 | 1.50 | 14,632.50 | 0.40 | 3,902.00 | 1.55 | 15,120.25 | | 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 217 | CUYD | 20.00 | 4,340.00 | 30.00 | 6,510.00 | 15.00 | 3,255.00 | 56.00 | 12,152.00 | | 0008 | 502-01-00100 | Superpave Asphaltic Concrete | 2,388 | TON | 80.00 | 191,040.00 | 84.00 | 200,592.00 | 110.00 | 262,680.00 | 84.00 | 200,592.00 | | 0009 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 784.6 | TON | 80.00 | 62,768.00 | 105.00 | 82,383.00 | 110.00 | 86,306.00 | 140.00 | 109,844.00 | | 0010 | 509-01-00100 | Cold Planing Asphaltic Pavement | 22,197 | SQYD | 2.00 | 44,394.00 | 2.00 | 44,394.00 | 3.00 | 66,591.00 | 3.15 | 69,920.55 | | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -925 | CUYD | 5.00 | -4,625.00 | 0.00 | 0.00 | 0.00 | 0.00 | 1.00 | -925.00 | | 0012 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 640 | SQYD | 70.00 | 44,800.00 | 90.00 | 57,600.00 | 95.00 | 60,800.00 | 97.00 | 62,080.00 | | 0013 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 76 | LNFT | 200.00 | 15,200.00 | 105.00 | 7,980.00 | 163.00 | 12,388.00 | 198.00 | 15,048.00 | | 0014 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 3 | EACH | 100.00 | 300.00 | 250.00 | 750.00 | 200.00 | 600.00 | 280.00 | 840.00 | | 0015 | 704-03-00100 | Blocked Out Guard Rail | 6.3 | LNFT | 24.00 | 151.20 | 25.00 | 157.50 | 22.00 | 138.60 | 24.00 | 151.20 | | 0016 | 704-11-00100 | Guard Rail End Treatment (Flared) | 2 | EACH | 1,500.00 | 3,000.00 | 2,500.00 | 5,000.00 | 3,300.00 | 6,600.00 | 2,500.00 | 5,000.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 58,000.00 | 58,000.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 45,000.00 | 45,000.00 | | 0018 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 44 | LNFT | 2.00 | 88.00 | 5.00 | 220.00 | 1.00 | 44.00 | 3.00 | 132.00 | | 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3.32 | MILE | 300.00 | 996.00 | 400.00 | 1,328.00 | 160.00 | 531.20 | 154.00 | 511.28 | | 0020 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.84 | MILE | 0.10 | 0.08 | 280.00 | 235.20 | 100.00 | 84.00 | 1.00 | 0.84 | | 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 12.23 | MILE | 0.10 | 1.22 | 550.00 | 6,726.50 | 200.00 | 2,446.00 | 1.00 | 12.23 | | 0022 | 716-01-00100 | Mulch (Vegetative) | 0.8 | TON | 500.00 | 400.00 | 1,500.00 | 1,200.00 | 1,500.00 | 1,200.00 | 1,550.00 | 1,240.00 | | 0023 | 717-01-00100 | Seeding | 12 | LB | 15.00 | 180.00 | 12.00 | 144.00 | 25.00 | 300.00 | 26.00 | 312.00 | | 0024 | 718-01-00100 | Fertilizer | 404 | LB | 1.00 | 404.00 | 1.20 | 484.80 | 1.50 | 606.00 | 1.55 | 626.20 | | 0025 | 726-01-00100 | Bedding Material | 15.2 | CUYD | 150.00 | 2,280.00 | 80.00 | 1,216.00 | 81.00 | 1,231.20 | 1.00 | 15.20 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 58,000.00 | 58,000.00 | 65,000.00 | 65,000.00 | 69,000.00 | 69,000.00 | 70,000.00 | 70,000.00 | | 0027 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 90.00 | 180.00 | 50.00 | 100.00 | 45.00 | 90.00 | 77.00 | 154.00 | | 0028 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 65.00 | 130.00 | 85.00 | 170.00 | 75.00 | 150.00 | 88.00 | 176.00 | | 0029 | 731-02-00100 | Reflectorized Raised Pavement Markers | 384 | EACH | 15.00 | 5,760.00 | 12.00 | 4,608.00 | 21.00 | 8,064.00 | 21.00 | 8,064.00 | | 0030 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 22 | LNFT | 26.00 | 572.00 | 25.00 | 550.00 | 26.00 | 572.00 | 25.75 | 566.50 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.115 | MILE | 6,000.00 | 36,690.00 | 5,200.00 | 31,798.00 | 5,500.00 | 33,632.50 | 5,150.00 | 31,492.25 | | 0032 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.42 | MILE | 3,500.00 | 1,470.00 | 3,000.00 | 1,260.00 | 3,500.00 | 1,470.00 | 3,600.00 | 1,512.00 | | 0033 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.05 | MILE | 10,000.00 | 500.00 | 12,000.00 | 600.00 | 3,100.00 | 155.00 | 3,100.00 | 155.00 | | 0034 | 735-01-00100 | Mailboxes | 67 | EACH | 1.00 | 67.00 | 10.00 | 670.00 | 1.00 | 67.00 | 1.00 | 67.00 | | 0035 | 735-02-00100 | Mailbox Supports (Single) | 60 | EACH | 120.00 | 7,200.00 | 120.00 | 7,200.00 | 122.00 | 7,320.00 | 230.00 | 13,800.00 | | 0036 | 735-04-00100 | Mailbox Supports (Multiple) | 2 | EACH | 300.00 | 600.00 | 325.00 | 650.00 | 300.00 | 600.00 | 330.00 | 660.00 | | 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 22,900.00 | 22,900.00 | 5,000.00 | 5,000.00 | 7,000.00 | 7,000.00 | 22,000.00 | 22,000.00 | | 0038 | 741-11-00100 | Adjusting Water Valve | 7 | EACH | 35.00 | 245.00 | 300.00 | 2,100.00 | 150.00 | 1,050.00 | 169.00 | 1,183.00 | | 0039 | NS-200-00020 | Cleaning Existing Ditches | 400 | LNFT | 5.00 | 2,000.00 | 6.00 | 2,400.00 | 8.00 | 3,200.00 | 9.75 | 3,900.00 | | 0040 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 2,500 | INLF | 0.01 | 25.00 | 0.70 | 1,750.00 | 0.25 | 625.00 | 0.65 | 1,625.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 568,781.00 | | 578,859.50 | | 678,904.50 | | 711,111.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 83 | LNFT | 15.00 | 1,245.00 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) see summary of drainage sheet | 61 | LNFT | 15.00 | 915.00 | | 0003 | 202-02-38300 | Removal of Sign and U-Channel Post | 2 | EACH | 50.00 | 100.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 100 | CUYD | 25.00 | 2,500.00 | | 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 10 | EACH | 20.00 | 200.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 9,755 | LNFT | 2.00 | 19,510.00 | | 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 217 | CUYD | 75.00 | 16,275.00 | | 0008 | 502-01-00100 | Superpave Asphaltic Concrete | 2,388 | TON | 110.00 | 262,680.00 | | 0009 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 784.6 | TON | 175.00 | 137,305.00 | | 0010 | 509-01-00100 | Cold Planing Asphaltic Pavement | 22,197 | SQYD | 5.25 | 116,534.25 | | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -925 | CUYD | 1.00 | -925.00 | | 0012 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 640 | SQYD | 140.00 | 89,600.00 | | 0013 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 76 | LNFT | 165.00 | 12,540.00 | | 0014 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 3 | EACH | 300.00 | 900.00 | | 0015 | 704-03-00100 | Blocked Out Guard Rail | 6.3 | LNFT | 26.00 | 163.80 | | 0016 | 704-11-00100 | Guard Rail End Treatment (Flared) | 2 | EACH | 2,700.00 | 5,400.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 71,000.00 | 71,000.00 | | 0018 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 44 | LNFT | 1.00 | 44.00 | | 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3.32 | MILE | 100.00 | 332.00 | | 0020 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.84 | MILE | 100.00 | 84.00 | | 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 12.23 | MILE | 100.00 | 1,223.00 | | 0022 | 716-01-00100 | Mulch (Vegetative) | 0.8 | TON | 1,700.00 | 1,360.00 | | 0023 | 717-01-00100 | Seeding | 12 | LB | 30.00 | 360.00 | | 0024 | 718-01-00100 | Fertilizer | 404 | LB | 2.00 | 808.00 | | 0025 | 726-01-00100 | Bedding Material | 15.2 | CUYD | 100.00 | 1,520.00 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 76,000.00 | 76,000.00 | | 0027 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 80.00 | 160.00 | | 0028 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 90.00 | 180.00 | | 0029 | 731-02-00100 | Reflectorized Raised Pavement Markers | 384 | EACH | 23.00 | 8,832.00 | | 0030 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 22 | LNFT | 30.00 | 660.00 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.115 | MILE | 5,900.00 | 36,078.50 | | 0032 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.42 | MILE | 4,000.00 | 1,680.00 | | 0033 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.05 | MILE | 3,500.00 | 175.00 | | 0034 | 735-01-00100 | Mailboxes | 67 | EACH | 7.00 | 469.00 | | 0035 | 735-02-00100 | Mailbox Supports (Single) | 60 | EACH | 150.00 | 9,000.00 | | 0036 | 735-04-00100 | Mailbox Supports (Multiple) | 2 | EACH | 525.00 | 1,050.00 | | 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,000.00 | 4,000.00 | | 0038 | 741-11-00100 | Adjusting Water Valve | 7 | EACH | 200.00 | 1,400.00 | | 0039 | NS-200-00020 | Cleaning Existing Ditches | 400 | LNFT | 10.00 | 4,000.00 | | 0040 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 2,500 | INLF | 0.75 | 1,875.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 887,233.55 |
|