Search


Bid Tabulations for the Letting of 5/13/2015 LA DOTD Headquarters

Proposal:H.011407.6-R1
Parish:Lafourche, Terrebonne
Description:District 02H Controller Upgrade
Type Construction:TRAFFIC SIGNALIZATION AND RELATED WORK.
Estimated Construction Cost:$252,960.00
Rank License BidderConstruction Bid
108470Diamond Electrical Co., Inc.$269,505.00
247985INTELLIGENT TRANS. SYSTEMS, LLC$275,107.00
300448WALTER J. BARNES ELECTRIC CO., INC.$279,635.00
405473Jack B. Harper Electrical LLC$279,675.00
501165Ernest P. Breaux Electrical, Inc.$285,078.00


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Diamond Electrical Co., Inc.
- 2 -
INTELLIGENT TRANS. SYSTEMS, LLC
- 3 -
WALTER J. BARNES ELECTRIC CO., INC.
- 4 -
Jack B. Harper Electrical LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001713-01-00100Temporary Signs and Barricades 1     LUMP500.00500.00559.00559.00500.00500.002,000.002,000.00
0002727-01-00100Mobilization 1     LUMP3,130.003,130.002,485.502,485.501,500.001,500.0012,000.0012,000.00
0003736-08-00101Signal Controller (980 ATC, Type 2)(Existing Cab)(Furnish & Install) 50     EACH4,780.00239,000.004,699.50234,975.004,740.00237,000.004,475.00223,750.00
0004NS-736-00001GPS 43     EACH625.0026,875.00862.5037,087.50945.0040,635.00975.0041,925.00
             
  CONTRACTOR TOTAL   269,505.00 275,107.00 279,635.00 279,675.00



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
Ernest P. Breaux Electrical, Inc.
Unit PriceTotal
Amount
0001713-01-00100Temporary Signs and Barricades 1     LUMP450.00450.00
0002727-01-00100Mobilization 1     LUMP2,048.002,048.00
0003736-08-00101Signal Controller (980 ATC, Type 2)(Existing Cab)(Furnish & Install) 50     EACH4,912.00245,600.00
0004NS-736-00001GPS 43     EACH860.0036,980.00
       
  CONTRACTOR TOTAL   285,078.00