Proposal:H.011182.6-R1
Parish:Jefferson
Routes:LA 49, LOYOLA DR.
Description:ITS DYNAMIC MESSAGE SIGNS (KENNER)
Type Construction:INTELLIGENT TRANSPORTATION SYSTEMS AND DYNAMIC MESSAGE SIGNS (DMS)
Estimated Construction Cost:$763,418.50
| Rank | License | Bidder | Construction Bid |
| 1 | 01165 | Ernest P. Breaux Electrical, Inc. | $588,309.65 |
| 2 | 08470 | Diamond Electrical Co., Inc. | $724,218.91 |
| 3 | 07764 | Grady Crawford Const. Co., Inc. | $744,851.57 |
| 4 | 56160 | CONTACT NETWORK, LLC | $831,953.25 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Ernest P. Breaux Electrical, Inc. | - 2 - Diamond Electrical Co., Inc. | - 3 - Grady Crawford Const. Co., Inc. | - 4 - CONTACT NETWORK, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 1,500.00 | 1,500.00 | 5,850.00 | 5,850.00 | 5,982.00 | 5,982.00 | 5,000.00 | 5,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,500.00 | 3,500.00 | 8,623.00 | 8,623.00 | 11,059.00 | 11,059.00 | 3,125.00 | 3,125.00 | | 0003 | 202-02-38300 | Removal of Sign and U-Channel Post | 1 | EACH | 110.00 | 110.00 | 1,480.00 | 1,480.00 | 164.00 | 164.00 | 12.50 | 12.50 | | 0004 | 202-03-38000 | Relocation of Sign Site 2 | 1 | EACH | 250.00 | 250.00 | 1,995.00 | 1,995.00 | 552.00 | 552.00 | 187.50 | 187.50 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 4,000.00 | 4,000.00 | 5,265.00 | 5,265.00 | 6,635.00 | 6,635.00 | 12,500.00 | 12,500.00 | | 0006 | 704-01-02000 | Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) | 12.5 | LNFT | 110.00 | 1,375.00 | 58.50 | 731.25 | 86.25 | 1,078.13 | 93.75 | 1,171.88 | | 0007 | 704-03-00100 | Blocked Out Guard Rail | 18.8 | LNFT | 40.00 | 752.00 | 23.40 | 439.92 | 25.30 | 475.64 | 27.50 | 517.00 | | 0008 | 704-06-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 6.3 | LNFT | 170.00 | 1,071.00 | 87.80 | 553.14 | 120.75 | 760.73 | 131.25 | 826.88 | | 0009 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 6.3 | LNFT | 110.00 | 693.00 | 99.50 | 626.85 | 86.25 | 543.38 | 93.75 | 590.63 | | 0010 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 39.45 | SQYD | 92.00 | 3,629.40 | 123.00 | 4,852.35 | 73.40 | 2,895.63 | 106.25 | 4,191.56 | | 0011 | 707-01-00100 | Concrete Curb | 10 | LNFT | 115.00 | 1,150.00 | 234.00 | 2,340.00 | 106.80 | 1,068.00 | 125.00 | 1,250.00 | | 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 13,700.00 | 13,700.00 | 27,225.00 | 27,225.00 | 18,000.00 | 18,000.00 | 33,928.68 | 33,928.68 | | 0013 | 714-01-00600 | Slab Sodding (St. Augustine) | 30 | SQYD | 43.00 | 1,290.00 | 55.30 | 1,659.00 | 332.00 | 9,960.00 | 33.75 | 1,012.50 | | 0014 | 727-01-00100 | Mobilization | 1 | LUMP | 32,800.00 | 32,800.00 | 62,682.00 | 62,682.00 | 19,650.00 | 19,650.00 | 116,560.99 | 116,560.99 | | 0015 | 729-16-00300 | Object Marker Assembly (Type 3) | 1 | EACH | 97.00 | 97.00 | 87.80 | 87.80 | 97.75 | 97.75 | 106.25 | 106.25 | | 0016 | 730-01-00100 | Trenching and Backfilling | 375 | LNFT | 6.62 | 2,482.50 | 7.40 | 2,775.00 | 10.84 | 4,065.00 | 4.50 | 1,687.50 | | 0017 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (Empty) | 1,195 | LNFT | 4.05 | 4,839.75 | 6.40 | 7,648.00 | 2.17 | 2,593.15 | 7.18 | 8,580.10 | | 0018 | 730-04-00200 | Jacked or Bored Casing (6" Diameter) (PVC/HDPE) | 205 | LNFT | 39.90 | 8,179.50 | 57.80 | 11,849.00 | 46.17 | 9,464.85 | 30.22 | 6,195.10 | | 0019 | 730-22-00420 | Underground Marker Tape (6")(Detectable) | 375 | LNFT | 0.52 | 195.00 | 0.70 | 262.50 | 0.25 | 93.75 | 2.42 | 907.50 | | 0020 | 736-10-00200 | Underground Junction Box (Type E) | 6 | EACH | 610.00 | 3,660.00 | 875.00 | 5,250.00 | 1,255.71 | 7,534.26 | 805.78 | 4,834.68 | | 0021 | 736-12-00986 | Conductor (1c, #4 awg) | 1,800 | LNFT | 1.55 | 2,790.00 | 1.80 | 3,240.00 | 3.39 | 6,102.00 | 2.96 | 5,328.00 | | 0022 | 736-12-01001 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 550 | LNFT | 1.25 | 687.50 | 1.50 | 825.00 | 3.33 | 1,831.50 | 3.86 | 2,123.00 | | 0023 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,000.00 | 2,000.00 | 5,663.00 | 5,663.00 | 2,100.00 | 2,100.00 | 9,795.88 | 9,795.88 | | 0024 | NS-700-00240 | Special Guard Rail Anchor Section | 1 | EACH | 3,450.00 | 3,450.00 | 2,925.00 | 2,925.00 | 2,185.00 | 2,185.00 | 2,375.00 | 2,375.00 | | 0025 | NS-804-00006 | Vibration Monitoring | 6 | DAY | 1.00 | 6.00 | 643.00 | 3,858.00 | 1.00 | 6.00 | 937.50 | 5,625.00 | | 0026 | NS-ITS-02140 | Dynamic Message Sign, Furnish & Install, LED Full Matrix, Front Access, Cantilever Mount | 3 | EACH | 144,839.00 | 434,517.00 | 156,312.00 | 468,936.00 | 174,171.00 | 522,513.00 | 156,004.87 | 468,014.61 | | 0027 | NS-ITS-07220 | ITS Controller Cabinet, Pad Mount, Furnish & Install | 3 | EACH | 11,850.00 | 35,550.00 | 8,680.00 | 26,040.00 | 15,423.00 | 46,269.00 | 12,831.73 | 38,495.19 | | 0028 | NS-ITS-09560 | Cellular Modem, Install | 3 | EACH | 235.00 | 705.00 | 470.00 | 1,410.00 | 450.00 | 1,350.00 | 1,626.30 | 4,878.90 | | 0029 | NS-ITS-10042 | IP-UPS, Install | 3 | EACH | 305.00 | 915.00 | 483.00 | 1,449.00 | 450.00 | 1,350.00 | 986.47 | 2,959.41 | | 0030 | NS-ITS-10060 | Electrical Service | 3 | EACH | 3,900.00 | 11,700.00 | 10,296.00 | 30,888.00 | 13,379.95 | 40,139.85 | 7,096.16 | 21,288.48 | | 0031 | NS-ITS-10340 | Data Surge Suppressor, Furnish & Install | 6 | EACH | 150.00 | 900.00 | 126.10 | 756.60 | 399.00 | 2,394.00 | 154.41 | 926.46 | | 0032 | NS-ITS-10362 | Power Surge Suppressor (ITS Cabinet), Furnish & Install | 3 | EACH | 245.00 | 735.00 | 407.00 | 1,221.00 | 668.00 | 2,004.00 | 651.18 | 1,953.54 | | 0033 | NS-ITS-12000 | Communications System Integration | 1 | LUMP | 3,000.00 | 3,000.00 | 4,891.00 | 4,891.00 | 4,980.00 | 4,980.00 | 47,112.50 | 47,112.50 | | 0034 | NS-ITS-13080 | Maintenance Procedures Manuals | 1 | LUMP | 1,100.00 | 1,100.00 | 4,248.00 | 4,248.00 | 1,000.00 | 1,000.00 | 600.00 | 600.00 | | 0035 | NS-ITS-13140 | Cabinet & Rack Wiring Diagrams | 1 | LUMP | 1,100.00 | 1,100.00 | 4,248.00 | 4,248.00 | 1,000.00 | 1,000.00 | 3,886.76 | 3,886.76 | | 0036 | NS-ITS-13160 | Electrical Schematic, Wiring, & Logic Diagrams | 1 | LUMP | 1,100.00 | 1,100.00 | 4,248.00 | 4,248.00 | 1,000.00 | 1,000.00 | 5,449.26 | 5,449.26 | | 0037 | NS-ITS-13200 | As-Builts | 1 | LUMP | 1,100.00 | 1,100.00 | 4,248.00 | 4,248.00 | 1,000.00 | 1,000.00 | 6,049.26 | 6,049.26 | | 0038 | NS-ITS-15320 | 2" Rigid Galvanized Steel Conduit | 105 | LNFT | 16.00 | 1,680.00 | 27.90 | 2,929.50 | 47.19 | 4,954.95 | 18.15 | 1,905.75 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 588,309.65 | | 724,218.91 | | 744,851.57 | | 831,953.25 |
|