Proposal:H.010260.6
Parish:Washington
Routes:LA 21
Description:LA 21 VARNADO DRAINAGE IMPROVEMENTS
Type Construction:DRAINAGE STRUCTURES, PAVEMENT PATCHING, AND RELATED WORK.
Estimated Construction Cost:$86,790.95
| Rank | License | Bidder | Construction Bid |
| 1 | 59230 | MCR CONSTRUCTION LLC | $98,848.20 |
| 2 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $105,757.09 |
| 3 | 57931 | KCR CONTRACTORS, LLC | $114,253.93 |
| 4 | 60022 | D. O'BRIAN CONSTRUCTION, LLC | $122,594.85 |
| 5 | 06487 | Huey Stockstill, Inc. | $132,890.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - MCR CONSTRUCTION LLC | - 2 - KORT's CONSTRUCTION SERVICES, INC. | - 3 - KCR CONTRACTORS, LLC | - 4 - D. O'BRIAN CONSTRUCTION, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 73 | SQYD | 25.00 | 1,825.00 | 20.00 | 1,460.00 | 5.00 | 365.00 | 15.00 | 1,095.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 187 | SQYD | 13.00 | 2,431.00 | 20.00 | 3,740.00 | 13.96 | 2,610.52 | 23.00 | 4,301.00 | | 0003 | 204-02-00100 | Temporary Hay or Straw Bales | 24 | EACH | 20.00 | 480.00 | 10.00 | 240.00 | 25.00 | 600.00 | 20.00 | 480.00 | | 0004 | 204-06-00100 | Temporary Silt Fencing | 140 | LNFT | 1.50 | 210.00 | 1.00 | 140.00 | 5.50 | 770.00 | 3.25 | 455.00 | | 0005 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 86 | CUYD | 75.00 | 6,450.00 | 1.00 | 86.00 | 100.00 | 8,600.00 | 58.00 | 4,988.00 | | 0006 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 73 | SQYD | 150.00 | 10,950.00 | 150.00 | 10,950.00 | 100.00 | 7,300.00 | 190.00 | 13,870.00 | | 0007 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 16 | LNFT | 90.00 | 1,440.00 | 95.00 | 1,520.00 | 96.01 | 1,536.16 | 100.00 | 1,600.00 | | 0008 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 223 | LNFT | 90.00 | 20,070.00 | 110.00 | 24,530.00 | 111.95 | 24,964.85 | 130.00 | 28,990.00 | | 0009 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 3,500.00 | 14,000.00 | 3,000.00 | 12,000.00 | 2,205.00 | 8,820.00 | 3,200.00 | 12,800.00 | | 0010 | 706-02-00200 | Concrete Drive (6" Thick) | 187 | SQYD | 80.00 | 14,960.00 | 70.00 | 13,090.00 | 88.25 | 16,502.75 | 70.00 | 13,090.00 | | 0011 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 60 | SQYD | 80.00 | 4,800.00 | 60.00 | 3,600.00 | 50.00 | 3,000.00 | 85.00 | 5,100.00 | | 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 1,500.00 | 1,500.00 | 6,500.00 | 6,500.00 | 3,000.00 | 3,000.00 | 7,000.00 | 7,000.00 | | 0013 | 716-01-00100 | Mulch (Vegetative) | 0.175 | TON | 500.00 | 87.50 | 5,000.00 | 875.00 | 5,000.00 | 875.00 | 600.00 | 105.00 | | 0014 | 717-01-00100 | Seeding | 3 | LB | 13.00 | 39.00 | 50.00 | 150.00 | 50.00 | 150.00 | 50.00 | 150.00 | | 0015 | 718-01-00100 | Fertilizer | 100 | LB | 0.60 | 60.00 | 3.50 | 350.00 | 3.50 | 350.00 | 7.00 | 700.00 | | 0016 | 726-01-00100 | Bedding Material | 48.09 | CUYD | 150.00 | 7,213.50 | 1.00 | 48.09 | 85.00 | 4,087.65 | 65.00 | 3,125.85 | | 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 2,000.00 | 2,000.00 | 14,000.00 | 14,000.00 | 14,910.00 | 14,910.00 | 8,000.00 | 8,000.00 | | 0018 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.02 | MILE | 3,000.00 | 60.00 | 100,000.00 | 2,000.00 | 200,000.00 | 4,000.00 | 25,000.00 | 500.00 | | 0019 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 | 5,654.00 | 5,654.00 | 2,500.00 | 2,500.00 | | 0020 | NS-200-00020 | Cleaning Existing Ditches | 40 | LNFT | 75.00 | 3,000.00 | 3.00 | 120.00 | 20.00 | 800.00 | 20.00 | 800.00 | | 0021 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 186 | INLF | 0.90 | 167.40 | 1.00 | 186.00 | 1.00 | 186.00 | 2.50 | 465.00 | | 0022 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 672 | INLF | 0.90 | 604.80 | 1.00 | 672.00 | 1.00 | 672.00 | 2.50 | 1,680.00 | | 0023 | 203-07-00100 | Borrow (Vehicular Measurement) | 300 | CUYD | 15.00 | 4,500.00 | 15.00 | 4,500.00 | 15.00 | 4,500.00 | 36.00 | 10,800.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 98,848.20 | | 105,757.09 | | 114,253.93 | | 122,594.85 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Huey Stockstill, Inc. | | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 73 | SQYD | 14.00 | 1,022.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 187 | SQYD | 14.00 | 2,618.00 | | 0003 | 204-02-00100 | Temporary Hay or Straw Bales | 24 | EACH | 14.00 | 336.00 | | 0004 | 204-06-00100 | Temporary Silt Fencing | 140 | LNFT | 2.20 | 308.00 | | 0005 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 86 | CUYD | 33.00 | 2,838.00 | | 0006 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 73 | SQYD | 87.00 | 6,351.00 | | 0007 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 16 | LNFT | 77.00 | 1,232.00 | | 0008 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 223 | LNFT | 96.00 | 21,408.00 | | 0009 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 3,500.00 | 14,000.00 | | 0010 | 706-02-00200 | Concrete Drive (6" Thick) | 187 | SQYD | 61.00 | 11,407.00 | | 0011 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 60 | SQYD | 100.00 | 6,000.00 | | 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | | 0013 | 716-01-00100 | Mulch (Vegetative) | 0.175 | TON | 600.00 | 105.00 | | 0014 | 717-01-00100 | Seeding | 3 | LB | 10.00 | 30.00 | | 0015 | 718-01-00100 | Fertilizer | 100 | LB | 0.50 | 50.00 | | 0016 | 726-01-00100 | Bedding Material | 48.09 | CUYD | 80.00 | 3,847.20 | | 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 34,000.00 | 34,000.00 | | 0018 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.02 | MILE | 200,000.00 | 4,000.00 | | 0019 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,800.00 | 4,800.00 | | 0020 | NS-200-00020 | Cleaning Existing Ditches | 40 | LNFT | 27.00 | 1,080.00 | | 0021 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 186 | INLF | 1.00 | 186.00 | | 0022 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 672 | INLF | 1.00 | 672.00 | | 0023 | 203-07-00100 | Borrow (Vehicular Measurement) | 300 | CUYD | 22.00 | 6,600.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 132,890.20 |
|