Proposal:H.009479.6
Parish:Lafourche
Routes:LA 1
Description:West Larose Vertical Lift Bridge Rehabilitation
Type Construction:BRIDGE REPAIRS AND RELATED WORK.
Estimated Construction Cost:$25,393,606.05
| Rank | License | Bidder | Construction Bid |
| 1 | 26435 | C.E.C., Inc. | $24,147,107.80 |
| 2 | 00481 | COASTAL BRIDGE CO., L.L.C. | $24,932,830.00 |
| 3 | 00271 | Massman Construction Co. | $25,152,820.90 |
| 4 | 00755 | L & A Contracting Co. | $26,580,948.58 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - C.E.C., Inc. | - 2 - COASTAL BRIDGE CO., L.L.C. | - 3 - Massman Construction Co. | - 4 - L & A Contracting Co. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of Machinery Deck Cover | 2 | EACH | 20,000.00 | 40,000.00 | 15,000.00 | 30,000.00 | 25,000.00 | 50,000.00 | 16,318.80 | 32,637.60 | | 0002 | 202-02-00010 | Removal of Tower Strut | 1 | EACH | 11,000.00 | 11,000.00 | 12,500.00 | 12,500.00 | 15,000.00 | 15,000.00 | 3,175.80 | 3,175.80 | | 0003 | 202-02-04024 | Removal of Bridge Components (Access) | 1 | LUMP | 53,600.00 | 53,600.00 | 65,000.00 | 65,000.00 | 20,000.00 | 20,000.00 | 4,800.00 | 4,800.00 | | 0004 | 202-02-04024 | Removal of Bridge Components (Barrier Rail) | 1 | LUMP | 23,375.00 | 23,375.00 | 6,000.00 | 6,000.00 | 15,000.00 | 15,000.00 | 2,875.80 | 2,875.80 | | 0005 | 202-02-04024 | Removal of Bridge Components (Stair Rail) | 1 | LUMP | 10,300.00 | 10,300.00 | 30,000.00 | 30,000.00 | 5,000.00 | 5,000.00 | 16,852.80 | 16,852.80 | | 0006 | 202-02-04024 | Removal of Bridge Components (Guide Bars) | 1 | LUMP | 62,000.00 | 62,000.00 | 13,000.00 | 13,000.00 | 55,000.00 | 55,000.00 | 5,558.28 | 5,558.28 | | 0007 | 202-02-04024 | Removal of Bridge Components (Steel Plate Sidewalks) | 1 | LUMP | 5,500.00 | 5,500.00 | 3,250.00 | 3,250.00 | 5,000.00 | 5,000.00 | 12,102.96 | 12,102.96 | | 0008 | 202-02-04024 | Removal of Bridge Components (End Floorbeams) | 1 | LUMP | 17,875.00 | 17,875.00 | 75,000.00 | 75,000.00 | 150,000.00 | 150,000.00 | 20,292.84 | 20,292.84 | | 0009 | 202-02-04024 | Removal of Bridge Components (Laterals) | 1 | LUMP | 15,000.00 | 15,000.00 | 6,500.00 | 6,500.00 | 25,000.00 | 25,000.00 | 24,205.92 | 24,205.92 | | 0010 | 202-02-12300 | Removal of Fender System | 2 | EACH | 190,000.00 | 380,000.00 | 155,000.00 | 310,000.00 | 125,000.00 | 250,000.00 | 234,088.72 | 468,177.44 | | 0011 | 202-02-14500 | Removal of Guard Rail | 410 | LNFT | 13.00 | 5,330.00 | 6.00 | 2,460.00 | 10.50 | 4,305.00 | 13.20 | 5,412.00 | | 0012 | 704-03-00100 | Blocked Out Guard Rail | 250 | LNFT | 20.00 | 5,000.00 | 20.00 | 5,000.00 | 16.50 | 4,125.00 | 21.60 | 5,400.00 | | 0013 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 80 | LNFT | 35.00 | 2,800.00 | 33.50 | 2,680.00 | 27.80 | 2,224.00 | 44.40 | 3,552.00 | | 0014 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 76.00 | 7,600.00 | 70.00 | 7,000.00 | 60.80 | 6,080.00 | 72.00 | 7,200.00 | | 0016 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,440.00 | 9,760.00 | 2,250.00 | 9,000.00 | 1,950.00 | 7,800.00 | 2,520.00 | 10,080.00 | | 0017 | 707-01-00100 | Concrete Curb | 40 | LNFT | 120.00 | 4,800.00 | 160.00 | 6,400.00 | 50.00 | 2,000.00 | 30.00 | 1,200.00 | | 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 170,000.00 | 170,000.00 | 300,000.00 | 300,000.00 | 50,000.00 | 50,000.00 | 93,394.10 | 93,394.10 | | 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 2,400,000.00 | 2,400,000.00 | 2,450,000.00 | 2,450,000.00 | 2,400,000.00 | 2,400,000.00 | 3,000,000.00 | 3,000,000.00 | | 0020 | 729-06-00102 | Sign (Overhead Mounted)(Furnish and Install) | 39 | SQFT | 190.00 | 7,410.00 | 120.00 | 4,680.00 | 100.00 | 3,900.00 | 161.71 | 6,306.69 | | 0021 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 95.00 | 380.00 | 90.00 | 360.00 | 75.00 | 300.00 | 90.00 | 360.00 | | 0022 | 730-09-00100 | Electrical System | 1 | LUMP | 1,300,000.00 | 1,300,000.00 | 1,000,000.00 | 1,000,000.00 | 1,750,000.00 | 1,750,000.00 | 1,963,200.00 | 1,963,200.00 | | 0023 | 730-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 30,000.00 | 30,000.00 | 31,200.00 | 31,200.00 | | 0024 | 731-02-00100 | Reflectorized Raised Pavement Markers | 120 | EACH | 18.00 | 2,160.00 | 30.00 | 3,600.00 | 15.00 | 1,800.00 | 18.00 | 2,160.00 | | 0025 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.82 | MILE | 8,750.00 | 15,925.00 | 12,000.00 | 21,840.00 | 7,000.00 | 12,740.00 | 8,400.00 | 15,288.00 | | 0026 | 732-05-00100 | Removal of Existing Markings | 1.82 | MILE | 7,500.00 | 13,650.00 | 19,000.00 | 34,580.00 | 6,000.00 | 10,920.00 | 7,200.00 | 13,104.00 | | 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 130,000.00 | 130,000.00 | 125,000.00 | 125,000.00 | 15,000.00 | 15,000.00 | 226,610.40 | 226,610.40 | | 0028 | 803-03-00100 | Steel Sheet Pile Wall (Protection Cell) | 39,115 | SQFT | 50.40 | 1,971,396.00 | 50.00 | 1,955,750.00 | 50.00 | 1,955,750.00 | 55.14 | 2,156,801.10 | | 0029 | 804-03-01160 | Steel Piles (HP 14x89) | 12,688 | LNFT | 78.75 | 999,180.00 | 78.00 | 989,664.00 | 90.00 | 1,141,920.00 | 87.16 | 1,105,886.08 | | 0030 | 804-17-00100 | Dynamic Monitoring | 4 | EACH | 315.00 | 1,260.00 | 5,000.00 | 20,000.00 | 1,500.00 | 6,000.00 | 10,850.52 | 43,402.08 | | 0031 | 805-02-00100 | Class A(M) Concrete (Fender) | 549.96 | CUYD | 1,630.00 | 896,434.80 | 1,250.00 | 687,450.00 | 1,350.00 | 742,446.00 | 1,318.84 | 725,309.25 | | 0032 | 805-02-00100 | Class A(M) Concrete (Railing) | 1.33 | CUYD | 14,000.00 | 18,620.00 | 2,000.00 | 2,660.00 | 12,000.00 | 15,960.00 | 5,471.80 | 7,277.49 | | 0033 | 805-05-00100 | Class D Concrete (Protection Cell) | 1,652 | CUYD | 252.00 | 416,304.00 | 220.00 | 363,440.00 | 275.00 | 454,300.00 | 280.30 | 463,055.60 | | 0034 | 805-07-00100 | Class S Concrete (Protection Cell) | 1,030.4 | CUYD | 380.00 | 391,552.00 | 1,100.00 | 1,133,440.00 | 365.00 | 376,096.00 | 252.43 | 260,103.87 | | 0035 | 806-01-00100 | Deformed Reinforcing Steel (Railing) | 349 | LB | 10.00 | 3,490.00 | 3.50 | 1,221.50 | 2.00 | 698.00 | 4.51 | 1,573.99 | | 0036 | 806-01-00100 | Deformed Reinforcing Steel (Protection Cell) | 21,256 | LB | 2.00 | 42,512.00 | 1.45 | 30,821.20 | 1.00 | 21,256.00 | 1.12 | 23,806.72 | | 0037 | 806-01-00100 | Deformed Reinforcing Steel (Fender) | 370,152 | LB | 1.50 | 555,228.00 | 1.15 | 425,674.80 | 1.20 | 444,182.40 | 1.14 | 421,973.28 | | 0038 | 807-08-00100 | Structural Metalwork (Protection Cell) | 167,204 | LUMP | 630,000.00 | 630,000.00 | 1,000,000.00 | 1,000,000.00 | 1,500,000.00 | 1,500,000.00 | 1,023,072.00 | 1,023,072.00 | | 0039 | 807-08-00100 | Structural Metalwork (Fender) | 33,516 | LUMP | 290,000.00 | 290,000.00 | 360,000.00 | 360,000.00 | 300,000.00 | 300,000.00 | 337,636.06 | 337,636.06 | | 0040 | 807-08-00100 | Structural Metalwork (Strut) | 4,771.25 | LUMP | 30,000.00 | 30,000.00 | 43,000.00 | 43,000.00 | 25,000.00 | 25,000.00 | 32,361.60 | 32,361.60 | | 0041 | 807-08-00100 | Structural Metalwork (Patch Plates) | 1,500 | LUMP | 85,000.00 | 85,000.00 | 50,000.00 | 50,000.00 | 60,000.00 | 60,000.00 | 27,969.00 | 27,969.00 | | 0042 | 807-08-00100 | Structural Metalwork (Tower Bearings) | 10,000 | LUMP | 120,000.00 | 120,000.00 | 115,000.00 | 115,000.00 | 325,000.00 | 325,000.00 | 99,892.80 | 99,892.80 | | 0043 | 807-08-00100 | Structural Metalwork (Guide Bars) | 17,263.59 | LUMP | 140,000.00 | 140,000.00 | 110,000.00 | 110,000.00 | 150,000.00 | 150,000.00 | 70,495.20 | 70,495.20 | | 0044 | 807-08-00100 | Structural Metalwork (Lift Span) | 12,921 | LUMP | 145,000.00 | 145,000.00 | 210,000.00 | 210,000.00 | 115,000.00 | 115,000.00 | 119,471.82 | 119,471.82 | | 0045 | 807-08-00100 | Structural Metalwork (Balance Chain Support) | 716 | LUMP | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 2,272.80 | 2,272.80 | | 0046 | 807-08-00100 | Structural Metalwork (Machinery Deck) | 15,496 | LUMP | 155,000.00 | 155,000.00 | 190,000.00 | 190,000.00 | 350,000.00 | 350,000.00 | 128,967.48 | 128,967.48 | | 0047 | 807-08-00100 | Structural Metalwork (Approach Bearings) | 39,180 | LUMP | 910,000.00 | 910,000.00 | 845,000.00 | 845,000.00 | 875,000.00 | 875,000.00 | 1,675,828.80 | 1,675,828.80 | | 0048 | 807-08-00100 | Structural Metalwork (Platforms) | 5,748 | LUMP | 80,000.00 | 80,000.00 | 70,000.00 | 70,000.00 | 50,000.00 | 50,000.00 | 52,292.40 | 52,292.40 | | 0049 | 807-08-00100 | Structural Metalwork (Access) | 108,142 | LUMP | 700,000.00 | 700,000.00 | 800,000.00 | 800,000.00 | 895,924.00 | 895,924.00 | 219,123.12 | 219,123.12 | | 0050 | 807-08-00100 | Structural Metalwork (Buffer Strike Plate) | 1,240.31 | LUMP | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | 5,000.00 | 5,000.00 | 27,997.92 | 27,997.92 | | 0051 | 807-08-00100 | Structural Metalwork (Span 7) | 425.34 | LUMP | 20,000.00 | 20,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 4,588.74 | 4,588.74 | | 0052 | 809-01-00100 | Movable Bridge Machinery | 1 | LUMP | 1,900,000.00 | 1,900,000.00 | 1,400,000.00 | 1,400,000.00 | 2,000,000.00 | 2,000,000.00 | 1,546,080.00 | 1,546,080.00 | | 0053 | 809-02-00100 | Traffic Barriers | 1 | LUMP | 740,000.00 | 740,000.00 | 500,000.00 | 500,000.00 | 750,000.00 | 750,000.00 | 793,496.40 | 793,496.40 | | 0054 | 809-03-00100 | Operating House | 1 | LUMP | 425,000.00 | 425,000.00 | 220,000.00 | 220,000.00 | 250,000.00 | 250,000.00 | 600,000.00 | 600,000.00 | | 0055 | 809-04-00100 | Machinery House | 1 | LUMP | 280,000.00 | 280,000.00 | 450,000.00 | 450,000.00 | 350,000.00 | 350,000.00 | 106,800.00 | 106,800.00 | | 0056 | 810-03-00100 | Pipe Railing (Access) | 2,494 | LNFT | 230.00 | 573,620.00 | 160.00 | 399,040.00 | 125.00 | 311,750.00 | 155.10 | 386,819.40 | | 0057 | 810-03-00100 | Pipe Railing (Stairs) | 351 | LNFT | 325.00 | 114,075.00 | 540.00 | 189,540.00 | 550.00 | 193,050.00 | 383.27 | 134,527.77 | | 0058 | 810-03-00100 | Pipe Railing (Aluminum) | 72 | LNFT | 158.00 | 11,376.00 | 330.00 | 23,760.00 | 325.00 | 23,400.00 | 342.82 | 24,683.04 | | 0059 | 810-03-00100 | Pipe Railing (Pedestrian) | 583 | LNFT | 330.00 | 192,390.00 | 440.00 | 256,520.00 | 350.00 | 204,050.00 | 341.46 | 199,071.18 | | 0060 | NS-202-00003 | Removal of Debris (Bridge Joint) | 1 | LUMP | 2,800.00 | 2,800.00 | 6,000.00 | 6,000.00 | 25,000.00 | 25,000.00 | 8,400.00 | 8,400.00 | | 0061 | NS-507-00003 | Clean and Seal Ran Cracks in Asph Conc Pave (Hot Poured) | 224 | LNFT | 43.00 | 9,632.00 | 16.00 | 3,584.00 | 10.00 | 2,240.00 | 42.00 | 9,408.00 | | 0062 | NS-602-00001 | Milling Concrete Pavement (Concrete Spill) | 91.7 | SQYD | 60.00 | 5,502.00 | 65.00 | 5,960.50 | 50.00 | 4,585.00 | 120.00 | 11,004.00 | | 0063 | NS-602-00006 | Epoxy Injection (Deck Cracks) | 56 | LNFT | 60.00 | 3,360.00 | 60.00 | 3,360.00 | 300.00 | 16,800.00 | 36.54 | 2,046.24 | | 0064 | NS-602-00006 | Epoxy Injection (Stringers) | 7,525 | LNFT | 63.00 | 474,075.00 | 60.00 | 451,500.00 | 37.50 | 282,187.50 | 36.54 | 274,963.50 | | 0065 | NS-713-00008 | Portable Changeable Message Sign | 2 | EACH | 15,250.00 | 30,500.00 | 15,000.00 | 30,000.00 | 10,000.00 | 20,000.00 | 30,000.00 | 60,000.00 | | 0066 | NS-800-00009 | Epoxy-Urethane Overlay System | 52,500 | SQFT | 8.00 | 420,000.00 | 7.00 | 367,500.00 | 5.00 | 262,500.00 | 5.18 | 271,950.00 | | 0067 | NS-800-00020 | Cleaning, Painting and Disposal (Near White Finish) | 1 | LUMP | 4,000,000.00 | 4,000,000.00 | 4,500,000.00 | 4,500,000.00 | 4,200,000.00 | 4,200,000.00 | 3,900,000.00 | 3,900,000.00 | | 0068 | NS-800-00241 | Bearing Pads (Elastomeric) | 340 | EACH | 185.00 | 62,900.00 | 675.00 | 229,500.00 | 150.00 | 51,000.00 | 541.62 | 184,150.80 | | 0069 | NS-800-00644 | Reinforced Plastic Composite Marine Timbers (12 x 12) | 2,160 | LNFT | 142.00 | 306,720.00 | 170.00 | 367,200.00 | 200.00 | 432,000.00 | 132.78 | 286,804.80 | | 0070 | NS-804-00001 | Vibration Monitoring | 4 | EACH | 5,500.00 | 22,000.00 | 2,800.00 | 11,200.00 | 1,000.00 | 4,000.00 | 120,000.00 | 480,000.00 | | 0071 | NS-805-00005 | Joint Sealing System (Preformed Silicone) | 504 | LNFT | 64.00 | 32,256.00 | 36.00 | 18,144.00 | 27.00 | 13,608.00 | 135.60 | 68,342.40 | | 0072 | NS-805-00008 | Concrete Curb and Drain Repair | 4 | LNFT | 2,000.00 | 8,000.00 | 1,300.00 | 5,200.00 | 1,000.00 | 4,000.00 | 526.50 | 2,106.00 | | 0073 | NS-805-00013 | Concrete Pedestal and Cap Repairs (Grouting) | 28 | SQFT | 300.00 | 8,400.00 | 730.00 | 20,440.00 | 200.00 | 5,600.00 | 158.45 | 4,436.60 | | 0074 | NS-805-00016 | Bridge Superstructure Repair (Heat Straightening) | 1 | EACH | 125,000.00 | 125,000.00 | 115,000.00 | 115,000.00 | 150,000.00 | 150,000.00 | 320,000.00 | 320,000.00 | | 0075 | NS-805-00016 | Bridge Superstructure Repair (Drain Holes) | 132 | EACH | 130.00 | 17,160.00 | 230.00 | 30,360.00 | 30.00 | 3,960.00 | 59.95 | 7,913.40 | | 0076 | NS-805-00019 | Structural Polymer Concrete (Patching) (Curb, Guardrail, and Sidewalks) | 5 | SQFT | 940.00 | 4,700.00 | 600.00 | 3,000.00 | 330.00 | 1,650.00 | 1,200.00 | 6,000.00 | | 0077 | NS-805-00020 | Bridge Substructure Repair (Cleaning and Coating Concrete Surfaces) | 1 | EACH | 480,000.00 | 480,000.00 | 500,000.00 | 500,000.00 | 706,194.00 | 706,194.00 | 800,000.00 | 800,000.00 | | 0078 | NS-807-00010 | BOLT - RIVET REPLACEMENT (STRUCTURAL STEEL) (Lift Span) | 12 | EACH | 600.00 | 7,200.00 | 525.00 | 6,300.00 | 60.00 | 720.00 | 255.66 | 3,067.92 | | 0079 | NS-807-00010 | BOLT - RIVET REPLACEMENT (STRUCTURAL STEEL) (Tower) | 750 | EACH | 80.00 | 60,000.00 | 65.00 | 48,750.00 | 60.00 | 45,000.00 | 78.53 | 58,897.50 | | 0080 | NS-809-00001 | Temporary Operation and Maintenance of Movable Span | 800 | DAY | 500.00 | 400,000.00 | 720.00 | 576,000.00 | 1.00 | 800.00 | 1,160.40 | 928,320.00 | | 0081 | NS-811-00004 | Navigational Clearance Gauge (Painted) | 2 | EACH | 7,500.00 | 15,000.00 | 12,000.00 | 24,000.00 | 10,000.00 | 20,000.00 | 3,393.90 | 6,787.80 | | 0082 | 202-02-00010 | Removal of (Protection Cell Soil) | 4 | EACH | 11,000.00 | 44,000.00 | 37,000.00 | 148,000.00 | 15,000.00 | 60,000.00 | 20,058.00 | 80,232.00 | | 0083 | 807-08-00100 | Structural Metalwork (Steel Plate Sidewalks) | 333.33 | LUMP | 12,000.00 | 12,000.00 | 21,000.00 | 21,000.00 | 28,000.00 | 28,000.00 | 8,334.00 | 8,334.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 24,147,107.80 | | 24,932,830.00 | | 25,152,820.90 | | 26,580,948.58 |
|