Proposal:H.009979.6
Parish:Caldwell
Description:HESTER ROAD BRIDGE OVER PINEY CREEK
Type Construction:CLEARING AND GRUBBING, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, CONCRETE SLAB SPAN BRIDGE (CAST-IN-PLACE) AND RELATED WORK.
Estimated Construction Cost:$385,607.50
| Rank | License | Bidder | Construction Bid |
| 1 | 08815 | W. E. MCDONALD & SON, LLC. | $369,777.60 |
| 2 | 23112 | BEN ALLEN, INC. | $405,644.80 |
| 3 | 56994 | MATT L GUINN CONSTRUCTION, LLC | $419,706.00 |
| 4 | 49864 | Terral Construction L.L.C. | $457,983.00 |
| 5 | 18546 | C W & W Contractors, Inc. | $468,757.00 |
| 6 | 55519 | Key, LLC Of Mississippi | $512,263.50 |
| 7 | 49239 | WL Bass Construction Inc. | $525,251.50 |
| 8 | 40312 | GRAY CONSTRUCTION CORP. | $547,073.60 |
| 9 | 01012 | Cecil D. Gassiott, LLC | $650,156.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - W. E. MCDONALD & SON, LLC. | - 2 - BEN ALLEN, INC. | - 3 - MATT L GUINN CONSTRUCTION, LLC | - 4 - Terral Construction L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 16,000.00 | 16,000.00 | 12,500.00 | 12,500.00 | 15,000.00 | 15,000.00 | 12,800.00 | 12,800.00 | | 0002 | 202-02-04000 | Removal of Bridge (STA 15+00.00, 18.95 X 39.51 TIMBER BR) | 1 | EACH | 7,000.00 | 7,000.00 | 4,500.00 | 4,500.00 | 7,000.00 | 7,000.00 | 8,600.00 | 8,600.00 | | 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | 30,200.00 | 30,200.00 | | 0004 | 204-02-00100 | Temporary Hay or Straw Bales | 9 | EACH | 25.00 | 225.00 | 30.00 | 270.00 | 100.00 | 900.00 | 250.00 | 2,250.00 | | 0005 | 204-03-00100 | Temporary Slope Drains | 60 | LNFT | 10.00 | 600.00 | 10.00 | 600.00 | 10.00 | 600.00 | 45.00 | 2,700.00 | | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 150.00 | 600.00 | 100.00 | 400.00 | 100.00 | 400.00 | 600.00 | 2,400.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 1,074 | LNFT | 2.00 | 2,148.00 | 3.50 | 3,759.00 | 2.00 | 2,148.00 | 5.00 | 5,370.00 | | 0008 | 302-01-00700 | Class II Base Course (Stone) | 295.4 | CUYD | 109.00 | 32,198.60 | 112.00 | 33,084.80 | 100.00 | 29,540.00 | 130.00 | 38,402.00 | | 0009 | 304-05-00100 | Lime Treatment (Type E) (at the direction of the Project Engineer) | 8.38 | TON | 700.00 | 5,866.00 | 600.00 | 5,028.00 | 400.00 | 3,352.00 | 300.00 | 2,514.00 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 19 | CUYD | 100.00 | 1,900.00 | 112.00 | 2,128.00 | 175.00 | 3,325.00 | 250.00 | 4,750.00 | | 0011 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 1.00 | 50.00 | 75.00 | 3,750.00 | 100.00 | 5,000.00 | 80.00 | 4,000.00 | | 0012 | 502-01-00100 | Superpave Asphaltic Concrete | 230.5 | TON | 190.00 | 43,795.00 | 178.00 | 41,029.00 | 200.00 | 46,100.00 | 238.00 | 54,859.00 | | 0013 | 704-03-00100 | Blocked Out Guard Rail | 50 | LNFT | 20.00 | 1,000.00 | 19.00 | 950.00 | 25.00 | 1,250.00 | 20.00 | 1,000.00 | | 0014 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 60.00 | 6,000.00 | 86.00 | 8,600.00 | 75.00 | 7,500.00 | 66.00 | 6,600.00 | | 0015 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,050.00 | 8,200.00 | 2,500.00 | 10,000.00 | 2,800.00 | 11,200.00 | 2,200.00 | 8,800.00 | | 0016 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 346 | LNFT | 10.00 | 3,460.00 | 25.00 | 8,650.00 | 22.00 | 7,612.00 | 20.00 | 6,920.00 | | 0017 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 258 | SQYD | 60.00 | 15,480.00 | 67.00 | 17,286.00 | 68.00 | 17,544.00 | 90.00 | 23,220.00 | | 0018 | 711-04-00100 | Geotextile Fabric | 258 | SQYD | 3.00 | 774.00 | 3.00 | 774.00 | 5.00 | 1,290.00 | 5.00 | 1,290.00 | | 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 8,500.00 | 8,500.00 | 10,000.00 | 10,000.00 | 8,200.00 | 8,200.00 | 8,000.00 | 8,000.00 | | 0020 | 716-01-00100 | Mulch (Vegetative) | 0.44 | TON | 2,500.00 | 1,100.00 | 1,200.00 | 528.00 | 2,000.00 | 880.00 | 13,200.00 | 5,808.00 | | 0021 | 717-01-00100 | Seeding | 11 | LB | 40.00 | 440.00 | 50.00 | 550.00 | 20.00 | 220.00 | 200.00 | 2,200.00 | | 0022 | 718-01-00100 | Fertilizer | 220 | LB | 3.00 | 660.00 | 2.50 | 550.00 | 5.00 | 1,100.00 | 3.00 | 660.00 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 29,000.00 | 29,000.00 | 47,000.00 | 47,000.00 | | 0024 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 75.00 | 300.00 | 90.00 | 360.00 | 125.00 | 500.00 | 100.00 | 400.00 | | 0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,000.00 | 3,000.00 | 8,000.00 | 8,000.00 | 4,800.00 | 4,800.00 | 4,000.00 | 4,000.00 | | 0026 | 804-01-00300 | Precast Concrete Piles (16") | 928 | LNFT | 60.00 | 55,680.00 | 71.00 | 65,888.00 | 68.00 | 63,104.00 | 60.00 | 55,680.00 | | 0027 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1.00 | 1.00 | 0.00 | 0.00 | 1.00 | 1.00 | 0.00 | 0.00 | | 0028 | 805-10-01320 | Bridge Superstructure and Substructure (24' Clear Roadway; 90 Degree Crossing) (Cast-in-Place) | 3 | SPAN | 30,000.00 | 90,000.00 | 31,500.00 | 94,500.00 | 34,500.00 | 103,500.00 | 29,000.00 | 87,000.00 | | 0029 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 220 | INLF | 5.00 | 1,100.00 | 3.00 | 660.00 | 2.00 | 440.00 | 10.00 | 2,200.00 | | 0030 | NS-800-00040 | Concrete Approach Slabs (24' CLR RDWY 90 DEG CROSSING) (W/O ASPHALT) | 2 | EACH | 9,000.00 | 18,000.00 | 9,500.00 | 19,000.00 | 12,000.00 | 24,000.00 | 12,700.00 | 25,400.00 | | 0031 | NS-804-00001 | Vibration Monitoring | 16 | EACH | 200.00 | 3,200.00 | 300.00 | 4,800.00 | 400.00 | 6,400.00 | 60.00 | 960.00 | | 0032 | NS-804-00002 | Construction Site Survey | 1 | LUMP | 2,500.00 | 2,500.00 | 2,500.00 | 2,500.00 | 2,800.00 | 2,800.00 | 2,000.00 | 2,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 369,777.60 | | 405,644.80 | | 419,706.00 | | 457,983.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - C W & W Contractors, Inc. | - 6 - Key, LLC Of Mississippi | - 7 - WL Bass Construction Inc. | - 8 - GRAY CONSTRUCTION CORP. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | 50,000.00 | 50,000.00 | 15,000.00 | 15,000.00 | | 0002 | 202-02-04000 | Removal of Bridge (STA 15+00.00, 18.95 X 39.51 TIMBER BR) | 1 | EACH | 7,500.00 | 7,500.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | | 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 18,000.00 | 18,000.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | | 0004 | 204-02-00100 | Temporary Hay or Straw Bales | 9 | EACH | 20.00 | 180.00 | 15.00 | 135.00 | 10.00 | 90.00 | 15.00 | 135.00 | | 0005 | 204-03-00100 | Temporary Slope Drains | 60 | LNFT | 50.00 | 3,000.00 | 20.00 | 1,200.00 | 1.00 | 60.00 | 11.50 | 690.00 | | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 150.00 | 600.00 | 200.00 | 800.00 | 100.00 | 400.00 | 200.00 | 800.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 1,074 | LNFT | 3.00 | 3,222.00 | 5.00 | 5,370.00 | 1.00 | 1,074.00 | 2.00 | 2,148.00 | | 0008 | 302-01-00700 | Class II Base Course (Stone) | 295.4 | CUYD | 125.00 | 36,925.00 | 115.00 | 33,971.00 | 135.00 | 39,879.00 | 161.00 | 47,559.40 | | 0009 | 304-05-00100 | Lime Treatment (Type E) (at the direction of the Project Engineer) | 8.38 | TON | 400.00 | 3,352.00 | 450.00 | 3,771.00 | 250.00 | 2,095.00 | 1,100.00 | 9,218.00 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 19 | CUYD | 50.00 | 950.00 | 125.00 | 2,375.00 | 100.00 | 1,900.00 | 151.00 | 2,869.00 | | 0011 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 50.00 | 2,500.00 | 50.00 | 2,500.00 | 50.00 | 2,500.00 | 120.00 | 6,000.00 | | 0012 | 502-01-00100 | Superpave Asphaltic Concrete | 230.5 | TON | 250.00 | 57,625.00 | 165.00 | 38,032.50 | 225.00 | 51,862.50 | 187.00 | 43,103.50 | | 0013 | 704-03-00100 | Blocked Out Guard Rail | 50 | LNFT | 25.00 | 1,250.00 | 18.00 | 900.00 | 15.00 | 750.00 | 20.00 | 1,000.00 | | 0014 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 72.00 | 7,200.00 | 65.00 | 6,500.00 | 60.00 | 6,000.00 | 60.00 | 6,000.00 | | 0015 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,475.00 | 9,900.00 | 2,175.00 | 8,700.00 | 2,150.00 | 8,600.00 | 2,050.00 | 8,200.00 | | 0016 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 346 | LNFT | 10.00 | 3,460.00 | 15.00 | 5,190.00 | 10.00 | 3,460.00 | 10.00 | 3,460.00 | | 0017 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 258 | SQYD | 75.00 | 19,350.00 | 85.00 | 21,930.00 | 85.00 | 21,930.00 | 66.00 | 17,028.00 | | 0018 | 711-04-00100 | Geotextile Fabric | 258 | SQYD | 3.00 | 774.00 | 3.00 | 774.00 | 5.00 | 1,290.00 | 4.15 | 1,070.70 | | 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 9,750.00 | 9,750.00 | 4,775.00 | 4,775.00 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | | 0020 | 716-01-00100 | Mulch (Vegetative) | 0.44 | TON | 1,000.00 | 440.00 | 2,500.00 | 1,100.00 | 2,500.00 | 1,100.00 | 1,800.00 | 792.00 | | 0021 | 717-01-00100 | Seeding | 11 | LB | 30.00 | 330.00 | 20.00 | 220.00 | 20.00 | 220.00 | 25.00 | 275.00 | | 0022 | 718-01-00100 | Fertilizer | 220 | LB | 5.00 | 1,100.00 | 2.00 | 440.00 | 2.00 | 440.00 | 2.50 | 550.00 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 60,000.00 | 60,000.00 | 67,500.00 | 67,500.00 | 50,000.00 | 50,000.00 | 51,200.00 | 51,200.00 | | 0024 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 92.00 | 368.00 | 65.00 | 260.00 | 100.00 | 400.00 | 75.00 | 300.00 | | 0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 17,500.00 | 17,500.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | | 0026 | 804-01-00300 | Precast Concrete Piles (16") | 928 | LNFT | 85.00 | 78,880.00 | 85.00 | 78,880.00 | 85.00 | 78,880.00 | 70.00 | 64,960.00 | | 0027 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1.00 | 1.00 | 5,000.00 | 5,000.00 | 1.00 | 1.00 | 1,000.00 | 1,000.00 | | 0028 | 805-10-01320 | Bridge Superstructure and Substructure (24' Clear Roadway; 90 Degree Crossing) (Cast-in-Place) | 3 | SPAN | 24,000.00 | 72,000.00 | 37,500.00 | 112,500.00 | 40,000.00 | 120,000.00 | 53,000.00 | 159,000.00 | | 0029 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 220 | INLF | 5.00 | 1,100.00 | 2.00 | 440.00 | 1.00 | 220.00 | 3.25 | 715.00 | | 0030 | NS-800-00040 | Concrete Approach Slabs (24' CLR RDWY 90 DEG CROSSING) (W/O ASPHALT) | 2 | EACH | 14,000.00 | 28,000.00 | 17,500.00 | 35,000.00 | 12,000.00 | 24,000.00 | 9,000.00 | 18,000.00 | | 0031 | NS-804-00001 | Vibration Monitoring | 16 | EACH | 750.00 | 12,000.00 | 250.00 | 4,000.00 | 100.00 | 1,600.00 | 500.00 | 8,000.00 | | 0032 | NS-804-00002 | Construction Site Survey | 1 | LUMP | 5,000.00 | 5,000.00 | 7,500.00 | 7,500.00 | 1,500.00 | 1,500.00 | 8,000.00 | 8,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 468,757.00 | | 512,263.50 | | 525,251.50 | | 547,073.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Cecil D. Gassiott, LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 15,000.00 | 15,000.00 | | 0002 | 202-02-04000 | Removal of Bridge (STA 15+00.00, 18.95 X 39.51 TIMBER BR) | 1 | EACH | 27,500.00 | 27,500.00 | | 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 29,000.00 | 29,000.00 | | 0004 | 204-02-00100 | Temporary Hay or Straw Bales | 9 | EACH | 16.00 | 144.00 | | 0005 | 204-03-00100 | Temporary Slope Drains | 60 | LNFT | 10.00 | 600.00 | | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 210.00 | 840.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 1,074 | LNFT | 2.25 | 2,416.50 | | 0008 | 302-01-00700 | Class II Base Course (Stone) | 295.4 | CUYD | 150.00 | 44,310.00 | | 0009 | 304-05-00100 | Lime Treatment (Type E) (at the direction of the Project Engineer) | 8.38 | TON | 1,325.00 | 11,103.50 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 19 | CUYD | 235.00 | 4,465.00 | | 0011 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 92.00 | 4,600.00 | | 0012 | 502-01-00100 | Superpave Asphaltic Concrete | 230.5 | TON | 240.00 | 55,320.00 | | 0013 | 704-03-00100 | Blocked Out Guard Rail | 50 | LNFT | 21.00 | 1,050.00 | | 0014 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 61.00 | 6,100.00 | | 0015 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,150.00 | 8,600.00 | | 0016 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 346 | LNFT | 9.80 | 3,390.80 | | 0017 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 258 | SQYD | 85.00 | 21,930.00 | | 0018 | 711-04-00100 | Geotextile Fabric | 258 | SQYD | 5.00 | 1,290.00 | | 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | | 0020 | 716-01-00100 | Mulch (Vegetative) | 0.44 | TON | 1,800.00 | 792.00 | | 0021 | 717-01-00100 | Seeding | 11 | LB | 25.00 | 275.00 | | 0022 | 718-01-00100 | Fertilizer | 220 | LB | 2.50 | 550.00 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 60,000.00 | 60,000.00 | | 0024 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 80.00 | 320.00 | | 0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,500.00 | 3,500.00 | | 0026 | 804-01-00300 | Precast Concrete Piles (16") | 928 | LNFT | 120.00 | 111,360.00 | | 0027 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 100.00 | 100.00 | | 0028 | 805-10-01320 | Bridge Superstructure and Substructure (24' Clear Roadway; 90 Degree Crossing) (Cast-in-Place) | 3 | SPAN | 60,000.00 | 180,000.00 | | 0029 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 220 | INLF | 10.00 | 2,200.00 | | 0030 | NS-800-00040 | Concrete Approach Slabs (24' CLR RDWY 90 DEG CROSSING) (W/O ASPHALT) | 2 | EACH | 14,000.00 | 28,000.00 | | 0031 | NS-804-00001 | Vibration Monitoring | 16 | EACH | 650.00 | 10,400.00 | | 0032 | NS-804-00002 | Construction Site Survey | 1 | LUMP | 5,000.00 | 5,000.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 650,156.80 |
|