Proposal:H.010512.6
Parish:Caddo
Routes:LA 3049
Description:LA 3049: 3.4 Mi N I-220 - 2 Mi S LA 173
Type Construction:COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$2,497,346.23
| Rank | License | Bidder | Construction Bid |
| 1 | 17464 | Benton & Brown, LLC. | $2,173,090.96 |
| 2 | 36374 | Best-Yet Builders, Llc | $2,310,103.73 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Benton & Brown, LLC. | - 2 - Best-Yet Builders, Llc | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06040 | Removal of Concrete Box Headwall Stations 182+36 LT & Rt 207+26 Lt & Rt 236+70 Lt & Rt 265+69 Lt & Rt | 8 | EACH | 1,000.00 | 8,000.00 | 1,500.00 | 12,000.00 | | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 10,636 | CUYD | 15.00 | 159,540.00 | 15.00 | 159,540.00 | | 0003 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 20 | EACH | 80.00 | 1,600.00 | 20.00 | 400.00 | | 0004 | 204-06-00100 | Temporary Silt Fencing | 500 | LNFT | 1.60 | 800.00 | 2.00 | 1,000.00 | | 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 100 | CUYD | 50.00 | 5,000.00 | 50.00 | 5,000.00 | | 0006 | 502-01-00100 | Superpave Asphaltic Concrete | 13,428.1 | TON | 100.00 | 1,342,810.00 | 105.25 | 1,413,307.53 | | 0007 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 292 | TON | 150.00 | 43,800.00 | 108.25 | 31,609.00 | | 0008 | 509-01-00100 | Cold Planing Asphaltic Pavement | 52,948 | SQYD | 1.75 | 92,659.00 | 2.00 | 105,896.00 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -603 | CUYD | 0.01 | -6.03 | 0.10 | -60.30 | | 0010 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 5,000 | SQYD | 57.50 | 287,500.00 | 66.00 | 330,000.00 | | 0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 44,000.00 | 44,000.00 | 25,000.00 | 25,000.00 | | 0012 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 10.028 | MILE | 350.00 | 3,509.80 | 500.00 | 5,014.00 | | 0013 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 8.936 | MILE | 275.00 | 2,457.40 | 250.00 | 2,234.00 | | 0014 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.922 | MILE | 550.00 | 2,157.10 | 500.00 | 1,961.00 | | 0015 | 727-01-00100 | Mobilization | 1 | LUMP | 44,000.00 | 44,000.00 | 30,000.00 | 30,000.00 | | 0016 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 32 | SQFT | 16.50 | 528.00 | 100.00 | 3,200.00 | | 0017 | 729-16-00200 | Object Marker Assembly (Type 2) | 12 | EACH | 82.50 | 990.00 | 65.00 | 780.00 | | 0018 | 729-16-00300 | Object Marker Assembly (Type 3) | 22 | EACH | 110.00 | 2,420.00 | 100.00 | 2,200.00 | | 0019 | 729-21-00100 | U-Channel Post | 8 | EACH | 55.00 | 440.00 | 100.00 | 800.00 | | 0020 | 731-02-00100 | Reflectorized Raised Pavement Markers | 932 | EACH | 5.50 | 5,126.00 | 5.00 | 4,660.00 | | 0021 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.643 | MILE | 4,400.00 | 16,029.20 | 4,000.00 | 14,572.00 | | 0022 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.899 | MILE | 3,300.00 | 12,866.70 | 3,000.00 | 11,697.00 | | 0023 | 735-01-00100 | Mailboxes | 21 | EACH | 5.50 | 115.50 | 50.00 | 1,050.00 | | 0024 | 735-02-00100 | Mailbox Supports (Single) | 21 | EACH | 137.50 | 2,887.50 | 75.00 | 1,575.00 | | 0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 25,000.00 | 25,000.00 | | 0026 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 30.52 | CUYD | 1,250.00 | 38,150.00 | 650.00 | 19,838.00 | | 0027 | 805-12-32000 | Reinforced Concrete Box Culverts (3' x 3') (Extension) | 24 | LNFT | 700.00 | 16,800.00 | 2,500.00 | 60,000.00 | | 0028 | 806-01-00100 | Deformed Reinforcing Steel | 2,292 | LB | 1.50 | 3,438.00 | 2.50 | 5,730.00 | | 0029 | NS-700-00020 | Adjusting Guard Rail | 168 | LNFT | 0.01 | 1.68 | 50.00 | 8,400.00 | | 0030 | NS-725-00001 | Construction Access Road | 1 | LUMP | 0.01 | 0.01 | 1.00 | 1.00 | | 0031 | 716-01-00100 | Mulch (Vegetative) | 24.5 | TON | 770.00 | 18,865.00 | 745.00 | 18,252.50 | | 0032 | 717-01-00100 | Seeding | 368 | LB | 13.20 | 4,857.60 | 9.00 | 3,312.00 | | 0033 | 718-01-00100 | Fertilizer | 12,270 | LB | 0.55 | 6,748.50 | 0.50 | 6,135.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,173,090.96 | | 2,310,103.73 |
|