Proposal:H.010662.6
Parish:Bossier
Routes:LA 511
Description:LA 511: JIMMIE DAVIS BRIDGE REHABILITATION
Type Construction:CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, BRIDGE REPAIRS AND PAINTING, AND RELATED WORK.
Estimated Construction Cost:$20,227,731.34
| Rank | License | Bidder | Construction Bid |
| 1 | 51422 | PCL CIVIL CONSTRUCTORS INC | $23,437,790.82 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - PCL CIVIL CONSTRUCTORS INC | | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of Concrete Barrier Rail (Transition on Approach) | 4 | EACH | 1,295.00 | 5,180.00 | | 0002 | 202-02-00020 | Removal of Bridge Deck | 10,449 | SQYD | 112.00 | 1,170,288.00 | | 0003 | 202-02-00030 | Removal of Steel Barrier Rail | 5,642 | LNFT | 30.00 | 169,260.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 1,087.5 | SQYD | 15.00 | 16,312.50 | | 0005 | 202-02-04021 | Removal of Bridge Bearings | 6 | EACH | 6,500.00 | 39,000.00 | | 0006 | 202-02-06000 | Removal of Concrete Approach Slabs | 28 | SQYD | 370.00 | 10,360.00 | | 0007 | 202-02-06140 | Removal of Curbs (Concrete) | 180 | LNFT | 32.77 | 5,898.60 | | 0008 | 202-02-14500 | Removal of Guard Rail | 440 | LNFT | 10.00 | 4,400.00 | | 0009 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 43 | SQYD | 51.99 | 2,235.57 | | 0010 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 15,596.61 | 15,596.61 | | 0011 | 204-02-00100 | Temporary Hay or Straw Bales | 14 | EACH | 38.80 | 543.20 | | 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 339.50 | 1,018.50 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 2,195 | LNFT | 3.78 | 8,297.10 | | 0014 | 302-02-02020 | Class II Base Course (6" Thick) (Soil Cement) | 2,077 | SQYD | 17.16 | 35,641.32 | | 0015 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 138 | TON | 220.00 | 30,360.00 | | 0016 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 1,180.3 | SQYD | 75.00 | 88,522.50 | | 0017 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 3,032 | LNFT | 5.00 | 15,160.00 | | 0018 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 2,529 | LNFT | 5.00 | 12,645.00 | | 0019 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 16 | SQYD | 191.00 | 3,056.00 | | 0020 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 1,460 | SQYD | 150.02 | 219,029.20 | | 0021 | 704-03-00100 | Blocked Out Guard Rail | 256.3 | LNFT | 21.00 | 5,382.30 | | 0022 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 75 | LNFT | 65.00 | 4,875.00 | | 0023 | 704-11-00100 | Guard Rail End Treatment (Flared) | 2 | EACH | 2,200.00 | 4,400.00 | | 0024 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 1 | EACH | 2,550.00 | 2,550.00 | | 0025 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 4.3 | SQYD | 471.19 | 2,026.12 | | 0026 | 707-01-00200 | Concrete Curb (Barrier) | 1,015 | LNFT | 12.00 | 12,180.00 | | 0027 | 707-03-00100 | Combination Concrete Curb and Gutter | 493 | LNFT | 30.00 | 14,790.00 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 540,328.90 | 540,328.90 | | 0029 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 1.433 | MILE | 17,000.00 | 24,361.00 | | 0030 | 717-01-00100 | Seeding | 45 | LB | 48.50 | 2,182.50 | | 0031 | 718-01-00100 | Fertilizer | 1,500 | LB | 1.46 | 2,190.00 | | 0032 | 725-01-00100 | Temporary Detour Roads | 626.8 | SQYD | 255.00 | 159,834.00 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 2,352,000.00 | 2,352,000.00 | | 0034 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 16 | SQFT | 26.00 | 416.00 | | 0035 | 729-08-00200 | Mounting (3 1/2" Size Post) | 1 | EACH | 1,150.00 | 1,150.00 | | 0036 | 729-16-00300 | Object Marker Assembly (Type 3) | 3 | EACH | 75.00 | 225.00 | | 0037 | 730-01-00100 | Trenching and Backfilling | 1,160 | LNFT | 4.91 | 5,695.60 | | 0038 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") 2#2 XHHW-2, #2 BARE GND | 1,450 | LNFT | 8.94 | 12,963.00 | | 0039 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") 3#1/0 XHHW-2 | 220 | LNFT | 14.57 | 3,205.40 | | 0040 | 730-02-03040 | Conduit with Conductors (Rigid Galvanized Steel) (1") 2#10 XHHW-2, #10 XHHW-2 GND | 315 | LNFT | 15.78 | 4,970.70 | | 0041 | 730-02-03100 | Conduit with Conductors (Rigid Galvanized Steel) (2") 2#2 XHHW-2, #2 XHHW-2 GND | 4,970 | LNFT | 20.16 | 100,195.20 | | 0042 | 730-02-03100 | Conduit with Conductors (Rigid Galvanized Steel) (2") 2#8 XHHW-2, #8 XHHW-2 GND | 2,307 | LNFT | 19.04 | 43,925.28 | | 0043 | 730-02-03100 | Conduit with Conductors (Rigid Galvanized Steel) (2") 3#1/0 XHHW-2, #2 XHHW-2 GND | 20 | LNFT | 40.81 | 816.20 | | 0044 | 730-02-03100 | Conduit with Conductors (Rigid Galvanized Steel) (2") (3#1/0 XHHW-2) | 20 | LNFT | 89.81 | 1,796.20 | | 0045 | 730-02-04040 | Conduit with Conductors (Liquid Tight Flexible Metal) (1") 2#10 XHHW-2, #10 XHHW-2 GND | 45 | LNFT | 21.67 | 975.15 | | 0046 | 730-04-00300 | Jacked or Bored Casing (8" Diameter) (PVC/HDPE) | 225 | LNFT | 59.00 | 13,275.00 | | 0047 | 730-05-10000 | Light Pole (30')(ALUM)(DECORATIVE) | 27 | EACH | 4,031.00 | 108,837.00 | | 0048 | 730-07-03000 | Luminaire (100 Watt) (High PressureSodium) Decorative | 27 | EACH | 1,020.00 | 27,540.00 | | 0049 | 730-07-04000 | Luminaire (150 Watt) (High PressureSodium) | 9 | EACH | 322.00 | 2,898.00 | | 0050 | 730-08-00200 | Electrical Service Point (Structure) | 1 | EACH | 29,855.00 | 29,855.00 | | 0051 | 730-10-00100 | Fabricated Light Pole Support 2' Truss Arm | 9 | EACH | 405.00 | 3,645.00 | | 0052 | 730-16-00300 | Underground Junction Box (13" x 24") | 7 | EACH | 630.00 | 4,410.00 | | 0053 | 730-17-10100 | Structure Junction Box (Cast Aluminum) (12"X12"X8")(CAST ALUMINUM) | 38 | EACH | 1,470.00 | 55,860.00 | | 0054 | 730-20-00060 | Disconnect (Other) (SERVICE)(FUSED) | 2 | EACH | 3,765.00 | 7,530.00 | | 0055 | 730-21-00020 | Duct Marker (Concrete) | 4 | EACH | 245.00 | 980.00 | | 0056 | 730-22-00420 | Underground Marker Tape (6")(Detectable) | 1,080 | LNFT | 0.56 | 604.80 | | 0057 | 731-02-00100 | Reflectorized Raised Pavement Markers | 680 | EACH | 5.00 | 3,400.00 | | 0058 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 2,427 | LNFT | 1.20 | 2,912.40 | | 0059 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,643 | LNFT | 5.00 | 8,215.00 | | 0060 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.32 | MILE | 3,000.00 | 12,960.00 | | 0061 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.521 | MILE | 1,000.00 | 521.00 | | 0062 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.02 | MILE | 3,000.00 | 60.00 | | 0063 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.074 | MILE | 4,000.00 | 296.00 | | 0064 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.17 | MILE | 6,000.00 | 1,020.00 | | 0065 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 6 | EACH | 300.00 | 1,800.00 | | 0066 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 1 | EACH | 500.00 | 500.00 | | 0067 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 1 | EACH | 500.00 | 500.00 | | 0068 | 732-04-25020 | Plastic Pavement Legends and Symbols (Yield Line) | 2 | EACH | 500.00 | 1,000.00 | | 0069 | 732-05-00100 | Removal of Existing Markings | 2.93 | MILE | 5,000.00 | 14,650.00 | | 0070 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 80 | LNFT | 38.18 | 3,054.40 | | 0071 | 740-01-00100 | Construction Layout | 1 | LUMP | 35,000.00 | 35,000.00 | | 0072 | 805-04-00100 | Class AA(M) Concrete | 2,365.48 | CUYD | 1,750.00 | 4,139,590.00 | | 0073 | 806-01-00100 | Deformed Reinforcing Steel | 900,207 | LB | 0.73 | 657,151.11 | | 0074 | 807-08-00100 | Structural Metalwork | 475,405 | LUMP | 770,000.00 | 770,000.00 | | 0075 | 810-01-00100 | Concrete Railing (Standard Barrier) | 5,623.08 | LNFT | 125.00 | 702,885.00 | | 0076 | 813-01-00100 | Concrete Approach Slabs | 27.56 | SQYD | 258.00 | 7,110.48 | | 0077 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 248 | INLF | 5.00 | 1,240.00 | | 0078 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,125 | INLF | 3.00 | 3,375.00 | | 0079 | NS-713-00008 | Portable Changeable Message Sign | 28 | EACH | 6,840.00 | 191,520.00 | | 0080 | NS-800-00003 | Structure Jacking Span 9 | 1 | LUMP | 87,000.00 | 87,000.00 | | 0081 | NS-800-00003 | Structure Jacking Span 10 | 1 | LUMP | 87,000.00 | 87,000.00 | | 0082 | NS-800-00003 | Structure Jacking Span 11 | 1 | LUMP | 87,000.00 | 87,000.00 | | 0083 | NS-800-00004 | Disc Bearing Pier 1 | 2 | EACH | 13,040.76 | 26,081.52 | | 0084 | NS-800-00004 | Disc Bearing Pier 3 | 2 | EACH | 13,040.76 | 26,081.52 | | 0085 | NS-800-00004 | Disc Bearing Pier 4 | 2 | EACH | 13,040.76 | 26,081.52 | | 0086 | NS-800-00020 | Cleaning, Painting and Disposal (Near White Finish) Spans 1, 4-5, & 15-16 | 1 | LUMP | 568,548.63 | 568,548.63 | | 0087 | NS-800-00020 | Cleaning, Painting and Disposal (Near White Finish) Span 2 & 3 | 1 | LUMP | 243,663.70 | 243,663.70 | | 0088 | NS-800-00020 | Cleaning, Painting and Disposal (Near White Finish) Spans 6--8 & 12 | 1 | LUMP | 974,654.80 | 974,654.80 | | 0089 | NS-800-00020 | Cleaning, Painting and Disposal (Near White Finish) Spans 9-11, Stage I | 1 | LUMP | 2,837,000.00 | 2,837,000.00 | | 0090 | NS-800-00020 | Cleaning, Painting and Disposal (Near White Finish) Spans 9-11, Stage II | 1 | LUMP | 2,818,900.00 | 2,818,900.00 | | 0091 | NS-800-00020 | Cleaning, Painting and Disposal (Near White Finish) Spans 13 & 14 | 1 | LUMP | 730,991.10 | 730,991.10 | | 0092 | NS-800-00060 | Deck Drainage System Scuppers & Down Drain Pipe System, Spans 1, 4-5, & 15 | 1 | LUMP | 193,986.57 | 193,986.57 | | 0093 | NS-800-00060 | Deck Drainage System Scuppers & Down Drain Pipe System, Spans 6-8 & 12-14 | 1 | LUMP | 193,986.57 | 193,986.57 | | 0094 | NS-800-00060 | Deck Drainage System Scuppers & Down Drain Pipe System, Spans 9-11 | 1 | LUMP | 193,986.57 | 193,986.57 | | 0095 | NS-800-00060 | Deck Drainage System Finger Joint Through Plate, Neoprene Membrane and Down Drain Pipe System, Spans 6, 8, 12 & 14 | 1 | LUMP | 365,879.15 | 365,879.15 | | 0096 | NS-800-00060 | Deck Drainage System Finger Joint Through Plate, Neoprene Membrane and Down Drain Pipe System, Piers 1, 3 & 4 | 1 | LUMP | 274,409.33 | 274,409.33 | | 0097 | NS-805-00005 | Joint Sealing System (Preformed Silicone) | 310 | LNFT | 497.00 | 154,070.00 | | 0098 | NS-805-00016 | Bridge Superstructure Repair Type "A" | 57 | EACH | 7,700.00 | 438,900.00 | | 0099 | NS-805-00016 | Bridge Superstructure Repair Type "B" | 30 | EACH | 1,878.00 | 56,340.00 | | 0100 | NS-805-00016 | Bridge Superstructure Repair Type "C" | 29 | EACH | 897.00 | 26,013.00 | | 0101 | NS-805-00016 | Bridge Superstructure Repair Type "D" | 1 | EACH | 6,895.00 | 6,895.00 | | 0102 | NS-805-00016 | Bridge Superstructure Repair Type "E" | 1 | EACH | 4,250.00 | 4,250.00 | | 0104 | NS-805-00016 | Bridge Superstructure Repair Pin & Hanger Replacement, Type 1 | 4 | EACH | 72,500.00 | 290,000.00 | | 0105 | NS-805-00016 | Bridge Superstructure Repair Pin & Hanger Replacement, Type 2 | 8 | EACH | 72,500.00 | 580,000.00 | | 0106 | NS-805-00020 | Bridge Substructure Repair Anchor Bolt Repair at Bents | 3 | EACH | 4,300.00 | 12,900.00 | | 0107 | NS-805-00020 | Bridge Substructure Repair Concrete Crack Repair | 1 | EACH | 5,177.00 | 5,177.00 | | 0108 | NS-ITS-06020 | Pullbox, In-ground, Furnish & Install - New Type K | 4 | EACH | 2,530.00 | 10,120.00 | | 0109 | NS-ITS-06120 | Pullbox, Structure Mount, Furnish & Install - New Type L | 14 | EACH | 1,005.00 | 14,070.00 | | 0110 | NS-ITS-15320 | 2" Rigid Galvanized Steel Conduit | 5,920 | LNFT | 15.35 | 90,872.00 | | 0111 | NS-MSC-00005 | Construction Photographs And Video (Roadway Surfaces) | 1 | LUMP | 5,000.00 | 5,000.00 | | 0112 | NS-807-00010 | BOLT - RIVET REPLACEMENT (STRUCTURAL STEEL) | 300 | EACH | 125.00 | 37,500.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 23,437,790.82 |
|