Proposal:H.009945.6
Parish:Bossier
Description:KORAN DOYLINE ROAD BRIDGE/CLARKE BAYOU
Type Construction:GRADING, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, LIME TREATMENT, PRECAST PRESTRESSED CONCRETE GIRDER SPANS BRIDGE, AND RELATED WORK
Estimated Construction Cost:$1,369,863.50
| Rank | License | Bidder | Construction Bid |
| 1 | 49239 | WL Bass Construction Inc. | $1,398,564.75 |
| 2 | 00044 | Guinn Construction, LLC | $1,456,348.50 |
| 3 | 34567 | James Construction Group LLC | $1,458,279.25 |
| 4 | 39462 | JB JAMES CONSTRUCTION LLC | $1,563,429.90 |
| 5 | 01012 | Cecil D. Gassiott, LLC | $1,688,025.60 |
| 6 | 55519 | Key, LLC Of Mississippi | $1,933,127.40 |
| 7 | 12135 | Blount Bros. Construction, LLC | $1,979,340.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - WL Bass Construction Inc. | - 2 - Guinn Construction, LLC | - 3 - James Construction Group LLC | - 4 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 45,000.00 | 45,000.00 | 40,000.00 | 40,000.00 | 100,000.00 | 100,000.00 | 50,000.00 | 50,000.00 | | 0002 | 202-02-04000 | Removal of Bridge STA. 16+35; 23.2' X 270.8' TIMBER BRIDGE | 1 | EACH | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 150,000.00 | 150,000.00 | 100,000.00 | 100,000.00 | | 0003 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 1,173 | SQYD | 5.00 | 5,865.00 | 4.00 | 4,692.00 | 6.00 | 7,038.00 | 3.00 | 3,519.00 | | 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 30,000.00 | 30,000.00 | 15,000.00 | 15,000.00 | 12,980.00 | 12,980.00 | 70,000.00 | 70,000.00 | | 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 8 | EACH | 5.00 | 40.00 | 10.00 | 80.00 | 21.00 | 168.00 | 25.00 | 200.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 1,173 | LNFT | 0.25 | 293.25 | 2.00 | 2,346.00 | 3.25 | 3,812.25 | 3.50 | 4,105.50 | | 0007 | 302-01-00700 | Class II Base Course (Stone) (Crushed) | 285.4 | CUYD | 115.00 | 32,821.00 | 80.00 | 22,832.00 | 110.00 | 31,394.00 | 131.00 | 37,387.40 | | 0008 | 304-05-00100 | Lime Treatment (Type E) | 15.24 | TON | 150.00 | 2,286.00 | 550.00 | 8,382.00 | 150.00 | 2,286.00 | 650.00 | 9,906.00 | | 0009 | 502-01-00100 | Superpave Asphaltic Concrete | 223.6 | TON | 170.00 | 38,012.00 | 200.00 | 44,720.00 | 170.00 | 38,012.00 | 170.00 | 38,012.00 | | 0010 | 704-03-00100 | Blocked Out Guard Rail | 50 | LNFT | 21.00 | 1,050.00 | 23.00 | 1,150.00 | 20.00 | 1,000.00 | 20.00 | 1,000.00 | | 0011 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 60.00 | 6,000.00 | 63.00 | 6,300.00 | 58.00 | 5,800.00 | 58.00 | 5,800.00 | | 0012 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,100.00 | 8,400.00 | 2,250.00 | 9,000.00 | 2,000.00 | 8,000.00 | 2,000.00 | 8,000.00 | | 0013 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 361 | SQYD | 65.00 | 23,465.00 | 70.00 | 25,270.00 | 96.00 | 34,656.00 | 60.00 | 21,660.00 | | 0014 | 711-04-00100 | Geotextile Fabric | 361 | SQYD | 2.00 | 722.00 | 4.00 | 1,444.00 | 10.00 | 3,610.00 | 6.00 | 2,166.00 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 12,000.00 | 12,000.00 | | 0016 | 716-01-00100 | Mulch (Vegetative) | 0.4 | TON | 1,500.00 | 600.00 | 3,500.00 | 1,400.00 | 2,900.00 | 1,160.00 | 2,900.00 | 1,160.00 | | 0017 | 717-01-00100 | Seeding | 9 | LB | 20.00 | 180.00 | 25.00 | 225.00 | 75.00 | 675.00 | 40.00 | 360.00 | | 0018 | 718-01-00100 | Fertilizer | 190 | LB | 1.00 | 190.00 | 2.00 | 380.00 | 8.00 | 1,520.00 | 2.50 | 475.00 | | 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 140,000.00 | 140,000.00 | 120,000.00 | 120,000.00 | 140,500.00 | 140,500.00 | 150,000.00 | 150,000.00 | | 0020 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 75.00 | 300.00 | 100.00 | 400.00 | 75.00 | 300.00 | 75.00 | 300.00 | | 0021 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 12,500.00 | 12,500.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | | 0022 | 804-01-00600 | Precast Concrete Piles (24") | 2,160 | LNFT | 122.00 | 263,520.00 | 140.00 | 302,400.00 | 46.00 | 99,360.00 | 94.00 | 203,040.00 | | 0023 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1.00 | 1.00 | 1.00 | 1.00 | 1,500.00 | 1,500.00 | 2,000.00 | 2,000.00 | | 0024 | 804-13-00100 | Precast Concrete Indicator Piles | 1 | EACH | 14,000.00 | 14,000.00 | 15,000.00 | 15,000.00 | 80,000.00 | 80,000.00 | 22,000.00 | 22,000.00 | | 0025 | 804-17-00100 | Dynamic Monitoring | 7 | EACH | 100.00 | 700.00 | 750.00 | 5,250.00 | 2,200.00 | 15,400.00 | 2,000.00 | 14,000.00 | | 0026 | 805-01-00700 | Class A Concrete (Bents) | 87.83 | CUYD | 1,100.00 | 96,613.00 | 1,250.00 | 109,787.50 | 800.00 | 70,264.00 | 1,300.00 | 114,179.00 | | 0027 | 805-04-00100 | Class AA(M) Concrete | 265.68 | CUYD | 1,000.00 | 265,680.00 | 1,000.00 | 265,680.00 | 650.00 | 172,692.00 | 1,000.00 | 265,680.00 | | 0028 | 805-08-00800 | Precast-Prestressed Concrete Girder (Type Quad Beam) | 1,896 | LNFT | 85.00 | 161,160.00 | 94.00 | 178,224.00 | 105.00 | 199,080.00 | 90.00 | 170,640.00 | | 0029 | 806-01-00100 | Deformed Reinforcing Steel | 89,685 | LB | 0.90 | 80,716.50 | 1.00 | 89,685.00 | 1.20 | 107,622.00 | 1.00 | 89,685.00 | | 0030 | 807-08-00100 | Structural Metalwork 7506 LBS. | 7,506 | LUMP | 30,000.00 | 30,000.00 | 35,000.00 | 35,000.00 | 40,000.00 | 40,000.00 | 35,000.00 | 35,000.00 | | 0031 | 810-01-00100 | Concrete Railing (Standard Barrier) | 160 | LNFT | 65.00 | 10,400.00 | 85.00 | 13,600.00 | 60.00 | 9,600.00 | 67.00 | 10,720.00 | | 0032 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 480 | LNFT | 65.00 | 31,200.00 | 85.00 | 40,800.00 | 70.00 | 33,600.00 | 67.00 | 32,160.00 | | 0033 | NS-736-00120 | Construction Photographs And Video | 1 | LUMP | 1,500.00 | 1,500.00 | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | | 0034 | NS-800-00040 | Concrete Approach Slabs 28' CLR RDWY; 90 DEG; CROSSING W/O ASPHALT | 2 | EACH | 18,000.00 | 36,000.00 | 14,000.00 | 28,000.00 | 21,000.00 | 42,000.00 | 21,000.00 | 42,000.00 | | 0035 | NS-804-00001 | Vibration Monitoring INCLUDING INITIAL SITE SURVEY | 37 | EACH | 50.00 | 1,850.00 | 400.00 | 14,800.00 | 250.00 | 9,250.00 | 575.00 | 21,275.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,398,564.75 | | 1,456,348.50 | | 1,458,279.25 | | 1,563,429.90 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Cecil D. Gassiott, LLC | - 6 - Key, LLC Of Mississippi | - 7 - Blount Bros. Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 25,000.00 | 25,000.00 | 45,000.00 | 45,000.00 | 20,000.00 | 20,000.00 | | 0002 | 202-02-04000 | Removal of Bridge STA. 16+35; 23.2' X 270.8' TIMBER BRIDGE | 1 | EACH | 50,000.00 | 50,000.00 | 30,000.00 | 30,000.00 | 250,000.00 | 250,000.00 | | 0003 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 1,173 | SQYD | 9.00 | 10,557.00 | 8.50 | 9,970.50 | 8.00 | 9,384.00 | | 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 20,000.00 | 20,000.00 | 60,000.00 | 60,000.00 | 31,000.00 | 31,000.00 | | 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 8 | EACH | 25.00 | 200.00 | 25.00 | 200.00 | 20.00 | 160.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 1,173 | LNFT | 5.00 | 5,865.00 | 5.00 | 5,865.00 | 3.00 | 3,519.00 | | 0007 | 302-01-00700 | Class II Base Course (Stone) (Crushed) | 285.4 | CUYD | 115.00 | 32,821.00 | 155.00 | 44,237.00 | 100.00 | 28,540.00 | | 0008 | 304-05-00100 | Lime Treatment (Type E) | 15.24 | TON | 500.00 | 7,620.00 | 650.00 | 9,906.00 | 300.00 | 4,572.00 | | 0009 | 502-01-00100 | Superpave Asphaltic Concrete | 223.6 | TON | 200.00 | 44,720.00 | 200.00 | 44,720.00 | 150.00 | 33,540.00 | | 0010 | 704-03-00100 | Blocked Out Guard Rail | 50 | LNFT | 21.00 | 1,050.00 | 35.00 | 1,750.00 | 25.00 | 1,250.00 | | 0011 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 60.00 | 6,000.00 | 85.00 | 8,500.00 | 75.00 | 7,500.00 | | 0012 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,100.00 | 8,400.00 | 2,500.00 | 10,000.00 | 2,500.00 | 10,000.00 | | 0013 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 361 | SQYD | 85.00 | 30,685.00 | 87.50 | 31,587.50 | 75.00 | 27,075.00 | | 0014 | 711-04-00100 | Geotextile Fabric | 361 | SQYD | 5.00 | 1,805.00 | 3.15 | 1,137.15 | 3.00 | 1,083.00 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 20,000.00 | 20,000.00 | | 0016 | 716-01-00100 | Mulch (Vegetative) | 0.4 | TON | 2,900.00 | 1,160.00 | 2,900.00 | 1,160.00 | 1,000.00 | 400.00 | | 0017 | 717-01-00100 | Seeding | 9 | LB | 40.00 | 360.00 | 40.00 | 360.00 | 25.00 | 225.00 | | 0018 | 718-01-00100 | Fertilizer | 190 | LB | 2.50 | 475.00 | 2.50 | 475.00 | 2.00 | 380.00 | | 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 160,000.00 | 160,000.00 | 375,000.00 | 375,000.00 | 100,000.00 | 100,000.00 | | 0020 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 80.00 | 320.00 | 150.00 | 600.00 | 100.00 | 400.00 | | 0021 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 55,000.00 | 55,000.00 | 50,000.00 | 50,000.00 | | 0022 | 804-01-00600 | Precast Concrete Piles (24") | 2,160 | LNFT | 170.00 | 367,200.00 | 140.00 | 302,400.00 | 180.00 | 388,800.00 | | 0023 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 2,500.00 | 2,500.00 | 10,000.00 | 10,000.00 | 2,500.00 | 2,500.00 | | 0024 | 804-13-00100 | Precast Concrete Indicator Piles | 1 | EACH | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 22,500.00 | 22,500.00 | | 0025 | 804-17-00100 | Dynamic Monitoring | 7 | EACH | 1,600.00 | 11,200.00 | 2,000.00 | 14,000.00 | 1,000.00 | 7,000.00 | | 0026 | 805-01-00700 | Class A Concrete (Bents) | 87.83 | CUYD | 1,300.00 | 114,179.00 | 1,250.00 | 109,787.50 | 1,000.00 | 87,830.00 | | 0027 | 805-04-00100 | Class AA(M) Concrete | 265.68 | CUYD | 1,320.00 | 350,697.60 | 1,050.00 | 278,964.00 | 900.00 | 239,112.00 | | 0028 | 805-08-00800 | Precast-Prestressed Concrete Girder (Type Quad Beam) | 1,896 | LNFT | 106.00 | 200,976.00 | 95.00 | 180,120.00 | 100.00 | 189,600.00 | | 0029 | 806-01-00100 | Deformed Reinforcing Steel | 89,685 | LB | 1.00 | 89,685.00 | 1.15 | 103,137.75 | 2.00 | 179,370.00 | | 0030 | 807-08-00100 | Structural Metalwork 7506 LBS. | 7,506 | LUMP | 15,000.00 | 15,000.00 | 45,000.00 | 45,000.00 | 50,000.00 | 50,000.00 | | 0031 | 810-01-00100 | Concrete Railing (Standard Barrier) | 160 | LNFT | 60.00 | 9,600.00 | 75.00 | 12,000.00 | 120.00 | 19,200.00 | | 0032 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 480 | LNFT | 65.00 | 31,200.00 | 85.00 | 40,800.00 | 130.00 | 62,400.00 | | 0033 | NS-736-00120 | Construction Photographs And Video | 1 | LUMP | 250.00 | 250.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | | 0034 | NS-800-00040 | Concrete Approach Slabs 28' CLR RDWY; 90 DEG; CROSSING W/O ASPHALT | 2 | EACH | 25,000.00 | 50,000.00 | 25,000.00 | 50,000.00 | 45,000.00 | 90,000.00 | | 0035 | NS-804-00001 | Vibration Monitoring INCLUDING INITIAL SITE SURVEY | 37 | EACH | 500.00 | 18,500.00 | 850.00 | 31,450.00 | 1,000.00 | 37,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,688,025.60 | | 1,933,127.40 | | 1,979,340.00 |
|