Proposal:H.011300.6
Parish:Franklin, Richland
Routes:US 425
Description:US 425: FRANKLIN PARISH LINE - JCT. LA 856
Type Construction:SUPERPAVE ASPHALTIC CONCRETE OVERLAY, COLD PLANING, PAVEMENT PATCHING AND RELATED WORK.
Estimated Construction Cost:$3,349,499.08
| Rank | License | Bidder | Construction Bid |
| 1 | 05789 | D & J CONSTRUCTION CO., LLC | $3,072,449.31 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $3,600,453.18 |
| 3 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $3,776,988.66 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - D & J CONSTRUCTION CO., LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 1,075 | LNFT | 10.00 | 10,750.00 | 15.00 | 16,125.00 | 11.00 | 11,825.00 | | 0002 | 202-02-38300 | Removal of Sign and U-Channel Post | 12 | EACH | 100.00 | 1,200.00 | 300.00 | 3,600.00 | 115.00 | 1,380.00 | | 0003 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 14 | EACH | 150.00 | 2,100.00 | 135.00 | 1,890.00 | 230.00 | 3,220.00 | | 0004 | 204-06-00100 | Temporary Silt Fencing | 1,400 | LNFT | 2.00 | 2,800.00 | 2.20 | 3,080.00 | 2.30 | 3,220.00 | | 0005 | 502-01-00100 | Superpave Asphaltic Concrete | 20,223.3 | TON | 91.00 | 1,840,320.30 | 94.00 | 1,900,990.20 | 105.00 | 2,123,446.50 | | 0006 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 214.6 | TON | 130.00 | 27,898.00 | 145.00 | 31,117.00 | 143.00 | 30,687.80 | | 0007 | 509-01-00100 | Cold Planing Asphaltic Pavement | 182,657 | SQYD | 1.50 | 273,985.50 | 3.00 | 547,971.00 | 2.10 | 383,579.70 | | 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -7,611 | CUYD | 1.00 | -7,611.00 | 0.10 | -761.10 | 1.00 | -7,611.00 | | 0009 | 510-01-00400 | Pavement Patching (24" Minimum Thickness) | 3,776.6 | SQYD | 136.00 | 513,617.60 | 140.00 | 528,724.00 | 155.00 | 585,373.00 | | 0010 | 704-03-00100 | Blocked Out Guard Rail | 962.6 | LNFT | 20.00 | 19,252.00 | 20.00 | 19,252.00 | 20.00 | 19,252.00 | | 0011 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 75 | LNFT | 47.00 | 3,525.00 | 60.00 | 4,500.00 | 59.00 | 4,425.00 | | 0012 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 150 | LNFT | 60.00 | 9,000.00 | 75.00 | 11,250.00 | 79.00 | 11,850.00 | | 0013 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,100.00 | 8,400.00 | 2,400.00 | 9,600.00 | 2,400.00 | 9,600.00 | | 0014 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 2 | EACH | 2,400.00 | 4,800.00 | 2,600.00 | 5,200.00 | 2,800.00 | 5,600.00 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 60,000.00 | 60,000.00 | 38,000.00 | 38,000.00 | 200,000.00 | 200,000.00 | | 0016 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 800 | LNFT | 0.15 | 120.00 | 0.25 | 200.00 | 0.30 | 240.00 | | 0017 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,986 | LNFT | 0.50 | 993.00 | 0.50 | 993.00 | 0.60 | 1,191.60 | | 0018 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 10.018 | MILE | 225.00 | 2,254.05 | 100.00 | 1,001.80 | 275.00 | 2,754.95 | | 0019 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 10.018 | MILE | 250.00 | 2,504.50 | 100.00 | 1,001.80 | 330.00 | 3,305.94 | | 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 33.896 | MILE | 1.00 | 33.90 | 100.00 | 3,389.60 | 570.00 | 19,320.72 | | 0021 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 54 | EACH | 1.00 | 54.00 | 20.00 | 1,080.00 | 17.00 | 918.00 | | 0022 | 716-01-00100 | Mulch (Vegetative) | 1.5 | TON | 800.00 | 1,200.00 | 1,500.00 | 2,250.00 | 1,600.00 | 2,400.00 | | 0023 | 717-01-00100 | Seeding | 45 | LB | 10.00 | 450.00 | 20.00 | 900.00 | 13.00 | 585.00 | | 0024 | 718-01-00100 | Fertilizer | 758 | LB | 1.00 | 758.00 | 1.50 | 1,137.00 | 1.35 | 1,023.30 | | 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 64,000.00 | 64,000.00 | 125,000.00 | 125,000.00 | 100,000.00 | 100,000.00 | | 0026 | 729-16-00300 | Object Marker Assembly (Type 3) | 6 | EACH | 100.00 | 600.00 | 85.00 | 510.00 | 85.00 | 510.00 | | 0027 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,563 | EACH | 5.50 | 8,596.50 | 5.50 | 8,596.50 | 5.70 | 8,909.10 | | 0028 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 400 | LNFT | 4.00 | 1,600.00 | 4.50 | 1,800.00 | 4.60 | 1,840.00 | | 0029 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 992.5 | LNFT | 5.00 | 4,962.50 | 8.50 | 8,436.25 | 9.00 | 8,932.50 | | 0030 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 16.948 | MILE | 2,900.00 | 49,149.20 | 3,000.00 | 50,844.00 | 3,200.00 | 54,233.60 | | 0031 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 10.018 | MILE | 1,000.00 | 10,018.00 | 1,000.00 | 10,018.00 | 1,000.00 | 10,018.00 | | 0032 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 27 | EACH | 275.00 | 7,425.00 | 300.00 | 8,100.00 | 300.00 | 8,100.00 | | 0033 | 735-01-00100 | Mailboxes | 20 | EACH | 5.00 | 100.00 | 10.00 | 200.00 | 1.15 | 23.00 | | 0034 | 735-02-00100 | Mailbox Supports (Single) | 17 | EACH | 125.00 | 2,125.00 | 125.00 | 2,125.00 | 200.00 | 3,400.00 | | 0035 | 735-04-00100 | Mailbox Supports (Multiple) | 1 | EACH | 260.00 | 260.00 | 325.00 | 325.00 | 345.00 | 345.00 | | 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 40,000.00 | 40,000.00 | 10,000.00 | 10,000.00 | | 0037 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 39,072 | LNFT | 1.20 | 46,886.40 | 2.00 | 78,144.00 | 1.35 | 52,747.20 | | 0038 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 15,629 | LNFT | 1.00 | 15,629.00 | 1.25 | 19,536.25 | 1.20 | 18,754.80 | | 0039 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 54,701 | LNFT | 0.90 | 49,230.90 | 1.00 | 54,701.00 | 1.00 | 54,701.00 | | 0040 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 47,527 | INLF | 0.20 | 9,505.40 | 0.60 | 28,516.20 | 0.25 | 11,881.75 | | 0041 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 41,932.8 | INLF | 0.20 | 8,386.56 | 0.60 | 25,159.68 | 0.25 | 10,483.20 | | 0042 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 11.9 | MILE | 300.00 | 3,570.00 | 500.00 | 5,950.00 | 380.00 | 4,522.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,072,449.31 | | 3,600,453.18 | | 3,776,988.66 |
|