Proposal:H.011169.6
Parish:Rapides
Routes:US 165
Description:US 165: ALLEN P/L - 0.312 S OF ASHMORE NB
Type Construction:COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$2,265,440.63
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $2,220,979.25 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $3,024,623.29 |
| 3 | 05789 | D & J CONSTRUCTION CO., LLC | $3,198,758.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - GILCHRIST CONSTRUCTION CO. LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06140 | Removal of Curbs (Concrete) | 33 | LNFT | 24.00 | 792.00 | 95.00 | 3,135.00 | 15.00 | 495.00 | | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 930 | CUYD | 21.00 | 19,530.00 | 19.00 | 17,670.00 | 28.00 | 26,040.00 | | 0003 | 502-01-00100 | Superpave Asphaltic Concrete | 21,084.4 | TON | 77.00 | 1,623,498.80 | 98.00 | 2,066,271.20 | 108.00 | 2,277,115.20 | | 0004 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 23.1 | TON | 338.00 | 7,807.80 | 900.00 | 20,790.00 | 136.00 | 3,141.60 | | 0005 | 509-01-00100 | Cold Planing Asphaltic Pavement | 70,354 | SQYD | 0.90 | 63,318.60 | 3.50 | 246,239.00 | 2.00 | 140,708.00 | | 0006 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -2,935 | CUYD | 7.00 | -20,545.00 | 1.00 | -2,935.00 | 1.00 | -2,935.00 | | 0007 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 1,345 | SQYD | 123.00 | 165,435.00 | 135.00 | 181,575.00 | 160.00 | 215,200.00 | | 0008 | 510-03-00100 | Pavement Joint Repair | 155 | TON | 250.00 | 38,750.00 | 335.00 | 51,925.00 | 300.00 | 46,500.00 | | 0009 | 707-01-00300 | Concrete Curb (Mountable) | 33 | LNFT | 80.00 | 2,640.00 | 300.00 | 9,900.00 | 30.00 | 990.00 | | 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 90,000.00 | 90,000.00 | 63,000.00 | 63,000.00 | 150,000.00 | 150,000.00 | | 0011 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 14.273 | MILE | 250.00 | 3,568.25 | 154.00 | 2,198.04 | 250.00 | 3,568.25 | | 0012 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 9.515 | MILE | 300.00 | 2,854.50 | 1.00 | 9.52 | 250.00 | 2,378.75 | | 0013 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 19.03 | MILE | 500.00 | 9,515.00 | 1.00 | 19.03 | 500.00 | 9,515.00 | | 0014 | 727-01-00100 | Mobilization | 1 | LUMP | 67,500.00 | 67,500.00 | 180,000.00 | 180,000.00 | 150,000.00 | 150,000.00 | | 0015 | 731-02-00100 | Reflectorized Raised Pavement Markers | 650 | EACH | 5.20 | 3,380.00 | 6.00 | 3,900.00 | 6.00 | 3,900.00 | | 0016 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 90 | LNFT | 12.25 | 1,102.50 | 6.00 | 540.00 | 5.00 | 450.00 | | 0017 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 9.515 | MILE | 2,900.00 | 27,593.50 | 3,200.00 | 30,448.00 | 3,000.00 | 28,545.00 | | 0018 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.758 | MILE | 900.00 | 4,282.20 | 1,000.00 | 4,758.00 | 1,000.00 | 4,758.00 | | 0019 | 739-01-00100 | Hydro-Seeding | 3.46 | ACRE | 1,400.00 | 4,844.00 | 1,500.00 | 5,190.00 | 1,600.00 | 5,536.00 | | 0020 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,000.00 | 7,000.00 | 26,000.00 | 26,000.00 | 8,000.00 | 8,000.00 | | 0021 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 50,240 | LNFT | 1.25 | 62,800.00 | 1.30 | 65,312.00 | 1.30 | 65,312.00 | | 0022 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 12,100 | LNFT | 1.10 | 13,310.00 | 1.15 | 13,915.00 | 2.00 | 24,200.00 | | 0023 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 7,550 | LNFT | 1.30 | 9,815.00 | 1.30 | 9,815.00 | 2.00 | 15,100.00 | | 0024 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 33,790 | INLF | 0.25 | 8,447.50 | 0.60 | 20,274.00 | 0.35 | 11,826.50 | | 0025 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 9.349 | MILE | 400.00 | 3,739.60 | 500.00 | 4,674.50 | 900.00 | 8,414.10 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,220,979.25 | | 3,024,623.29 | | 3,198,758.40 |
|