Proposal:H.010546.6
Parish:St. Martin
Routes:LA 96
Description:LA 96: 0.66 MILES W OF LA 352 - LA 352
Type Construction:PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$219,878.75
| Rank | License | Bidder | Construction Bid |
| 1 | 51821 | Elliott Construction, LLC | $240,483.60 |
| 2 | 33663 | Glenn Lege Construction Inc | $249,795.59 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $375,182.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Elliott Construction, LLC | - 2 - Glenn Lege Construction Inc | - 3 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-32100 | Removal of Pipe (Cross Drain) (12" X 30" CMPA) | 30 | LNFT | 50.00 | 1,500.00 | 25.00 | 750.00 | 35.00 | 1,050.00 | | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 375 | CUYD | 20.00 | 7,500.00 | 15.00 | 5,625.00 | 27.00 | 10,125.00 | | 0003 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 10 | EACH | 100.00 | 1,000.00 | 200.00 | 2,000.00 | 175.00 | 1,750.00 | | 0004 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 265 | CUYD | 85.00 | 22,525.00 | 30.00 | 7,950.00 | 70.00 | 18,550.00 | | 0005 | 502-01-00100 | Superpave Asphaltic Concrete | 833.6 | TON | 120.00 | 100,032.00 | 100.00 | 83,360.00 | 135.00 | 112,536.00 | | 0006 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 226.3 | TON | 140.00 | 31,682.00 | 125.00 | 28,287.50 | 300.00 | 67,890.00 | | 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 130 | SQYD | 110.00 | 14,300.00 | 105.00 | 13,650.00 | 240.00 | 31,200.00 | | 0008 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 38 | LNFT | 125.00 | 4,750.00 | 120.00 | 4,560.00 | 240.00 | 9,120.00 | | 0009 | 710-01-00100 | Flowable Fill | 20 | CUYD | 175.00 | 3,500.00 | 150.00 | 3,000.00 | 190.00 | 3,800.00 | | 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,000.00 | 5,000.00 | 45,500.00 | 45,500.00 | 15,000.00 | 15,000.00 | | 0011 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.66 | MILE | 1,000.00 | 660.00 | 700.00 | 462.00 | 190.00 | 125.40 | | 0012 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.564 | MILE | 550.00 | 310.20 | 705.00 | 397.62 | 575.00 | 324.30 | | 0013 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.47 | MILE | 700.00 | 329.00 | 1,760.00 | 827.20 | 400.00 | 188.00 | | 0014 | 726-01-00100 | Bedding Material | 4 | CUYD | 115.00 | 460.00 | 90.00 | 360.00 | 365.00 | 1,460.00 | | 0015 | 727-01-00100 | Mobilization | 1 | LUMP | 25,000.00 | 25,000.00 | 27,140.00 | 27,140.00 | 36,000.00 | 36,000.00 | | 0016 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 110.00 | 440.00 | 120.00 | 480.00 | 125.00 | 500.00 | | 0017 | 731-02-00100 | Reflectorized Raised Pavement Markers | 267 | EACH | 11.00 | 2,937.00 | 12.00 | 3,204.00 | 12.00 | 3,204.00 | | 0018 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.47 | MILE | 5,500.00 | 2,585.00 | 5,270.00 | 2,476.90 | 6,200.00 | 2,914.00 | | 0019 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.564 | MILE | 2,750.00 | 1,551.00 | 1,640.00 | 924.96 | 3,100.00 | 1,748.40 | | 0020 | 732-05-00100 | Removal of Existing Markings | 0.002 | MILE | 16,500.00 | 33.00 | 11,707.00 | 23.41 | 15,000.00 | 30.00 | | 0021 | 735-01-00100 | Mailboxes | 14 | EACH | 1.10 | 15.40 | 10.50 | 147.00 | 1.25 | 17.50 | | 0022 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 292.00 | 1,168.00 | 310.00 | 1,240.00 | 325.00 | 1,300.00 | | 0023 | 735-03-00100 | Mailbox Supports (Double) | 3 | EACH | 292.00 | 876.00 | 310.00 | 930.00 | 325.00 | 975.00 | | 0024 | 735-04-00100 | Mailbox Supports (Multiple) | 1 | EACH | 330.00 | 330.00 | 350.00 | 350.00 | 375.00 | 375.00 | | 0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,000.00 | 2,000.00 | 5,500.00 | 5,500.00 | 35,000.00 | 35,000.00 | | 0026 | NS-500-00280 | Surface Preparation | 1 | LUMP | 10,000.00 | 10,000.00 | 10,650.00 | 10,650.00 | 20,000.00 | 20,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 240,483.60 | | 249,795.59 | | 375,182.60 |
|