Proposal:H.010396.6
Parish:Ouachita
Routes:US 165
Description:US 165: Bayou DeSiard - Sterlington
Type Construction:COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, PAVEMENT WIDENING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$10,878,060.61
Maximum Number of Days Allowed for Construction:250
Calculated Daily User Cost:$5,000.00
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $11,917,749.05 | 250.00 | $13,167,749.05 |
| 2 | 05789 | D & J CONSTRUCTION CO., LLC | $13,697,268.85 | 250.00 | $14,947,268.85 |
| 3 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $13,726,268.12 | 250.00 | $14,976,268.12 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - D & J CONSTRUCTION CO., LLC | - 3 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of Brick and Stucco Mailboxes | 2 | EACH | 1,000.00 | 2,000.00 | 250.00 | 500.00 | 200.00 | 400.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 2,890 | SQYD | 15.00 | 43,350.00 | 12.00 | 34,680.00 | 16.25 | 46,962.50 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 1,348 | LNFT | 11.50 | 15,502.00 | 16.00 | 21,568.00 | 17.00 | 22,916.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 993.8 | LNFT | 10.00 | 9,938.00 | 15.00 | 14,907.00 | 5.00 | 4,969.00 | | 0005 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 2,200.00 | 2,200.00 | 1,500.00 | 1,500.00 | 1,100.00 | 1,100.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 19,621 | CUYD | 15.00 | 294,315.00 | 20.00 | 392,420.00 | 18.00 | 353,178.00 | | 0007 | 204-02-00100 | Temporary Hay or Straw Bales | 44 | EACH | 11.00 | 484.00 | 12.00 | 528.00 | 11.00 | 484.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 10 | EACH | 175.00 | 1,750.00 | 165.00 | 1,650.00 | 170.00 | 1,700.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 44,369 | LNFT | 2.00 | 88,738.00 | 1.65 | 73,208.85 | 1.70 | 75,427.30 | | 0010 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 300 | CUYD | 75.00 | 22,500.00 | 75.00 | 22,500.00 | 65.00 | 19,500.00 | | 0011 | 502-01-00100 | Superpave Asphaltic Concrete | 41,426.1 | TON | 90.00 | 3,728,349.00 | 102.00 | 4,225,462.20 | 102.00 | 4,225,462.20 | | 0012 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,219 | TON | 150.00 | 182,850.00 | 156.00 | 190,164.00 | 181.00 | 220,639.00 | | 0013 | 508-01-00100 | Asphalt Concrete (SMA) Wearing Course | 19,716.9 | TON | 130.00 | 2,563,197.00 | 132.00 | 2,602,630.80 | 147.00 | 2,898,384.30 | | 0014 | 509-01-00100 | Cold Planing Asphaltic Pavement | 107,834 | SQYD | 2.25 | 242,626.50 | 3.75 | 404,377.50 | 2.00 | 215,668.00 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -4,502 | CUYD | 0.10 | -450.20 | 1.00 | -4,502.00 | 1.00 | -4,502.00 | | 0016 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 800 | SQYD | 110.00 | 88,000.00 | 120.00 | 96,000.00 | 103.00 | 82,400.00 | | 0017 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 3,800 | SQYD | 115.00 | 437,000.00 | 150.00 | 570,000.00 | 147.00 | 558,600.00 | | 0018 | 510-02-00100 | Pavement Widening | 753.3 | SQYD | 50.00 | 37,665.00 | 85.00 | 64,030.50 | 83.00 | 62,523.90 | | 0019 | 510-03-00100 | Pavement Joint Repair | 50 | TON | 750.00 | 37,500.00 | 500.00 | 25,000.00 | 460.00 | 23,000.00 | | 0020 | 602-03-00100 | Cleaning and Sealing Random cracks | 71,000 | LNFT | 2.25 | 159,750.00 | 2.50 | 177,500.00 | 2.60 | 184,600.00 | | 0021 | 602-05-01160 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (9" Thick) | 300 | SQYD | 300.00 | 90,000.00 | 300.00 | 90,000.00 | 305.00 | 91,500.00 | | 0022 | 602-05-02160 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (9" Thick) | 700 | SQYD | 285.00 | 199,500.00 | 275.00 | 192,500.00 | 288.00 | 201,600.00 | | 0023 | 602-05-03160 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) | 5,100 | SQYD | 240.00 | 1,224,000.00 | 230.00 | 1,173,000.00 | 270.00 | 1,377,000.00 | | 0024 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 2,000.00 | 4,000.00 | 1,500.00 | 3,000.00 | 2,795.00 | 5,590.00 | | 0025 | 702-04-00200 | Adjusting Catch Basins | 5 | EACH | 4,000.00 | 20,000.00 | 3,500.00 | 17,500.00 | 2,100.00 | 10,500.00 | | 0026 | 704-03-00100 | Blocked Out Guard Rail | 887.5 | LNFT | 25.00 | 22,187.50 | 22.00 | 19,525.00 | 23.00 | 20,412.50 | | 0027 | 704-06-00100 | Guard Rail Anchor Sections (Trailing End) | 25 | LNFT | 40.00 | 1,000.00 | 110.00 | 2,750.00 | 117.00 | 2,925.00 | | 0028 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 25 | LNFT | 40.00 | 1,000.00 | 55.00 | 1,375.00 | 55.00 | 1,375.00 | | 0029 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 41.7 | LNFT | 60.00 | 2,502.00 | 65.00 | 2,710.50 | 75.00 | 3,127.50 | | 0030 | 704-11-00100 | Guard Rail End Treatment (Flared) | 1 | EACH | 2,200.00 | 2,200.00 | 2,300.00 | 2,300.00 | 2,900.00 | 2,900.00 | | 0031 | 706-02-00200 | Concrete Drive (6" Thick) | 2,889.2 | SQYD | 80.00 | 231,136.00 | 60.00 | 173,352.00 | 72.00 | 208,022.40 | | 0032 | 707-01-00200 | Concrete Curb (Barrier) | 992 | LNFT | 11.00 | 10,912.00 | 22.00 | 21,824.00 | 28.00 | 27,776.00 | | 0033 | 707-01-00300 | Concrete Curb (Mountable) | 134 | LNFT | 11.00 | 1,474.00 | 22.00 | 2,948.00 | 55.00 | 7,370.00 | | 0034 | 707-03-00100 | Combination Concrete Curb and Gutter | 156 | LNFT | 25.00 | 3,900.00 | 35.00 | 5,460.00 | 66.00 | 10,296.00 | | 0035 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 245,000.00 | 245,000.00 | 600,000.00 | 600,000.00 | 415,000.00 | 415,000.00 | | 0036 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 6,379 | LNFT | 0.25 | 1,594.75 | 0.25 | 1,594.75 | 0.30 | 1,913.70 | | 0037 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,885 | LNFT | 0.50 | 942.50 | 0.75 | 1,413.75 | 0.55 | 1,036.75 | | 0038 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 29.055 | MILE | 100.00 | 2,905.50 | 250.00 | 7,263.75 | 280.00 | 8,135.40 | | 0039 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 29.055 | MILE | 350.00 | 10,169.25 | 450.00 | 13,074.75 | 470.00 | 13,655.85 | | 0040 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 58.109 | MILE | 750.00 | 43,581.75 | 850.00 | 49,392.65 | 940.00 | 54,622.46 | | 0041 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 81 | EACH | 15.00 | 1,215.00 | 15.00 | 1,215.00 | 17.00 | 1,377.00 | | 0042 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 54 | EACH | 25.00 | 1,350.00 | 25.00 | 1,350.00 | 29.00 | 1,566.00 | | 0043 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 1,490 | EACH | 2.00 | 2,980.00 | 6.00 | 8,940.00 | 7.00 | 10,430.00 | | 0044 | 716-01-00100 | Mulch (Vegetative) | 174.6 | TON | 550.00 | 96,030.00 | 550.00 | 96,030.00 | 580.00 | 101,268.00 | | 0045 | 717-01-00100 | Seeding | 5,238 | LB | 9.00 | 47,142.00 | 8.50 | 44,523.00 | 9.00 | 47,142.00 | | 0046 | 718-01-00100 | Fertilizer | 87,306 | LB | 0.60 | 52,383.60 | 0.55 | 48,018.30 | 0.60 | 52,383.60 | | 0047 | 727-01-00100 | Mobilization | 1 | LUMP | 450,000.00 | 450,000.00 | 950,000.00 | 950,000.00 | 790,000.00 | 790,000.00 | | 0048 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 80.00 | 160.00 | 100.00 | 200.00 | 88.00 | 176.00 | | 0049 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,977 | EACH | 6.50 | 12,850.50 | 7.50 | 14,827.50 | 7.00 | 13,839.00 | | 0050 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 17.068 | MILE | 3,200.00 | 54,617.60 | 3,000.00 | 51,204.00 | 3,400.00 | 58,031.20 | | 0051 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.403 | MILE | 20,000.00 | 8,060.00 | 25,000.00 | 10,075.00 | 23,500.00 | 9,470.50 | | 0052 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.119 | MILE | 60,000.00 | 7,140.00 | 60,000.00 | 7,140.00 | 70,500.00 | 8,389.50 | | 0053 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 13.373 | MILE | 1,000.00 | 13,373.00 | 1,000.00 | 13,373.00 | 1,100.00 | 14,710.30 | | 0054 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 27 | EACH | 400.00 | 10,800.00 | 500.00 | 13,500.00 | 400.00 | 10,800.00 | | 0055 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 18 | EACH | 550.00 | 9,900.00 | 500.00 | 9,000.00 | 550.00 | 9,900.00 | | 0056 | 732-05-00100 | Removal of Existing Markings | 11.083 | MILE | 5,000.00 | 55,415.00 | 5,000.00 | 55,415.00 | 5,200.00 | 57,631.60 | | 0057 | 735-01-00100 | Mailboxes | 21 | EACH | 10.00 | 210.00 | 5.00 | 105.00 | 10.00 | 210.00 | | 0058 | 735-02-00100 | Mailbox Supports (Single) | 14 | EACH | 100.00 | 1,400.00 | 125.00 | 1,750.00 | 115.00 | 1,610.00 | | 0059 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 130.00 | 260.00 | 200.00 | 400.00 | 150.00 | 300.00 | | 0060 | 735-04-00100 | Mailbox Supports (Multiple) | 1 | EACH | 300.00 | 300.00 | 350.00 | 350.00 | 330.00 | 330.00 | | 0061 | 736-09-00100 | Loop Detector | 600 | LNFT | 27.00 | 16,200.00 | 30.00 | 18,000.00 | 29.00 | 17,400.00 | | 0062 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 47,000.00 | 47,000.00 | 20,000.00 | 20,000.00 | | 0063 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 163,421 | LNFT | 1.20 | 196,105.20 | 1.15 | 187,934.15 | 1.25 | 204,276.25 | | 0064 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 105,403 | LNFT | 1.20 | 126,483.60 | 1.30 | 137,023.90 | 1.35 | 142,294.05 | | 0065 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 524,556 | LNFT | 1.00 | 524,556.00 | 1.00 | 524,556.00 | 1.05 | 550,783.80 | | 0066 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 4,772 | INLF | 0.60 | 2,863.20 | 0.50 | 2,386.00 | 0.70 | 3,340.40 | | 0067 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 59,508 | INLF | 0.60 | 35,704.80 | 0.50 | 29,754.00 | 0.30 | 17,852.40 | | 0068 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 7,800 | INLF | 1.00 | 7,800.00 | 2.20 | 17,160.00 | 0.97 | 7,566.00 | | 0069 | NS-602-00001 | Milling Concrete Pavement | 1,951 | SQYD | 20.00 | 39,020.00 | 30.00 | 58,530.00 | 23.76 | 46,355.76 | | 0070 | NS-713-00008 | Portable Changeable Message Sign | 4 | EACH | 3,000.00 | 12,000.00 | 12,000.00 | 48,000.00 | 16,000.00 | 64,000.00 | | 0071 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 8.8 | MILE | 700.00 | 6,160.00 | 500.00 | 4,400.00 | 530.00 | 4,664.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 11,917,749.05 | | 13,697,268.85 | | 13,726,268.12 |
|