Proposal:H.008322.6
Parish:St. John
Routes:LA 637
Description:LA 637: PORT OF S. LOUISIANA CONNECTOR
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, GRADING, SUBGRADE TREATMENT, CLASS II BASE COURSE, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, TRAFFIC SIGNALIZATION AND RELATED WORK.
Estimated Construction Cost:$7,046,776.06
| Rank | License | Bidder | Construction Bid |
| 1 | 04674 | Durr Heavy Construction L.L.C. | $7,316,535.70 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $7,638,384.34 |
| 3 | 06276 | BARRIERE CONSTRUCTION CO., LLC. | $7,701,053.65 |
| 4 | 36961 | Cycle Construction Co. L.L.C. | $8,210,524.47 |
| 5 | 12198 | Byron E. Talbot Contractor, Inc. | $8,617,361.47 |
| 48896 | Command Construction Industries LLC | IRREGULAR |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Durr Heavy Construction L.L.C. | - 2 - Barber Bros. Contracting Co., L.L.C | - 3 - BARRIERE CONSTRUCTION CO., LLC. | - 4 - Cycle Construction Co. L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 7,996.64 | 7,996.64 | 75,000.00 | 75,000.00 | 20,000.00 | 20,000.00 | 95,000.00 | 95,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 32,419.96 | 32,419.96 | 25,000.00 | 25,000.00 | 71,000.00 | 71,000.00 | 75,000.00 | 75,000.00 | | 0004 | 202-02-02000 | Removal of Asphalt Drives | 1,543.1 | SQYD | 4.76 | 7,345.16 | 20.00 | 30,862.00 | 12.00 | 18,517.20 | 7.75 | 11,959.03 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 4,670.2 | SQYD | 3.62 | 16,906.12 | 10.00 | 46,702.00 | 12.00 | 56,042.40 | 7.00 | 32,691.40 | | 0006 | 202-02-12000 | Removal of Fence | 4,676 | LNFT | 1.83 | 8,557.08 | 5.00 | 23,380.00 | 6.00 | 28,056.00 | 3.00 | 14,028.00 | | 0007 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 69.6 | SQYD | 8.37 | 582.55 | 20.00 | 1,392.00 | 10.00 | 696.00 | 15.00 | 1,044.00 | | 0009 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 26,606.3 | SQYD | 6.56 | 174,537.33 | 6.00 | 159,637.80 | 10.00 | 266,063.00 | 9.00 | 239,456.70 | | 0010 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 3,070.14 | 3,070.14 | 3,500.00 | 3,500.00 | 20,000.00 | 20,000.00 | 15,700.00 | 15,700.00 | | 0011 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 442.70 | 442.70 | 500.00 | 500.00 | 550.00 | 550.00 | 500.00 | 500.00 | | 0012 | 203-01-00100 | General Excavation | 6,177 | CUYD | 9.59 | 59,237.43 | 10.00 | 61,770.00 | 10.00 | 61,770.00 | 17.00 | 105,009.00 | | 0013 | 203-03-00100 | Embankment | 24,966 | CUYD | 19.20 | 479,347.20 | 25.00 | 624,150.00 | 25.00 | 624,150.00 | 24.00 | 599,184.00 | | 0014 | 204-02-00100 | Temporary Hay or Straw Bales | 1,026 | EACH | 12.65 | 12,978.90 | 22.00 | 22,572.00 | 11.00 | 11,286.00 | 12.50 | 12,825.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 15,490 | LNFT | 2.10 | 32,529.00 | 2.00 | 30,980.00 | 1.00 | 15,490.00 | 1.75 | 27,107.50 | | 0016 | 302-02-06020 | Class II Base Course (12" Thick) (Soil Cement) | 39,433.9 | SQYD | 21.97 | 866,362.78 | 20.00 | 788,678.00 | 22.00 | 867,545.80 | 7.50 | 295,754.25 | | 0017 | 304-05-00100 | Lime Treatment (Type E) | 126.3 | TON | 201.58 | 25,459.55 | 350.00 | 44,205.00 | 400.00 | 50,520.00 | 500.00 | 63,150.00 | | 0018 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 11,768.9 | SQYD | 16.10 | 189,479.29 | 7.25 | 85,324.53 | 10.00 | 117,689.00 | 18.00 | 211,840.20 | | 0019 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 500 | CUYD | 58.03 | 29,015.00 | 70.00 | 35,000.00 | 75.00 | 37,500.00 | 61.00 | 30,500.00 | | 0020 | 502-01-00100 | Superpave Asphaltic Concrete | 13,035.6 | TON | 108.25 | 1,411,103.70 | 85.00 | 1,108,026.00 | 92.00 | 1,199,275.20 | 92.00 | 1,199,275.20 | | 0021 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 644.2 | TON | 153.10 | 98,627.02 | 125.00 | 80,525.00 | 92.00 | 59,266.40 | 130.00 | 83,746.00 | | 0022 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 26,815.1 | GAL | 3.36 | 90,098.74 | 3.30 | 88,489.83 | 3.00 | 80,445.30 | 3.00 | 80,445.30 | | 0023 | 507-02-00200 | Aggregate (S2) | 39,433.9 | SQYD | 1.25 | 49,292.38 | 1.25 | 49,292.38 | 1.00 | 39,433.90 | 1.10 | 43,377.29 | | 0024 | 507-02-00300 | Aggregate (S3) | 39,433.9 | SQYD | 1.01 | 39,828.24 | 1.00 | 39,433.90 | 1.00 | 39,433.90 | 1.00 | 39,433.90 | | 0025 | 701-01-02001 | Cross Drain Pipe (24" RCP/PP/CMP) | 86 | LNFT | 88.90 | 7,645.40 | 115.00 | 9,890.00 | 100.00 | 8,600.00 | 135.00 | 11,610.00 | | 0026 | 701-01-02160 | Cross Drain Pipe (48" RCP/PP or 54" CMP) | 258 | LNFT | 164.38 | 42,410.04 | 200.00 | 51,600.00 | 210.00 | 54,180.00 | 390.00 | 100,620.00 | | 0027 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 952 | LNFT | 52.15 | 49,646.80 | 45.00 | 42,840.00 | 55.00 | 52,360.00 | 62.00 | 59,024.00 | | 0028 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 2,077 | LNFT | 52.13 | 108,274.01 | 50.00 | 103,850.00 | 60.00 | 124,620.00 | 75.00 | 155,775.00 | | 0029 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 1,670 | LNFT | 65.70 | 109,719.00 | 60.00 | 100,200.00 | 65.00 | 108,550.00 | 90.00 | 150,300.00 | | 0030 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 1,999 | LNFT | 78.85 | 157,621.15 | 80.00 | 159,920.00 | 75.00 | 149,925.00 | 108.00 | 215,892.00 | | 0031 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 200 | LNFT | 105.86 | 21,172.00 | 125.00 | 25,000.00 | 100.00 | 20,000.00 | 140.00 | 28,000.00 | | 0032 | 701-03-02080 | Storm Drain Pipe (Outfall) (36" PP or 42" CMP) | 113 | LNFT | 104.45 | 11,802.85 | 130.00 | 14,690.00 | 100.00 | 11,300.00 | 245.00 | 27,685.00 | | 0033 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 8 | LNFT | 92.91 | 743.28 | 150.00 | 1,200.00 | 100.00 | 800.00 | 82.00 | 656.00 | | 0034 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 141 | LNFT | 97.55 | 13,754.55 | 85.00 | 11,985.00 | 65.00 | 9,165.00 | 117.00 | 16,497.00 | | 0035 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 915 | LNFT | 76.73 | 70,207.95 | 85.00 | 77,775.00 | 70.00 | 64,050.00 | 98.00 | 89,670.00 | | 0036 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 2,858 | LNFT | 90.08 | 257,448.64 | 100.00 | 285,800.00 | 80.00 | 228,640.00 | 125.00 | 357,250.00 | | 0037 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 3,712 | LNFT | 108.84 | 404,014.08 | 120.00 | 445,440.00 | 110.00 | 408,320.00 | 150.00 | 556,800.00 | | 0038 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 2,181 | LNFT | 127.80 | 278,731.80 | 130.00 | 283,530.00 | 150.00 | 327,150.00 | 182.00 | 396,942.00 | | 0039 | 701-09-00100 | Fabricating Pipe Fittings | 34 | EACH | 2,566.00 | 87,244.00 | 3,000.00 | 102,000.00 | 1,500.00 | 51,000.00 | 3,200.00 | 108,800.00 | | 0040 | 701-10-01020 | Reinforced Concrete Pipe (Extension) (15") | 37 | LNFT | 77.01 | 2,849.37 | 200.00 | 7,400.00 | 150.00 | 5,550.00 | 70.00 | 2,590.00 | | 0041 | 701-15-00100 | Concrete Collar | 1 | EACH | 344.98 | 344.98 | 1,500.00 | 1,500.00 | 2,000.00 | 2,000.00 | 2,100.00 | 2,100.00 | | 0042 | 702-02-00100 | Manholes (MH-06) | 2 | EACH | 5,091.39 | 10,182.78 | 20,000.00 | 40,000.00 | 3,300.00 | 6,600.00 | 7,400.00 | 14,800.00 | | 0043 | 702-02-00200 | Manholes (R-CB-11) | 17 | EACH | 3,901.13 | 66,319.21 | 4,000.00 | 68,000.00 | 3,000.00 | 51,000.00 | 5,100.00 | 86,700.00 | | 0044 | 702-02-00300 | Manholes (R-CB-11 MOD) | 13 | EACH | 6,129.81 | 79,687.53 | 4,800.00 | 62,400.00 | 3,200.00 | 41,600.00 | 7,000.00 | 91,000.00 | | 0045 | 702-03-00100 | Catch Basins (CB-01) | 52 | EACH | 2,353.51 | 122,382.52 | 2,600.00 | 135,200.00 | 2,600.00 | 135,200.00 | 2,800.00 | 145,600.00 | | 0046 | 702-03-00500 | Catch Basins (CB-06) | 44 | EACH | 4,390.29 | 193,172.76 | 4,600.00 | 202,400.00 | 6,400.00 | 281,600.00 | 5,200.00 | 228,800.00 | | 0047 | 702-03-00600 | Catch Basins (CB-07) | 18 | EACH | 4,816.64 | 86,699.52 | 5,500.00 | 99,000.00 | 8,000.00 | 144,000.00 | 9,000.00 | 162,000.00 | | 0048 | 702-03-00700 | Catch Basins (CB-08) | 9 | EACH | 8,212.58 | 73,913.22 | 9,000.00 | 81,000.00 | 12,000.00 | 108,000.00 | 12,300.00 | 110,700.00 | | 0049 | 702-04-00100 | Adjusting Manholes | 10 | EACH | 583.57 | 5,835.70 | 2,500.00 | 25,000.00 | 1,000.00 | 10,000.00 | 600.00 | 6,000.00 | | 0050 | 706-01-00100 | Concrete Walk (4" Thick) | 1,094.9 | SQYD | 65.74 | 71,978.73 | 45.00 | 49,270.50 | 70.00 | 76,643.00 | 80.00 | 87,592.00 | | 0051 | 706-02-00200 | Concrete Drive (6" Thick) | 2,033.6 | SQYD | 73.87 | 150,222.03 | 100.00 | 203,360.00 | 75.00 | 152,520.00 | 90.00 | 183,024.00 | | 0052 | 706-03-00500 | Incidental Concrete Paving (8" Thick) | 424 | SQYD | 79.32 | 33,631.68 | 110.00 | 46,640.00 | 80.00 | 33,920.00 | 90.00 | 38,160.00 | | 0053 | 707-03-00100 | Combination Concrete Curb and Gutter | 16,125.5 | LNFT | 23.13 | 372,982.82 | 38.00 | 612,769.00 | 25.00 | 403,137.50 | 31.00 | 499,890.50 | | 0054 | 708-01-00100 | Right-of-Way Monument | 69 | EACH | 172.48 | 11,901.12 | 300.00 | 20,700.00 | 120.00 | 8,280.00 | 150.00 | 10,350.00 | | 0055 | 708-02-00100 | Right-of-Way Monument Witness Post | 69 | EACH | 86.24 | 5,950.56 | 250.00 | 17,250.00 | 75.00 | 5,175.00 | 85.00 | 5,865.00 | | 0056 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 42,141.10 | 42,141.10 | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | 21,300.00 | 21,300.00 | | 0057 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 5,608 | LNFT | 0.40 | 2,243.20 | 0.40 | 2,243.20 | 0.40 | 2,243.20 | 0.50 | 2,804.00 | | 0058 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 886 | LNFT | 1.15 | 1,018.90 | 1.15 | 1,018.90 | 1.00 | 886.00 | 1.00 | 886.00 | | 0059 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.378 | MILE | 345.09 | 1,855.89 | 350.00 | 1,882.30 | 300.00 | 1,613.40 | 2,100.00 | 11,293.80 | | 0060 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 1.982 | MILE | 4,618.04 | 9,152.96 | 4,000.00 | 7,928.00 | 4,000.00 | 7,928.00 | 4,500.00 | 8,919.00 | | 0061 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 7.36 | MILE | 517.44 | 3,808.36 | 500.00 | 3,680.00 | 500.00 | 3,680.00 | 500.00 | 3,680.00 | | 0062 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 27.059 | MILE | 574.11 | 15,534.84 | 500.00 | 13,529.50 | 50.00 | 1,352.95 | 550.00 | 14,882.45 | | 0063 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 130 | EACH | 34.50 | 4,485.00 | 35.00 | 4,550.00 | 35.00 | 4,550.00 | 33.00 | 4,290.00 | | 0064 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 4 | EACH | 34.50 | 138.00 | 35.00 | 140.00 | 35.00 | 140.00 | 33.00 | 132.00 | | 0065 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 16 | EACH | 45.99 | 735.84 | 50.00 | 800.00 | 35.00 | 560.00 | 45.00 | 720.00 | | 0066 | 716-01-00100 | Mulch (Vegetative) | 20.08 | TON | 747.41 | 15,007.99 | 500.00 | 10,040.00 | 250.00 | 5,020.00 | 700.00 | 14,056.00 | | 0067 | 717-01-00100 | Seeding | 301 | LB | 11.50 | 3,461.50 | 12.00 | 3,612.00 | 6.00 | 1,806.00 | 11.00 | 3,311.00 | | 0068 | 718-01-00100 | Fertilizer | 10,038 | LB | 0.69 | 6,926.22 | 1.25 | 12,547.50 | 0.50 | 5,019.00 | 1.00 | 10,038.00 | | 0069 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 14,948.29 | 14,948.29 | 16,000.00 | 16,000.00 | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 | | 0070 | 726-01-00100 | Bedding Material | 1,803.57 | CUYD | 45.78 | 82,567.43 | 80.00 | 144,285.60 | 80.00 | 144,285.60 | 60.00 | 108,214.20 | | 0071 | 727-01-00100 | Mobilization | 1 | LUMP | 224,835.31 | 224,835.31 | 232,000.00 | 232,000.00 | 380,000.00 | 380,000.00 | 450,000.00 | 450,000.00 | | 0072 | 729-01-00100 | Sign (Type A) | 30 | SQFT | 60.94 | 1,828.20 | 65.00 | 1,950.00 | 55.00 | 1,650.00 | 50.00 | 1,500.00 | | 0073 | 731-02-00100 | Reflectorized Raised Pavement Markers | 679 | EACH | 8.05 | 5,465.95 | 8.00 | 5,432.00 | 8.00 | 5,432.00 | 7.00 | 4,753.00 | | 0074 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,402 | LNFT | 2.18 | 3,056.36 | 2.20 | 3,084.40 | 2.00 | 2,804.00 | 2.00 | 2,804.00 | | 0075 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 310 | LNFT | 4.02 | 1,246.20 | 4.00 | 1,240.00 | 4.00 | 1,240.00 | 3.50 | 1,085.00 | | 0076 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 223 | LNFT | 9.77 | 2,178.71 | 10.00 | 2,230.00 | 10.00 | 2,230.00 | 9.50 | 2,118.50 | | 0077 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.565 | MILE | 4,200.21 | 27,574.38 | 4,200.00 | 27,573.00 | 4,200.00 | 27,573.00 | 4,050.00 | 26,588.25 | | 0078 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.982 | MILE | 1,269.96 | 2,517.06 | 1,500.00 | 2,973.00 | 1,200.00 | 2,378.40 | 1,250.00 | 2,477.50 | | 0079 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.036 | MILE | 2,555.28 | 91.99 | 2,000.00 | 72.00 | 2,300.00 | 82.80 | 2,500.00 | 90.00 | | 0080 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.301 | MILE | 4,737.01 | 1,425.84 | 5,000.00 | 1,505.00 | 4,700.00 | 1,414.70 | 4,500.00 | 1,354.50 | | 0081 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 18 | EACH | 287.47 | 5,174.46 | 300.00 | 5,400.00 | 300.00 | 5,400.00 | 300.00 | 5,400.00 | | 0082 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 18 | EACH | 287.47 | 5,174.46 | 300.00 | 5,400.00 | 300.00 | 5,400.00 | 300.00 | 5,400.00 | | 0083 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 287.47 | 287.47 | 300.00 | 300.00 | 300.00 | 300.00 | 300.00 | 300.00 | | 0084 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 4 | EACH | 574.94 | 2,299.76 | 600.00 | 2,400.00 | 300.00 | 1,200.00 | 555.00 | 2,220.00 | | 0085 | 732-05-00100 | Removal of Existing Markings | 4.42 | MILE | 5,749.34 | 25,412.08 | 6,000.00 | 26,520.00 | 1,000.00 | 4,420.00 | 5,500.00 | 24,310.00 | | 0086 | 735-01-00100 | Mailboxes | 16 | EACH | 6.90 | 110.40 | 8.00 | 128.00 | 10.00 | 160.00 | 7.00 | 112.00 | | 0087 | 735-02-00100 | Mailbox Supports (Single) | 16 | EACH | 201.23 | 3,219.68 | 200.00 | 3,200.00 | 200.00 | 3,200.00 | 185.00 | 2,960.00 | | 0088 | 736-01-00100 | Trenching and Backfilling | 140 | LNFT | 8.45 | 1,183.00 | 8.50 | 1,190.00 | 5.00 | 700.00 | 5.00 | 700.00 | | 0089 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 350 | LNFT | 21.85 | 7,647.50 | 22.00 | 7,700.00 | 35.00 | 12,250.00 | 32.00 | 11,200.00 | | 0090 | 736-04-04180 | Signal Support (50' Single Mast Arm) | 2 | EACH | 15,100.07 | 30,200.14 | 15,000.00 | 30,000.00 | 20,000.00 | 40,000.00 | 15,000.00 | 30,000.00 | | 0091 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 4 | EACH | 1,154.47 | 4,617.88 | 1,200.00 | 4,800.00 | 1,200.00 | 4,800.00 | 1,000.00 | 4,000.00 | | 0092 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 1 | EACH | 1,656.96 | 1,656.96 | 1,800.00 | 1,800.00 | 1,700.00 | 1,700.00 | 1,500.00 | 1,500.00 | | 0093 | 736-10-00300 | Underground Junction Box (Type F) | 2 | EACH | 686.47 | 1,372.94 | 800.00 | 1,600.00 | 800.00 | 1,600.00 | 700.00 | 1,400.00 | | 0094 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 140 | LNFT | 4.60 | 644.00 | 5.00 | 700.00 | 10.00 | 1,400.00 | 9.00 | 1,260.00 | | 0095 | 736-12-04000 | Conductor (6c, #14 awg) | 165 | LNFT | 2.30 | 379.50 | 3.00 | 495.00 | 2.00 | 330.00 | 1.50 | 247.50 | | 0096 | 736-12-06000 | Conductor (10c, #14 awg) | 885 | LNFT | 2.53 | 2,239.05 | 3.00 | 2,655.00 | 2.00 | 1,770.00 | 2.00 | 1,770.00 | | 0097 | 737-04-00001 | Painted Curbs and Islands | 424 | SQYD | 17.25 | 7,314.00 | 18.00 | 7,632.00 | 20.00 | 8,480.00 | 16.50 | 6,996.00 | | 0098 | 740-01-00100 | Construction Layout | 1 | LUMP | 154,899.43 | 154,899.43 | 90,000.00 | 90,000.00 | 43,000.00 | 43,000.00 | 90,000.00 | 90,000.00 | | 0099 | 742-01-00400 | Sanitary Sewer Pipe (8") | 72 | LNFT | 112.99 | 8,135.28 | 120.00 | 8,640.00 | 100.00 | 7,200.00 | 217.00 | 15,624.00 | | 0100 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 6,739 | INLF | 0.80 | 5,391.20 | 2.00 | 13,478.00 | 1.00 | 6,739.00 | 1.50 | 10,108.50 | | 0101 | NS-736-00006 | Video Detection Camera | 2 | EACH | 2,675.75 | 5,351.50 | 6,000.00 | 12,000.00 | 8,000.00 | 16,000.00 | 7,500.00 | 15,000.00 | | 0102 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 250 | SQYD | 103.49 | 25,872.50 | 100.00 | 25,000.00 | 90.00 | 22,500.00 | 120.00 | 30,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,316,535.70 | | 7,638,384.34 | | 7,701,053.65 | | 8,210,524.47 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Byron E. Talbot Contractor, Inc. | Command Construction Industries LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | | 0004 | 202-02-02000 | Removal of Asphalt Drives | 1,543.1 | SQYD | 11.50 | 17,745.65 | 5.00 | 7,715.50 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 4,670.2 | SQYD | 11.00 | 51,372.20 | 5.00 | 23,351.00 | | 0006 | 202-02-12000 | Removal of Fence | 4,676 | LNFT | 6.00 | 28,056.00 | 5.00 | 23,380.00 | | 0007 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 69.6 | SQYD | 11.45 | 796.92 | 50.00 | 3,480.00 | | 0009 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 26,606.3 | SQYD | 7.25 | 192,895.68 | 5.00 | 133,031.50 | | 0010 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 4,500.00 | 4,500.00 | 1,000.00 | 1,000.00 | | 0011 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 1,100.00 | 1,100.00 | 1,000.00 | 1,000.00 | | 0012 | 203-01-00100 | General Excavation | 6,177 | CUYD | 10.30 | 63,623.10 | 10.00 | 61,770.00 | | 0013 | 203-03-00100 | Embankment | 24,966 | CUYD | 25.00 | 624,150.00 | 10.00 | 249,660.00 | | 0014 | 204-02-00100 | Temporary Hay or Straw Bales | 1,026 | EACH | 15.00 | 15,390.00 | 10.00 | 10,260.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 15,490 | LNFT | 2.00 | 30,980.00 | 2.00 | 30,980.00 | | 0016 | 302-02-06020 | Class II Base Course (12" Thick) (Soil Cement) | 39,433.9 | SQYD | 26.85 | 1,058,800.22 | 13.00 | 512,640.70 | | 0017 | 304-05-00100 | Lime Treatment (Type E) | 126.3 | TON | 480.00 | 60,624.00 | 325.00 | 41,047.50 | | 0018 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 11,768.9 | SQYD | 14.00 | 164,764.60 | 5.00 | 58,844.50 | | 0019 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 500 | CUYD | 60.00 | 30,000.00 | 10.00 | 5,000.00 | | 0020 | 502-01-00100 | Superpave Asphaltic Concrete | 13,035.6 | TON | 101.00 | 1,316,595.60 | 100.00 | 1,303,560.00 | | 0021 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 644.2 | TON | 101.00 | 65,064.20 | 150.00 | 96,630.00 | | 0022 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 26,815.1 | GAL | 3.20 | 85,808.32 | 3.00 | 80,445.30 | | 0023 | 507-02-00200 | Aggregate (S2) | 39,433.9 | SQYD | 1.20 | 47,320.68 | 1.00 | 39,433.90 | | 0024 | 507-02-00300 | Aggregate (S3) | 39,433.9 | SQYD | 0.95 | 37,462.21 | 1.00 | 39,433.90 | | 0025 | 701-01-02001 | Cross Drain Pipe (24" RCP/PP/CMP) | 86 | LNFT | 142.00 | 12,212.00 | 150.00 | 12,900.00 | | 0026 | 701-01-02160 | Cross Drain Pipe (48" RCP/PP or 54" CMP) | 258 | LNFT | 245.00 | 63,210.00 | 200.00 | 51,600.00 | | 0027 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 952 | LNFT | 82.00 | 78,064.00 | 50.00 | 47,600.00 | | 0028 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 2,077 | LNFT | 78.50 | 163,044.50 | 55.00 | 114,235.00 | | 0029 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 1,670 | LNFT | 89.70 | 149,799.00 | 60.00 | 100,200.00 | | 0030 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 1,999 | LNFT | 110.55 | 220,989.45 | 70.00 | 139,930.00 | | 0031 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 200 | LNFT | 123.00 | 24,600.00 | 90.00 | 18,000.00 | | 0032 | 701-03-02080 | Storm Drain Pipe (Outfall) (36" PP or 42" CMP) | 113 | LNFT | 225.00 | 25,425.00 | 125.00 | 14,125.00 | | 0033 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 8 | LNFT | 320.00 | 2,560.00 | 55.00 | 440.00 | | 0034 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 141 | LNFT | 87.00 | 12,267.00 | 60.00 | 8,460.00 | | 0035 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 915 | LNFT | 104.00 | 95,160.00 | 65.00 | 59,475.00 | | 0036 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 2,858 | LNFT | 135.20 | 386,401.60 | 75.00 | 214,350.00 | | 0037 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 3,712 | LNFT | 158.35 | 587,795.20 | 110.00 | 408,320.00 | | 0038 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 2,181 | LNFT | 180.00 | 392,580.00 | 120.00 | 261,720.00 | | 0039 | 701-09-00100 | Fabricating Pipe Fittings | 34 | EACH | 2,175.00 | 73,950.00 | 1,500.00 | 51,000.00 | | 0040 | 701-10-01020 | Reinforced Concrete Pipe (Extension) (15") | 37 | LNFT | 260.00 | 9,620.00 | 100.00 | 3,700.00 | | 0041 | 701-15-00100 | Concrete Collar | 1 | EACH | 385.00 | 385.00 | 750.00 | 750.00 | | 0042 | 702-02-00100 | Manholes (MH-06) | 2 | EACH | 10,000.00 | 20,000.00 | 3,500.00 | 7,000.00 | | 0043 | 702-02-00200 | Manholes (R-CB-11) | 17 | EACH | 3,895.00 | 66,215.00 | 3,500.00 | 59,500.00 | | 0044 | 702-02-00300 | Manholes (R-CB-11 MOD) | 13 | EACH | 4,100.00 | 53,300.00 | 3,500.00 | 45,500.00 | | 0045 | 702-03-00100 | Catch Basins (CB-01) | 52 | EACH | 2,650.00 | 137,800.00 | 3,500.00 | 182,000.00 | | 0046 | 702-03-00500 | Catch Basins (CB-06) | 44 | EACH | 5,200.00 | 228,800.00 | 3,500.00 | 154,000.00 | | 0047 | 702-03-00600 | Catch Basins (CB-07) | 18 | EACH | 6,400.00 | 115,200.00 | 5,000.00 | 90,000.00 | | 0048 | 702-03-00700 | Catch Basins (CB-08) | 9 | EACH | 11,650.00 | 104,850.00 | 7,000.00 | 63,000.00 | | 0049 | 702-04-00100 | Adjusting Manholes | 10 | EACH | 600.00 | 6,000.00 | 500.00 | 5,000.00 | | 0050 | 706-01-00100 | Concrete Walk (4" Thick) | 1,094.9 | SQYD | 50.00 | 54,745.00 | 50.00 | 54,745.00 | | 0051 | 706-02-00200 | Concrete Drive (6" Thick) | 2,033.6 | SQYD | 76.50 | 155,570.40 | 55.00 | 111,848.00 | | 0052 | 706-03-00500 | Incidental Concrete Paving (8" Thick) | 424 | SQYD | 60.00 | 25,440.00 | 50.00 | 21,200.00 | | 0053 | 707-03-00100 | Combination Concrete Curb and Gutter | 16,125.5 | LNFT | 28.30 | 456,351.65 | 20.00 | 322,510.00 | | 0054 | 708-01-00100 | Right-of-Way Monument | 69 | EACH | 50.00 | 3,450.00 | 250.00 | 17,250.00 | | 0055 | 708-02-00100 | Right-of-Way Monument Witness Post | 69 | EACH | 105.00 | 7,245.00 | 250.00 | 17,250.00 | | 0056 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 85,000.00 | 85,000.00 | 250,000.00 | 250,000.00 | | 0057 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 5,608 | LNFT | 0.50 | 2,804.00 | 1.00 | 5,608.00 | | 0058 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 886 | LNFT | 1.10 | 974.60 | 2.00 | 1,772.00 | | 0059 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.378 | MILE | 330.00 | 1,774.74 | 500.00 | 2,689.00 | | 0060 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 1.982 | MILE | 4,500.00 | 8,919.00 | 4,500.00 | 8,919.00 | | 0061 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 7.36 | MILE | 500.00 | 3,680.00 | 400.00 | 2,944.00 | | 0062 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 27.059 | MILE | 550.00 | 14,882.45 | 700.00 | 18,941.30 | | 0063 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 130 | EACH | 50.00 | 6,500.00 | 40.00 | 5,200.00 | | 0064 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 4 | EACH | 40.00 | 160.00 | 40.00 | 160.00 | | 0065 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 16 | EACH | 55.00 | 880.00 | 40.00 | 640.00 | | 0066 | 716-01-00100 | Mulch (Vegetative) | 20.08 | TON | 700.00 | 14,056.00 | 1,000.00 | 20,080.00 | | 0067 | 717-01-00100 | Seeding | 301 | LB | 11.00 | 3,311.00 | 10.00 | 3,010.00 | | 0068 | 718-01-00100 | Fertilizer | 10,038 | LB | 1.00 | 10,038.00 | 0.50 | 5,019.00 | | 0069 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 35,000.00 | 35,000.00 | 1,000.00 | 1,000.00 | | 0070 | 726-01-00100 | Bedding Material | 1,803.57 | CUYD | 85.00 | 153,303.45 | 60.00 | 108,214.20 | | 0071 | 727-01-00100 | Mobilization | 1 | LUMP | 255,000.00 | 255,000.00 | 600,000.00 | 600,000.00 | | 0072 | 729-01-00100 | Sign (Type A) | 30 | SQFT | 60.00 | 1,800.00 | 25.00 | 750.00 | | 0073 | 731-02-00100 | Reflectorized Raised Pavement Markers | 679 | EACH | 7.50 | 5,092.50 | 8.00 | 5,432.00 | | 0074 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,402 | LNFT | 2.00 | 2,804.00 | 2.00 | 2,804.00 | | 0075 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 310 | LNFT | 3.75 | 1,162.50 | 4.00 | 1,240.00 | | 0076 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 223 | LNFT | 9.00 | 2,007.00 | 7.00 | 1,561.00 | | 0077 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.565 | MILE | 4,000.00 | 26,260.00 | 4,000.00 | 26,260.00 | | 0078 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.982 | MILE | 1,175.00 | 2,328.85 | 2,000.00 | 3,964.00 | | 0079 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.036 | MILE | 2,125.00 | 76.50 | 2,500.00 | 90.00 | | 0080 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.301 | MILE | 4,300.00 | 1,294.30 | 5,000.00 | 1,505.00 | | 0081 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 18 | EACH | 265.00 | 4,770.00 | 300.00 | 5,400.00 | | 0082 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 18 | EACH | 265.00 | 4,770.00 | 300.00 | 5,400.00 | | 0083 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 265.00 | 265.00 | 300.00 | 300.00 | | 0084 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 4 | EACH | 530.00 | 2,120.00 | 500.00 | 2,000.00 | | 0085 | 732-05-00100 | Removal of Existing Markings | 4.42 | MILE | 5,500.00 | 24,310.00 | 1,000.00 | 4,420.00 | | 0086 | 735-01-00100 | Mailboxes | 16 | EACH | 7.00 | 112.00 | 10.00 | 160.00 | | 0087 | 735-02-00100 | Mailbox Supports (Single) | 16 | EACH | 185.00 | 2,960.00 | 125.00 | 2,000.00 | | 0088 | 736-01-00100 | Trenching and Backfilling | 140 | LNFT | 7.00 | 980.00 | 10.00 | 1,400.00 | | 0089 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 350 | LNFT | 26.50 | 9,275.00 | 100.00 | 35,000.00 | | 0090 | 736-04-04180 | Signal Support (50' Single Mast Arm) | 2 | EACH | 18,000.00 | 36,000.00 | 15,000.00 | 30,000.00 | | 0091 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 4 | EACH | 1,225.00 | 4,900.00 | 1,000.00 | 4,000.00 | | 0092 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 1 | EACH | 1,800.00 | 1,800.00 | 1,000.00 | 1,000.00 | | 0093 | 736-10-00300 | Underground Junction Box (Type F) | 2 | EACH | 720.00 | 1,440.00 | 750.00 | 1,500.00 | | 0094 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 140 | LNFT | 4.25 | 595.00 | 8.00 | 1,120.00 | | 0095 | 736-12-04000 | Conductor (6c, #14 awg) | 165 | LNFT | 2.65 | 437.25 | 2.00 | 330.00 | | 0096 | 736-12-06000 | Conductor (10c, #14 awg) | 885 | LNFT | 2.85 | 2,522.25 | 2.00 | 1,770.00 | | 0097 | 737-04-00001 | Painted Curbs and Islands | 424 | SQYD | 16.00 | 6,784.00 | 25.00 | 10,600.00 | | 0098 | 740-01-00100 | Construction Layout | 1 | LUMP | 80,000.00 | 80,000.00 | 50,000.00 | 50,000.00 | | 0099 | 742-01-00400 | Sanitary Sewer Pipe (8") | 72 | LNFT | 260.00 | 18,720.00 | 100.00 | 7,200.00 | | 0100 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 6,739 | INLF | 1.10 | 7,412.90 | 1.00 | 6,739.00 | | 0101 | NS-736-00006 | Video Detection Camera | 2 | EACH | 6,500.00 | 13,000.00 | 7,000.00 | 14,000.00 | | 0102 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 250 | SQYD | 100.00 | 25,000.00 | 80.00 | 20,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,617,361.47 | | IRREGULAR |
|