Proposal:H.005972.6-R1
Parish:St. Tammany
Routes:CAUSEWAY
Description:9 - MILE TURNAROUND SPANS
Type Construction:BRIDGE REPAIRS AND RELATED WORK
Estimated Construction Cost:$6,198,800.25
| Rank | License | Bidder | Construction Bid |
| 1 | 02179 | Boh Bros. Construction Co., LLC. | $8,248,040.10 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of ELECTRICAL SYSTEM | 1 | EACH | 50,000.00 | 50,000.00 | | 0002 | 202-02-04001 | Removal of Bridge (Partial Removal) (Barrier Rail) | 1 | LUMP | 200,000.00 | 200,000.00 | | 0003 | 202-03-00010 | Relocation of Existing Crossover Appurtenances | 1 | EACH | 150,000.00 | 150,000.00 | | 0004 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 800,000.00 | 800,000.00 | | 0005 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 0.739 | MILE | 14,000.00 | 10,346.00 | | 0006 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 28 | EACH | 2,900.00 | 81,200.00 | | 0007 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 19 | EACH | 385.00 | 7,315.00 | | 0008 | 727-01-00100 | Mobilization | 1 | LUMP | 750,000.00 | 750,000.00 | | 0009 | 730-09-00100 | Electrical System | 1 | LUMP | 1,850,000.00 | 1,850,000.00 | | 0010 | 731-02-00100 | Reflectorized Raised Pavement Markers | 252 | EACH | 10.00 | 2,520.00 | | 0011 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.012 | MILE | 30,000.00 | 360.00 | | 0012 | 732-02-02100 | Plastic Pavement Striping (Solid Line) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil) | 0.47 | MILE | 10,000.00 | 4,700.00 | | 0013 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.022 | MILE | 6,500.00 | 143.00 | | 0014 | 732-03-02101 | Plastic Pavement Striping (Broken Line) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black Contrast) | 0.246 | MILE | 13,800.00 | 3,394.80 | | 0015 | 732-05-00100 | Removal of Existing Markings | 0.246 | MILE | 13,800.00 | 3,394.80 | | 0016 | 740-01-00100 | Construction Layout | 1 | LUMP | 315,000.00 | 315,000.00 | | 0017 | 804-01-00800 | Precast Concrete Piles (36") Cylinder | 2,080 | LNFT | 535.00 | 1,112,800.00 | | 0018 | 804-17-00100 | Dynamic Monitoring | 4 | EACH | 6,000.00 | 24,000.00 | | 0019 | 805-02-00400 | Class A(M) Concrete (Bents) | 138.66 | CUYD | 3,500.00 | 485,310.00 | | 0020 | 805-04-00100 | Class AA(M) Concrete | 316.05 | CUYD | 2,500.00 | 790,125.00 | | 0021 | 805-08-00400 | Precast-Prestressed Concrete Girder (Type IV) | 1,255 | LNFT | 555.00 | 696,525.00 | | 0022 | 806-01-00100 | Deformed Reinforcing Steel | 113,319 | LB | 2.00 | 226,638.00 | | 0023 | 807-08-00100 | Structural Metalwork | 14,240 | LUMP | 500,000.00 | 500,000.00 | | 0024 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 78.67 | LNFT | 550.00 | 43,268.50 | | 0025 | NS-700-00180 | Impact Attenuator (Construction Zone) | 2 | EACH | 48,000.00 | 96,000.00 | | 0026 | NS-700-00181 | Impact Attenuator Relocation (Construction Zone) | 2 | EACH | 4,500.00 | 9,000.00 | | 0027 | NS-800-00080 | Dynamic Analysis | 4 | EACH | 4,000.00 | 16,000.00 | | 0028 | NS-800-00541 | Dynamic Pile Monitoring Instrumentation Accessories | 1 | LUMP | 20,000.00 | 20,000.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,248,040.10 |
|