Proposal:H.011246.6
Parish:Orleans
Description:P2P - MACARTHUR AND SULLEN
Type Construction:COLD PLANE ASPHALTIC CONCRETE, FULL DEPTH ASPHALT PATCHING, CONCRETE PAVEMENT PATCHING, ASPHALTIC CONCRETE OVERLAY, CONCRETE CURB/GUTTER, STRIPING CONCRETE ADA RAMPS
Estimated Construction Cost:$3,901,852.90
Maximum Number of Days Allowed for Construction:9999
Calculated Daily User Cost:$5,000.00
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 02179 | Boh Bros. Construction Co., LLC. | $3,413,930.75 | 75.00 | $3,788,930.75 |
| 2 | 06276 | Barriere Construction Co., LLC | $4,053,547.46 | 140.00 | $4,753,547.46 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Boh Bros. Construction Co., LLC. | - 2 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.31 | LUMP | 5,000.00 | 5,000.00 | 1,500.00 | 1,500.00 | | 0002 | 203-01-00100 | General Excavation | 1,167.93 | CUYD | 10.00 | 11,679.30 | 35.00 | 40,877.55 | | 0003 | 302-02-03121 | Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 5,255.7 | SQYD | 20.00 | 105,114.00 | 17.50 | 91,974.75 | | 0004 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 400 | CUYD | 2.50 | 1,000.00 | 20.00 | 8,000.00 | | 0005 | 502-01-00100 | Superpave Asphaltic Concrete | 7,154.1 | TON | 110.00 | 786,951.00 | 98.00 | 701,101.80 | | 0006 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 592.5 | TON | 125.00 | 74,062.50 | 220.00 | 130,350.00 | | 0007 | 509-01-00100 | Cold Planing Asphaltic Pavement | 29,403 | SQYD | 1.75 | 51,455.25 | 3.00 | 88,209.00 | | 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 5,256 | SQYD | 65.00 | 341,640.00 | 90.00 | 473,040.00 | | 0009 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 28,733 | LNFT | 1.40 | 40,226.20 | 1.65 | 47,409.45 | | 0010 | 602-03-00100 | Cleaning and Sealing Random cracks | 652 | LNFT | 3.50 | 2,282.00 | 3.00 | 1,956.00 | | 0011 | 602-08-00100 | Grinding Concrete Pavement | 1,685.8 | SQYD | 10.00 | 16,858.00 | 30.00 | 50,574.00 | | 0012 | 706-01-00100 | Concrete Walk (4" Thick) | 247.4 | SQYD | 65.00 | 16,081.00 | 78.00 | 19,297.20 | | 0013 | 707-01-00200 | Concrete Curb (Barrier) | 131 | LNFT | 25.00 | 3,275.00 | 18.00 | 2,358.00 | | 0014 | 707-01-00300 | Concrete Curb (Mountable) | 1,016 | LNFT | 25.00 | 25,400.00 | 17.00 | 17,272.00 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 90,000.00 | 90,000.00 | 250,000.00 | 250,000.00 | | 0016 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 2,455 | LNFT | 0.50 | 1,227.50 | 0.25 | 613.75 | | 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 340,000.00 | 340,000.00 | 325,000.00 | 325,000.00 | | 0018 | 729-01-00100 | Sign (Type A) | 32 | SQFT | 25.00 | 800.00 | 40.00 | 1,280.00 | | 0019 | 729-21-00100 | U-Channel Post | 8 | EACH | 100.00 | 800.00 | 135.00 | 1,080.00 | | 0020 | 731-02-00100 | Reflectorized Raised Pavement Markers | 327 | EACH | 9.00 | 2,943.00 | 10.00 | 3,270.00 | | 0021 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 19,287 | LNFT | 0.75 | 14,465.25 | 0.90 | 17,358.30 | | 0022 | 732-01-01020 | Plastic Pavement Striping (6" Width) (Thermoplastic 90 mil) | 2,992 | LNFT | 1.50 | 4,488.00 | 1.30 | 3,889.60 | | 0023 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 461 | LNFT | 2.25 | 1,037.25 | 2.50 | 1,152.50 | | 0024 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 1,341 | LNFT | 4.00 | 5,364.00 | 4.00 | 5,364.00 | | 0025 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 3,849 | LNFT | 10.00 | 38,490.00 | 12.00 | 46,188.00 | | 0026 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 83 | EACH | 350.00 | 29,050.00 | 500.00 | 41,500.00 | | 0027 | 732-04-19000 | Plastic Pavement Legends and Symbols (SCHOOL CROSSING) | 4 | EACH | 500.00 | 2,000.00 | 500.00 | 2,000.00 | | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 80,000.00 | 80,000.00 | 32,000.00 | 32,000.00 | | 0029 | 741-11-00100 | Adjusting Water Valve | 7 | EACH | 700.00 | 4,900.00 | 700.00 | 4,900.00 | | 0030 | NS-300-00060 | Geogrid | 9,198 | SQYD | 1.00 | 9,198.00 | 2.50 | 22,995.00 | | 0031 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 19,892 | LNFT | 1.75 | 34,811.00 | 2.00 | 39,784.00 | | 0032 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 8,846 | LNFT | 1.75 | 15,480.50 | 2.00 | 17,692.00 | | 0033 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 28,733 | LNFT | 0.50 | 14,366.50 | 0.60 | 17,239.80 | | 0034 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 63,069 | INLF | 0.50 | 31,534.50 | 0.60 | 37,841.40 | | 0035 | NS-SRP-00002 | ADA Ramps (Type B) | 129 | EACH | 2,000.00 | 258,000.00 | 2,250.00 | 290,250.00 | | 0036 | NS-SRP-00003 | Adjust (Manhole with Rings) | 42 | EACH | 150.00 | 6,300.00 | 150.00 | 6,300.00 | | 0037 | NS-SRP-00004 | Adjust (Manhole) | 32 | EACH | 850.00 | 27,200.00 | 773.48 | 24,751.36 | | 0038 | NS-SRP-00005 | Adjust Catch Basin (Type A) | 8 | EACH | 1,000.00 | 8,000.00 | 750.00 | 6,000.00 | | 0039 | NS-SRP-00006 | Adjust Catch Basin (Type C) | 11 | EACH | 1,600.00 | 17,600.00 | 1,400.00 | 15,400.00 | | 0040 | NS-SRP-00007 | Adjust Drop Inlet | 1 | EACH | 1,000.00 | 1,000.00 | 400.00 | 400.00 | | 0041 | NS-SRP-00009 | Adjust Frame and Cover (Rectangular) | 2 | EACH | 1,500.00 | 3,000.00 | 1,000.00 | 2,000.00 | | 0042 | NS-SRP-00012 | Concrete Pavement Repair (18.0 sq. yd. and Under) | 550.6 | SQYD | 145.00 | 79,837.00 | 160.00 | 88,096.00 | | 0043 | NS-SRP-00013 | Concrete Pavement Repair (18.1 sq. yd. to 48.0 sq. yd.) | 1,894.6 | SQYD | 130.00 | 246,298.00 | 155.00 | 293,663.00 | | 0044 | NS-SRP-00014 | Concrete Pavement Repair (48.1 sq. yd. and Over) | 1,494.6 | SQYD | 110.00 | 164,406.00 | 150.00 | 224,190.00 | | 0045 | NS-SRP-00018 | Concrete Curb Barrier (Drilled and Doweled) | 120 | LNFT | 40.00 | 4,800.00 | 40.00 | 4,800.00 | | 0046 | NS-SRP-00029 | Project Signs (SRP) | 4 | EACH | 350.00 | 1,400.00 | 325.00 | 1,300.00 | | 0047 | NS-SRP-00030 | Recon of Concrete Curb and Gutterbottom (Barrier Curb) | 4,672 | LNFT | 40.00 | 186,880.00 | 55.00 | 256,960.00 | | 0048 | NS-SRP-00031 | Recon of Concrete Curb and Gutterbottom (Mountable Curb) | 231 | LNFT | 50.00 | 11,550.00 | 55.00 | 12,705.00 | | 0049 | NS-SRP-00037 | Replace Frame and Cover (Manhole Drain) | 1 | EACH | 1,400.00 | 1,400.00 | 475.00 | 475.00 | | 0050 | NS-SRP-00038 | Replace Frame and Cover (Catch Basin) | 3 | EACH | 1,600.00 | 4,800.00 | 600.00 | 1,800.00 | | 0051 | NS-SRP-00040 | Replace Frame and Cover (Manhole) (Sanitary Sewer) | 5 | EACH | 1,400.00 | 7,000.00 | 475.00 | 2,375.00 | | 0052 | NS-SRP-00044 | Tree Protection | 1 | LUMP | 6,000.00 | 6,000.00 | 4,200.00 | 4,200.00 | | 0053 | NS-SRP-00045 | Tree Trimming | 1 | LUMP | 8,000.00 | 8,000.00 | 9,000.00 | 9,000.00 | | 0054 | NS-SRP-00046 | Root Pruning and Trenching | 1 | LUMP | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 | | 0055 | NS-SRP-00047 | Hnd Frm and Pour In-Plc Cncr Crb Wthn Lim of the Tree Drpln | 150 | LNFT | 25.00 | 3,750.00 | 55.00 | 8,250.00 | | 0056 | NS-SRP-00048 | Gravel Bed and Filter Cloth Over Tree Roots | 200 | SQYD | 5.00 | 1,000.00 | 8.00 | 1,600.00 | | 0057 | NS-SRP-00050 | Bus Pads Repair (High Early Strength PCC) | 1,302 | SQYD | 115.00 | 149,730.00 | 182.00 | 236,964.00 | | 0058 | NS-SRP-00071 | Temporary Curb and Gutter Inlet Protection System | 100 | EACH | 120.00 | 12,000.00 | 120.00 | 12,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,413,930.75 | | 4,053,547.46 |
|