Proposal:H.000698.6
Parish:East Baton Rouge
Routes:US 61
Description:Baker Canal Bridge
Type Construction:DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, PRECAST PRESTRESSED CONCRETE GIRDER SPANS BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$4,483,465.59
| Rank | License | Bidder | Construction Bid |
| 1 | 34567 | James Construction Group LLC | $4,684,273.21 |
| 2 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $5,084,388.15 |
| 3 | 39462 | JB JAMES CONSTRUCTION LLC | $5,418,524.46 |
| 4 | 55519 | Key, LLC Of Mississippi | $5,455,698.71 |
| 5 | 01012 | Cecil D. Gassiott, LLC | $5,600,101.35 |
| 6 | 00481 | COASTAL BRIDGE CO., L.L.C. | $5,689,930.86 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - James Construction Group LLC | - 2 - GILCHRIST CONSTRUCTION CO. LLC | - 3 - JB JAMES CONSTRUCTION LLC | - 4 - Key, LLC Of Mississippi | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 16,000.00 | 16,000.00 | 8,000.00 | 8,000.00 | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 272.9 | SQYD | 11.55 | 3,152.00 | 12.00 | 3,274.80 | 18.00 | 4,912.20 | 10.00 | 2,729.00 | | 0003 | 202-02-04000 | Removal of Bridge 2 - 160'X28' Steel Girder Bridges | 2 | EACH | 40,000.00 | 80,000.00 | 100,000.00 | 200,000.00 | 95,000.00 | 190,000.00 | 75,000.00 | 150,000.00 | | 0004 | 202-02-06000 | Removal of Concrete Approach Slabs | 266 | SQYD | 25.00 | 6,650.00 | 65.00 | 17,290.00 | 65.00 | 17,290.00 | 40.00 | 10,640.00 | | 0005 | 202-02-06090 | Removal of Concrete Revetment | 1 | LUMP | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 100,000.00 | 100,000.00 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 107 | SQYD | 6.00 | 642.00 | 17.00 | 1,819.00 | 14.00 | 1,498.00 | 7.00 | 749.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 676.3 | LNFT | 4.00 | 2,705.20 | 9.50 | 6,424.85 | 7.00 | 4,734.10 | 4.00 | 2,705.20 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) STA. 219+55.83 To 231+44.23 | 119 | LNFT | 12.50 | 1,487.50 | 16.00 | 1,904.00 | 15.00 | 1,785.00 | 12.50 | 1,487.50 | | 0009 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 432.4 | SQYD | 12.00 | 5,188.80 | 16.00 | 6,918.40 | 15.00 | 6,486.00 | 42.50 | 18,377.00 | | 0010 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 4,520 | SQYD | 6.00 | 27,120.00 | 15.00 | 67,800.00 | 4.00 | 18,080.00 | 0.75 | 3,390.00 | | 0011 | 203-01-00100 | General Excavation | 3,581 | CUYD | 11.50 | 41,181.50 | 11.00 | 39,391.00 | 10.00 | 35,810.00 | 16.50 | 59,086.50 | | 0012 | 203-02-00100 | Drainage Excavation | 29 | CUYD | 14.50 | 420.50 | 28.00 | 812.00 | 40.00 | 1,160.00 | 45.00 | 1,305.00 | | 0013 | 203-03-00100 | Embankment | 3,598 | CUYD | 25.00 | 89,950.00 | 25.00 | 89,950.00 | 30.00 | 107,940.00 | 26.75 | 96,246.50 | | 0014 | 204-02-00100 | Temporary Hay or Straw Bales | 56 | EACH | 17.00 | 952.00 | 14.00 | 784.00 | 25.00 | 1,400.00 | 15.00 | 840.00 | | 0015 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 12 | EACH | 156.00 | 1,872.00 | 135.00 | 1,620.00 | 115.00 | 1,380.00 | 175.00 | 2,100.00 | | 0016 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 5 | EACH | 250.00 | 1,250.00 | 375.00 | 1,875.00 | 800.00 | 4,000.00 | 700.00 | 3,500.00 | | 0017 | 204-06-00100 | Temporary Silt Fencing | 5,969 | LNFT | 2.50 | 14,922.50 | 1.55 | 9,251.95 | 3.00 | 17,907.00 | 5.00 | 29,845.00 | | 0018 | 302-02-06080 | Class II Base Course (12" Thick) (Asphaltic Concrete Base on Embankment Layer) | 6,123.3 | SQYD | 62.25 | 381,175.43 | 37.00 | 226,562.10 | 55.00 | 336,781.50 | 62.25 | 381,175.43 | | 0019 | 304-05-00100 | Lime Treatment (Type E) | 22.4 | TON | 100.00 | 2,240.00 | 575.00 | 12,880.00 | 300.00 | 6,720.00 | 1,550.00 | 34,720.00 | | 0020 | 401-01-00100 | Aggregate Surface Course (Net Section) | 2.2 | CUYD | 300.00 | 660.00 | 450.00 | 990.00 | 400.00 | 880.00 | 200.00 | 440.00 | | 0021 | 502-01-00100 | Superpave Asphaltic Concrete (Roadway) | 2,121.3 | TON | 105.00 | 222,736.50 | 125.00 | 265,162.50 | 105.00 | 222,736.50 | 105.00 | 222,736.50 | | 0022 | 502-01-00100 | Superpave Asphaltic Concrete (Bridge) | 87.4 | TON | 105.00 | 9,177.00 | 185.00 | 16,169.00 | 105.00 | 9,177.00 | 105.00 | 9,177.00 | | 0023 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 1,948.5 | SQYD | 125.00 | 243,562.50 | 62.00 | 120,807.00 | 90.00 | 175,365.00 | 102.00 | 198,747.00 | | 0024 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 80 | LNFT | 51.50 | 4,120.00 | 100.00 | 8,000.00 | 52.00 | 4,160.00 | 52.00 | 4,160.00 | | 0025 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 352 | LNFT | 55.00 | 19,360.00 | 102.00 | 35,904.00 | 55.00 | 19,360.00 | 55.00 | 19,360.00 | | 0026 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 186 | LNFT | 130.00 | 24,180.00 | 175.00 | 32,550.00 | 130.00 | 24,180.00 | 130.00 | 24,180.00 | | 0027 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 16 | LNFT | 55.00 | 880.00 | 118.00 | 1,888.00 | 55.00 | 880.00 | 55.00 | 880.00 | | 0028 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 134 | LNFT | 55.00 | 7,370.00 | 108.00 | 14,472.00 | 55.00 | 7,370.00 | 55.00 | 7,370.00 | | 0029 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 88 | LNFT | 70.00 | 6,160.00 | 92.00 | 8,096.00 | 70.00 | 6,160.00 | 70.00 | 6,160.00 | | 0030 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 3,550.00 | 3,550.00 | 5,000.00 | 5,000.00 | 3,550.00 | 3,550.00 | 3,550.00 | 3,550.00 | | 0031 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 2,250.00 | 9,000.00 | 2,700.00 | 10,800.00 | 2,260.00 | 9,040.00 | 2,250.00 | 9,000.00 | | 0032 | 702-03-00200 | Catch Basins (CB-02) | 4 | EACH | 4,500.00 | 18,000.00 | 3,600.00 | 14,400.00 | 4,500.00 | 18,000.00 | 4,500.00 | 18,000.00 | | 0033 | 702-08-00100 | Side Drain Safety End (Type I) | 2 | EACH | 2,500.00 | 5,000.00 | 2,100.00 | 4,200.00 | 2,500.00 | 5,000.00 | 2,500.00 | 5,000.00 | | 0034 | 704-03-00100 | Blocked Out Guard Rail | 118.8 | LNFT | 20.00 | 2,376.00 | 18.00 | 2,138.40 | 20.00 | 2,376.00 | 20.00 | 2,376.00 | | 0035 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 118.8 | LNFT | 62.00 | 7,365.60 | 72.00 | 8,553.60 | 59.00 | 7,009.20 | 59.00 | 7,009.20 | | 0036 | 704-11-00100 | Guard Rail End Treatment (Flared) | 3 | EACH | 2,100.00 | 6,300.00 | 2,200.00 | 6,600.00 | 2,400.00 | 7,200.00 | 2,400.00 | 7,200.00 | | 0037 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 54.6 | SQYD | 60.00 | 3,276.00 | 105.00 | 5,733.00 | 84.00 | 4,586.40 | 65.00 | 3,549.00 | | 0038 | 707-01-00200 | Concrete Curb (Barrier) | 504.2 | LNFT | 30.00 | 15,126.00 | 21.00 | 10,588.20 | 35.00 | 17,647.00 | 22.00 | 11,092.40 | | 0039 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 1,015 | SQYD | 47.00 | 47,705.00 | 95.00 | 96,425.00 | 90.00 | 91,350.00 | 75.00 | 76,125.00 | | 0040 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 110,000.00 | 110,000.00 | 80,000.00 | 80,000.00 | 45,000.00 | 45,000.00 | | 0041 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.516 | MILE | 1,335.00 | 688.86 | 700.00 | 361.20 | 630.00 | 325.08 | 625.00 | 322.50 | | 0042 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.147 | MILE | 1,342.00 | 1,539.27 | 1,500.00 | 1,720.50 | 630.00 | 722.61 | 625.00 | 716.88 | | 0043 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 22 | EACH | 464.00 | 10,208.00 | 975.00 | 21,450.00 | 1,200.00 | 26,400.00 | 605.00 | 13,310.00 | | 0044 | 716-01-00100 | Mulch (Vegetative) | 5 | TON | 800.00 | 4,000.00 | 875.00 | 4,375.00 | 750.00 | 3,750.00 | 750.00 | 3,750.00 | | 0045 | 717-01-00100 | Seeding | 85 | LB | 10.00 | 850.00 | 10.00 | 850.00 | 12.00 | 1,020.00 | 12.00 | 1,020.00 | | 0046 | 718-01-00100 | Fertilizer | 2,122 | LB | 0.60 | 1,273.20 | 0.65 | 1,379.30 | 0.50 | 1,061.00 | 0.50 | 1,061.00 | | 0047 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 3,589 | SQYD | 1.20 | 4,306.80 | 1.25 | 4,486.25 | 1.25 | 4,486.25 | 1.25 | 4,486.25 | | 0048 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 285 | SQYD | 1.40 | 399.00 | 1.50 | 427.50 | 2.00 | 570.00 | 2.00 | 570.00 | | 0049 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 1,037 | SQYD | 1.65 | 1,711.05 | 1.75 | 1,814.75 | 2.00 | 2,074.00 | 2.50 | 2,592.50 | | 0050 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 10,000.00 | 10,000.00 | 30,000.00 | 30,000.00 | 35,000.00 | 35,000.00 | 30,000.00 | 30,000.00 | | 0051 | 725-01-00100 | Temporary Detour Roads | 909.7 | SQYD | 103.00 | 93,699.10 | 90.00 | 81,873.00 | 110.00 | 100,067.00 | 110.00 | 100,067.00 | | 0052 | 726-01-00100 | Bedding Material | 83.6 | CUYD | 85.00 | 7,106.00 | 100.00 | 8,360.00 | 85.00 | 7,106.00 | 85.00 | 7,106.00 | | 0053 | 727-01-00100 | Mobilization | 1 | LUMP | 450,000.00 | 450,000.00 | 510,000.00 | 510,000.00 | 540,000.00 | 540,000.00 | 500,000.00 | 500,000.00 | | 0054 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 75.00 | 300.00 | 80.00 | 320.00 | 80.00 | 320.00 | 80.00 | 320.00 | | 0055 | 731-02-00100 | Reflectorized Raised Pavement Markers | 157 | EACH | 10.00 | 1,570.00 | 10.00 | 1,570.00 | 10.00 | 1,570.00 | 10.00 | 1,570.00 | | 0056 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.004 | MILE | 4,333.00 | 4,350.33 | 4,800.00 | 4,819.20 | 10,000.00 | 10,040.00 | 10,000.00 | 10,040.00 | | 0057 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.142 | MILE | 12,324.00 | 1,750.01 | 13,000.00 | 1,846.00 | 20,000.00 | 2,840.00 | 20,000.00 | 2,840.00 | | 0058 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.042 | MILE | 40,477.00 | 1,700.03 | 43,000.00 | 1,806.00 | 50,000.00 | 2,100.00 | 50,000.00 | 2,100.00 | | 0059 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.571 | MILE | 1,348.00 | 769.71 | 1,400.00 | 799.40 | 1,500.00 | 856.50 | 1,500.00 | 856.50 | | 0060 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.296 | MILE | 5,384.00 | 1,593.66 | 6,000.00 | 1,776.00 | 5,100.00 | 1,509.60 | 5,000.00 | 1,480.00 | | 0061 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 3 | EACH | 350.00 | 1,050.00 | 375.00 | 1,125.00 | 245.00 | 735.00 | 245.00 | 735.00 | | 0062 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 450.00 | 900.00 | 500.00 | 1,000.00 | 250.00 | 500.00 | 250.00 | 500.00 | | 0063 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 100,000.00 | 100,000.00 | 45,000.00 | 45,000.00 | 50,000.00 | 50,000.00 | | 0064 | 802-01-00100 | Structural Excavation | 440 | CUYD | 13.50 | 5,940.00 | 27.00 | 11,880.00 | 35.00 | 15,400.00 | 15.00 | 6,600.00 | | 0065 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 40,000.00 | 40,000.00 | 40,000.00 | 40,000.00 | 105,000.00 | 105,000.00 | 200,000.00 | 200,000.00 | | 0066 | 804-01-00200 | Precast Concrete Piles (14") | 104 | LNFT | 90.00 | 9,360.00 | 93.00 | 9,672.00 | 76.00 | 7,904.00 | 55.00 | 5,720.00 | | 0067 | 804-01-00400 | Precast Concrete Piles (18") | 3,640 | LNFT | 70.00 | 254,800.00 | 60.00 | 218,400.00 | 55.00 | 200,200.00 | 62.25 | 226,590.00 | | 0068 | 804-01-00700 | Precast Concrete Piles (30") | 1,820 | LNFT | 185.00 | 336,700.00 | 182.00 | 331,240.00 | 168.00 | 305,760.00 | 305.00 | 555,100.00 | | 0069 | 804-05-00700 | Precast Concrete Test Piles (30") | 1 | EACH | 70,000.00 | 70,000.00 | 125,000.00 | 125,000.00 | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | | 0070 | 804-09-00100 | Loading Test Piles | 1 | EACH | 9,000.00 | 9,000.00 | 44,000.00 | 44,000.00 | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | | 0071 | 804-10-00100 | Reloading Test Piles | 1 | EACH | 2,000.00 | 2,000.00 | 9,500.00 | 9,500.00 | 2,000.00 | 2,000.00 | 1,000.00 | 1,000.00 | | 0072 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 2,000.00 | 2,000.00 | 2,500.00 | 2,500.00 | 1,500.00 | 1,500.00 | 1,500.00 | 1,500.00 | | 0073 | 804-17-00100 | Dynamic Monitoring | 7 | EACH | 1,900.00 | 13,300.00 | 750.00 | 5,250.00 | 1,000.00 | 7,000.00 | 2,500.00 | 17,500.00 | | 0074 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 3.99 | CUYD | 2,000.00 | 7,980.00 | 1,250.00 | 4,987.50 | 2,000.00 | 7,980.00 | 2,000.00 | 7,980.00 | | 0075 | 805-01-00700 | Class A Concrete (Bents) | 312.51 | CUYD | 900.00 | 281,259.00 | 1,150.00 | 359,386.50 | 1,500.00 | 468,765.00 | 925.00 | 289,071.75 | | 0076 | 805-03-00100 | Class AA Concrete | 13.83 | CUYD | 900.00 | 12,447.00 | 1,250.00 | 17,287.50 | 3,500.00 | 48,405.00 | 1,000.00 | 13,830.00 | | 0077 | 805-04-00100 | Class AA(M) Concrete | 575.18 | CUYD | 850.00 | 488,903.00 | 925.00 | 532,041.50 | 1,000.00 | 575,180.00 | 825.00 | 474,523.50 | | 0078 | 805-11-00100 | Strip Seal Joints | 248.39 | LNFT | 135.00 | 33,532.65 | 140.00 | 34,774.60 | 210.00 | 52,161.90 | 250.00 | 62,097.50 | | 0079 | 805-12-32020 | Reinforced Concrete Box Culverts (4' x 3') (Extension) | 19 | LNFT | 975.00 | 18,525.00 | 850.00 | 16,150.00 | 850.00 | 16,150.00 | 850.00 | 16,150.00 | | 0080 | 806-01-00100 | Deformed Reinforcing Steel Box Culvert Headwalls | 300 | LB | 1.05 | 315.00 | 2.75 | 825.00 | 3.00 | 900.00 | 1.10 | 330.00 | | 0081 | 806-01-00100 | Deformed Reinforcing Steel Bridge | 266,398 | LB | 0.90 | 239,758.20 | 0.80 | 213,118.40 | 1.10 | 293,037.80 | 1.10 | 293,037.80 | | 0082 | 807-08-00100 | Structural Metalwork | 3,428 | LUMP | 20,000.00 | 20,000.00 | 18,500.00 | 18,500.00 | 45,000.00 | 45,000.00 | 20,000.00 | 20,000.00 | | 0083 | 810-01-00100 | Concrete Railing (Standard Barrier) | 300 | LNFT | 75.00 | 22,500.00 | 72.00 | 21,600.00 | 65.00 | 19,500.00 | 85.00 | 25,500.00 | | 0084 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 496.94 | LNFT | 79.00 | 39,258.26 | 85.00 | 42,239.90 | 73.00 | 36,276.62 | 85.00 | 42,239.90 | | 0085 | 813-01-00100 | Concrete Approach Slabs | 1,076.6 | SQYD | 215.00 | 231,469.00 | 250.00 | 269,150.00 | 292.00 | 314,367.20 | 289.00 | 311,137.40 | | 0086 | NS-200-00020 | Cleaning Existing Ditches | 900 | LNFT | 4.50 | 4,050.00 | 10.00 | 9,000.00 | 36.00 | 32,400.00 | 28.00 | 25,200.00 | | 0087 | NS-201-00002 | Tree and Stump Removal (Over 36" - 48" Diameter) | 2 | EACH | 25,000.00 | 50,000.00 | 4,200.00 | 8,400.00 | 6,000.00 | 12,000.00 | 3,500.00 | 7,000.00 | | 0088 | NS-202-00001 | Removal of Debris | 1 | LUMP | 40,000.00 | 40,000.00 | 22,000.00 | 22,000.00 | 85,000.00 | 85,000.00 | 25,000.00 | 25,000.00 | | 0089 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 184 | LNFT | 4.00 | 736.00 | 40.00 | 7,360.00 | 5.00 | 920.00 | 25.00 | 4,600.00 | | 0090 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 7,013 | INLF | 0.85 | 5,961.05 | 0.95 | 6,662.35 | 1.00 | 7,013.00 | 3.00 | 21,039.00 | | 0091 | NS-700-00180 | Impact Attenuator (Construction Zone) | 2 | EACH | 19,000.00 | 38,000.00 | 7,200.00 | 14,400.00 | 15,000.00 | 30,000.00 | 1,500.00 | 3,000.00 | | 0092 | NS-700-00181 | Impact Attenuator Relocation (Construction Zone) | 2 | EACH | 12,550.00 | 25,100.00 | 2,700.00 | 5,400.00 | 3,000.00 | 6,000.00 | 1,500.00 | 3,000.00 | | 0093 | NS-700-00240 | Special Guard Rail Anchor Section | 1 | EACH | 1,500.00 | 1,500.00 | 1,750.00 | 1,750.00 | 1,500.00 | 1,500.00 | 1,500.00 | 1,500.00 | | 0094 | NS-800-00080 | Dynamic Analysis | 1 | EACH | 1,500.00 | 1,500.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | | 0095 | NS-800-00188 | Precast Prestressed Concrete Girder (Type II) Class P (HPC) | 2,952 | LNFT | 125.00 | 369,000.00 | 110.00 | 324,720.00 | 95.00 | 280,440.00 | 125.00 | 369,000.00 | | 0096 | NS-804-00002 | Construction Site Survey | 1 | LUMP | 4,000.00 | 4,000.00 | 40,000.00 | 40,000.00 | 45,000.00 | 45,000.00 | 10,000.00 | 10,000.00 | | 0097 | NS-804-00006 | Vibration Monitoring | 40 | DAY | 570.00 | 22,800.00 | 1,100.00 | 44,000.00 | 820.00 | 32,800.00 | 1,500.00 | 60,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,684,273.21 | | 5,084,388.15 | | 5,418,524.46 | | 5,455,698.71 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Cecil D. Gassiott, LLC | - 6 - COASTAL BRIDGE CO., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 12,000.00 | 12,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 272.9 | SQYD | 50.00 | 13,645.00 | 10.00 | 2,729.00 | | 0003 | 202-02-04000 | Removal of Bridge 2 - 160'X28' Steel Girder Bridges | 2 | EACH | 100,000.00 | 200,000.00 | 83,000.00 | 166,000.00 | | 0004 | 202-02-06000 | Removal of Concrete Approach Slabs | 266 | SQYD | 400.00 | 106,400.00 | 30.00 | 7,980.00 | | 0005 | 202-02-06090 | Removal of Concrete Revetment | 1 | LUMP | 100,000.00 | 100,000.00 | 25,000.00 | 25,000.00 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 107 | SQYD | 50.00 | 5,350.00 | 10.00 | 1,070.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 676.3 | LNFT | 20.00 | 13,526.00 | 6.50 | 4,395.95 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) STA. 219+55.83 To 231+44.23 | 119 | LNFT | 25.00 | 2,975.00 | 12.50 | 1,487.50 | | 0009 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 432.4 | SQYD | 25.00 | 10,810.00 | 13.00 | 5,621.20 | | 0010 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 4,520 | SQYD | 10.00 | 45,200.00 | 12.00 | 54,240.00 | | 0011 | 203-01-00100 | General Excavation | 3,581 | CUYD | 10.00 | 35,810.00 | 15.00 | 53,715.00 | | 0012 | 203-02-00100 | Drainage Excavation | 29 | CUYD | 50.00 | 1,450.00 | 75.00 | 2,175.00 | | 0013 | 203-03-00100 | Embankment | 3,598 | CUYD | 25.00 | 89,950.00 | 15.00 | 53,970.00 | | 0014 | 204-02-00100 | Temporary Hay or Straw Bales | 56 | EACH | 25.00 | 1,400.00 | 15.00 | 840.00 | | 0015 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 12 | EACH | 750.00 | 9,000.00 | 175.00 | 2,100.00 | | 0016 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 5 | EACH | 800.00 | 4,000.00 | 700.00 | 3,500.00 | | 0017 | 204-06-00100 | Temporary Silt Fencing | 5,969 | LNFT | 2.00 | 11,938.00 | 2.20 | 13,131.80 | | 0018 | 302-02-06080 | Class II Base Course (12" Thick) (Asphaltic Concrete Base on Embankment Layer) | 6,123.3 | SQYD | 70.00 | 428,631.00 | 70.00 | 428,631.00 | | 0019 | 304-05-00100 | Lime Treatment (Type E) | 22.4 | TON | 500.00 | 11,200.00 | 500.00 | 11,200.00 | | 0020 | 401-01-00100 | Aggregate Surface Course (Net Section) | 2.2 | CUYD | 200.00 | 440.00 | 1,000.00 | 2,200.00 | | 0021 | 502-01-00100 | Superpave Asphaltic Concrete (Roadway) | 2,121.3 | TON | 110.00 | 233,343.00 | 100.00 | 212,130.00 | | 0022 | 502-01-00100 | Superpave Asphaltic Concrete (Bridge) | 87.4 | TON | 115.00 | 10,051.00 | 250.00 | 21,850.00 | | 0023 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 1,948.5 | SQYD | 104.00 | 202,644.00 | 140.00 | 272,790.00 | | 0024 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 80 | LNFT | 50.00 | 4,000.00 | 52.00 | 4,160.00 | | 0025 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 352 | LNFT | 55.00 | 19,360.00 | 55.00 | 19,360.00 | | 0026 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 186 | LNFT | 130.00 | 24,180.00 | 130.00 | 24,180.00 | | 0027 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 16 | LNFT | 70.00 | 1,120.00 | 55.00 | 880.00 | | 0028 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 134 | LNFT | 55.00 | 7,370.00 | 55.00 | 7,370.00 | | 0029 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 88 | LNFT | 55.00 | 4,840.00 | 70.00 | 6,160.00 | | 0030 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 3,600.00 | 3,600.00 | 3,550.00 | 3,550.00 | | 0031 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 2,500.00 | 10,000.00 | 2,250.00 | 9,000.00 | | 0032 | 702-03-00200 | Catch Basins (CB-02) | 4 | EACH | 5,000.00 | 20,000.00 | 4,500.00 | 18,000.00 | | 0033 | 702-08-00100 | Side Drain Safety End (Type I) | 2 | EACH | 3,000.00 | 6,000.00 | 2,500.00 | 5,000.00 | | 0034 | 704-03-00100 | Blocked Out Guard Rail | 118.8 | LNFT | 25.00 | 2,970.00 | 17.00 | 2,019.60 | | 0035 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 118.8 | LNFT | 70.00 | 8,316.00 | 66.00 | 7,840.80 | | 0036 | 704-11-00100 | Guard Rail End Treatment (Flared) | 3 | EACH | 2,500.00 | 7,500.00 | 2,000.00 | 6,000.00 | | 0037 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 54.6 | SQYD | 100.00 | 5,460.00 | 82.00 | 4,477.20 | | 0038 | 707-01-00200 | Concrete Curb (Barrier) | 504.2 | LNFT | 35.00 | 17,647.00 | 22.00 | 11,092.40 | | 0039 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 1,015 | SQYD | 100.00 | 101,500.00 | 92.00 | 93,380.00 | | 0040 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | | 0041 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.516 | MILE | 1,350.00 | 696.60 | 500.00 | 258.00 | | 0042 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.147 | MILE | 1,350.00 | 1,548.45 | 625.00 | 716.88 | | 0043 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 22 | EACH | 1,800.00 | 39,600.00 | 1,350.00 | 29,700.00 | | 0044 | 716-01-00100 | Mulch (Vegetative) | 5 | TON | 200.00 | 1,000.00 | 800.00 | 4,000.00 | | 0045 | 717-01-00100 | Seeding | 85 | LB | 25.00 | 2,125.00 | 10.00 | 850.00 | | 0046 | 718-01-00100 | Fertilizer | 2,122 | LB | 4.00 | 8,488.00 | 0.60 | 1,273.20 | | 0047 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 3,589 | SQYD | 1.20 | 4,306.80 | 1.25 | 4,486.25 | | 0048 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 285 | SQYD | 1.40 | 399.00 | 1.50 | 427.50 | | 0049 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 1,037 | SQYD | 1.65 | 1,711.05 | 1.75 | 1,814.75 | | 0050 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 30,000.00 | 30,000.00 | 15,000.00 | 15,000.00 | | 0051 | 725-01-00100 | Temporary Detour Roads | 909.7 | SQYD | 95.00 | 86,421.50 | 60.00 | 54,582.00 | | 0052 | 726-01-00100 | Bedding Material | 83.6 | CUYD | 75.00 | 6,270.00 | 85.00 | 7,106.00 | | 0053 | 727-01-00100 | Mobilization | 1 | LUMP | 445,000.00 | 445,000.00 | 483,000.00 | 483,000.00 | | 0054 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 75.00 | 300.00 | | 0055 | 731-02-00100 | Reflectorized Raised Pavement Markers | 157 | EACH | 15.00 | 2,355.00 | 10.00 | 1,570.00 | | 0056 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.004 | MILE | 4,350.00 | 4,367.40 | 1,000.00 | 1,004.00 | | 0057 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.142 | MILE | 12,500.00 | 1,775.00 | 20,000.00 | 2,840.00 | | 0058 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.042 | MILE | 42,500.00 | 1,785.00 | 50,000.00 | 2,100.00 | | 0059 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.571 | MILE | 1,350.00 | 770.85 | 1,500.00 | 856.50 | | 0060 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.296 | MILE | 5,500.00 | 1,628.00 | 5,000.00 | 1,480.00 | | 0061 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 3 | EACH | 400.00 | 1,200.00 | 250.00 | 750.00 | | 0062 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 500.00 | 1,000.00 | 250.00 | 500.00 | | 0063 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 30,000.00 | 30,000.00 | | 0064 | 802-01-00100 | Structural Excavation | 440 | CUYD | 25.00 | 11,000.00 | 27.00 | 11,880.00 | | 0065 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 5,000.00 | 5,000.00 | 225,000.00 | 225,000.00 | | 0066 | 804-01-00200 | Precast Concrete Piles (14") | 104 | LNFT | 130.00 | 13,520.00 | 88.00 | 9,152.00 | | 0067 | 804-01-00400 | Precast Concrete Piles (18") | 3,640 | LNFT | 100.00 | 364,000.00 | 83.50 | 303,940.00 | | 0068 | 804-01-00700 | Precast Concrete Piles (30") | 1,820 | LNFT | 230.00 | 418,600.00 | 163.00 | 296,660.00 | | 0069 | 804-05-00700 | Precast Concrete Test Piles (30") | 1 | EACH | 10,000.00 | 10,000.00 | 45,000.00 | 45,000.00 | | 0070 | 804-09-00100 | Loading Test Piles | 1 | EACH | 10,000.00 | 10,000.00 | 35,000.00 | 35,000.00 | | 0071 | 804-10-00100 | Reloading Test Piles | 1 | EACH | 1,000.00 | 1,000.00 | 250.00 | 250.00 | | 0072 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1,000.00 | 1,000.00 | 250.00 | 250.00 | | 0073 | 804-17-00100 | Dynamic Monitoring | 7 | EACH | 11,000.00 | 77,000.00 | 350.00 | 2,450.00 | | 0074 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 3.99 | CUYD | 2,000.00 | 7,980.00 | 2,000.00 | 7,980.00 | | 0075 | 805-01-00700 | Class A Concrete (Bents) | 312.51 | CUYD | 1,100.00 | 343,761.00 | 2,425.00 | 757,836.75 | | 0076 | 805-03-00100 | Class AA Concrete | 13.83 | CUYD | 1,100.00 | 15,213.00 | 800.00 | 11,064.00 | | 0077 | 805-04-00100 | Class AA(M) Concrete | 575.18 | CUYD | 1,100.00 | 632,698.00 | 1,115.00 | 641,325.70 | | 0078 | 805-11-00100 | Strip Seal Joints | 248.39 | LNFT | 130.00 | 32,290.70 | 110.00 | 27,322.90 | | 0079 | 805-12-32020 | Reinforced Concrete Box Culverts (4' x 3') (Extension) | 19 | LNFT | 900.00 | 17,100.00 | 850.00 | 16,150.00 | | 0080 | 806-01-00100 | Deformed Reinforcing Steel Box Culvert Headwalls | 300 | LB | 2.80 | 840.00 | 2.75 | 825.00 | | 0081 | 806-01-00100 | Deformed Reinforcing Steel Bridge | 266,398 | LB | 0.50 | 133,199.00 | 1.21 | 322,341.58 | | 0082 | 807-08-00100 | Structural Metalwork | 3,428 | LUMP | 7,000.00 | 7,000.00 | 7,750.00 | 7,750.00 | | 0083 | 810-01-00100 | Concrete Railing (Standard Barrier) | 300 | LNFT | 150.00 | 45,000.00 | 65.00 | 19,500.00 | | 0084 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 496.94 | LNFT | 150.00 | 74,541.00 | 70.00 | 34,785.80 | | 0085 | 813-01-00100 | Concrete Approach Slabs | 1,076.6 | SQYD | 300.00 | 322,980.00 | 215.00 | 231,469.00 | | 0086 | NS-200-00020 | Cleaning Existing Ditches | 900 | LNFT | 15.00 | 13,500.00 | 7.00 | 6,300.00 | | 0087 | NS-201-00002 | Tree and Stump Removal (Over 36" - 48" Diameter) | 2 | EACH | 5,000.00 | 10,000.00 | 3,000.00 | 6,000.00 | | 0088 | NS-202-00001 | Removal of Debris | 1 | LUMP | 5,000.00 | 5,000.00 | 7,000.00 | 7,000.00 | | 0089 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 184 | LNFT | 25.00 | 4,600.00 | 1.65 | 303.60 | | 0090 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 7,013 | INLF | 5.00 | 35,065.00 | 1.00 | 7,013.00 | | 0091 | NS-700-00180 | Impact Attenuator (Construction Zone) | 2 | EACH | 10,000.00 | 20,000.00 | 11,000.00 | 22,000.00 | | 0092 | NS-700-00181 | Impact Attenuator Relocation (Construction Zone) | 2 | EACH | 2,500.00 | 5,000.00 | 5,800.00 | 11,600.00 | | 0093 | NS-700-00240 | Special Guard Rail Anchor Section | 1 | EACH | 2,000.00 | 2,000.00 | 1,550.00 | 1,550.00 | | 0094 | NS-800-00080 | Dynamic Analysis | 1 | EACH | 2,500.00 | 2,500.00 | 1,500.00 | 1,500.00 | | 0095 | NS-800-00188 | Precast Prestressed Concrete Girder (Type II) Class P (HPC) | 2,952 | LNFT | 120.00 | 354,240.00 | 101.25 | 298,890.00 | | 0096 | NS-804-00002 | Construction Site Survey | 1 | LUMP | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | | 0097 | NS-804-00006 | Vibration Monitoring | 40 | DAY | 1,500.00 | 60,000.00 | 850.00 | 34,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,600,101.35 | | 5,689,930.86 |
|