Proposal:H.011062.6
Parish:Rapides
Routes:LA 1203
Description:LA 1203: US 71 - 0.27 MI W Hickory Hill Rd
Type Construction:COLD PLANING ASPHALTIC PAVEMENT, IN PLACE CEMENT STABILIZED BASE COURSE, ASPHALTIC SURFACE TREATMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AAND RELATED WORK.
Estimated Construction Cost:$1,975,986.00
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $1,622,326.76 |
| 2 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $1,887,703.26 |
| 3 | 05789 | D & J Construction Co., Inc. | $2,142,149.95 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - GILCHRIST CONSTRUCTION CO. LLC | - 3 - D & J Construction Co., Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,500.00 | 2,500.00 | 10,000.00 | 10,000.00 | 2,500.00 | 2,500.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 226 | SQYD | 11.00 | 2,486.00 | 15.00 | 3,390.00 | 15.00 | 3,390.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 600 | CUYD | 10.00 | 6,000.00 | 23.00 | 13,800.00 | 15.00 | 9,000.00 | | 0004 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 3,384 | CUYD | 10.00 | 33,840.00 | 15.00 | 50,760.00 | 15.00 | 50,760.00 | | 0005 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 38,589 | SQYD | 6.90 | 266,264.10 | 8.75 | 337,653.75 | 9.00 | 347,301.00 | | 0006 | 303-02-00100 | Removal of Existing Patches | 250 | SQYD | 10.00 | 2,500.00 | 15.00 | 3,750.00 | 10.00 | 2,500.00 | | 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,220 | CUYD | 22.00 | 26,840.00 | 50.00 | 61,000.00 | 21.00 | 25,620.00 | | 0008 | 502-01-00100 | Superpave Asphaltic Concrete | 8,797.2 | TON | 75.00 | 659,790.00 | 79.00 | 694,978.80 | 96.00 | 844,531.20 | | 0009 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,489.7 | TON | 110.00 | 163,867.00 | 148.00 | 220,475.60 | 140.00 | 208,558.00 | | 0010 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 26,241 | GAL | 3.25 | 85,283.25 | 3.00 | 78,723.00 | 3.15 | 82,659.15 | | 0011 | 507-02-00200 | Aggregate (S2) | 38,589 | SQYD | 1.25 | 48,236.25 | 1.15 | 44,377.35 | 1.50 | 57,883.50 | | 0012 | 507-02-00300 | Aggregate (S3) | 38,589 | SQYD | 1.00 | 38,589.00 | 0.95 | 36,659.55 | 1.25 | 48,236.25 | | 0013 | 509-01-00100 | Cold Planing Asphaltic Pavement | 36,973 | SQYD | 1.50 | 55,459.50 | 1.75 | 64,702.75 | 2.00 | 73,946.00 | | 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,027 | CUYD | 0.10 | -102.70 | 1.00 | -1,027.00 | 0.00 | 0.00 | | 0015 | 701-01-02000 | Cross Drain Pipe (24" RCP/PP or 30" CMP) | 80 | LNFT | 100.00 | 8,000.00 | 160.00 | 12,800.00 | 100.00 | 8,000.00 | | 0016 | 701-01-02080 | Cross Drain Pipe (36" RCP/PP or 42" CMP) | 40 | LNFT | 125.00 | 5,000.00 | 200.00 | 8,000.00 | 120.00 | 4,800.00 | | 0017 | 701-02-02040 | Cross Drain Pipe Arch (30" Equiv. RCPA or 36" Equiv. CMPA) | 80 | LNFT | 115.00 | 9,200.00 | 180.00 | 14,400.00 | 110.00 | 8,800.00 | | 0018 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 20 | LNFT | 100.00 | 2,000.00 | 275.00 | 5,500.00 | 100.00 | 2,000.00 | | 0019 | 701-15-00100 | Concrete Collar | 3 | EACH | 800.00 | 2,400.00 | 2,100.00 | 6,300.00 | 700.00 | 2,100.00 | | 0020 | 712-02-00100 | Sacked Concrete Revetment | 22 | SQYD | 375.00 | 8,250.00 | 250.00 | 5,500.00 | 400.00 | 8,800.00 | | 0021 | 712-04-00100 | Flexible Revetment | 32 | SQYD | 80.00 | 2,560.00 | 65.00 | 2,080.00 | 100.00 | 3,200.00 | | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 4,000.00 | 4,000.00 | 20,000.00 | 20,000.00 | 61,000.00 | 61,000.00 | | 0023 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 50 | LNFT | 1.00 | 50.00 | 0.50 | 25.00 | 3.00 | 150.00 | | 0024 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 10.16 | MILE | 150.00 | 1,524.00 | 250.00 | 2,540.00 | 250.00 | 2,540.00 | | 0025 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.458 | MILE | 350.00 | 1,910.30 | 260.00 | 1,419.08 | 250.00 | 1,364.50 | | 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 13.043 | MILE | 700.00 | 9,130.10 | 460.00 | 5,999.78 | 450.00 | 5,869.35 | | 0027 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 2 | EACH | 110.00 | 220.00 | 50.00 | 100.00 | 50.00 | 100.00 | | 0028 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 3,500.00 | 3,500.00 | 4,000.00 | 4,000.00 | 7,500.00 | 7,500.00 | | 0029 | 726-01-00100 | Bedding Material | 103.5 | CUYD | 100.00 | 10,350.00 | 100.00 | 10,350.00 | 100.00 | 10,350.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 80,000.00 | 80,000.00 | 75,000.00 | 75,000.00 | 105,000.00 | 105,000.00 | | 0031 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 100.00 | 1,200.00 | 100.00 | 1,200.00 | 100.00 | 1,200.00 | | 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 654 | EACH | 5.25 | 3,433.50 | 6.25 | 4,087.50 | 6.00 | 3,924.00 | | 0033 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 50 | LNFT | 5.25 | 262.50 | 14.00 | 700.00 | 15.00 | 750.00 | | 0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 11.12 | MILE | 2,700.00 | 30,024.00 | 2,800.00 | 31,136.00 | 2,800.00 | 31,136.00 | | 0035 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.819 | MILE | 840.00 | 1,527.96 | 900.00 | 1,637.10 | 1,000.00 | 1,819.00 | | 0036 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 400.00 | 800.00 | 525.00 | 1,050.00 | 500.00 | 1,000.00 | | 0037 | 735-01-00100 | Mailboxes | 83 | EACH | 10.00 | 830.00 | 1.00 | 83.00 | 5.00 | 415.00 | | 0038 | 735-02-00100 | Mailbox Supports (Single) | 79 | EACH | 100.00 | 7,900.00 | 115.00 | 9,085.00 | 125.00 | 9,875.00 | | 0039 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 130.00 | 260.00 | 150.00 | 300.00 | 175.00 | 350.00 | | 0040 | 739-01-00100 | Hydro-Seeding | 3.7 | ACRE | 2,200.00 | 8,140.00 | 1,300.00 | 4,810.00 | 2,100.00 | 7,770.00 | | 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | 50,000.00 | 50,000.00 | | 0042 | NS-200-00020 | Cleaning Existing Ditches | 40 | LNFT | 10.00 | 400.00 | 35.00 | 1,400.00 | 25.00 | 1,000.00 | | 0043 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 290 | LNFT | 5.50 | 1,595.00 | 15.00 | 4,350.00 | 5.00 | 1,450.00 | | 0044 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 96 | LNFT | 7.50 | 720.00 | 20.00 | 1,920.00 | 7.00 | 672.00 | | 0045 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 386 | LNFT | 4.50 | 1,737.00 | 4.50 | 1,737.00 | 5.00 | 1,930.00 | | 0046 | NS-500-00280 | Surface Preparation | 1 | LUMP | 2,500.00 | 2,500.00 | 16,900.00 | 16,900.00 | 35,000.00 | 35,000.00 | | 0047 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,700 | INLF | 0.50 | 1,350.00 | 1.50 | 4,050.00 | 2.00 | 5,400.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,622,326.76 | | 1,887,703.26 | | 2,142,149.95 |
|