Proposal:H.011061.6
Parish:Grant
Routes:LA 1241
Description:LA 1241: US 71 - US 167
Type Construction:GRADING , DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC PAVEMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALTIC SURFACE TREATMENT INTERLAYER, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT AND RELATED WORK.
Estimated Construction Cost:$3,130,514.92
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $2,938,317.80 |
| 2 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $3,058,786.38 |
| 3 | 05789 | D & J Construction Co., Inc. | $3,441,523.72 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - GILCHRIST CONSTRUCTION CO. LLC | - 3 - D & J Construction Co., Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 10,300.00 | 10,300.00 | 2,500.00 | 2,500.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 38.6 | SQYD | 10.00 | 386.00 | 50.00 | 1,930.00 | 15.00 | 579.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 553 | LNFT | 16.00 | 8,848.00 | 16.00 | 8,848.00 | 22.00 | 12,166.00 | | 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 2,500.00 | 2,500.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 3,000 | CUYD | 10.00 | 30,000.00 | 15.00 | 45,000.00 | 15.00 | 45,000.00 | | 0006 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 3,555 | CUYD | 20.00 | 71,100.00 | 15.00 | 53,325.00 | 15.00 | 53,325.00 | | 0007 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 58,488 | SQYD | 7.25 | 424,038.00 | 8.60 | 502,996.80 | 9.00 | 526,392.00 | | 0008 | 304-05-00100 | Lime Treatment (Type E) | 249.2 | TON | 395.00 | 98,434.00 | 445.00 | 110,894.00 | 400.00 | 99,680.00 | | 0009 | 308-02-00100 | Removal of Existing Patches | 500 | SQYD | 2.50 | 1,250.00 | 15.00 | 7,500.00 | 10.00 | 5,000.00 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,783 | CUYD | 60.00 | 106,980.00 | 40.00 | 71,320.00 | 25.00 | 44,575.00 | | 0011 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 30.00 | 3,000.00 | 50.00 | 5,000.00 | 50.00 | 5,000.00 | | 0012 | 502-01-00100 | Superpave Asphaltic Concrete | 15,310.7 | TON | 82.00 | 1,255,477.40 | 73.00 | 1,117,681.10 | 95.00 | 1,454,516.50 | | 0013 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 2,715 | TON | 1.00 | 2,715.00 | 150.00 | 407,250.00 | 120.00 | 325,800.00 | | 0014 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 39,772 | GAL | 3.50 | 139,202.00 | 3.00 | 119,316.00 | 3.15 | 125,281.80 | | 0015 | 507-02-00200 | Aggregate (S2) | 58,488 | SQYD | 1.25 | 73,110.00 | 1.10 | 64,336.80 | 1.30 | 76,034.40 | | 0016 | 507-02-00300 | Aggregate (S3) | 58,488 | SQYD | 1.00 | 58,488.00 | 0.80 | 46,790.40 | 1.15 | 67,261.20 | | 0017 | 509-01-00100 | Cold Planing Asphaltic Pavement | 51,869 | SQYD | 2.75 | 142,639.75 | 2.50 | 129,672.50 | 3.00 | 155,607.00 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -4,426 | CUYD | 0.10 | -442.60 | 1.00 | -4,426.00 | 1.00 | -4,426.00 | | 0019 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 16 | LNFT | 110.00 | 1,760.00 | 250.00 | 4,000.00 | 100.00 | 1,600.00 | | 0020 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 8 | LNFT | 130.00 | 1,040.00 | 270.00 | 2,160.00 | 100.00 | 800.00 | | 0021 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 64 | LNFT | 150.00 | 9,600.00 | 170.00 | 10,880.00 | 120.00 | 7,680.00 | | 0022 | 701-10-01120 | Reinforced Concrete Pipe (Extension) (42") | 32 | LNFT | 200.00 | 6,400.00 | 190.00 | 6,080.00 | 160.00 | 5,120.00 | | 0023 | 701-15-00100 | Concrete Collar | 15 | EACH | 1,000.00 | 15,000.00 | 1,200.00 | 18,000.00 | 700.00 | 10,500.00 | | 0024 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 440 | LNFT | 37.00 | 16,280.00 | 31.00 | 13,640.00 | 32.00 | 14,080.00 | | 0025 | 704-03-00100 | Blocked Out Guard Rail | 150 | LNFT | 24.00 | 3,600.00 | 20.00 | 3,000.00 | 21.00 | 3,150.00 | | 0026 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 70.00 | 14,000.00 | 74.00 | 14,800.00 | 60.00 | 12,000.00 | | 0027 | 704-11-00100 | Guard Rail End Treatment (Flared) | 8 | EACH | 2,200.00 | 17,600.00 | 2,300.00 | 18,400.00 | 2,100.00 | 16,800.00 | | 0028 | 707-01-00100 | Concrete Curb | 80 | LNFT | 20.00 | 1,600.00 | 90.00 | 7,200.00 | 20.00 | 1,600.00 | | 0029 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 34 | SQYD | 90.00 | 3,060.00 | 105.00 | 3,570.00 | 80.00 | 2,720.00 | | 0030 | 711-04-00100 | Geotextile Fabric | 34 | SQYD | 3.00 | 102.00 | 13.00 | 442.00 | 4.00 | 136.00 | | 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 21,000.00 | 21,000.00 | 75,000.00 | 75,000.00 | | 0032 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 48 | LNFT | 1.00 | 48.00 | 0.55 | 26.40 | 0.50 | 24.00 | | 0033 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 12.536 | MILE | 150.00 | 1,880.40 | 250.00 | 3,134.00 | 225.00 | 2,820.60 | | 0034 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 8.981 | MILE | 350.00 | 3,143.35 | 275.00 | 2,469.78 | 250.00 | 2,245.25 | | 0035 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 38.172 | MILE | 650.00 | 24,811.80 | 475.00 | 18,131.70 | 1.00 | 38.17 | | 0036 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 10,000.00 | 10,000.00 | 4,000.00 | 4,000.00 | 7,500.00 | 7,500.00 | | 0037 | 726-01-00100 | Bedding Material | 65.9 | CUYD | 120.00 | 7,908.00 | 120.00 | 7,908.00 | 100.00 | 6,590.00 | | 0038 | 727-01-00100 | Mobilization | 1 | LUMP | 260,000.00 | 260,000.00 | 107,000.00 | 107,000.00 | 150,000.00 | 150,000.00 | | 0039 | 729-16-00200 | Object Marker Assembly (Type 2) | 12 | EACH | 75.00 | 900.00 | 50.00 | 600.00 | 100.00 | 1,200.00 | | 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 90.00 | 720.00 | 78.00 | 624.00 | 100.00 | 800.00 | | 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 708 | EACH | 5.50 | 3,894.00 | 5.25 | 3,717.00 | 6.00 | 4,248.00 | | 0042 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 760 | LNFT | 5.50 | 4,180.00 | 6.25 | 4,750.00 | 7.00 | 5,320.00 | | 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 15.184 | MILE | 3,000.00 | 45,552.00 | 2,800.00 | 42,515.20 | 2,800.00 | 42,515.20 | | 0044 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.14 | MILE | 5,500.00 | 770.00 | 9,000.00 | 1,260.00 | 9,000.00 | 1,260.00 | | 0045 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.994 | MILE | 550.00 | 1,646.70 | 900.00 | 2,694.60 | 900.00 | 2,694.60 | | 0046 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 3 | EACH | 350.00 | 1,050.00 | 300.00 | 900.00 | 500.00 | 1,500.00 | | 0047 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 350.00 | 1,050.00 | 400.00 | 1,200.00 | 500.00 | 1,500.00 | | 0048 | 732-05-00100 | Removal of Existing Markings | 0.042 | MILE | 5,000.00 | 210.00 | 5,000.00 | 210.00 | 5,000.00 | 210.00 | | 0049 | 735-01-00100 | Mailboxes | 80 | EACH | 10.00 | 800.00 | 1.00 | 80.00 | 5.00 | 400.00 | | 0050 | 735-02-00100 | Mailbox Supports (Single) | 73 | EACH | 100.00 | 7,300.00 | 110.00 | 8,030.00 | 125.00 | 9,125.00 | | 0051 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 135.00 | 270.00 | 150.00 | 300.00 | 200.00 | 400.00 | | 0052 | 735-04-00100 | Mailbox Supports (Multiple) | 1 | EACH | 300.00 | 300.00 | 260.00 | 260.00 | 300.00 | 300.00 | | 0053 | 739-01-00100 | Hydro-Seeding | 3.01 | ACRE | 2,400.00 | 7,224.00 | 1,350.00 | 4,063.50 | 2,100.00 | 6,321.00 | | 0054 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 10,000.00 | 10,000.00 | 35,000.00 | 35,000.00 | | 0055 | NS-200-00020 | Cleaning Existing Ditches | 50 | LNFT | 10.00 | 500.00 | 30.00 | 1,500.00 | 25.00 | 1,250.00 | | 0056 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,392 | INLF | 1.00 | 1,392.00 | 1.80 | 2,505.60 | 2.00 | 2,784.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,938,317.80 | | 3,058,786.38 | | 3,441,523.72 |
|