Bid Tabulations for the Letting of 6/11/2014 LA DOTD Headquarters

Proposal:H.010270.6
Parish:Lincoln
Routes:I-20
Description:I-20: TREE REMOVAL IN LINCOLN PARISH
Type Construction:CLEARING AND GRUBBING AND RELATED WORK.
Estimated Construction Cost:$817,976.81
Rank License BidderConstruction Bid
141771HOLLIDAY CONSTRUCTION LLC$775,971.00
239001Jd's Rebar & Construction Inc.$871,618.85
336936Dirtworks Inc Of Vicksburg$1,674,844.00


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
HOLLIDAY CONSTRUCTION LLC
- 2 -
Jd's Rebar & Construction Inc.
- 3 -
Dirtworks Inc Of Vicksburg
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 1     LUMP305,000.00305,000.0015,000.0015,000.001,020,000.001,020,000.00
0002203-07-00100Borrow (Vehicular Measurement) 500     CUYD25.0012,500.0071.1435,570.0025.0012,500.00
0003204-05-00100Temporary Sediment Check Dams (Hay) 128     EACH150.0019,200.0026.693,416.32110.0014,080.00
0004204-06-00100Temporary Silt Fencing 64,000     LNFT2.45156,800.001.5096,000.000.5032,000.00
0005713-01-00100Temporary Signs and Barricades 1     LUMP30,000.0030,000.0042,076.9942,076.99110,000.00110,000.00
0006716-01-00100Mulch (Vegetative) 212.4   TON350.0074,340.00243.8051,783.12530.00112,572.00
0007717-01-00100Seeding 6,372     LB4.2527,081.0025.00159,300.0011.0070,092.00
0008718-01-00100Fertilizer 106,200     LB0.5053,100.000.2425,488.000.5053,100.00
0009727-01-00100Mobilization 1     LUMP20,000.0020,000.00190,587.00190,587.00150,000.00150,000.00
0010740-01-00100Construction Layout 1     LUMP25,000.0025,000.0019,069.1119,069.1115,000.0015,000.00
0011NS-201-00001Tree and Stump Removal (Under 36" - 36" Diameter) 30     EACH500.0015,000.002,589.1577,674.50900.0027,000.00
0012NS-201-00002Tree and Stump Removal (Over 36" - 48" Diameter) 10     EACH1,250.0012,500.006,063.6360,636.30900.009,000.00
0013NS-201-00003Tree and Stump Removal (Over 48" Diameter) 5     EACH1,250.006,250.008,841.8344,209.15900.004,500.00
0014NS-713-00008Portable Changeable Message Sign 6     EACH3,200.0019,200.008,468.0650,808.367,500.0045,000.00
           
  CONTRACTOR TOTAL   775,971.00 871,618.85 1,674,844.00