Proposal:H.009187.6
Parish:Jefferson
Description:23RD STREET BRIDGE OVER CANAL NO. 17
Type Construction:CLASS II BASE COURSE, DRAINAGE STRUCTURES, CONCRETE SLAB SPAN BRIDGE, PORTLAND CEMENT CONCRETE PAVEMENT AND RELATED WORK.
Estimated Construction Cost:$1,363,607.00
| Rank | License | Bidder | Construction Bid |
| 1 | 01012 | Cecil D. Gassiott, LLC | $949,661.50 |
| 2 | 02179 | Boh Bros. Construction Co., LLC. | $985,383.00 |
| 3 | 00481 | COASTAL BRIDGE CO., L.L.C. | $1,019,119.10 |
| 4 | 34567 | James Construction Group LLC | $1,029,392.25 |
| 5 | 39462 | JB JAMES CONSTRUCTION LLC | $1,073,938.23 |
| 6 | 36961 | Cycle Construction Co. L.L.C. | $1,159,212.40 |
| 7 | 46722 | Bld Services Llc | $1,167,764.00 |
| 8 | 04435 | Thigpen Construction Co., Inc. | $1,239,551.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Cecil D. Gassiott, LLC | - 2 - Boh Bros. Construction Co., LLC. | - 3 - COASTAL BRIDGE CO., L.L.C. | - 4 - James Construction Group LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | 1,100.00 | 1,100.00 | | 0002 | 202-02-04000 | Removal of Bridge (STA 7+00; 31.6.' X 58.4' CONCRETE BRIDGE) | 1 | EACH | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 | 50,000.00 | 50,000.00 | 35,000.00 | 35,000.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 131.1 | LNFT | 25.00 | 3,277.50 | 15.00 | 1,966.50 | 16.00 | 2,097.60 | 5.00 | 655.50 | | 0004 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 240 | SQYD | 35.00 | 8,400.00 | 20.00 | 4,800.00 | 23.00 | 5,520.00 | 21.00 | 5,040.00 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 195 | LNFT | 25.00 | 4,875.00 | 7.00 | 1,365.00 | 6.00 | 1,170.00 | 10.00 | 1,950.00 | | 0007 | 302-02-02080 | Class II Base Course (6" Thick) (Stone) | 62.6 | SQYD | 50.00 | 3,130.00 | 65.00 | 4,069.00 | 50.00 | 3,130.00 | 75.00 | 4,695.00 | | 0008 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 90 | CUYD | 40.00 | 3,600.00 | 150.00 | 13,500.00 | 60.00 | 5,400.00 | 50.00 | 4,500.00 | | 0009 | 601-01-00900 | Portland Cement Concrete Pavement (12" Thick) | 62.6 | SQYD | 200.00 | 12,520.00 | 220.00 | 13,772.00 | 200.00 | 12,520.00 | 100.00 | 6,260.00 | | 0013 | 702-02-00200 | Manholes (R-CB-11) | 2 | EACH | 1,500.00 | 3,000.00 | 4,000.00 | 8,000.00 | 3,500.00 | 7,000.00 | 4,500.00 | 9,000.00 | | 0014 | 705-09-00100 | Rebuilt Fence | 50 | LNFT | 50.00 | 2,500.00 | 28.00 | 1,400.00 | 50.00 | 2,500.00 | 75.00 | 3,750.00 | | 0015 | 707-01-00300 | Concrete Curb (Mountable) | 40 | LNFT | 25.00 | 1,000.00 | 30.00 | 1,200.00 | 65.00 | 2,600.00 | 30.00 | 1,200.00 | | 0016 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 444 | SQYD | 85.00 | 37,740.00 | 70.00 | 31,080.00 | 85.00 | 37,740.00 | 85.00 | 37,740.00 | | 0017 | 711-04-00100 | Geotextile Fabric | 143 | SQYD | 15.00 | 2,145.00 | 27.50 | 3,932.50 | 8.00 | 1,144.00 | 21.00 | 3,003.00 | | 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 8,030.00 | 8,030.00 | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | | 0020 | 717-01-00100 | Seeding | 1 | LB | 100.00 | 100.00 | 75.00 | 75.00 | 100.00 | 100.00 | 100.00 | 100.00 | | 0021 | 718-01-00100 | Fertilizer | 10 | LB | 100.00 | 1,000.00 | 15.00 | 150.00 | 10.00 | 100.00 | 10.00 | 100.00 | | 0022 | 726-01-00100 | Bedding Material | 14.8 | CUYD | 50.00 | 740.00 | 55.00 | 814.00 | 75.00 | 1,110.00 | 75.00 | 1,110.00 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 90,000.00 | 90,000.00 | 65,000.00 | 65,000.00 | 101,000.00 | 101,000.00 | 100,000.00 | 100,000.00 | | 0024 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 50.00 | 200.00 | 150.00 | 600.00 | 85.00 | 340.00 | 60.00 | 240.00 | | 0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,500.00 | 4,500.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | | 0026 | 803-03-00100 | Steel Sheet Pile Wall (PZ27) | 6,390 | SQFT | 32.00 | 204,480.00 | 35.00 | 223,650.00 | 40.00 | 255,600.00 | 35.00 | 223,650.00 | | 0027 | 804-01-00400 | Precast Concrete Piles (18") | 2,072 | LNFT | 108.00 | 223,776.00 | 80.00 | 165,760.00 | 95.00 | 196,840.00 | 80.00 | 165,760.00 | | 0028 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 50,000.00 | 50,000.00 | 76,100.00 | 76,100.00 | 150.00 | 150.00 | 1,500.00 | 1,500.00 | | 0029 | 805-10-02320 | Bridge Superstructure and Substructure (28' Clear Roadway; 90 Degree Crossing) (Cast-in-Place) | 3 | SPAN | 64,000.00 | 192,000.00 | 71,750.00 | 215,250.00 | 65,000.00 | 195,000.00 | 87,020.00 | 261,060.00 | | 0030 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 811 | INLF | 2.00 | 1,622.00 | 2.00 | 1,622.00 | 2.50 | 2,027.50 | 1.25 | 1,013.75 | | 0031 | NS-736-00120 | Construction Photographs And Video | 1 | LUMP | 1,000.00 | 1,000.00 | 5,000.00 | 5,000.00 | 2,500.00 | 2,500.00 | 10,000.00 | 10,000.00 | | 0032 | NS-800-00040 | Concrete Approach Slabs (28' CLR RDWY 90 DEG CROSSING WITH TAPERED BARRIER RAILING) (W/O ASPHALT) (WEST END) | 1 | EACH | 9,500.00 | 9,500.00 | 35,000.00 | 35,000.00 | 20,000.00 | 20,000.00 | 45,000.00 | 45,000.00 | | 0033 | NS-800-00040 | Concrete Approach Slabs (28' CLR RDWY 90 DEG CROSSING WITH TAPERED BARRIER RAILING) (W/O ASPHALT) (EAST END) | 1 | EACH | 9,500.00 | 9,500.00 | 20,000.00 | 20,000.00 | 15,500.00 | 15,500.00 | 28,000.00 | 28,000.00 | | 0034 | NS-804-00001 | Vibration Monitoring (INCLUDING INITIAL SURVEY) (28 PPC PILES & 95 SHEET PILES) | 123 | EACH | 122.00 | 15,006.00 | 65.00 | 7,995.00 | 250.00 | 30,750.00 | 110.00 | 13,530.00 | | 0035 | 203-04-00100 | Nonplastic Embankment | 10 | CUYD | 30.00 | 300.00 | 80.00 | 800.00 | 100.00 | 1,000.00 | 100.00 | 1,000.00 | | 0036 | 203-07-00300 | Borrow (Vehicular Measurement) (Plastic Soils) | 16 | CUYD | 30.00 | 480.00 | 100.00 | 1,600.00 | 65.00 | 1,040.00 | 100.00 | 1,600.00 | | 0037 | 701-03-02000 | Storm Drain Pipe (Outfall) (15" PP or 18" CMP) | 16 | LNFT | 140.00 | 2,240.00 | 260.00 | 4,160.00 | 90.00 | 1,440.00 | 160.00 | 2,560.00 | | 0038 | 701-03-02040 | Storm Drain Pipe (Outfall) (24" PP or 30" CMP) | 47 | LNFT | 150.00 | 7,050.00 | 180.00 | 8,460.00 | 100.00 | 4,700.00 | 175.00 | 8,225.00 | | 0039 | 701-03-02060 | Storm Drain Pipe (Outfall) (30" PP or 36" CMP) | 26 | LNFT | 200.00 | 5,200.00 | 312.00 | 8,112.00 | 125.00 | 3,250.00 | 200.00 | 5,200.00 | | 0040 | 716-01-00200 | Mulch (Fiber) | 0.1 | TON | 7,500.00 | 750.00 | 1,500.00 | 150.00 | 8,500.00 | 850.00 | 8,500.00 | 850.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 949,661.50 | | 985,383.00 | | 1,019,119.10 | | 1,029,392.25 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - JB JAMES CONSTRUCTION LLC | - 6 - Cycle Construction Co. L.L.C. | - 7 - Bld Services Llc | - 8 - Thigpen Construction Co., Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 41,000.00 | 41,000.00 | 8,265.00 | 8,265.00 | 16,000.00 | 16,000.00 | 25,000.00 | 25,000.00 | | 0002 | 202-02-04000 | Removal of Bridge (STA 7+00; 31.6.' X 58.4' CONCRETE BRIDGE) | 1 | EACH | 45,000.00 | 45,000.00 | 27,830.00 | 27,830.00 | 29,000.00 | 29,000.00 | 100,000.00 | 100,000.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 131.1 | LNFT | 11.35 | 1,487.99 | 5.00 | 655.50 | 12.00 | 1,573.20 | 5.00 | 655.50 | | 0004 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 240 | SQYD | 25.97 | 6,232.80 | 13.00 | 3,120.00 | 15.00 | 3,600.00 | 20.00 | 4,800.00 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 7,000.00 | 7,000.00 | 5,340.00 | 5,340.00 | 12,000.00 | 12,000.00 | 10,000.00 | 10,000.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 195 | LNFT | 7.43 | 1,448.85 | 2.30 | 448.50 | 6.00 | 1,170.00 | 5.00 | 975.00 | | 0007 | 302-02-02080 | Class II Base Course (6" Thick) (Stone) | 62.6 | SQYD | 187.23 | 11,720.60 | 29.00 | 1,815.40 | 25.00 | 1,565.00 | 30.00 | 1,878.00 | | 0008 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 90 | CUYD | 157.61 | 14,184.90 | 73.00 | 6,570.00 | 41.00 | 3,690.00 | 60.00 | 5,400.00 | | 0009 | 601-01-00900 | Portland Cement Concrete Pavement (12" Thick) | 62.6 | SQYD | 127.68 | 7,992.77 | 151.00 | 9,452.60 | 160.00 | 10,016.00 | 200.00 | 12,520.00 | | 0013 | 702-02-00200 | Manholes (R-CB-11) | 2 | EACH | 4,045.07 | 8,090.14 | 4,180.00 | 8,360.00 | 6,500.00 | 13,000.00 | 10,000.00 | 20,000.00 | | 0014 | 705-09-00100 | Rebuilt Fence | 50 | LNFT | 37.14 | 1,857.00 | 58.00 | 2,900.00 | 50.00 | 2,500.00 | 35.00 | 1,750.00 | | 0015 | 707-01-00300 | Concrete Curb (Mountable) | 40 | LNFT | 28.93 | 1,157.20 | 50.00 | 2,000.00 | 50.00 | 2,000.00 | 50.00 | 2,000.00 | | 0016 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 444 | SQYD | 67.51 | 29,974.44 | 92.00 | 40,848.00 | 110.00 | 48,840.00 | 90.00 | 39,960.00 | | 0017 | 711-04-00100 | Geotextile Fabric | 143 | SQYD | 5.96 | 852.28 | 8.00 | 1,144.00 | 2.00 | 286.00 | 8.00 | 1,144.00 | | 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 7,065.49 | 7,065.49 | 9,155.00 | 9,155.00 | 11,000.00 | 11,000.00 | 15,000.00 | 15,000.00 | | 0020 | 717-01-00100 | Seeding | 1 | LB | 123.80 | 123.80 | 24.00 | 24.00 | 100.00 | 100.00 | 200.00 | 200.00 | | 0021 | 718-01-00100 | Fertilizer | 10 | LB | 12.38 | 123.80 | 2.30 | 23.00 | 20.00 | 200.00 | 50.00 | 500.00 | | 0022 | 726-01-00100 | Bedding Material | 14.8 | CUYD | 75.31 | 1,114.59 | 129.00 | 1,909.20 | 86.00 | 1,272.80 | 70.00 | 1,036.00 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 162,000.00 | 162,000.00 | 73,000.00 | 73,000.00 | 138,000.00 | 138,000.00 | | 0024 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 92.85 | 371.40 | 110.00 | 440.00 | 110.00 | 440.00 | 200.00 | 800.00 | | 0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 55,000.00 | 55,000.00 | 21,850.00 | 21,850.00 | 6,000.00 | 6,000.00 | 30,000.00 | 30,000.00 | | 0026 | 803-03-00100 | Steel Sheet Pile Wall (PZ27) | 6,390 | SQFT | 30.39 | 194,192.10 | 33.00 | 210,870.00 | 45.00 | 287,550.00 | 35.00 | 223,650.00 | | 0027 | 804-01-00400 | Precast Concrete Piles (18") | 2,072 | LNFT | 84.00 | 174,048.00 | 92.50 | 191,660.00 | 120.00 | 248,640.00 | 100.00 | 207,200.00 | | 0028 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 100.00 | 100.00 | 11,340.00 | 11,340.00 | 14,000.00 | 14,000.00 | 2,000.00 | 2,000.00 | | 0029 | 805-10-02320 | Bridge Superstructure and Substructure (28' Clear Roadway; 90 Degree Crossing) (Cast-in-Place) | 3 | SPAN | 71,656.11 | 214,968.33 | 92,910.00 | 278,730.00 | 93,000.00 | 279,000.00 | 75,000.00 | 225,000.00 | | 0030 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 811 | INLF | 1.24 | 1,005.64 | 2.00 | 1,622.00 | 12.00 | 9,732.00 | 3.00 | 2,433.00 | | 0031 | NS-736-00120 | Construction Photographs And Video | 1 | LUMP | 3,201.65 | 3,201.65 | 4,240.00 | 4,240.00 | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 | | 0032 | NS-800-00040 | Concrete Approach Slabs (28' CLR RDWY 90 DEG CROSSING WITH TAPERED BARRIER RAILING) (W/O ASPHALT) (WEST END) | 1 | EACH | 50,257.35 | 50,257.35 | 37,770.00 | 37,770.00 | 36,217.00 | 36,217.00 | 55,000.00 | 55,000.00 | | 0033 | NS-800-00040 | Concrete Approach Slabs (28' CLR RDWY 90 DEG CROSSING WITH TAPERED BARRIER RAILING) (W/O ASPHALT) (EAST END) | 1 | EACH | 30,694.93 | 30,694.93 | 27,680.00 | 27,680.00 | 32,500.00 | 32,500.00 | 45,000.00 | 45,000.00 | | 0034 | NS-804-00001 | Vibration Monitoring (INCLUDING INITIAL SURVEY) (28 PPC PILES & 95 SHEET PILES) | 123 | EACH | 427.76 | 52,614.48 | 495.00 | 60,885.00 | 100.00 | 12,300.00 | 150.00 | 18,450.00 | | 0035 | 203-04-00100 | Nonplastic Embankment | 10 | CUYD | 145.13 | 1,451.30 | 39.00 | 390.00 | 50.00 | 500.00 | 100.00 | 1,000.00 | | 0036 | 203-07-00300 | Borrow (Vehicular Measurement) (Plastic Soils) | 16 | CUYD | 61.69 | 987.04 | 49.00 | 784.00 | 50.00 | 800.00 | 100.00 | 1,600.00 | | 0037 | 701-03-02000 | Storm Drain Pipe (Outfall) (15" PP or 18" CMP) | 16 | LNFT | 117.17 | 1,874.72 | 221.00 | 3,536.00 | 60.00 | 960.00 | 500.00 | 8,000.00 | | 0038 | 701-03-02040 | Storm Drain Pipe (Outfall) (24" PP or 30" CMP) | 47 | LNFT | 74.69 | 3,510.43 | 209.00 | 9,823.00 | 76.00 | 3,572.00 | 500.00 | 23,500.00 | | 0039 | 701-03-02060 | Storm Drain Pipe (Outfall) (30" PP or 36" CMP) | 26 | LNFT | 83.92 | 2,181.92 | 216.00 | 5,616.00 | 90.00 | 2,340.00 | 500.00 | 13,000.00 | | 0040 | 716-01-00200 | Mulch (Fiber) | 0.1 | TON | 10,522.90 | 1,052.29 | 1,162.00 | 116.20 | 4,000.00 | 400.00 | 1,000.00 | 100.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,073,938.23 | | 1,159,212.40 | | 1,167,764.00 | | 1,239,551.50 |
|