Proposal:H.006157.6
Parish:Livingston
Description:WAX ROAD BRIDGE
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$531,336.50
| Rank | License | Bidder | Construction Bid |
| 1 | 00044 | Guinn Construction, LLC | $567,558.00 |
| 2 | 02109 | Chambers Construction Co, Inc. | $591,001.20 |
| 3 | 01012 | Cecil D. Gassiott, LLC | $608,202.00 |
| 4 | 56994 | Matt L. Guinn Construction, LLC | $717,530.00 |
| 5 | 00481 | COASTAL BRIDGE CO., L.L.C. | $724,606.50 |
| 6 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $731,443.95 |
| 7 | 39462 | JB JAMES CONSTRUCTION LLC | $795,579.36 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Guinn Construction, LLC | - 2 - Chambers Construction Co, Inc. | - 3 - Cecil D. Gassiott, LLC | - 4 - Matt L. Guinn Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 15,000.00 | 15,000.00 | 7,725.00 | 7,725.00 | 5,000.00 | 5,000.00 | 40,000.00 | 40,000.00 | | 0002 | 202-02-04000 | Removal of Bridge STA 103+00, 24'X97' TIMBER TRESTLE BRIDG | 1 | EACH | 12,500.00 | 12,500.00 | 16,700.00 | 16,700.00 | 15,000.00 | 15,000.00 | 12,500.00 | 12,500.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 32 | SQYD | 25.00 | 800.00 | 29.17 | 933.44 | 50.00 | 1,600.00 | 45.00 | 1,440.00 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) STA.101+86 RT. | 22 | LNFT | 75.00 | 1,650.00 | 39.93 | 878.46 | 50.00 | 1,100.00 | 25.00 | 550.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) STA. 103+06 LT. | 21 | LNFT | 75.00 | 1,575.00 | 41.83 | 878.43 | 50.00 | 1,050.00 | 25.00 | 525.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 25,000.00 | 25,000.00 | 24,700.00 | 24,700.00 | 21,000.00 | 21,000.00 | 45,000.00 | 45,000.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 461 | LNFT | 3.00 | 1,383.00 | 4.69 | 2,162.09 | 4.00 | 1,844.00 | 3.50 | 1,613.50 | | 0009 | 308-01-00100 | In-Place Cement Treated Base Course (12" Thick) | 552 | SQYD | 35.00 | 19,320.00 | 20.70 | 11,426.40 | 60.00 | 33,120.00 | 45.00 | 24,840.00 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 3 | CUYD | 150.00 | 450.00 | 534.27 | 1,602.81 | 100.00 | 300.00 | 250.00 | 750.00 | | 0011 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 10.2 | CUYD | 50.00 | 510.00 | 143.77 | 1,466.45 | 100.00 | 1,020.00 | 150.00 | 1,530.00 | | 0012 | 502-01-00100 | Superpave Asphaltic Concrete | 101.7 | TON | 275.00 | 27,967.50 | 285.07 | 28,991.62 | 225.00 | 22,882.50 | 220.00 | 22,374.00 | | 0013 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 28 | TON | 275.00 | 7,700.00 | 284.23 | 7,958.44 | 225.00 | 6,300.00 | 220.00 | 6,160.00 | | 0014 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 83 | LNFT | 48.00 | 3,984.00 | 53.60 | 4,448.80 | 80.00 | 6,640.00 | 85.00 | 7,055.00 | | 0015 | 701-05-02040 | Side Drain Pipe (Erosion) (18" PP/CMP) | 40 | LNFT | 48.00 | 1,920.00 | 42.22 | 1,688.80 | 80.00 | 3,200.00 | 85.00 | 3,400.00 | | 0016 | 701-05-02060 | Side Drain Pipe (Erosion) (24" PP/CMP) | 198 | LNFT | 86.00 | 17,028.00 | 59.00 | 11,682.00 | 90.00 | 17,820.00 | 92.50 | 18,315.00 | | 0017 | 701-05-02100 | Side Drain Pipe (Erosion) (36" PP/CMP) | 57 | LNFT | 168.00 | 9,576.00 | 115.54 | 6,585.78 | 110.00 | 6,270.00 | 120.00 | 6,840.00 | | 0018 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 4,500.00 | 4,500.00 | 4,620.00 | 4,620.00 | 2,500.00 | 2,500.00 | 7,500.00 | 7,500.00 | | 0019 | 704-03-00100 | Blocked Out Guard Rail | 37.5 | LNFT | 23.00 | 862.50 | 26.40 | 990.00 | 15.00 | 562.50 | 30.00 | 1,125.00 | | 0020 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 75 | LNFT | 66.00 | 4,950.00 | 78.00 | 5,850.00 | 60.00 | 4,500.00 | 70.00 | 5,250.00 | | 0021 | 704-11-00100 | Guard Rail End Treatment (Flared) | 1 | EACH | 2,250.00 | 2,250.00 | 2,750.00 | 2,750.00 | 2,000.00 | 2,000.00 | 3,000.00 | 3,000.00 | | 0022 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 3 | EACH | 2,500.00 | 7,500.00 | 3,139.00 | 9,417.00 | 2,200.00 | 6,600.00 | 3,000.00 | 9,000.00 | | 0023 | 706-02-00200 | Concrete Drive (6" Thick) | 38 | SQYD | 75.00 | 2,850.00 | 79.09 | 3,005.42 | 100.00 | 3,800.00 | 75.00 | 2,850.00 | | 0024 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 453 | SQYD | 70.00 | 31,710.00 | 54.19 | 24,548.07 | 49.00 | 22,197.00 | 72.50 | 32,842.50 | | 0025 | 711-04-00100 | Geotextile Fabric | 453 | SQYD | 5.00 | 2,265.00 | 3.92 | 1,775.76 | 12.00 | 5,436.00 | 3.00 | 1,359.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 7,500.00 | 7,500.00 | 19,354.00 | 19,354.00 | 4,200.00 | 4,200.00 | 10,500.00 | 10,500.00 | | 0027 | 726-01-00100 | Bedding Material | 35.6 | CUYD | 100.00 | 3,560.00 | 92.27 | 3,284.81 | 75.00 | 2,670.00 | 130.00 | 4,628.00 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 60,000.00 | 60,000.00 | 33,587.00 | 33,587.00 | 60,000.00 | 60,000.00 | 62,500.00 | 62,500.00 | | 0029 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 96.00 | 384.00 | 100.00 | 400.00 | 175.00 | 700.00 | | 0030 | 735-01-00100 | Mailboxes | 1 | EACH | 100.00 | 100.00 | 257.00 | 257.00 | 50.00 | 50.00 | 300.00 | 300.00 | | 0031 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 100.00 | 100.00 | 32.70 | 32.70 | 50.00 | 50.00 | 300.00 | 300.00 | | 0032 | 739-01-00100 | Hydro-Seeding | 0.06 | ACRE | 25,000.00 | 1,500.00 | 27,630.00 | 1,657.80 | 12,500.00 | 750.00 | 20,000.00 | 1,200.00 | | 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,500.00 | 4,500.00 | 6,907.00 | 6,907.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | | 0034 | 804-01-00300 | Precast Concrete Piles (16") | 1,320 | LNFT | 62.00 | 81,840.00 | 58.48 | 77,193.60 | 75.00 | 99,000.00 | 77.00 | 101,640.00 | | 0035 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1.00 | 1.00 | 120.00 | 120.00 | 100.00 | 100.00 | 3.00 | 3.00 | | 0036 | 804-17-00100 | Dynamic Monitoring | 4 | EACH | 1,000.00 | 4,000.00 | 2,000.00 | 8,000.00 | 2,150.00 | 8,600.00 | 1,250.00 | 5,000.00 | | 0037 | 805-10-02240 | Bridge Superstructure and Substructure (28' Clear Roadway; 75 Degree Crossing) (Cast-in-Place Bents Only) | 5 | SPAN | 32,500.00 | 162,500.00 | 43,855.12 | 219,275.60 | 41,000.00 | 205,000.00 | 45,000.00 | 225,000.00 | | 0038 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 88 | INLF | 12.00 | 1,056.00 | 5.70 | 501.60 | 5.00 | 440.00 | 5.00 | 440.00 | | 0039 | NS-736-00120 | Construction Photographs And Video | 1 | LUMP | 1,250.00 | 1,250.00 | 3,924.00 | 3,924.00 | 1,000.00 | 1,000.00 | 3,000.00 | 3,000.00 | | 0040 | NS-800-00040 | Concrete Approach Slabs 28' CLR RDWY, 75 DEG CROSSING, W/O ASPHALT | 1 | EACH | 12,000.00 | 12,000.00 | 11,795.00 | 11,795.00 | 9,500.00 | 9,500.00 | 12,000.00 | 12,000.00 | | 0041 | NS-800-00040 | Concrete Approach Slabs 28' CLEAR ROADWAY, 75 DEG. CROSSING, W/O ASPHALT (PART CURVED) | 1 | EACH | 12,000.00 | 12,000.00 | 12,188.00 | 12,188.00 | 9,500.00 | 9,500.00 | 12,500.00 | 12,500.00 | | 0042 | NS-804-00001 | Vibration Monitoring INCLUDING PRELIMINARY SURVEY | 24 | EACH | 500.00 | 12,000.00 | 406.43 | 9,754.32 | 425.00 | 10,200.00 | 500.00 | 12,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 567,558.00 | | 591,001.20 | | 608,202.00 | | 717,530.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - COASTAL BRIDGE CO., L.L.C. | - 6 - GILCHRIST CONSTRUCTION CO. LLC | - 7 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 15,000.00 | 15,000.00 | 22,000.00 | 22,000.00 | 45,000.00 | 45,000.00 | | 0002 | 202-02-04000 | Removal of Bridge STA 103+00, 24'X97' TIMBER TRESTLE BRIDG | 1 | EACH | 20,000.00 | 20,000.00 | 28,000.00 | 28,000.00 | 41,000.00 | 41,000.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 32 | SQYD | 50.00 | 1,600.00 | 10.00 | 320.00 | 13.91 | 445.12 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) STA.101+86 RT. | 22 | LNFT | 40.00 | 880.00 | 14.00 | 308.00 | 12.53 | 275.66 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) STA. 103+06 LT. | 21 | LNFT | 40.00 | 840.00 | 15.00 | 315.00 | 13.12 | 275.52 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 40,000.00 | 40,000.00 | 30,500.00 | 30,500.00 | 55,000.00 | 55,000.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 461 | LNFT | 3.50 | 1,613.50 | 3.75 | 1,728.75 | 4.31 | 1,986.91 | | 0009 | 308-01-00100 | In-Place Cement Treated Base Course (12" Thick) | 552 | SQYD | 20.00 | 11,040.00 | 18.00 | 9,936.00 | 22.17 | 12,237.84 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 3 | CUYD | 100.00 | 300.00 | 200.00 | 600.00 | 111.54 | 334.62 | | 0011 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 10.2 | CUYD | 100.00 | 1,020.00 | 92.00 | 938.40 | 117.76 | 1,201.15 | | 0012 | 502-01-00100 | Superpave Asphaltic Concrete | 101.7 | TON | 150.00 | 15,255.00 | 165.00 | 16,780.50 | 241.72 | 24,582.92 | | 0013 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 28 | TON | 180.00 | 5,040.00 | 250.00 | 7,000.00 | 241.72 | 6,768.16 | | 0014 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 83 | LNFT | 65.00 | 5,395.00 | 42.00 | 3,486.00 | 68.53 | 5,687.99 | | 0015 | 701-05-02040 | Side Drain Pipe (Erosion) (18" PP/CMP) | 40 | LNFT | 65.00 | 2,600.00 | 64.00 | 2,560.00 | 45.93 | 1,837.20 | | 0016 | 701-05-02060 | Side Drain Pipe (Erosion) (24" PP/CMP) | 198 | LNFT | 80.00 | 15,840.00 | 55.00 | 10,890.00 | 54.33 | 10,757.34 | | 0017 | 701-05-02100 | Side Drain Pipe (Erosion) (36" PP/CMP) | 57 | LNFT | 90.00 | 5,130.00 | 80.00 | 4,560.00 | 81.74 | 4,659.18 | | 0018 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 5,500.00 | 5,500.00 | 5,000.00 | 5,000.00 | 2,770.30 | 2,770.30 | | 0019 | 704-03-00100 | Blocked Out Guard Rail | 37.5 | LNFT | 22.00 | 825.00 | 16.00 | 600.00 | 22.96 | 861.00 | | 0020 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 75 | LNFT | 68.00 | 5,100.00 | 65.00 | 4,875.00 | 72.52 | 5,439.00 | | 0021 | 704-11-00100 | Guard Rail End Treatment (Flared) | 1 | EACH | 2,500.00 | 2,500.00 | 2,200.00 | 2,200.00 | 2,417.22 | 2,417.22 | | 0022 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 3 | EACH | 3,000.00 | 9,000.00 | 2,400.00 | 7,200.00 | 2,719.37 | 8,158.11 | | 0023 | 706-02-00200 | Concrete Drive (6" Thick) | 38 | SQYD | 140.00 | 5,320.00 | 114.00 | 4,332.00 | 90.65 | 3,444.70 | | 0024 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 453 | SQYD | 65.00 | 29,445.00 | 62.00 | 28,086.00 | 73.73 | 33,399.69 | | 0025 | 711-04-00100 | Geotextile Fabric | 453 | SQYD | 6.00 | 2,718.00 | 2.25 | 1,019.25 | 7.92 | 3,587.76 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 16,000.00 | 16,000.00 | 70,000.00 | 70,000.00 | 13,454.51 | 13,454.51 | | 0027 | 726-01-00100 | Bedding Material | 35.6 | CUYD | 90.00 | 3,204.00 | 110.00 | 3,916.00 | 48.68 | 1,733.01 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 70,000.00 | 70,000.00 | 73,000.00 | 73,000.00 | 75,000.00 | 75,000.00 | | 0029 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 90.00 | 360.00 | 82.00 | 328.00 | 90.65 | 362.60 | | 0030 | 735-01-00100 | Mailboxes | 1 | EACH | 30.00 | 30.00 | 1.05 | 1.05 | 10.88 | 10.88 | | 0031 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 175.00 | 175.00 | 118.00 | 118.00 | 598.26 | 598.26 | | 0032 | 739-01-00100 | Hydro-Seeding | 0.06 | ACRE | 15,000.00 | 900.00 | 13,500.00 | 810.00 | 15,107.67 | 906.46 | | 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 18,000.00 | 18,000.00 | 68,000.00 | 68,000.00 | 30,000.00 | 30,000.00 | | 0034 | 804-01-00300 | Precast Concrete Piles (16") | 1,320 | LNFT | 85.00 | 112,200.00 | 64.00 | 84,480.00 | 81.94 | 108,160.80 | | 0035 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 100.00 | 100.00 | 500.00 | 500.00 | 1,484.63 | 1,484.63 | | 0036 | 804-17-00100 | Dynamic Monitoring | 4 | EACH | 1,800.00 | 7,200.00 | 1,000.00 | 4,000.00 | 1,208.61 | 4,834.44 | | 0037 | 805-10-02240 | Bridge Superstructure and Substructure (28' Clear Roadway; 75 Degree Crossing) (Cast-in-Place Bents Only) | 5 | SPAN | 50,000.00 | 250,000.00 | 39,000.00 | 195,000.00 | 44,427.30 | 222,136.50 | | 0038 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 88 | INLF | 2.00 | 176.00 | 12.00 | 1,056.00 | 6.04 | 531.52 | | 0039 | NS-736-00120 | Construction Photographs And Video | 1 | LUMP | 5,000.00 | 5,000.00 | 2,000.00 | 2,000.00 | 3,125.30 | 3,125.30 | | 0040 | NS-800-00040 | Concrete Approach Slabs 28' CLR RDWY, 75 DEG CROSSING, W/O ASPHALT | 1 | EACH | 12,500.00 | 12,500.00 | 11,500.00 | 11,500.00 | 23,829.94 | 23,829.94 | | 0041 | NS-800-00040 | Concrete Approach Slabs 28' CLEAR ROADWAY, 75 DEG. CROSSING, W/O ASPHALT (PART CURVED) | 1 | EACH | 13,000.00 | 13,000.00 | 11,500.00 | 11,500.00 | 22,883.12 | 22,883.12 | | 0042 | NS-804-00001 | Vibration Monitoring INCLUDING PRELIMINARY SURVEY | 24 | EACH | 575.00 | 13,800.00 | 500.00 | 12,000.00 | 600.00 | 14,400.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 724,606.50 | | 731,443.95 | | 795,579.36 |
|