Bid Tabulations for the Letting of 6/11/2014 LA DOTD Headquarters

Proposal:H.006157.6
Parish:Livingston
Description:WAX ROAD BRIDGE
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$531,336.50
Rank License BidderConstruction Bid
100044Guinn Construction, LLC$567,558.00
202109Chambers Construction Co, Inc.$591,001.20
301012Cecil D. Gassiott, LLC$608,202.00
456994Matt L. Guinn Construction, LLC$717,530.00
500481COASTAL BRIDGE CO., L.L.C.$724,606.50
612312GILCHRIST CONSTRUCTION CO. LLC$731,443.95
739462JB JAMES CONSTRUCTION LLC$795,579.36


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Guinn Construction, LLC
- 2 -
Chambers Construction Co, Inc.
- 3 -
Cecil D. Gassiott, LLC
- 4 -
Matt L. Guinn Construction, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 1     LUMP15,000.0015,000.007,725.007,725.005,000.005,000.0040,000.0040,000.00
0002202-02-04000Removal of Bridge STA 103+00, 24'X97' TIMBER TRESTLE BRIDG1     EACH12,500.0012,500.0016,700.0016,700.0015,000.0015,000.0012,500.0012,500.00
0003202-02-06100Removal of Concrete Walks and Drives 32     SQYD25.00800.0029.17933.4450.001,600.0045.001,440.00
0005202-02-32120Removal of Pipe (Side Drain) STA.101+86 RT.22     LNFT75.001,650.0039.93878.4650.001,100.0025.00550.00
0006202-02-32120Removal of Pipe (Side Drain) STA. 103+06 LT.21     LNFT75.001,575.0041.83878.4350.001,050.0025.00525.00
0007203-05-00100Excavation and Embankment 1     LUMP25,000.0025,000.0024,700.0024,700.0021,000.0021,000.0045,000.0045,000.00
0008204-06-00100Temporary Silt Fencing 461     LNFT3.001,383.004.692,162.094.001,844.003.501,613.50
0009308-01-00100In-Place Cement Treated Base Course (12" Thick) 552     SQYD35.0019,320.0020.7011,426.4060.0033,120.0045.0024,840.00
0010401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 3     CUYD150.00450.00534.271,602.81100.00300.00250.00750.00
0011402-01-00100Traffic Maintenance Aggregate (Vehicular Measurement) 10.2   CUYD50.00510.00143.771,466.45100.001,020.00150.001,530.00
0012502-01-00100Superpave Asphaltic Concrete 101.7   TON275.0027,967.50285.0728,991.62225.0022,882.50220.0022,374.00
0013502-01-00200Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 28     TON275.007,700.00284.237,958.44225.006,300.00220.006,160.00
0014701-05-01040Side Drain Pipe (18" RCP/PP/CMP) 83     LNFT48.003,984.0053.604,448.8080.006,640.0085.007,055.00
0015701-05-02040Side Drain Pipe (Erosion) (18" PP/CMP) 40     LNFT48.001,920.0042.221,688.8080.003,200.0085.003,400.00
0016701-05-02060Side Drain Pipe (Erosion) (24" PP/CMP) 198     LNFT86.0017,028.0059.0011,682.0090.0017,820.0092.5018,315.00
0017701-05-02100Side Drain Pipe (Erosion) (36" PP/CMP) 57     LNFT168.009,576.00115.546,585.78110.006,270.00120.006,840.00
0018702-02-00100Manholes (MH-06) 1     EACH4,500.004,500.004,620.004,620.002,500.002,500.007,500.007,500.00
0019704-03-00100Blocked Out Guard Rail 37.5   LNFT23.00862.5026.40990.0015.00562.5030.001,125.00
0020704-08-00200Guard Rail Transitions (Double Thrie Beam) 75     LNFT66.004,950.0078.005,850.0060.004,500.0070.005,250.00
0021704-11-00100Guard Rail End Treatment (Flared) 1     EACH2,250.002,250.002,750.002,750.002,000.002,000.003,000.003,000.00
0022704-11-00200Guard Rail End Treatment (Tangent) 3     EACH2,500.007,500.003,139.009,417.002,200.006,600.003,000.009,000.00
0023706-02-00200Concrete Drive (6" Thick) 38     SQYD75.002,850.0079.093,005.42100.003,800.0075.002,850.00
0024711-01-04000Riprap (55 lb, 18" Thick) 453     SQYD70.0031,710.0054.1924,548.0749.0022,197.0072.5032,842.50
0025711-04-00100Geotextile Fabric 453     SQYD5.002,265.003.921,775.7612.005,436.003.001,359.00
0026713-01-00100Temporary Signs and Barricades 1     LUMP7,500.007,500.0019,354.0019,354.004,200.004,200.0010,500.0010,500.00
0027726-01-00100Bedding Material 35.6   CUYD100.003,560.0092.273,284.8175.002,670.00130.004,628.00
0028727-01-00100Mobilization 1     LUMP60,000.0060,000.0033,587.0033,587.0060,000.0060,000.0062,500.0062,500.00
0029729-16-00300Object Marker Assembly (Type 3) 4     EACH100.00400.0096.00384.00100.00400.00175.00700.00
0030735-01-00100Mailboxes 1     EACH100.00100.00257.00257.0050.0050.00300.00300.00
0031735-02-00100Mailbox Supports (Single) 1     EACH100.00100.0032.7032.7050.0050.00300.00300.00
0032739-01-00100Hydro-Seeding 0.06  ACRE25,000.001,500.0027,630.001,657.8012,500.00750.0020,000.001,200.00
0033740-01-00100Construction Layout 1     LUMP4,500.004,500.006,907.006,907.005,000.005,000.0010,000.0010,000.00
0034804-01-00300Precast Concrete Piles (16") 1,320     LNFT62.0081,840.0058.4877,193.6075.0099,000.0077.00101,640.00
0035804-12-00100Loading Permanent Piles 1     EACH1.001.00120.00120.00100.00100.003.003.00
0036804-17-00100Dynamic Monitoring 4     EACH1,000.004,000.002,000.008,000.002,150.008,600.001,250.005,000.00
0037805-10-02240Bridge Superstructure and Substructure (28' Clear Roadway; 75 Degree Crossing) (Cast-in-Place Bents Only) 5     SPAN32,500.00162,500.0043,855.12219,275.6041,000.00205,000.0045,000.00225,000.00
0038NS-500-00340Saw Cutting Asphaltic Concrete Pavement 88     INLF12.001,056.005.70501.605.00440.005.00440.00
0039NS-736-00120Construction Photographs And Video 1     LUMP1,250.001,250.003,924.003,924.001,000.001,000.003,000.003,000.00
0040NS-800-00040Concrete Approach Slabs 28' CLR RDWY, 75 DEG CROSSING, W/O ASPHALT1     EACH12,000.0012,000.0011,795.0011,795.009,500.009,500.0012,000.0012,000.00
0041NS-800-00040Concrete Approach Slabs 28' CLEAR ROADWAY, 75 DEG. CROSSING, W/O ASPHALT (PART CURVED)1     EACH12,000.0012,000.0012,188.0012,188.009,500.009,500.0012,500.0012,500.00
0042NS-804-00001Vibration Monitoring INCLUDING PRELIMINARY SURVEY24     EACH500.0012,000.00406.439,754.32425.0010,200.00500.0012,000.00
             
  CONTRACTOR TOTAL   567,558.00 591,001.20 608,202.00 717,530.00



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
COASTAL BRIDGE CO., L.L.C.
- 6 -
GILCHRIST CONSTRUCTION CO. LLC
- 7 -
JB JAMES CONSTRUCTION LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 1     LUMP15,000.0015,000.0022,000.0022,000.0045,000.0045,000.00
0002202-02-04000Removal of Bridge STA 103+00, 24'X97' TIMBER TRESTLE BRIDG1     EACH20,000.0020,000.0028,000.0028,000.0041,000.0041,000.00
0003202-02-06100Removal of Concrete Walks and Drives 32     SQYD50.001,600.0010.00320.0013.91445.12
0005202-02-32120Removal of Pipe (Side Drain) STA.101+86 RT.22     LNFT40.00880.0014.00308.0012.53275.66
0006202-02-32120Removal of Pipe (Side Drain) STA. 103+06 LT.21     LNFT40.00840.0015.00315.0013.12275.52
0007203-05-00100Excavation and Embankment 1     LUMP40,000.0040,000.0030,500.0030,500.0055,000.0055,000.00
0008204-06-00100Temporary Silt Fencing 461     LNFT3.501,613.503.751,728.754.311,986.91
0009308-01-00100In-Place Cement Treated Base Course (12" Thick) 552     SQYD20.0011,040.0018.009,936.0022.1712,237.84
0010401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 3     CUYD100.00300.00200.00600.00111.54334.62
0011402-01-00100Traffic Maintenance Aggregate (Vehicular Measurement) 10.2   CUYD100.001,020.0092.00938.40117.761,201.15
0012502-01-00100Superpave Asphaltic Concrete 101.7   TON150.0015,255.00165.0016,780.50241.7224,582.92
0013502-01-00200Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 28     TON180.005,040.00250.007,000.00241.726,768.16
0014701-05-01040Side Drain Pipe (18" RCP/PP/CMP) 83     LNFT65.005,395.0042.003,486.0068.535,687.99
0015701-05-02040Side Drain Pipe (Erosion) (18" PP/CMP) 40     LNFT65.002,600.0064.002,560.0045.931,837.20
0016701-05-02060Side Drain Pipe (Erosion) (24" PP/CMP) 198     LNFT80.0015,840.0055.0010,890.0054.3310,757.34
0017701-05-02100Side Drain Pipe (Erosion) (36" PP/CMP) 57     LNFT90.005,130.0080.004,560.0081.744,659.18
0018702-02-00100Manholes (MH-06) 1     EACH5,500.005,500.005,000.005,000.002,770.302,770.30
0019704-03-00100Blocked Out Guard Rail 37.5   LNFT22.00825.0016.00600.0022.96861.00
0020704-08-00200Guard Rail Transitions (Double Thrie Beam) 75     LNFT68.005,100.0065.004,875.0072.525,439.00
0021704-11-00100Guard Rail End Treatment (Flared) 1     EACH2,500.002,500.002,200.002,200.002,417.222,417.22
0022704-11-00200Guard Rail End Treatment (Tangent) 3     EACH3,000.009,000.002,400.007,200.002,719.378,158.11
0023706-02-00200Concrete Drive (6" Thick) 38     SQYD140.005,320.00114.004,332.0090.653,444.70
0024711-01-04000Riprap (55 lb, 18" Thick) 453     SQYD65.0029,445.0062.0028,086.0073.7333,399.69
0025711-04-00100Geotextile Fabric 453     SQYD6.002,718.002.251,019.257.923,587.76
0026713-01-00100Temporary Signs and Barricades 1     LUMP16,000.0016,000.0070,000.0070,000.0013,454.5113,454.51
0027726-01-00100Bedding Material 35.6   CUYD90.003,204.00110.003,916.0048.681,733.01
0028727-01-00100Mobilization 1     LUMP70,000.0070,000.0073,000.0073,000.0075,000.0075,000.00
0029729-16-00300Object Marker Assembly (Type 3) 4     EACH90.00360.0082.00328.0090.65362.60
0030735-01-00100Mailboxes 1     EACH30.0030.001.051.0510.8810.88
0031735-02-00100Mailbox Supports (Single) 1     EACH175.00175.00118.00118.00598.26598.26
0032739-01-00100Hydro-Seeding 0.06  ACRE15,000.00900.0013,500.00810.0015,107.67906.46
0033740-01-00100Construction Layout 1     LUMP18,000.0018,000.0068,000.0068,000.0030,000.0030,000.00
0034804-01-00300Precast Concrete Piles (16") 1,320     LNFT85.00112,200.0064.0084,480.0081.94108,160.80
0035804-12-00100Loading Permanent Piles 1     EACH100.00100.00500.00500.001,484.631,484.63
0036804-17-00100Dynamic Monitoring 4     EACH1,800.007,200.001,000.004,000.001,208.614,834.44
0037805-10-02240Bridge Superstructure and Substructure (28' Clear Roadway; 75 Degree Crossing) (Cast-in-Place Bents Only) 5     SPAN50,000.00250,000.0039,000.00195,000.0044,427.30222,136.50
0038NS-500-00340Saw Cutting Asphaltic Concrete Pavement 88     INLF2.00176.0012.001,056.006.04531.52
0039NS-736-00120Construction Photographs And Video 1     LUMP5,000.005,000.002,000.002,000.003,125.303,125.30
0040NS-800-00040Concrete Approach Slabs 28' CLR RDWY, 75 DEG CROSSING, W/O ASPHALT1     EACH12,500.0012,500.0011,500.0011,500.0023,829.9423,829.94
0041NS-800-00040Concrete Approach Slabs 28' CLEAR ROADWAY, 75 DEG. CROSSING, W/O ASPHALT (PART CURVED)1     EACH13,000.0013,000.0011,500.0011,500.0022,883.1222,883.12
0042NS-804-00001Vibration Monitoring INCLUDING PRELIMINARY SURVEY24     EACH575.0013,800.00500.0012,000.00600.0014,400.00
           
  CONTRACTOR TOTAL   724,606.50 731,443.95 795,579.36