Proposal:H.010537.6
Parish:Winn
Routes:LA 3136, LA 471
Description:LA 471 AND LA 3136 OVERLAYS
Type Construction:DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, SUBGRADE TREATMENT, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, CEMENT TREATED BASE COURSE, ASPHALTIC SURFACE TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$3,658,636.12
| Rank | License | Bidder | Construction Bid |
| 1 | 08815 | W. E. Mcdonald & Son, LLC. | $3,238,918.01 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $3,578,034.27 |
| 3 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $3,639,513.40 |
| 4 | 02268 | Soil Stabilizers, Inc. | $3,919,486.01 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - W. E. Mcdonald & Son, LLC. | - 2 - Diamond B Construction Co., L.L.C. | - 3 - GILCHRIST CONSTRUCTION CO. LLC | - 4 - Soil Stabilizers, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 13,000.00 | 13,000.00 | 15,000.00 | 15,000.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 414 | LNFT | 5.00 | 2,070.00 | 15.00 | 6,210.00 | 13.00 | 5,382.00 | 15.00 | 6,210.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 52 | CUYD | 20.00 | 1,040.00 | 35.00 | 1,820.00 | 40.00 | 2,080.00 | 20.00 | 1,040.00 | | 0004 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 1,213 | CUYD | 12.00 | 14,556.00 | 25.00 | 30,325.00 | 23.00 | 27,899.00 | 20.00 | 24,260.00 | | 0005 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 81,428 | SQYD | 6.91 | 562,667.48 | 7.35 | 598,495.80 | 8.10 | 659,566.80 | 8.45 | 688,066.60 | | 0006 | 304-05-00100 | Lime Treatment (Type E) | 133.1 | TON | 425.00 | 56,567.50 | 600.00 | 79,860.00 | 360.00 | 47,916.00 | 375.00 | 49,912.50 | | 0007 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 37,727 | SQYD | 7.60 | 286,725.20 | 10.00 | 377,270.00 | 12.60 | 475,360.20 | 11.00 | 414,997.00 | | 0008 | 308-01-00100 | In-Place Cement Treated Base Course (12" Thick) | 9,389 | SQYD | 6.91 | 64,877.99 | 7.00 | 65,723.00 | 8.40 | 78,867.60 | 7.95 | 74,642.55 | | 0009 | 308-02-00100 | Removal of Existing Patches | 400 | SQYD | 9.00 | 3,600.00 | 5.00 | 2,000.00 | 15.00 | 6,000.00 | 10.00 | 4,000.00 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,201 | CUYD | 25.00 | 55,025.00 | 35.00 | 77,035.00 | 36.00 | 79,236.00 | 35.00 | 77,035.00 | | 0011 | 502-01-00100 | Superpave Asphaltic Concrete | 19,200.1 | TON | 76.00 | 1,459,207.60 | 80.00 | 1,536,008.00 | 77.00 | 1,478,407.70 | 90.00 | 1,728,009.00 | | 0012 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 479.3 | TON | 133.00 | 63,746.90 | 145.00 | 69,498.50 | 185.00 | 88,670.50 | 65.00 | 31,154.50 | | 0013 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 55,293 | GAL | 2.81 | 155,373.33 | 3.00 | 165,879.00 | 3.00 | 165,879.00 | 2.81 | 155,373.33 | | 0014 | 507-02-00200 | Aggregate (S2) | 81,313 | SQYD | 0.82 | 66,676.66 | 1.00 | 81,313.00 | 0.75 | 60,984.75 | 0.99 | 80,499.87 | | 0015 | 507-02-00300 | Aggregate (S3) | 81,313 | SQYD | 0.64 | 52,040.32 | 0.74 | 60,171.62 | 0.65 | 52,853.45 | 0.77 | 62,611.01 | | 0016 | 509-01-00100 | Cold Planing Asphaltic Pavement | 77,459 | SQYD | 1.75 | 135,553.25 | 1.90 | 147,172.10 | 0.75 | 58,094.25 | 1.60 | 123,934.40 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -6,132 | CUYD | 0.01 | -61.32 | 0.10 | -613.20 | 1.00 | -6,132.00 | 0.10 | -613.20 | | 0021 | 701-01-02000 | Cross Drain Pipe (24" RCP/PP or 30" CMP) | 80 | LNFT | 90.00 | 7,200.00 | 100.00 | 8,000.00 | 175.00 | 14,000.00 | 140.00 | 11,200.00 | | 0022 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 16 | LNFT | 66.00 | 1,056.00 | 70.00 | 1,120.00 | 140.00 | 2,240.00 | 150.00 | 2,400.00 | | 0023 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 72 | LNFT | 80.00 | 5,760.00 | 100.00 | 7,200.00 | 180.00 | 12,960.00 | 175.00 | 12,600.00 | | 0024 | 701-15-00100 | Concrete Collar | 8 | EACH | 975.00 | 7,800.00 | 700.00 | 5,600.00 | 1,400.00 | 11,200.00 | 800.00 | 6,400.00 | | 0025 | 704-03-00100 | Blocked Out Guard Rail | 187.5 | LNFT | 19.00 | 3,562.50 | 20.00 | 3,750.00 | 21.00 | 3,937.50 | 19.00 | 3,562.50 | | 0026 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 59.00 | 5,900.00 | 60.00 | 6,000.00 | 67.00 | 6,700.00 | 59.00 | 5,900.00 | | 0027 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 1,950.00 | 7,800.00 | 2,000.00 | 8,000.00 | 2,600.00 | 10,400.00 | 1,950.00 | 7,800.00 | | 0028 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 65 | SQYD | 74.00 | 4,810.00 | 135.00 | 8,775.00 | 100.00 | 6,500.00 | 125.00 | 8,125.00 | | 0029 | 711-04-00100 | Geotextile Fabric | 65 | SQYD | 2.00 | 130.00 | 3.50 | 227.50 | 15.00 | 975.00 | 3.00 | 195.00 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 51,000.00 | 51,000.00 | | 0031 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 21.278 | MILE | 400.00 | 8,511.20 | 150.00 | 3,191.70 | 250.00 | 5,319.50 | 300.00 | 6,383.40 | | 0032 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 20.235 | MILE | 300.00 | 6,070.50 | 250.00 | 5,058.75 | 280.00 | 5,665.80 | 250.00 | 5,058.75 | | 0033 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 31.254 | MILE | 700.00 | 21,877.80 | 750.00 | 23,440.50 | 500.00 | 15,627.00 | 450.00 | 14,064.30 | | 0034 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 3,495 | EACH | 1.50 | 5,242.50 | 1.20 | 4,194.00 | 1.60 | 5,592.00 | 1.50 | 5,242.50 | | 0035 | 722-01-00100 | Project Site Laboratory | 2 | EACH | 1,000.00 | 2,000.00 | 4,000.00 | 8,000.00 | 3,000.00 | 6,000.00 | 5,000.00 | 10,000.00 | | 0036 | 726-01-00100 | Bedding Material | 72.7 | CUYD | 100.00 | 7,270.00 | 120.00 | 8,724.00 | 120.00 | 8,724.00 | 100.00 | 7,270.00 | | 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 60,000.00 | 60,000.00 | 75,000.00 | 75,000.00 | 97,000.00 | 97,000.00 | 122,000.00 | 122,000.00 | | 0038 | 729-16-00300 | Object Marker Assembly (Type 3) | 26 | EACH | 75.00 | 1,950.00 | 80.00 | 2,080.00 | 70.00 | 1,820.00 | 100.00 | 2,600.00 | | 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,271 | EACH | 5.00 | 6,355.00 | 5.50 | 6,990.50 | 5.25 | 6,672.75 | 5.00 | 6,355.00 | | 0040 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 36 | LNFT | 6.00 | 216.00 | 6.00 | 216.00 | 16.00 | 576.00 | 15.00 | 540.00 | | 0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.999 | MILE | 2,900.00 | 26,097.10 | 3,000.00 | 26,997.00 | 2,800.00 | 25,197.20 | 2,700.00 | 24,297.30 | | 0042 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.059 | MILE | 1,000.00 | 5,059.00 | 1,000.00 | 5,059.00 | 900.00 | 4,553.10 | 800.00 | 4,047.20 | | 0043 | 735-01-00100 | Mailboxes | 13 | EACH | 1.00 | 13.00 | 10.00 | 130.00 | 1.10 | 14.30 | 150.00 | 1,950.00 | | 0044 | 735-02-00100 | Mailbox Supports (Single) | 9 | EACH | 218.00 | 1,962.00 | 120.00 | 1,080.00 | 130.00 | 1,170.00 | 100.00 | 900.00 | | 0045 | 735-03-00100 | Mailbox Supports (Double) | 3 | EACH | 218.00 | 654.00 | 140.00 | 420.00 | 260.00 | 780.00 | 175.00 | 525.00 | | 0046 | 739-01-00100 | Hydro-Seeding | 3.37 | ACRE | 2,750.00 | 9,267.50 | 1,250.00 | 4,212.50 | 1,200.00 | 4,044.00 | 1,750.00 | 5,897.50 | | 0047 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,000.00 | 6,000.00 | 10,000.00 | 10,000.00 | 13,100.00 | 13,100.00 | 15,000.00 | 15,000.00 | | 0048 | NS-200-00020 | Cleaning Existing Ditches | 240 | LNFT | 7.50 | 1,800.00 | 8.00 | 1,920.00 | 30.00 | 7,200.00 | 15.00 | 3,600.00 | | 0049 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 4 | EACH | 550.00 | 2,200.00 | 600.00 | 2,400.00 | 630.00 | 2,520.00 | 400.00 | 1,600.00 | | 0050 | 701-01-01020 | Cross Drain Pipe (30" RCP/PP) | 56 | LNFT | 108.00 | 6,048.00 | 115.00 | 6,440.00 | 180.00 | 10,080.00 | 150.00 | 8,400.00 | | 0051 | 701-01-01040 | Cross Drain Pipe (36" RCP/PP) | 56 | LNFT | 135.00 | 7,560.00 | 140.00 | 7,840.00 | 200.00 | 11,200.00 | 165.00 | 9,240.00 | | 0052 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 128 | LNFT | 110.00 | 14,080.00 | 100.00 | 12,800.00 | 185.00 | 23,680.00 | 150.00 | 19,200.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,238,918.01 | | 3,578,034.27 | | 3,639,513.40 | | 3,919,486.01 |
|