Proposal:H.010490.6
Parish:Rapides
Routes:I-49, LA 8
Description:I-49: 0.66 MI E LA 1200 - 0.36 MI N LA 8
Type Construction:GRADING, COLD PLANING ASPHALTIC CONCRETE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT PAVEMENT PATCHING, AND RELATED WORK
Estimated Construction Cost:$5,199,520.67
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $4,953,481.29 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $5,191,319.95 |
| 3 | 05789 | D & J Construction Co., Inc. | $7,331,256.90 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - GILCHRIST CONSTRUCTION CO. LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - D & J Construction Co., Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06120 | Removal of Curbs (Asphalt) | 20 | LNFT | 50.00 | 1,000.00 | 50.00 | 1,000.00 | 10.00 | 200.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 2,973 | LNFT | 9.00 | 26,757.00 | 7.50 | 22,297.50 | 25.00 | 74,325.00 | | 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 15,000.00 | 15,000.00 | 12,500.00 | 12,500.00 | 50,000.00 | 50,000.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,820 | CUYD | 7.00 | 12,740.00 | 18.00 | 32,760.00 | 35.00 | 63,700.00 | | 0005 | 502-01-00100 | Superpave Asphaltic Concrete | 29,004.4 | TON | 76.00 | 2,204,334.40 | 80.00 | 2,320,352.00 | 105.00 | 3,045,462.00 | | 0006 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 3,534.2 | TON | 97.00 | 342,817.40 | 95.00 | 335,749.00 | 132.00 | 466,514.40 | | 0007 | 508-01-00100 | Asphalt Concrete (SMA) Wearing Course | 13,578.5 | TON | 110.00 | 1,493,635.00 | 105.00 | 1,425,742.50 | 115.00 | 1,561,527.50 | | 0008 | 509-01-00100 | Cold Planing Asphaltic Pavement | 234,112 | SQYD | 1.20 | 280,934.40 | 1.85 | 433,107.20 | 3.00 | 702,336.00 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -3,334 | CUYD | 1.00 | -3,334.00 | 0.10 | -333.40 | 1.00 | -3,334.00 | | 0010 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 329 | SQYD | 100.00 | 32,900.00 | 109.53 | 36,035.37 | 120.00 | 39,480.00 | | 0011 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 350 | LNFT | 37.00 | 12,950.00 | 55.00 | 19,250.00 | 55.00 | 19,250.00 | | 0012 | 704-03-00100 | Blocked Out Guard Rail | 3,831.3 | LNFT | 20.00 | 76,626.00 | 20.00 | 76,626.00 | 20.00 | 76,626.00 | | 0013 | 704-06-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 25 | LNFT | 72.00 | 1,800.00 | 100.00 | 2,500.00 | 100.00 | 2,500.00 | | 0014 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 225 | LNFT | 31.00 | 6,975.00 | 44.00 | 9,900.00 | 50.00 | 11,250.00 | | 0015 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 450 | LNFT | 52.00 | 23,400.00 | 60.00 | 27,000.00 | 60.00 | 27,000.00 | | 0016 | 704-11-00100 | Guard Rail End Treatment (Flared) | 20 | EACH | 2,550.00 | 51,000.00 | 2,000.00 | 40,000.00 | 2,000.00 | 40,000.00 | | 0017 | 707-01-00100 | Concrete Curb | 130 | LNFT | 45.00 | 5,850.00 | 17.00 | 2,210.00 | 30.00 | 3,900.00 | | 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 55,000.00 | 55,000.00 | 300,000.00 | 300,000.00 | | 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 27.4 | MILE | 220.00 | 6,028.00 | 175.00 | 4,795.00 | 250.00 | 6,850.00 | | 0020 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 27.3 | MILE | 1.00 | 27.30 | 450.00 | 12,285.00 | 500.00 | 13,650.00 | | 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 63.54 | MILE | 1.00 | 63.54 | 850.00 | 54,009.00 | 800.00 | 50,832.00 | | 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 70,000.00 | 70,000.00 | 575,000.00 | 575,000.00 | | 0023 | 729-16-00300 | Object Marker Assembly (Type 3) | 22 | EACH | 77.00 | 1,694.00 | 80.00 | 1,760.00 | 100.00 | 2,200.00 | | 0024 | 731-02-00100 | Reflectorized Raised Pavement Markers | 4,434 | EACH | 5.25 | 23,278.50 | 6.50 | 28,821.00 | 6.00 | 26,604.00 | | 0025 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 360 | LNFT | 8.50 | 3,060.00 | 1.00 | 360.00 | 9.00 | 3,240.00 | | 0026 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 4,775 | LNFT | 2.75 | 13,131.25 | 2.00 | 9,550.00 | 3.00 | 14,325.00 | | 0027 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 35 | LNFT | 26.00 | 910.00 | 3.00 | 105.00 | 30.00 | 1,050.00 | | 0028 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 700 | LNFT | 7.00 | 4,900.00 | 6.50 | 4,550.00 | 7.00 | 4,900.00 | | 0029 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 72 | LNFT | 7.00 | 504.00 | 6.50 | 468.00 | 7.00 | 504.00 | | 0030 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 23.2 | MILE | 2,800.00 | 64,960.00 | 3,300.00 | 76,560.00 | 3,000.00 | 69,600.00 | | 0031 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 9.2 | MILE | 800.00 | 7,360.00 | 1,100.00 | 10,120.00 | 1,000.00 | 9,200.00 | | 0032 | 732-04-00001 | Plastic Pavement Legends and Symbols (Message) STOP | 1 | EACH | 700.00 | 700.00 | 1,100.00 | 1,100.00 | 700.00 | 700.00 | | 0033 | 739-01-00100 | Hydro-Seeding | 9.12 | ACRE | 1,650.00 | 15,048.00 | 2,800.00 | 25,536.00 | 2,000.00 | 18,240.00 | | 0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 14,300.00 | 14,300.00 | 16,000.00 | 16,000.00 | 25,000.00 | 25,000.00 | | 0035 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 14,850 | INLF | 0.17 | 2,524.50 | 0.50 | 7,425.00 | 0.50 | 7,425.00 | | 0036 | NS-700-00240 | Special Guard Rail Anchor Section | 2 | EACH | 1,300.00 | 2,600.00 | 1,650.00 | 3,300.00 | 1,500.00 | 3,000.00 | | 0037 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 18.2 | MILE | 385.00 | 7,007.00 | 707.68 | 12,879.78 | 1,000.00 | 18,200.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,953,481.29 | | 5,191,319.95 | | 7,331,256.90 |
|