Proposal:H.016826.6
Parish:Natchitoches
Description:LA 117: PIPE REPLACEMENT AT LG ML 10.711
Type Construction:
Estimated Construction Cost:$99,170.00
| Rank | License | Bidder | Construction Bid |
| 1 | 46716 | BRUDD CONSTRUCTION CO., LLC | $84,124.00 |
| 2 | 40486 | REGIONAL CONSTRUCTION, LLC | $93,965.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - BRUDD CONSTRUCTION CO., LLC | - 2 - REGIONAL CONSTRUCTION, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.1 | LUMP | 5,555.00 | 5,555.00 | 25,000.00 | 25,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,389.00 | 1,389.00 | 6,500.00 | 6,500.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 111 | SQYD | 25.00 | 2,775.00 | 20.00 | 2,220.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 35 | CUYD | 175.00 | 6,125.00 | 65.00 | 2,275.00 | | 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 42.00 | 168.00 | 25.00 | 100.00 | | 0006 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 37 | CUYD | 156.00 | 5,772.00 | 115.00 | 4,255.00 | | 0007 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 72 | LNFT | 567.00 | 40,824.00 | 300.00 | 21,600.00 | | 0008 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 72 | LNFT | 18.00 | 1,296.00 | 20.00 | 1,440.00 | | 0009 | 712-02-00100 | Sacked Concrete Revetment | 5 | SQYD | 430.00 | 2,150.00 | 500.00 | 2,500.00 | | 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 2,500.00 | 2,500.00 | 10,000.00 | 10,000.00 | | 0011 | 726-01-00100 | Bedding Material | 15 | CUYD | 154.00 | 2,310.00 | 145.00 | 2,175.00 | | 0012 | 727-01-00100 | Mobilization | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | | 0013 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 130.00 | 260.00 | 200.00 | 400.00 | | 0014 | 739-01-00100 | Hydro-Seeding | 0.1 | ACRE | 5,000.00 | 500.00 | 15,000.00 | 1,500.00 | | 0015 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,500.00 | 2,500.00 | 4,000.00 | 4,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 84,124.00 | | 93,965.00 |
|