Search


Bid Tabulations for the Letting of 2/20/2024 in District 08 - Alexandria

Proposal:H.015359.6
Parish:Natchitoches
Description:I-49 Emergency Slide Repair
Type Construction:
Estimated Construction Cost:$1,191,304.00
Rank License BidderConstruction Bid
140486REGIONAL CONSTRUCTION, LLC$858,719.20
258601Legacy Construction, LLC$926,171.00
3C0002SkyPlex Trucking, LLC dba SkyPlex Construction$937,580.50
454928Womack And Sons Constr. Group LLC$1,117,670.30
555505MERRICK, LLC$1,375,099.00
635849T.L. CONSTRUCTION LLC$1,612,450.50
712312GILCHRIST CONSTRUCTION COMPANY, LLC$1,786,363.00
855276Turner & Turner Contracting, LLC$1,957,106.46
949239WL Bass Construction Inc.$2,362,462.00


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
REGIONAL CONSTRUCTION, LLC
- 2 -
Legacy Construction, LLC
- 3 -
SkyPlex Trucking, LLC dba SkyPlex Construction
- 4 -
Womack And Sons Constr. Group LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001203-01-00100General Excavation 25,874     CUYD8.00206,992.0010.00258,740.0010.75278,145.5015.35397,165.90
0002203-03-00100Embankment 26,813     CUYD15.00402,195.0016.00429,008.0015.00402,195.0017.90479,952.70
0003203-08-00100Geotextile Fabric 63,704     SQYD1.80114,667.202.00127,408.001.5095,556.001.65105,111.60
0004204-05-00100Temporary Sediment Check Dams (Hay) 8     EACH200.001,600.00250.002,000.00270.002,160.00212.001,696.00
0005204-06-00100Temporary Silt Fencing 253     LNFT5.001,265.005.001,265.008.002,024.009.702,454.10
0006713-01-00100Temporary Signs and Barricades 1     LUMP28,000.0028,000.0035,000.0035,000.0067,000.0067,000.0056,700.0056,700.00
0007713-11-00100Portable Changeable Message Signs 1     EACH7,200.007,200.005,000.005,000.008,000.008,000.002,830.002,830.00
0008722-01-00100Project Site Laboratory 1     EACH10,000.0010,000.0010,000.0010,000.0010,000.0010,000.0045,200.0045,200.00
0009727-01-00100Mobilization 1     LUMP60,000.0060,000.0025,000.0025,000.0060,000.0060,000.0011,450.0011,450.00
0010739-01-00100Hydro-Seeding 1.7   ACRE4,000.006,800.007,500.0012,750.005,000.008,500.005,300.009,010.00
0011740-01-00100Construction Layout 1     LUMP20,000.0020,000.0020,000.0020,000.004,000.004,000.006,100.006,100.00
             
  CONTRACTOR TOTAL   858,719.20 926,171.00 937,580.50 1,117,670.30



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
MERRICK, LLC
- 6 -
T.L. CONSTRUCTION LLC
- 7 -
GILCHRIST CONSTRUCTION COMPANY, LLC
- 8 -
Turner & Turner Contracting, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001203-01-00100General Excavation 25,874     CUYD14.00362,236.0022.50582,165.0021.00543,354.0013.34345,159.16
0002203-03-00100Embankment 26,813     CUYD26.00697,138.0027.50737,357.5028.00750,764.0041.411,110,326.33
0003203-08-00100Geotextile Fabric 63,704     SQYD2.50159,260.001.5095,556.002.25143,334.006.02383,498.08
0004204-05-00100Temporary Sediment Check Dams (Hay) 8     EACH300.002,400.00370.002,960.00250.002,000.00266.262,130.08
0005204-06-00100Temporary Silt Fencing 253     LNFT5.001,265.0014.003,542.007.001,771.004.691,186.57
0006713-01-00100Temporary Signs and Barricades 1     LUMP30,000.0030,000.0045,000.0045,000.00125,000.00125,000.0013,108.0013,108.00
0007713-11-00100Portable Changeable Message Signs 1     EACH7,000.007,000.003,500.003,500.005,000.005,000.001,212.201,212.20
0008722-01-00100Project Site Laboratory 1     EACH3,000.003,000.0042,000.0042,000.0020,000.0020,000.0012,650.0012,650.00
0009727-01-00100Mobilization 1     LUMP100,000.00100,000.0075,000.0075,000.00178,000.00178,000.0074,637.0074,637.00
0010739-01-00100Hydro-Seeding 1.7   ACRE4,000.006,800.006,100.0010,370.004,200.007,140.005,558.269,449.04
0011740-01-00100Construction Layout 1     LUMP6,000.006,000.0015,000.0015,000.0010,000.0010,000.003,750.003,750.00
             
  CONTRACTOR TOTAL   1,375,099.00 1,612,450.50 1,786,363.00 1,957,106.46



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 9 -
WL Bass Construction Inc.
Unit PriceTotal
Amount
0001203-01-00100General Excavation 25,874     CUYD20.00517,480.00
0002203-03-00100Embankment 26,813     CUYD53.001,421,089.00
0003203-08-00100Geotextile Fabric 63,704     SQYD2.00127,408.00
0004204-05-00100Temporary Sediment Check Dams (Hay) 8     EACH165.001,320.00
0005204-06-00100Temporary Silt Fencing 253     LNFT5.001,265.00
0006713-01-00100Temporary Signs and Barricades 1     LUMP35,000.0035,000.00
0007713-11-00100Portable Changeable Message Signs 1     EACH5,000.005,000.00
0008722-01-00100Project Site Laboratory 1     EACH2,000.002,000.00
0009727-01-00100Mobilization 1     LUMP230,000.00230,000.00
0010739-01-00100Hydro-Seeding 1.7   ACRE7,000.0011,900.00
0011740-01-00100Construction Layout 1     LUMP10,000.0010,000.00
       
  CONTRACTOR TOTAL   2,362,462.00