Bid Tabulations for the Letting of 6/30/2022 in District 08 - Alexandria

Proposal:H.014673.6-R1
Parish:Rapides
Description:I-49, US 165: DEBONDED PPC GIRDER REHAB
Type Construction:
Estimated Construction Cost:$470,250.00
Rank License BidderConstruction Bid
169505Composite Rehabilitation Technology LLC$330,696.20
226435C.E.C., Inc.$474,920.00
343292STRUCTURAL TECHNOLOGIES, LLC$489,997.00
452306SIEMA CONSTRUCTION, LLC$694,750.00
544133Gibson & Associates Inc.$896,250.00


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Composite Rehabilitation Technology LLC
- 2 -
C.E.C., Inc.
- 3 -
STRUCTURAL TECHNOLOGIES, LLC
- 4 -
SIEMA CONSTRUCTION, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001713-01-00100Temporary Signs and Barricades 1     LUMP53,105.0753,105.0730,660.0030,660.0078,906.0078,906.0065,900.0065,900.00
0002713-11-00100Portable Changeable Message Signs 4     EACH3,136.8512,547.401,545.006,180.004,028.2516,113.003,800.0015,200.00
0003727-01-00100Mobilization 1     LUMP7,842.137,842.1347,000.0047,000.0026,184.0026,184.0065,000.0065,000.00
0004830-01-00100Bridge Superstructure Repair 30     EACH78.422,352.601,756.0052,680.001,240.0037,200.00950.0028,500.00
0005830-10-00100Epoxy Injection 250     LNFT70.5817,645.0086.4021,600.0086.5021,625.00160.0040,000.00
0006NS-830-01200Carbon Fiber Reinforced Polymer Repairs 4,950     SQFT47.92237,204.0064.00316,800.0062.62309,969.0097.00480,150.00
             
  CONTRACTOR TOTAL   330,696.20 474,920.00 489,997.00 694,750.00



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
Gibson & Associates Inc.
Unit PriceTotal
Amount
0001713-01-00100Temporary Signs and Barricades 1     LUMP109,500.00109,500.00
0002713-11-00100Portable Changeable Message Signs 4     EACH5,000.0020,000.00
0003727-01-00100Mobilization 1     LUMP85,000.0085,000.00
0004830-01-00100Bridge Superstructure Repair 30     EACH3,200.0096,000.00
0005830-10-00100Epoxy Injection 250     LNFT165.0041,250.00
0006NS-830-01200Carbon Fiber Reinforced Polymer Repairs 4,950     SQFT110.00544,500.00
       
  CONTRACTOR TOTAL   896,250.00